Novel boring cutter blade adjusting and cooling device
By designing the boring tool on the boring tool to adjust the insert cooling device, and using water jet holes and flow components to clean and cool the boring tool in real time, the problem of difficult cleaning of insert iron chips during the boring process is solved, and the accuracy of boring pin processing is improved. Efficiency reduces hole size error and maintenance costs.
Patent Information
- Application Number
- CN202420941620.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-04-30
AI Technical Summary
During the boring process, the iron chips adhered to the boring blade are difficult to clean, resulting in internal hole scratches and processing errors, increasing processing time and maintenance costs.
A boring tool adjustment blade cooling device is designed, including pipe body, disc, tool mount, tool body and adjustment components. Real-time cleaning and cooling are achieved through water jet holes and flow components, reducing the blade temperature and reducing the number of boring tool adjustments. and processing error.
It significantly reduces the number of tool adjustments during boring pin processing, improves processing accuracy and efficiency, reduces internal hole size error, and avoids scratches on the inner hole by blade debris, and improves the processing effect of boring pins.
Smart Images

Figure CN222153973U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of boring machine processing, in particular to a novel boring tool blade adjusting cooling device. Background Art
[0002] Hydraulic jacks are used more and more frequently in construction machinery and hydraulic supports. When the service life of the jack reaches a certain limit, problems such as unloading, fluid leakage, cylinder swelling, and seal aging that need to be replaced will gradually occur. Recently, the replacement and maintenance volume of jacks has gradually increased. Among them, the production and maintenance volume of jack cylinders is the largest, and it is also a key factor in controlling maintenance costs. Usually, maintenance is based on the principle of maximizing benefits, and those that can be recycled, repaired and reused are repaired as much as possible. However, the rust and pitting of the inner hole of the jack cylinder are deep. At present, the jack cylinder body is mostly blind bored without cutting the bottom of the cylinder, and then the inner hole is melted copper or stainless steel clad. After completion, the blind hole is bored and honed to the drawing size.
[0003] Usually, when boring blind holes in jack cylinders, it is difficult to adjust the boring tool and clean and remove the iron chips adhered to the blade. The iron chips adhered to the blade can easily cause scratches on the bored part of the inner hole and produce processing marks, which in turn causes many problems such as repeated stopping, withdrawing the boring bar, measuring and adjusting, and cleaning the iron chips adhered to the blade. Utility Model Content
[0004] The purpose of the utility model is to solve the problems raised in the above background technology, and then propose a new type of boring tool blade adjustment cooling device.
[0005] The technical solution adopted by the utility model to solve its technical problems is:
[0006] A novel boring tool blade adjustment cooling device comprises a tube body, a first disc, a second disc, a tool mounting seat, a tool body, a blade arranged on the tool body and an adjustment component;
[0007] The first disc is arranged at one end of the tube body and is provided with a first water spray hole for spraying the workpiece, and the first disc is also provided with a second water spray hole;
[0008] The second disc is arranged at the other end of the tube body and has a water pipe connection hole opened thereon to allow external water source to enter the tube body;
[0009] The tool mounting seat is mounted on the first disc and is provided with an adjustment assembly and a tool body, and the adjustment assembly is connected to the tool body to extend or retract the tool body;
[0010] A circulation component is also arranged on the tool mounting seat, and the circulation component is connected with the second water spray hole so that part of the water source can spray the blade.
[0011] The device can significantly reduce the number of times the tool is adjusted during the boring pin processing, while improving the accuracy of the tool adjustment, improving the processing efficiency and reducing the error in the size of the inner hole after processing. At the same time, during the boring pin processing, the debris attached to the blade can be sprayed in real time to remove it in time and effectively cool the blade, thereby effectively reducing the probability of subsequent debris scratching the inner hole. There is no need to repeatedly stop the machine, withdraw the boring bar, measure and adjust, and clean up the iron chips attached to the blade during boring, and the boring pin processing effect is better.
