Bridge maintenance support
By installing bridge maintenance brackets on flatbed trucks and using the self-locking functions of worm gear and worm transmission and motor drive, the high cost and time waste of rental special vehicles during bridge side maintenance is solved, and more efficient and convenient maintenance operations are achieved.
Patent Information
- Application Number
- CN202420999499.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-09
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-05-09
AI Technical Summary
In the existing bridge maintenance technology, the maintenance work on the side of the bridge requires special inspection of vehicles. The rental method leads to high cost and time expenditures, and requires early communication and arrangement, which is inefficient.
A bridge maintenance bracket was designed, including mounting fixing plates, extension frames, climbing frames, connecting rods, vertical railings, pedals, steel cables, guide wheels, reels and other components on flatbed trucks, and transmission through worm gear and worm gear and The motor drive realizes a self-locking function, which is convenient for independent disassembly and installation, and reduces dependence on special vehicles.
The bracket is transported by flatbed trucks, reducing cost and time expenditure. The self-locking function of the worm gear and worm gear avoids unnecessary locking components. The toolbox is easy for workers to carry and repair operations, improving maintenance efficiency and safety.
Smart Images

Figure CN222206031U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge maintenance, in particular to a bracket for bridge maintenance. Background Art
[0002] In general bridge inspections or external disease treatment, affected by the bridge structure, the side inspection work of the bridge generally requires the cooperation of a bridge inspection vehicle. The current bridge inspection vehicles are special vehicles specifically used for bridge inspections. In addition, except for some well-funded units that purchase bridge inspection vehicles themselves, the main mode of operation of bridge inspection vehicles is still leasing. During each inspection, an inspection vehicle needs to be leased, and considering the inventory and leasing arrangements of the leasing company, advance communication and arrangements are required each time, which is relatively time-consuming and costly. Utility Model Content
[0003] 1. Technical issues to be solved
[0004] In view of the deficiencies in the prior art, the utility model provides a bracket for bridge maintenance to solve the problems in the background technology.
[0005] (II) Technical solution
[0006] In order to solve the above problems, the utility model provides the following technical solutions:
[0007] A bracket for bridge maintenance comprises a fixed plate fixed on a flatbed truck's compartment, the fixed plate is provided with a plurality of counterweights, two extension frames are installed on the fixed plate, climbing frames are provided on the two extension frames at the front end position, an opening is reserved at the front end of the extension frame, the climbing frames are movably fixed through the opening, four connecting rods which are symmetrical with each other up and down and left and right are installed between the bottoms of the two climbing frames, a plurality of vertical railings are installed between the connecting rods, pedals are installed on the two lower connecting rods, a rope hook is installed at the bottom position of the climbing frame, a steel cable is connected to the rope hook, a support plate is installed on the top surface of the extension frame, a support frame is installed at the front end of the top of the support plate, a guide wheel is installed on the support frame, a mounting seat is installed at the rear position of the top surface of the support plate, a winding drum is installed on the mounting seat, the steel cable is wound around the winding drum via the guide wheel, and a motor for driving the winding drum to rotate is installed on the support plate outside the mounting seat.
[0008] Preferably, an anti-slip plate is installed on the top of the climbing frame, and the length and width of the anti-slip plate are greater than the length and width of the front end opening of the extension frame.
[0009] Preferably, a worm wheel is installed on the guide wheel shaft outside the mounting seat, and a worm that meshes with each other is provided below the worm wheel. A reducer is installed on the top surface of the support plate on the rear side of the mounting seat, and the reducer is connected to the worm. The motor is installed on the top surface of the support plate on the side of the reducer, and the motor shaft and the reducer are connected through a pin-key transmission connection.
[0010] Preferably, a vertical frame is installed on the top surface of the fixed plate at the rear side of the extension frame, and a diagonal frame is welded and installed between the vertical frame and the extension frame.
[0011] Preferably, a plurality of hanging rings are installed on the extension frame at the inner side surface close to the climbing frame.
[0012] Preferably, a tool box is installed at the upper position of the connecting rod, and a hanging ear is installed on the side of the tool box. The hanging ear is hung and fixed on the connecting rod at a corresponding position, and the tool box is arranged toward the outside of the connecting rod.
[0013] (III) Beneficial effects
[0014] Compared with the prior art, the utility model provides a bracket for bridge maintenance, which has the following beneficial effects:
[0015] 1. The bracket is transported and carried by a flatbed truck. The bracket can be disassembled or installed on the flatbed truck independently, and does not require a special vehicle for maintenance. Compared with the existing special vehicle rental of bridge inspection vehicles, the cost and time expenditure are reduced.
