Base for fixing drilling equipment of concrete structure
By designing a drilling equipment base for fixing concrete structures, the problems of drilling deviation and physical strength consumption caused by artificial handheld drilling rigs are solved, the accuracy and verticality of the drilling position are achieved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202420680112.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-04-03
AI Technical Summary
During the drilling and maintenance of concrete structures such as bridges, manual hand-held drilling rigs can easily lead to the drilling being deviated and the holes are not vertical, and the workers consume a lot of physical strength, which affects construction efficiency and safety.
Design a base for fixing drilling equipment for concrete structures, fixing the drilling mast through panels and positioning frame structures to ensure the verticality and position accuracy of the drilling holes, and to adapt the concrete structure of different sizes by adjusting components to reduce the burden on workers.
The accuracy and verticality of the drilling position are achieved, which reduces the physical burden of workers, improves construction efficiency and progress, and reduces the production and installation costs.
Smart Images

Figure CN222201124U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge maintenance and reinforcement, and more specifically, to a base for fixing a concrete structure drilling device. Background Art
[0002] After the construction of building structures, such as bridges and houses, necessary repairs and reinforcements are required, and other facilities are added to improve or enhance the existing condition of the building structure to keep it in good functional condition. Most of the repair and reinforcement operations of building structures require the use of drilling and rebar planting technology to repair and reinforce the damaged parts or add other facilities to the original structure.
[0003] During the construction process, drilling is a key step in rebar planting. Usually, a core drilling machine is used for drilling. During construction, the location of the rebar to be planted is first measured and laid out, and then the worker uses a handheld core drilling machine to perform drilling. The following problems are prone to occur when using a manually controlled core drilling machine for drilling: (1) When drilling with a manually controlled core drilling machine, it is easy for the drilling hole to be offset or the hole to be non-vertical. The accuracy and verticality of the drilling position cannot be guaranteed, which will ultimately affect the construction quality and pose a certain risk to the safety of the structure. (2) Manually controlled core drilling machines consume a lot of physical strength from the workers, resulting in low construction efficiency and affecting the progress of the project. Utility Model Content
[0004] Another object of the utility model is to provide a base for fixing a concrete structure drilling device, which fixes the position of the drilling machine during the drilling operation, thereby ensuring the accuracy of the drilling position and the verticality of the drilling.
[0005] In order to achieve these purposes and other advantages according to the utility model, a base for fixing a concrete structure drilling device is provided, comprising:
[0006] A panel, on which a positioning frame is provided, and the panel is vertically erected on the top of the concrete structure to be drilled through the positioning frame;
[0007] A plurality of positioning grooves are arranged at intervals along the height direction of the panel, and any positioning groove is opened on the panel along the length direction of the panel. The mast of the drilling rig is detachably arranged in the positioning groove, and the mast of the drilling rig is arranged perpendicular to the panel.
[0008] Preferably, the positioning frame comprises:
[0009] Two cross bars are arranged at intervals along the length direction of the panel, one cross bar is vertically fixed on the back of the panel, and the bottom surface of one cross bar is vertically fixed with a first leg;
[0010] Two second legs are arranged at intervals along the length direction of the panel, and any second leg is vertically fixed at the bottom of the panel; the panel is clamped on the top of the concrete structure to be drilled through the first leg and the second leg.
[0011] Preferably, a plurality of adjustment components are provided on any of the second legs, which are arranged at intervals along the height direction of the second leg, and any of the adjustment components includes a bolt hole opened on the second leg and an adjustment bolt arranged on the bolt hole, and the adjustment bolt is arranged perpendicular to the second leg.
[0012] Preferably, a shock-absorbing sleeve is sleeved on one end of any adjusting bolt close to the first leg.
[0013] Preferably, a connecting rod is provided between the two cross bars; and a stiffening plate is welded between the cross bar and the panel, and between the cross bar and the first leg.
[0014] Preferably, rubber pads are adhered to the contact surfaces of the positioning frame and the panel with the concrete structure to be drilled.
[0015] Preferably, the panel and the two second legs are integrally formed.
[0016] The utility model at least has the following beneficial effects:
[0017] 1. The utility model sets a base. During the drilling operation, the mast of the drilling rig is vertically installed in the positioning groove of the base panel, so that the drill bit of the drilling rig is directly in the area to be drilled. When the drilling rig is started, the drill bit will drill in the direction of the vertical panel at the drilling point, thereby ensuring the accuracy of the drilling position and the verticality of the drilling hole; since the mast of the drilling rig is set in the positioning groove, most of the weight of the drilling rig can be borne by the base, and the workers only need to hold the drilling rig to perform the drilling operation, which reduces the work intensity of the workers, improves the construction efficiency, and ensures the construction progress;
[0018] 2. The base of the utility model is composed of a panel and a positioning frame, and the positioning frame is composed of a crossbar and a leg. The overall device has a simple structure, low manufacturing cost, is easy to carry, and can be reused. By arranging an adjusting bolt on the second leg, the base can adapt to the needs of concrete structures of different sizes, has a wide applicability, and is easy to install and disassemble.