[0012] Further, the adjustment assembly includes a movable bolt and a fastening bolt;
[0013] The movable bolt thread is arranged on the tool mounting seat and the end face of the movable bolt is rotatably connected with the tool body, and the tool body is slidably arranged on the tool body mounting seat;
[0014] The thread of the fastening bolt is arranged on the tool mounting seat and the end surface thereof contacts the tool body.
[0015] Furthermore, the tool mounting seat is provided with a tool body placement groove and a receiving groove, the tool body is slidably arranged in the tool body placement groove, and a movable bolt is arranged in the receiving groove.
[0016] The above scheme realizes the extension or retraction of the cutter body along the cutter mounting seat by adjusting the assembly, and simultaneously realizes the position limitation of the cutter body before and after the tool adjustment.
[0017] Furthermore, the circulation component includes a notch, a blade water spray hole, a through hole, a plug and a water inlet groove, the second water spray hole is connected to the water inlet groove, the water inlet groove is connected to the through hole, a plug is provided at one end of the through hole and the through hole is connected to the blade water spray hole, and the blade water spray hole is in the area where the notch is located and is provided on one side of the blade.
[0018] The above scheme realizes flushing and cleaning of debris on the blade and cooling of the blade by a partial water source through the circulation component in cooperation with the second water spray hole.
[0019] Furthermore, a plurality of mounting blocks are arranged on the circumference of the tube body, and rubber blocks are movably mounted on the mounting blocks.
[0020] The above scheme can effectively reduce the vibration of the boring head during the boring pin processing by using the rubber block, thereby achieving a shock-absorbing effect. At the same time, the rubber block is convenient for replacement and maintenance.
[0021] Furthermore, the surface of the rubber block is an arc surface.
[0022] The above solution sets the surface of the rubber block as an arc surface, which can further improve the fit between the rubber block and the boring machine, that is, further increase the contact area and thus achieve a better chatter reduction effect.
[0023] Compared with the prior art, the beneficial effects of the utility model are:
[0024] Compared with the existing technology, the device can significantly reduce the number of times the tool is adjusted during the boring pin processing, while improving the accuracy of the tool adjustment, improving the processing efficiency and reducing the error of the inner hole size after processing. At the same time, during the boring pin processing, the debris attached to the blade can be sprayed in real time to remove it in time and effectively cool the blade, thereby effectively reducing the probability of subsequent debris scratching the inner hole. There is no need to repeatedly stop the machine, withdraw the boring bar, measure and adjust, and clean the iron chips attached to the blade during boring, and the boring pin processing effect is better. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0026] Figure 2 This is a schematic diagram of the installation of the second disc;
[0027] Figure 3 This is a schematic diagram of the installation of the mounting block and the tube body;
[0028] Figure 4 This is a schematic diagram of the installation of the mounting block and the rubber block;
[0029] Figure 5 This is a schematic diagram of the water spray hole of the blade;
[0030] Figure 6 This is a schematic diagram of the tool mounting seat;
[0031] Figure 7 for Figure 2 A partial enlarged view of the label A;
[0032] Figure 8 This is a cross-sectional view of the tool mounting seat;
[0033] Fig. 9 This is a schematic diagram of the water inlet tank;
[0034] Reference numerals:
[0035] 1. Tube body; 2. Mounting block; 3. Rubber block; 4. First disc; 41. First water spray hole; 42. Second water spray hole; 5. Second disc; 51. Water pipe connecting hole; 6. Cutter mounting seat; 61. Fastening bolt; 7. Movable bolt; 8. Cutter body; 9. Blade; 10. Notch; 11. Blade water spray hole; 12. Through hole; 13. Plug; 14. Water inlet trough. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. The utility model is further described in combination with the drawings and embodiments:
[0037] like Figures 1 to 9 As shown, a novel boring tool blade adjustment cooling device comprises a tube body 1, a first disc 4 and a second disc 5 are respectively arranged on both sides of the tube body 1, a first water spray hole 41, a second water spray hole 42 and a tool mounting seat 6 are arranged on the first disc 4, a water pipe connecting hole 51 connected to a water inlet pipe is opened on the second disc 5, and the water inlet pipe is not shown in the figure. A notch 10, a blade water spray hole 11, a through hole 12, a water inlet groove 14 and an adjusting component are arranged on the tool mounting seat 6, and the adjusting component is connected to the tool body 8. A blade 9 is arranged on the tool body 8, the second water spray hole 42 is connected to the water inlet groove 14, the water inlet groove 14 is connected to the through hole 12, a plug 13 is arranged at one end of the through hole 12 and the through hole 12 is connected to the blade water spray hole 11, and the blade water spray hole 11 is located in the area where the notch 10 is located and is arranged on one side of the blade 9.