[0016] 2. The bracket is driven by a worm gear, which has a self-locking feature. When the motor stops, the self-locking function of the worm gear can be relied on to prevent the winding drum from rotating by itself, without the need to lock other components.
[0017] 3. The bracket is provided with a tool box, and the maintenance worker can first place the tools in the tool box, and then lower the bracket. Finally, the worker goes down into the bracket empty-handed without carrying tools to climb down, which is convenient for the worker to go up and down and for maintenance operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is the appearance diagram of the utility model;
[0019] Figure 2 This is the installation structure diagram of the climbing frame and the extension frame in the utility model;
[0020] Figure 3 It is an enlarged view of point A in the utility model;
[0021] Figure 4 This is the installation structure diagram of the take-up reel in the utility model;
[0022] Figure 5 This is an example diagram of the use of the present utility model.
[0023] In the figure: 1. extension frame; 2. climbing frame; 3. pedal rod; 4. connecting rod; 5. vertical railing; 6. anti-slip plate; 7. rope hook; 8. steel cable; 9. guide wheel; 10. support frame; 11. take-up drum; 12. mounting seat; 13. worm gear; 14. worm; 15. shaft seat; 16. reducer; 17. motor; 18. support plate; 19. hanging ring; 20. fixing plate; 21. fixing buckle; 22. counterweight; 23. vertical frame; 24. inclined frame; 25. tool box; 26. hanging ear; 27. pedal; 28. flatbed truck. DETAILED DESCRIPTION
[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0025] See also Figure 1-5 A support for bridge maintenance comprises an extension frame 1, two extension frames 1 are provided, climbing frames 2 are arranged near the front end of the two extension frames 1, a plurality of pedal rods 3 are welded and installed on the climbing frames 2, openings are reserved at the front ends of the extension frames 1, the climbing frames 2 are movably fixed through the openings, an anti-slip plate 6 is welded and installed on the top of the climbing frames 2, the length and width of the anti-slip plate 6 are larger than the length and width of the opening at the front end of the extension frame 1, four connecting rods 4 symmetrical to each other in upper and lower directions and left and right directions are welded and installed at the bottom position between the two climbing frames 2, a plurality of vertical railings 5 are welded and installed between the connecting rods 4, pedal boards 27 are welded and installed on the two connecting rods 4 at the lower side, a rope hook 7 is welded and installed near the bottom position of the climbing frame 2, and a steel cable 8 is connected to the rope hook 7;
[0026] A support plate 18 is welded and installed on the top surface of the extension frame 1, and a support frame 10 is welded and installed on the front end of the top of the support plate 18. A guide wheel 9 is installed on the support frame 10 through a bearing set. A mounting seat 12 is welded and installed on the rear position of the top surface of the support plate 18, and a winding drum 11 is installed on the mounting seat 12 through a bearing set. The steel cable 8 is wound around the guide wheel 9 and is wound on the winding drum 11. A worm wheel 13 is welded and installed on the shaft of the guide wheel 9 outside the mounting seat 12. A worm 14 that meshes with each other is provided below the worm wheel 13. The front end of the worm 14 is sleeved on the bearing of the shaft seat 15, and the shaft seat 15 is bolted to the side of the mounting seat 12 at the corresponding position. A reducer 16 is installed on the top surface of the support plate 18 on the rear side of the mounting seat 12. The reducer 16 is connected to the worm 14 in transmission. A motor 17 is installed on the top surface of the support plate 18 on the side of the reducer 16, and the shaft of the motor 17 is connected to the reducer 16 in transmission through a pin key.
[0027] A fixing plate 20 is provided at the rear end of the extension frame 1 away from the climbing frame 2. The extension frame 1 is arranged on the front and rear sides of the top surface of the fixing plate 20. The fixing plate 20 is bolted on the flatbed of the flatbed truck 28. The extension frame 1 is welded and fixed to the top surface of the fixing plate 20. A fixing buckle 21 covering the extension frame 1 is also bolted to the top surface of the fixing plate 20 corresponding to the position of the extension frame 1. A plurality of counterweight blocks 22 are provided near the middle position of the top surface of the fixing plate 20.
