Self-compacting concrete filling layer filling hopper for plate-type ballastless track
By designing a self-contained concrete filling layer filling hopper with adjustable height, the air entry problem caused by the hopper gap in the prior art is solved, and the sealing property during the pouring process is achieved and Cost reduction.
Patent Information
- Application Number
- CN202420724984.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-04-09
AI Technical Summary
In the existing ballastless track construction technology, there is a gap between the feed port of the hopper and the pouring port, causing external air to enter the concrete, affecting its stability, and the height and size of the filling port are not easy to adjust, making it difficult to achieve sealing and efficient filling.
A plate-type ballastless track self-contained concrete filling layer filling hopper with adjustable height is designed. Through the guide tube and ring structure, the guide tube height can be adjusted and blocked the pouring port to ensure sealing and avoid external air entering. .
It realizes sealing during the pouring process, prevents external air from entering, reduces costs, and the height and discharge speed of the lead pipe can be adjusted freely without the support of hydraulic cylinders.
Smart Images

Figure CN222205889U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of plate type ballastless track construction, in particular to a hopper for pouring a self-compacting concrete filling layer of a plate type ballastless track. Background Art
[0002] As an important component of ballastless track, the self-compacting concrete layer has the functions of fully and evenly supporting the track plate and adjusting the construction. During pouring, a pouring port is generally reserved on the prestressed track plate, and the concrete enters between the track plate and the base through the hopper at the pouring port.
[0003] In the existing construction technology, there is usually a gap between the discharge port of the hopper and the casting port. Part of the outside air will flow into the space between the track plate and the base plate as the concrete is poured, resulting in bubbles inside the self-compacting concrete, affecting the stability of the filling layer concrete. In addition, the height and size of the pouring port of the hopper in the prior art are not convenient to adjust, and it is not easy to achieve overall push-type pouring. CN201627123U discloses a ballastless track switch slab concrete pouring hopper, which controls the opening and closing of the baffle by a hydraulic cylinder to pour concrete. On the one hand, a hydraulic cylinder needs to be set up in this scheme, which is costly. On the other hand, the height of the pouring port cannot be adjusted, and there is a large gap between the discharge port and the switch slab casting port. Outside air is easy to enter the ballastless track slab cavity, affecting the slab surface quality. Utility Model Content
[0004] In view of the shortcomings of the prior art, the purpose of the utility model is to provide a pouring hopper for the self-compacting concrete filling layer of a slab ballastless track. When pouring concrete, the height of the material guide pipe can be adjusted to allow it to be inserted into the pouring port of the ballast plate, and the pouring port of the ballast plate can be blocked by a retaining ring. In this way, during the pouring process, the sealing between the discharge port and the pouring port of the ballast plate can be maintained, effectively preventing outside air from entering.
[0005] In order to achieve the above purpose, the utility model is implemented through the following technical solutions:
[0006] A hopper for pouring a self-compacting concrete filling layer of a slab-type ballastless track comprises a silo, a material guide pipe is arranged at the bottom of the silo, the silo is supported by a plurality of support columns on the periphery, a height adjustment assembly is arranged at the bottom end of the support column to adjust the height of the material guide pipe; a circle of retaining rings is arranged on the periphery of the material guide pipe, an opening is arranged laterally near the top of the side wall of the material guide pipe, the outer side surface of the material guide pipe is rotatably connected to a material guide adjustment plate, the material guide adjustment plate is slidably matched with the opening, and the relative position of the material guide adjustment plate and the opening can be changed by rotating the material guide adjustment plate.
[0007] As a further implementation method, the height adjustment assembly includes a base plate arranged at the bottom end of the support column, the base plate is provided with a through hole, a screw is slidably connected in the through hole, two sets of nuts are threadedly connected on the screw, the two sets of nuts are respectively located above and below the base plate, and a pad is fixed at the bottom end of the screw.
[0008] As a further implementation, the retaining ring is a circular ring structure, and the retaining ring is located below the opening.
[0009] As a further implementation, a fixed block is provided on the circumference of the material guide tube, and the material guide adjustment plate includes a circular baffle, one end of the baffle is hinged to the fixed block through a rotating block, and the other end of the baffle is provided with an extension rod.
[0010] As a further implementation, the opening is an arc-shaped opening, and the fixing block is arranged close to one end of the opening.
[0011] As a further implementation, the support columns are connected by cross beams.
[0012] As a further implementation, the outer side of the support column is fixedly connected to a handlebar.
[0013] As a further implementation method, the support columns are connected by a fixing ring, the fixing ring has the same shape as the cross-sectional shape of the silo, and the fixing ring is fixedly connected to the silo.