[0019] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the structure of a base for fixing a drilling device for a concrete structure according to the utility model;
[0021] Figure 2 This is a schematic diagram of the installation structure of the base for fixing the concrete structure drilling equipment of the utility model;
[0022] Figure 3 This is a front view structural schematic diagram of a base for fixing a concrete structure drilling device according to the utility model;
[0023] Description of the Figures in the Specification:
[0024] 1. Panel, 101. Positioning groove, 102. Second leg, 2. Cross bar, 201. First leg, 3. Adjusting bolt, 301. Bolt hole, 302. Shock-absorbing sleeve, 303. Nut, 4. Connecting rod, 5. Stiffening plate, 6. Concrete structure, 601. Area to be drilled. DETAILED DESCRIPTION
[0025] The present invention will be further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.
[0026] It should be noted that, in the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0027] like Figure 1-3 As shown, the utility model provides a base for fixing a concrete structure drilling device, comprising:
[0028] A panel 1, on which a positioning frame is provided, and the panel 1 is vertically erected on the top of the concrete structure 6 to be drilled through the positioning frame;
[0029] A plurality of positioning grooves 101 are arranged at intervals along the height direction of the panel 1. Any positioning groove 101 is opened on the panel 1 along the length direction of the panel 1. The mast of the drilling rig is detachably arranged in the positioning groove 101. The mast of the drilling rig is arranged perpendicular to the panel 1.
[0030] In the above technical solution, if Figure 1 , Figure 3As shown, the base is composed of a rectangular panel 1 and a positioning frame, the panel 1 is mounted on the concrete structure 6 to be drilled through the positioning frame, and the lower part of the panel 1 is the area 601 to be drilled of the concrete structure 6; a positioning groove 101 is provided on the panel 1, and the positioning groove 101 is used to connect with the mast of the core drilling machine, so that the core drilling machine is vertically installed on the panel 1, and the drill bit of the drilling machine is directly above the area 601 to be drilled; because the mast of the drilling machine is arranged parallel to the drill bit at an interval, when installing the mast, it is only necessary to make the installation position of the mast directly above the hole to be drilled, start the drilling machine, and the drill bit will be at the drilling layout point, along the vertical surface The drilling rig is drilled in the direction of the panel 1, thereby ensuring the accuracy of the drilling position and the verticality of the drilling hole; a plurality of positioning grooves 101 are provided along the height direction of the panel 1, so that drilling operations can be carried out on holes at different heights, and for multiple holes located in the same vertical direction, there is no need for multiple measurements and layouts, which can improve construction efficiency; since the mast of the drilling rig is arranged in the positioning groove 101, most of the weight of the drilling rig can be borne by the base, and the workers only need to hold the drilling rig to carry out drilling operations, which reduces the workers' work intensity, improves construction efficiency, and ensures construction progress; the mast of the drilling rig is detachably installed in the positioning groove 101 by bolts.
[0031] In another technical solution, the positioning frame includes:
[0032] Two cross bars 2 are arranged at intervals along the length direction of the panel 1, and any cross bar 2 is vertically fixed on the back of the panel 1, and a first leg 201 is vertically fixed on the bottom surface of any cross bar 2;
[0033] Two second legs 102 are spaced apart along the length direction of the panel 1, and any second leg 102 is vertically fixed at the bottom of the panel 1; the panel 1 is clamped on the top of the concrete structure 6 to be drilled through the first leg 201 and the second leg 102.
[0034] In the present technical solution, the back side of the panel 1 is the side away from the area to be drilled 601, and the panel 1 is clamped on the concrete structure 6 by the first leg 201 and the second leg 102. The overall device has a simple structure, low manufacturing cost, easy installation, and is reusable. In order to further improve the convenience of manufacturing and installation, as well as the integrity of the base structure, the cross bar 2, the panel 1, the first leg 201 and the second leg 102 are connected by welding.
[0035] In another technical solution, a plurality of adjustment components are provided on any of the second legs 102, which are arranged at intervals along the height direction of the second leg 102, and any of the adjustment components includes a bolt hole 301 opened on the second leg 102 and an adjustment bolt 3 arranged on the bolt hole 301, and the adjustment bolt 3 is arranged perpendicular to the second leg 102.