[0028] When in use, the flatbed truck 28 is driven to the side of the bridge deck to be inspected, and the truck is close to the stone railing of the bridge deck, with a distance of 1-1.5m, and then the engine is turned off and the truck is stopped. At this time, the motor 17 is controlled to work, so that it uses the reducer 16 and the worm gear structure to drive the winding drum 11 to reverse, so that the steel cable 8 is loosened, and the climbing frame 2 and the connecting rod 4 descend under the action of their own weight, and then descend to below the bridge deck. After descending into place, the machine is stopped, and the personnel climb under the climbing frame 2 to the pedal 27 to carry out inspection and maintenance work below the bridge deck.
[0029] In this embodiment, a vertical frame 23 is welded and installed on the top surface of the fixing plate 20 at the rear side of the extension frame 1 , and a diagonal bracket 24 is welded and installed between the vertical frame 23 and the extension frame 1 .
[0030] Since the extension frame 1 has a long extension length, in order to ensure the stability of the extension frame 1, a diagonal support frame 24 is provided to distribute the force of the extension frame 1 and increase the structural strength of the entire support.
[0031] In this embodiment, a plurality of hanging rings 19 are welded and installed on the inner side surface of the extension frame 1 close to the climbing frame 2 .
[0032] The hanging ring 19 is used for hanging the worker's safety rope when climbing down, to ensure the safety of the climbing process.
[0033] In this embodiment, a tool box 25 is installed at the upper connecting rod 4 position on the four connecting rods 4, and a hanging ear 26 is welded and installed on the side of the tool box 25. The hanging ear 26 is hung on the connecting rod 4 at the corresponding position to be fixed, and the tool box 25 is arranged toward the outside of the connecting rod 4.
Claims
1. A support for bridge maintenance, comprising a fixing plate (20) fixed on a flatbed of a flatbed truck (28), a plurality of counterweights (22) being arranged on the fixing plate (20), characterized in that: Two extension frames (1) are installed on the fixed plate (20), and climbing frames (2) are arranged near the front end of the two extension frames (1). An opening is reserved at the front end of the extension frame (1), and the climbing frame (2) is fixed and movably passed through the opening. Four connecting rods (4) symmetrically arranged in the upper and lower directions and in the left and right directions are installed between the bottoms of the two climbing frames (2). A plurality of vertical railings (5) are installed between the connecting rods (4), and pedals (27) are installed on the two lower connecting rods (4). A rope hook (7) is installed near the bottom of the climbing frame (2), and a rope hook (7) is connected to the rope hook (7). A steel cable (8) is connected, a support plate (18) is installed on the top surface of the extension frame (1), a support frame (10) is installed on the front end of the top of the support plate (18), a guide wheel (9) is installed on the support frame (10), a mounting seat (12) is installed at the rear position of the top surface of the support plate (18), a winding drum (11) is installed on the mounting seat (12), the steel cable (8) is wound around the guide wheel (9) and wound on the winding drum (11), and a motor (17) for driving the winding drum (11) to rotate is installed on the support plate (18) outside the mounting seat (12).
2. A bracket for bridge maintenance according to claim 1, characterized in that: An anti-slip plate (6) is installed on the top of the climbing frame (2), and the length and width of the anti-slip plate (6) are both larger than the length and width of the front end opening of the extension frame (1).
3. A bracket for bridge maintenance according to claim 1, characterized in that: A worm wheel (13) is mounted on the shaft of the guide wheel (9) outside the mounting seat (12), and a worm (14) is provided below the worm wheel (13) for mutually meshing transmission. A reducer (16) is mounted on the top surface of a support plate (18) at the rear side of the mounting seat (12), and the reducer (16) is transmission-connected to the worm (14). A motor (17) is mounted on the top surface of the support plate (18) at the side of the reducer (16), and a shaft of the motor (17) is transmission-connected to the reducer (16) through a pin-key fit.
4. A bridge maintenance bracket according to claim 2, characterized in that: A vertical frame (23) is installed on the top surface of the fixing plate (20) at the rear side of the extension frame (1), and a diagonal bracket (24) is welded and installed between the vertical frame (23) and the extension frame (1).
5. A bracket for bridge maintenance according to claim 4, characterized in that: A plurality of hanging rings (19) are installed on the inner side surface of the extension frame (1) close to the climbing frame (2).
6. The bracket for bridge maintenance according to claim 1, characterized in that: A tool box (25) is installed at the upper side of the connecting rod (4), and a hanging ear (26) is installed on the side of the tool box (25). The hanging ear (26) is hung and fixed on the connecting rod (4) at a corresponding position, and the tool box (25) is arranged toward the outside of the connecting rod (4).