[0014] As a further implementation, the top of the silo is connected to a silo edge ring plate.
[0015] As a further implementation method, a plurality of lifting rings are fixedly connected to the warehouse edge ring plate.
[0016] The beneficial effects of the above utility model are as follows:
[0017] 1. When pouring concrete, the utility model can adjust the height of the support column by using the height adjustment component, thereby changing the height of the material guide pipe, so that the material guide pipe is inserted into the pouring port of the roadbed plate, and the pouring port of the roadbed plate is blocked by the retaining ring. In this way, during the pouring process, the sealing between the discharge port and the pouring port of the roadbed plate can be maintained, effectively preventing the outside air from entering.
[0018] 2. The height and discharging speed of the material guide pipe of the utility model can be freely adjusted. The rotation of the baffle is controlled by the extension rod to change the discharging speed. There is no need to set up a hydraulic cylinder, and the cost is low. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.
[0020] Figure 1 It is a schematic diagram of the overall structure of a hopper for pouring a self-compacting concrete filling layer of a slab-type ballastless track in an embodiment of the utility model;
[0021] Figure 2 yes Figure 1 Schematic diagram of the structure of part A;
[0022] Figure 3 It is a schematic diagram of the structure of the material guide pipe part in the embodiment of the utility model.
[0023] In the figure: the distances or sizes between parts are exaggerated to show the positions of various parts, and the schematic diagram is for reference only.
[0024] Among them: 1-support column, 2-crossbeam, 3-fixing ring, 4-bin, 5-bin edge ring plate, 6-material guide pipe, 7-material guide adjustment plate, 8-handle rod; 11-bottom plate, 12-nut, 13-screw, 14-pad, 51-lifting ring, 61-blocking ring, 62-fixing block, 63-opening, 71-baffle, 72-extension rod. DETAILED DESCRIPTION
[0025] It should be noted that the following detailed descriptions are all illustrative and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0026] Embodiment 1
[0027] In a typical implementation of the present invention, reference is made to Figure 1-Figure 3 As shown, a hopper for pouring a self-compacting concrete filling layer of a slab ballastless track includes a silo 4, which is supported by a support column 1. A height adjustment component is provided at the bottom of the support column 1. A guide pipe 6 is provided at the bottom of the silo 4. A guide adjustment plate 7 is rotatably provided on the guide pipe 6. The discharge speed can be adjusted by rotating the guide adjustment plate 7. A retaining ring 61 is provided on the periphery of the guide pipe 6. By setting the height adjustment component, the height of the guide pipe 6 can be adjusted so that the guide pipe 6 is inserted into the pouring port of the ballast plate, and the pouring port of the ballast plate is blocked by the retaining ring 61. In this way, during the pouring process, the sealing between the discharge port and the pouring port of the ballast plate can be maintained, effectively preventing the entry of outside air.
[0028] like Figure 1 As shown, the top of the silo 4 is cylindrical and the bottom is funnel-shaped, and a material guide pipe 6 is provided at the center of the bottom end of the silo funnel section. The silo 4 is supported by four support columns 1 on the periphery, and a height adjustment component is provided at the bottom end of the support column 1 to adjust the height of the material guide pipe 6.
[0029] The four support columns 1 are connected as a whole by a fixing ring 3, which is located at the bottom of the cylindrical section of the silo. The shape of the fixing ring 3 is the same as the cross-section of the silo, and the fixing ring 3 is fixedly welded to the silo. The support columns 1 are connected by a crossbeam 2 near the bottom to improve strength.
[0030] The top of the silo 4 is connected to a silo edge ring plate 5, and a plurality of lifting rings 51 are fixedly connected to the silo edge ring plate 5 for easy lifting. The outer side of the support column 1 is fixedly connected to a handle bar 8, through which the position of the hopper can be adjusted during lifting.
[0031] like Figure 2 As shown, the height adjustment assembly includes a bottom plate 11 disposed at the bottom end of the support column 1, and a through hole is provided on the bottom plate 11, and a screw rod 13 is slidably connected in the through hole. The screw rod is parallel to the support column and is disposed on the inner side of the support column 1. The cross section of the support column is preferably L-shaped, and two groups of nuts 12 are threadedly connected on the screw rod 13, and each group of nuts is provided with at least two. The two groups of nuts 12 are respectively located above and below the bottom plate 11 and support the bottom plate 11. The bottom end of the screw rod 13 is fixed with a pad 14 for anti-slip. By rotating the nut 12, the relative position of the screw rod 13 and the support column 1 can be adjusted. After adjusting the position, tighten the nut to adjust the height of the guide tube 6.