[0038] Further refinement of the embodiment of the present utility model is as follows: Figures 1 to 4 As shown, the adjustment assembly includes a movable bolt 7 and a fastening bolt 61; the movable bolt 7 is threadedly arranged on the tool mounting seat 6 and the end face of the movable bolt 7 is rotatably connected to the tool body 8, and the tool body 8 is slidably arranged on the tool body mounting seat 6; a plurality of fastening bolts 61 are threadedly arranged on the tool mounting seat 6 and their end faces are in contact with the tool body 8.
[0039] In a further optimization of the above embodiment, a tool body placement groove and a receiving groove are provided on the tool mounting seat 6, a tool body 8 is slidably arranged in the tool body placement groove, and a movable bolt 7 is arranged in the receiving groove; the tool body placement groove and the receiving groove are shown as unnumbered in the figure, and these two grooves make the tool structure design more compact.
[0040] The workflow of this utility model:
[0041] First, turn the movable bolt 7 to make the cutter body 8 move outward along the cutter body placement groove and extend. In this process, the length can be adjusted by using a vernier caliper and a pre-set vernier caliper size. After the adjustment is completed, there is generally a processing allowance between the blade 9 and the workpiece. After the extension is completed, the position of the cutter body 8 is fixed by a number of fastening bolts 61, and then the boring process of the inner hole of the workpiece can be started. The inner hole diameter of the workpiece after the boring pin processing is completed is generally about 10MM;
[0042] After the processing is completed, the cutter body 8 is immediately withdrawn from the inner hole of the workpiece, and then the inner hole size of the actual boring pin is measured. At this time, there will generally be an error between the standard size of the drawing. Then the actual processing size of the inner hole is compared with the standard size to calculate the difference, and then the head of the magnetic meter is pressed against the tip of the blade 9 of the cutter body 8, and then the movable bolt 7 is turned again. At this time, the needle reading on the magnetic meter is read. When the needle of the magnetic meter reaches the difference value, the tool adjustment can be completed, and then the inner hole can be processed again. The size of the inner hole after processing meets the design size requirements of the drawing, and then the processing error of the boring pin is further reduced and the processing size is more accurate. In this way, the tool adjustment in the boring pin process can be quickly realized, and only one adjustment is required, which greatly improves work efficiency.
[0043] During the boring pin processing, water is passed into the pipe body 1 through the water inlet pipe and the water pipe connecting hole 51, and then water is sprayed out from the first water spray hole 41 and the second water spray hole 42 at the same time. The water sprayed from the first water spray hole 41 flushes the processing debris on the workpiece and cools the workpiece, and the water sprayed from the second water spray hole 42 can be injected into the water inlet groove 14, and then the water moves along the water inlet groove 14 and is injected into the through hole 12. One end of the through hole 12 is blocked in advance by the plug 13 to prevent water from flowing out of one end of the through hole 12. Finally, water is sprayed out from the blade water spray hole 11 to flush the debris attached to the blade 9 and cool the blade 9, thereby preventing the debris attached to the blade 9 from being scratched in the subsequent inner hole during the processing;
[0044] Compared with the existing technology, the present device can significantly reduce the number of times the tool is adjusted during the boring pin processing, while improving the accuracy of the tool adjustment, improving the processing efficiency and reducing the error in the size of the inner hole after processing. At the same time, during the boring pin processing, the debris attached to the blade 9 can be sprayed in real time to remove it in time and effectively cool the blade 9, thereby effectively reducing the probability of subsequent debris scratching the inner hole. There is no need to repeatedly stop the machine, withdraw the boring bar, measure and adjust, and clean the iron chips adhered to the blade 9 during boring, and the boring pin processing effect is better.
