Pouring formwork for bridge building

By designing a cast formwork for bridge construction with adjustable height, combining 45° and 135° molding structures, the problems of existing formwork height inapplicability and line opening are solved, and the smoothness of the column surface and concrete utilization rate are achieved. promote.

CN222206038UActive Publication Date: 2024-12-20HENAN OURUI TEMPLATE TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323647095.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-12-20
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

The concrete casting formwork frames in existing bridge buildings lack height adjustment, resulting in concrete drilling into the formwork gaps, and obvious lines appear after the mold is opened, affecting the appearance.

Method used

Design a casting formwork frame for bridge construction, including a formwork structure with adjustable height, reduce opening by 45° and 135° mold clamping, and install fixed ears, connecting seats, hoppers and mud-proof grooves in the formwork frame to reduce gaps and waste.

Benefits of technology

It realizes flexible adjustment of the height of the mold frame, reduces the opening of the column surface after pouring, improves the surface smoothness, and reduces concrete waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222206038U_ABST
    Figure CN222206038U_ABST
Patent Text Reader

Abstract

The utility model discloses a pouring formwork for bridge construction. The pouring formwork comprises a right formwork. A left template is buckled on the left side of the right template, limiting plates are arranged at the upper ends of the right template and the left template, the upper ends of the limiting plates are inclined planes, limiting grooves are formed in the lower ends of the inner walls of the right template and the left template, the upper ends of the limiting grooves are inclined planes, the inclination angle of the vertical section of the front side of the right template is 45 degrees, and the inclination angle of the vertical section of the rear side of the left template is 135 degrees; the pouring formwork comprises a left formwork body, a right formwork body and fixing lugs, the fixing lugs are evenly arranged on the front side and the rear side of the left formwork body and the front side and the rear side of the right formwork body respectively, the fixing lugs of the left formwork body are connected with the adjacent fixing lugs on the rear side of the right formwork body through bolts, and the pouring formwork further comprises fixing bases and connecting bases. And meanwhile, opening lines generated by pouring are reduced through 45-degree mold closing, so that the surface of the poured stand column is smoother.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of casting formwork for construction, in particular to a casting formwork for bridge construction. Background Art

[0002] Concrete pouring refers to the process of pouring concrete into a mold until it is plasticized. In civil engineering, concrete and other materials are poured into a mold to form a predetermined shape. When pouring concrete, the free height of the concrete should not exceed 2m. If it exceeds 3m, corresponding measures should be taken. It should include three sections:

[0003] The circular formwork required for the bridge columns before pouring is customized according to the height of the columns, which lacks applicability. At the same time, during pouring, concrete drills into the gaps between the formworks, and an obvious line appears after the mold is opened, affecting the appearance. For this reason, we propose a pouring formwork for bridge construction. Utility Model Content

[0004] The technical problem to be solved by the utility model is to overcome the existing defects and provide a casting mold frame for bridge construction, which can adjust the height of the mold frame according to the height of the column to be cast, and has higher applicability. At the same time, the 45° mold closing can reduce the open lines caused by casting, so that the surface of the column after casting is smoother, which can effectively solve the problems in the background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pouring formwork for bridge construction, comprising a right formwork;

[0006] Right formwork: The left formwork is buckled on its left side. Limit plates are provided on the upper ends of the right and left formworks. The upper ends of the limit plates are inclined surfaces. Limit grooves are provided on the lower ends of the inner walls of the right and left formworks. The upper ends of the limit grooves are inclined surfaces. The inclination angle of the vertical section on the front side of the right formwork is 45°, and the inclination angle of the vertical section on the rear side of the left formwork is 135°. The height of the formwork can be adjusted according to the height of the column to be cast, which has higher applicability. At the same time, the 45° and 135° mold closing can reduce the open lines caused by casting, making the surface of the column smoother after casting.

[0007] Furthermore, it also includes fixing ears, which are evenly arranged on the front and rear sides of the left template and the right template respectively. The fixing ears of the left template are connected to the fixing ears adjacent to the rear side of the right template by bolts to fix the left template and the right template that are interlocked with each other.

[0008] Furthermore, it also includes a fixing seat and a connecting seat, wherein the fixing seats are respectively arranged at the outer lower end of the left template and the outer lower end of the right template, and the connecting seats are respectively arranged at the outer upper end of the left template and the outer upper end of the right template, and the connecting seats are respectively connected to the fixing seats adjacent to the upper end by bolts to connect the upper and lower adjacent left templates and right templates.