[0032] like Figure 1 and Figure 3 As shown, a retaining ring 61 is arranged around the guide tube, and an opening 63 is arranged horizontally near the top of the side wall of the guide tube 6. The retaining ring is a circular ring structure, and the retaining ring 61 is located below the opening 63. The opening 63 is a semicircular opening, and the opening 63 is slidably matched with the guide adjustment plate 7.
[0033] Specifically, the outer side of the material guide tube 6 is rotatably connected with the material guide adjustment plate 7, and a fixed block 62 is provided on the outer side of the side wall of the material guide tube. The material guide adjustment plate 7 includes a circular baffle, and a rotating block is provided at one end of the baffle 71. The fixed block 62 is relative to the hinge seat, and a through hole is provided on the rotating block. The rotating block is hinged with the fixed block 62 through a pin shaft to realize the rotational cooperation between the baffle and the material guide tube 6. The fixed block 62 is arranged near one end of the opening, and an extension rod 72 is provided at the other end of the baffle 71. The setting of the extension rod 72 facilitates the rotation of the baffle 71. Rotating the material guide adjustment plate 7 can change the relative position of the material guide adjustment plate 7 and the opening 63. When the baffle 71 rotates with the rotating block, it can enter the material guide tube 6 from the opening 63. The baffle 71 can completely block, partially block, or completely open the material guide tube 6 through the baffle 71, so that the speed of material guiding by the material guide tube 6 can be controlled.
[0034] When this embodiment is in use, the height of the support column 1 can be adjusted by the height adjustment component, thereby changing the height of the guide pipe 6, so that the bottom end of the guide pipe 6 can be inserted into the roadbed plate pouring port, and the roadbed plate pouring port is blocked by the retaining ring 61, so that during the pouring process, the sealing between the discharge port and the roadbed plate pouring port can be maintained, effectively preventing the entry of external air. In addition, the height and discharge speed of the guide pipe 6 can be freely adjusted.
[0035] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A hopper for pouring self-compacting concrete filling layer of slab track, It is characterized in that It includes a material silo, a material guide pipe is provided at the bottom of the material silo, the surrounding side of the material silo is supported by a plurality of support columns, and a height adjustment component is provided at the bottom end of the support column to adjust the height of the material guide pipe; a circle of retaining rings is provided around the material guide pipe, and an opening is laterally provided at the side wall of the material guide pipe near the top, the outer side surface of the material guide pipe is rotatably connected to a material guide adjustment plate, the material guide adjustment plate is slidably matched with the opening, and the relative position of the material guide adjustment plate and the opening can be changed by rotating the material guide adjustment plate.
2. A slab-type ballastless track self-compacting concrete filling layer pouring hopper according to claim 1, It is characterized in that The height adjustment assembly includes a base plate arranged at the bottom end of the support column, the base plate is provided with a through hole, a screw rod is slidably connected in the through hole, two sets of nuts are threadedly connected on the screw rod, the two sets of nuts are respectively located above and below the base plate, and a pad is fixed at the bottom end of the screw rod.
3. A slab-type ballastless track self-compacting concrete filling layer pouring hopper according to claim 1, It is characterized in that The retaining ring is a circular ring structure and is located below the opening.
4. A slab-type ballastless track self-compacting concrete filling layer pouring hopper according to claim 3, It is characterized in that A fixed block is arranged on the peripheral side of the material guiding pipe, and the material guiding adjusting plate comprises a circular baffle, one end of the baffle is hinged with the fixed block through a rotating block, and the other end of the baffle is provided with an extension rod.
5. A slab-type ballastless track self-compacting concrete filling layer pouring hopper according to claim 4, It is characterized in that The opening is an arc-shaped opening, and the fixing block is arranged close to one end of the opening.
6. A slab-type ballastless track self-compacting concrete filling layer pouring hopper according to claim 1, It is characterized in that The support columns are connected by cross beams.
7. A slab-type ballastless track self-compacting concrete filling layer pouring hopper according to claim 6, It is characterized in that The outer side of the support column is fixedly connected to a handlebar.
8. A slab-type ballastless track self-compacting concrete filling layer pouring hopper according to claim 1, It is characterized in that The support columns are connected by a fixing ring, the fixing ring has the same shape as the cross-section of the silo, and the fixing ring is fixedly connected to the silo.
9. A slab-type ballastless track self-compacting concrete filling layer pouring hopper according to claim 1, It is characterized in that The top of the silo is connected to a silo edge ring plate.
10. A slab-type ballastless track self-compacting concrete filling layer pouring hopper according to claim 9, It is characterized in that A plurality of lifting rings are fixedly connected to the warehouse edge ring plate.