[0045] In some embodiments, Figures 1 to 5 As shown, a plurality of mounting blocks 2 are arranged on the circumference of the tube body 1, and rubber blocks 3 are movably mounted on the mounting blocks 2; in this embodiment, the vibration of the boring head during boring pin processing can be effectively reduced by the rubber blocks 3, thereby achieving a shock-absorbing effect, and the rubber blocks 3 are convenient for replacement and maintenance.
[0046] In a further optimization of the above embodiment, the surface of the rubber block 3 is an arc surface; this can further improve the fit between the rubber block 3 and the boring machine, that is, further increase the contact area and thus achieve a better vibration reduction effect.
[0047] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions in the specification are only to illustrate the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the protection required by the utility model. The scope of protection required by the utility model is defined by the attached claims and their equivalents.
Claims
1. A new type of boring tool blade cooling device, characterized in that: It comprises a tube body (1), a first disc (4), a second disc (5), a tool mounting seat (6), a tool body (8), a blade (9) arranged on the tool body (8), and an adjustment component; The first disc (4) is arranged at one end of the tube body (1) and is provided with a first water spray hole (41) for spraying the workpiece, and the first disc (4) is also provided with a second water spray hole (42); The second disc (5) is arranged at the other end of the tube body (1) and is provided with a water pipe connection hole (51) to allow an external water source to enter the tube body (1); The tool mounting seat (6) is mounted on the first disc (4) and is provided with an adjustment component and a tool body (8), and the adjustment component is connected to the tool body (8) to enable the tool body (8) to extend or retract; A circulation component is also provided on the tool mounting seat (6), and the circulation component is connected to the second water spray hole (42) so that part of the water source sprays the blade (9).
2. A new type boring tool blade adjustment cooling device according to claim 1, characterized in that: The adjustment assembly comprises a movable bolt (7) and a fastening bolt (61); The movable bolt (7) is threadedly arranged on the tool mounting seat (6), and the end surface of the movable bolt (7) is rotatably connected to the tool body (8), and the tool body (8) is slidably arranged on the tool mounting seat (6); The fastening bolt (61) is threadedly arranged on the tool mounting seat (6) and its end surface is in contact with the tool body (8).
3. A new type boring tool blade adjustment cooling device according to claim 2, characterized in that: The tool mounting seat (6) is provided with a tool body placement groove and a receiving groove, a tool body (8) is slidably arranged in the tool body placement groove, and a movable bolt (7) is arranged in the receiving groove.
4. A new type boring tool blade adjustment cooling device according to claim 1, characterized in that: The circulation component comprises a notch (10), a blade water spray hole (11), a through hole (12), a plug (13) and a water inlet groove (14); the second water spray hole (42) is connected to the water inlet groove (14); the water inlet groove (14) is connected to the through hole (12); a plug (13) is provided at one end of the through hole (12) and the through hole (12) is connected to the blade water spray hole (11); the blade water spray hole (11) is located in the area where the notch (10) is located and is provided on one side of the blade (9).
5. A novel boring tool blade adjustment cooling device according to claim 1, characterized in that: A plurality of mounting blocks (2) are arranged on the circumference of the tube body (1), and a rubber block (3) is movably mounted on the mounting block (2).
6. A new type boring tool blade adjustment cooling device according to claim 5, characterized in that: The surface of the rubber block (3) is an arc surface.