[0009] Furthermore, it also includes a hopper, which is buckled on the upper end of the uppermost left template and the right template to form a whole, so as to reduce cement waste.

[0010] Furthermore, a mud-proof groove is provided at the lower end of the inner wall of the hopper, and the mud-proof groove is cooperated with the limiting plate to facilitate taking out the hopper.

[0011] Furthermore, it also includes a base, wherein a limiting ring is provided at the center of the upper end of the base, and the limiting ring is inserted into the interior of the whole formed by the two limiting grooves at the lower end to fix the position of the mold frame.

[0012] Furthermore, fixing holes are symmetrically arranged at the four corners of the upper surface of the base to facilitate fixing of the base.

[0013] Compared with the prior art, the beneficial effects of the utility model are: the pouring formwork for bridge construction has the following advantages:

[0014] 1. Before welding the steel bars, fix the base to the ground where the columns need to be cast through the fixing holes. After welding, buckle the left and right templates, and then connect them through the fixing ear bolts. According to the height of the columns to be cast, set multiple left and right templates to achieve the casting of columns of different heights, which is more applicable.

[0015] 2. The connecting seats of the left and right templates at the lower end are connected to the connecting seats of the left and right templates adjacent to the upper end through bolts to fix the templates. Before pouring, the upper end of the right template at the upper end is buckled with the hopper. During pouring, the anti-mud groove is in close contact with the limiting groove at the lower end, reducing the gap between the concrete flowing into the hopper and the uppermost left template and the uppermost right template, reducing the waste of concrete and facilitating the removal of the hopper. After the concrete solidifies, remove the bolts and open the mold. The inclination angle of the vertical section on the front side of the right template is 45°, and the inclination angle of the vertical section on the rear side of the left template is 135°. It is difficult for concrete to enter the gap, making the surface of the column smoother after pouring. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the utility model;

[0017] Figure 2 It is a schematic diagram of the structure of the right template and the left template buckled together in the utility model;

[0018] Figure 3 This is a schematic diagram of the right template structure of the utility model;

[0019] Figure 4 It is a cross-sectional structural schematic diagram of the hopper of the utility model;

[0020] Figure 5 It is a structural schematic diagram of the base of the utility model.

[0021] In the figure: 1 left template, 2 right template, 3 limit plate, 4 fixing ear, 5 fixing seat, 6 connecting seat, 7 limit groove, 8 hopper, 9 anti-mud groove, 10 base, 11 fixing hole. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-5 ,This embodiment provides a technical solution: a casting formwork for bridge construction, comprising a right formwork 2;

[0024] Right template 2: The left side of it is buckled with the left template 1, and the upper ends of the right template 2 and the left template 1 are provided with limit plates 3, and the upper ends of the limit plates 3 are inclined surfaces. The lower ends of the inner walls of the right template 2 and the left template 1 are provided with limit grooves 7, and the upper ends of the limit grooves 7 are inclined surfaces. The inclination angle of the vertical section on the front side of the right template 2 is 45°, and the inclination angle of the vertical section on the rear side of the left template 1 is 135°. The height of the formwork can be adjusted according to the height of the column to be cast, and it has higher applicability. At the same time, the 45° mold clamping can reduce the open lines caused by casting, so that the surface of the column after casting is smoother.

[0025] Among them: it also includes fixing ears 4, which are evenly arranged on the front and rear sides of the left template 1 and the right template 2. The fixing ears 4 of the left template 1 are connected to the fixing ears 4 adjacent to the rear side of the right template 2 by bolts. After welding is completed, the left template 1 and the right template 2 are buckled together and then connected by the fixing ears 4 bolts.

[0026] Wherein: it also includes a fixing seat 5 and a connecting seat 6, the fixing seat 5 is respectively arranged at the outer lower end of the left template 1 and the outer lower end of the right template 2, the connecting seat 6 is respectively arranged at the outer upper end of the left template 1 and the outer upper end of the right template 2, the connecting seat 6 is respectively connected to the fixing seat 5 adjacent to the upper end by bolts, and the connecting seat 6 of the left template 1 and the right template 2 at the lower end is connected to the connecting seat 6 of the left template 1 and the right template 2 adjacent to the upper end by bolts to realize the fixation of the template.