[0036] In this technical solution, if Figure 2 As shown, when in use, firstly, the first leg 201 and the second leg 102 are erected on the concrete structure 6 to be drilled, and the first leg 201 is close to the back of the concrete structure 6. The adjusting bolt 3 is screwed in and the end of the adjusting bolt 3 is pressed tightly against the front side (the surface to be drilled) of the concrete structure 6 through the nut 303 to fix the base on the concrete structure 6. Then, the mast is installed on the positioning groove 101 to complete the installation of the drilling rig, and then the drilling rig is started to perform the drilling operation. By arranging the adjusting bolt 3 on the second leg 102, the screwing length of the adjusting bolt 3 can be adjusted according to the shape of the concrete structure 6 and the inclination of the surface to be drilled, so that the base is always in a reliably fixed state, and its installation stability is ensured while it can also adapt to the requirements of concrete structures 6 of different widths and sizes, and it has a wide applicability. When installing and disassembling, it is only necessary to screw in and out the adjusting bolt 3, which is convenient for installation and disassembly.
[0037] In another technical solution, a shock-absorbing sleeve 302 is sleeved on one end of any adjusting bolt 3 close to the first leg 201 .
[0038] In the present technical solution, a shock-absorbing sleeve 302 is provided at the end of the adjusting bolt 3 that abuts against the surface to be drilled of the concrete structure 6. The shock-absorbing sleeve 302 can effectively absorb and disperse the vibration and impact force generated when the drilling rig is drilling, thereby preventing the base from shifting due to vibration, thereby ensuring the stability and durability of the base installation position.
[0039] In another technical solution, a connecting rod 4 is provided between the two cross bars 2 ; and a stiffening plate 5 is welded between the cross bar 2 and the panel 1 , and between the cross bar 2 and the first leg 201 .
[0040] In the present technical solution, the stiffening plates 5 and the connecting rods 4 are used to make the connections between the various components of the base more firm and more integrated.
[0041] In another technical solution, rubber pads are attached to the contact surfaces of the positioning frame and the panel 1 with the concrete structure 6 to be drilled.
[0042] In the present technical solution, rubber pads are adhered to the contact surfaces between the positioning frame and the panel 1 and the concrete structure 6. On the one hand, the rubber pads can increase the friction between the base and the concrete structure 6, further improving the stability of the base installation position. On the other hand, the rubber pads can prevent the base from making hard contact with the concrete structure 6. The cushioning effect of the rubber pads can prevent damage to the concrete structure 6 caused by vibration from drilling during construction.
[0043] In another technical solution, the panel 1 and the two second legs 102 are integrally formed.
[0044] In this technical solution, the panel 1 and the second leg 102 are integrally formed to facilitate the processing of the base; the structure of the panel 1 and the second leg 102 can be formed by simply cutting out a portion of the rectangular plate corresponding to the position of the area 601 to be drilled.
[0045] Although the implementation scheme of the utility model has been disclosed as above, it is not limited to the applications listed in the specification and implementation modes. It can be fully applied to various fields suitable for the utility model. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the utility model is not limited to the specific details and the illustrations shown and described herein.
Claims
1. A base for fixing a drilling device for a concrete structure, characterized in that: include: A panel, on which a positioning frame is provided, and the panel is vertically erected on the top of the concrete structure to be drilled through the positioning frame; A plurality of positioning grooves are arranged at intervals along the height direction of the panel, and any positioning groove is opened on the panel along the length direction of the panel. The mast of the drilling rig is detachably arranged in the positioning groove, and the mast of the drilling rig is arranged perpendicular to the panel.
2. The base for fixing the concrete structure drilling equipment according to claim 1, characterized in that: The positioning frame comprises: Two cross bars are arranged at intervals along the length direction of the panel, one cross bar is vertically fixed on the back of the panel, and the bottom surface of one cross bar is vertically fixed with a first leg; Two second legs are arranged at intervals along the length direction of the panel, and any second leg is vertically fixed at the bottom of the panel; the panel is clamped on the top of the concrete structure to be drilled through the first leg and the second leg.
3. The base for fixing the concrete structure drilling equipment according to claim 2, characterized in that: Any of the second legs is provided with a plurality of adjustment components, which are arranged at intervals along the height direction of the second leg. Any of the adjustment components includes a bolt hole opened on the second leg and an adjustment bolt arranged on the bolt hole, and the adjustment bolt is arranged perpendicular to the second leg.
4. The base for fixing a drilling device for a concrete structure as claimed in claim 3, characterized in that: A shock-absorbing sleeve is sleeved on one end of any adjusting bolt close to the first supporting leg.
5. The base for fixing a drilling device for a concrete structure according to claim 2, characterized in that: A connecting rod is arranged between the two cross bars; and a stiffening plate is welded between the cross bar and the panel, and between the cross bar and the first supporting leg.
6. The base for fixing a drilling device for a concrete structure according to claim 1, characterized in that: The contact surfaces of the positioning frame and the panel with the concrete structure to be drilled are adhered with rubber pads.
7. The base for fixing a drilling device for a concrete structure according to claim 2, characterized in that: The panel and the two second legs are integrally formed.