[0027] Wherein: it also includes a hopper 8, which is buckled on the upper end of the uppermost left template 1 and the right template 2 to form a whole. The lower end of the inner wall of the hopper 8 is provided with a mud-proof groove 9, which is arranged in cooperation with the limiting plate 3. Before pouring, the upper end of the uppermost right template 2 is buckled with the hopper 8. During pouring, the mud-proof groove 9 is in close contact with the limiting groove 7 at the lower end, which reduces the gap between the concrete flowing into the hopper 8 and the uppermost left template 1 and the uppermost right template 2, reduces the waste of concrete, and facilitates the removal of the hopper 8.

[0028] The base 10 is also provided with a limit ring at the center of the upper end of the base 10, which is inserted into the two limit grooves 7 at the lower end to form the interior of the whole, and the upper surface of the base 10 is symmetrically provided with fixing holes 11 at the four corners.

[0029] The working principle of a pouring formwork for bridge construction provided by the utility model is as follows: before welding the steel bars, the base 10 is fixed to the ground where the column needs to be poured through the fixing hole 11. After the welding is completed, the left formwork 1 and the right formwork 2 are buckled together, and then connected by the fixing ear 4 bolts. According to the height of the column to be poured, a plurality of left formworks 1 and right formworks 2 are set to realize the pouring of columns of different heights. The connection seat 6 of the left formwork 1 and the right formwork 2 at the lower end is connected to the connection seat 6 of the left formwork 1 and the right formwork 2 adjacent to the upper end by bolts, so as to realize The template is fixed. Before pouring, the upper end of the right template 2 is buckled with the hopper 8. During pouring, the mud-proof groove 9 is in close contact with the limiting groove 7 at the lower end, reducing the gap between the concrete flowing into the hopper 8 and the uppermost left template 1 and the uppermost right template 2, reducing the waste of concrete and facilitating the removal of the hopper 8. After the concrete solidifies, remove the bolts and open the mold. The inclination angle of the vertical section on the front side of the right template 2 is 45°, and the inclination angle of the vertical section on the rear side of the left template 1 is 135°. It is difficult for concrete to enter the gap, making the surface of the column smoother after pouring.

[0030] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A casting formwork for bridge construction, characterized in that: Include right template (2); The right template (2) is buckled with the left template (1) on its left side. The upper ends of the right template (2) and the left template (1) are both provided with a limit plate (3). The upper ends of the limit plates (3) are both inclined surfaces. The lower ends of the inner walls of the right template (2) and the left template (1) are both provided with a limit groove (7). The upper ends of the limit groove (7) are both inclined surfaces. The inclination angle of the vertical section of the front side of the right template (2) is 45°, and the inclination angle of the vertical section of the rear side of the left template (1) is 135°.

2. A pouring formwork for bridge construction according to claim 1, characterized in that: It also includes fixing ears (4), which are evenly arranged on the front and rear sides of the left template (1) and the right template (2), respectively, and the fixing ears (4) of the left template (1) are connected to adjacent fixing ears (4) adjacent to the rear side of the right template (2) by bolts.

3. A pouring formwork for bridge construction according to claim 1, characterized in that: It also includes a fixing seat (5) and a connecting seat (6), wherein the fixing seat (5) is respectively arranged at the lower end of the outer side of the left template (1) and the lower end of the outer side of the right template (2), and the connecting seat (6) is respectively arranged at the upper end of the outer side of the left template (1) and the upper end of the outer side of the right template (2), and the connecting seat (6) is respectively connected to the fixing seat (5) adjacent to the upper end by bolts.

4. A pouring formwork for bridge construction according to claim 1, characterized in that: It also includes a hopper (8), which is buckled onto the upper end of the whole formed by the uppermost left template (1) and the right template (2).

5. A pouring formwork for bridge construction according to claim 4, characterized in that: A mud prevention groove (9) is provided at the lower end of the inner wall of the hopper (8), and the mud prevention groove (9) is arranged in cooperation with the limiting plate (3).

6. The pouring formwork for bridge construction according to claim 1, characterized in that: It also comprises a base (10), wherein a limiting ring is provided at the center of the upper end of the base (10), and the limiting ring is inserted into the two limiting grooves (7) at the lower end to form the interior of the whole.

7. A casting formwork for bridge construction according to claim 6, characterized in that: The upper surface of the base (10) is symmetrically provided with fixing holes (11) at four corners.

Citation Information

Cited By

  • A rapid dismounting formwork structure for building

    CN224769806U