Rigid connection structure of prefabricated pipe pile and prefabricated foundation
By designing a rigid connection structure between prefabricated pipe piles and prefabricated foundations, using the mutual cooperation between the object body, pipe piles, connecting rings and other components, the problems of poor installation effect and inconvenient adjustment of the connection structure in the prior art are solved, and efficient connection and The effect of height adjustment.
Patent Information
- Application Number
- CN202420980863.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-05-08
AI Technical Summary
The connection structure between the existing prefabricated pipe piles and prefabricated foundations is poorly installed and the adjustment is inconvenient.
A rigid connection structure between prefabricated pipe piles and prefabricated foundations is designed, and components such as the object body, pipe piles, connecting rings, plug sleeves, cylindrical connecting rods, pull rings, plug openings, fixing blocks, nuts and threaded rods are used. The mutual cooperation and use of these components enables efficient limit plug-in and height adjustment.
It realizes efficient connection and height adjustment of the connection structure by users, meeting the user's needs for convenient installation and adjustment of the connection structure.
Smart Images

Figure CN222206448U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated pipe pile processing, in particular to a rigid connection structure between a prefabricated pipe pile and a prefabricated foundation. Background Art
[0002] PHC piles, prestressed high-strength concrete, are produced by professional manufacturers. They adopt prestressing by pre-tensioning method and adding ground materials, high-efficiency water reducing agent and other advanced technologies. The concrete is compacted by centrifugal dehydration and cured by two steam processes of normal pressure and high pressure to form a slender hollow equal-section precast concrete component. Temporary supports are set on the outside of the top of the precast pipe piles, and the precast foundation is connected to the precast pipe piles through the temporary supports. Then, corrugated pipes are set through the reserved holes preset at the corresponding positions of the precast foundation and the core of the precast pipe piles, and steel cages are lowered, and concrete is cast in situ, so as to form a rigid connection between the precast foundation and the precast pipe piles, thus filling the gap in the specification on the connection between precast pipe piles and precast foundations.
[0003] The existing technology has the following problems:
[0004] 1. When the user needs to use the connection structure to install the card connection, the effect is not good enough;
[0005] 2. It is not convenient enough when the user needs to adjust the connection structure using the installation pipe piles. Utility Model Content
[0006] The utility model provides a rigid connection structure of a prefabricated pipe pile and a prefabricated foundation to solve the problems raised in the above background technology.
[0007] In order to solve the above technical problems, the technical solution adopted by the utility model is:
[0008] The rigid connection structure of prefabricated pipe piles and prefabricated foundations comprises an object body, an inner circle of which is movably provided with pipe piles, one side of which is fixedly connected to a connecting ring, and one side of which is fixedly connected to a cylindrical connecting rod.
[0009] One side of the connecting ring is fixedly connected with a plug sleeve, one side of the plug sleeve is movably connected with a first plug rod, and one side of the connecting ring is fixedly connected with a sleeve ring.
[0010] One side of the collar is movably connected to a second plug-in rod, an upper surface of the second plug-in rod is fixedly connected to a support block, one side of the object body is fixedly connected to a fixed block, one side of the fixed block is fixedly connected to a nut, and one side of the connecting ring is fixedly connected to a plug-in block.
[0011] A further improvement of the technical solution of the utility model is that: a cylindrical connecting rod is fixedly connected to one side of the connecting ring, and the cylindrical connecting rods are multiple and parallel to each other.
[0012] By adopting the above technical solution, the solution can facilitate users to perform efficient limited plug-in connection.
[0013] A further improvement of the technical solution of the utility model is that: a second plug-in opening is opened on one side of the plug-in block, and the second plug-in opening and the first plug-in rod are structurally matched with each other.
[0014] By adopting the above technical solution, the solution can facilitate users to carry out efficient activities.
[0015] A further improvement of the technical solution of the utility model is that a threaded rod is movably connected to one side of the nut, and the threaded rod is connected between the nut and the fixing block.
[0016] By adopting the above technical solution, the solution can facilitate users to connect to each other efficiently.
[0017] A further improvement of the technical solution of the utility model is that: the fixing block connects the nut and the object body, and the fixing block is symmetrically arranged with the vertical center line of the nut as the symmetry axis.
[0018] By adopting the above technical solution, the solution can facilitate users to carry out efficient fixing and connection.
[0019] A further improvement of the technical solution of the utility model is that: a pull ring is fixedly connected to one side of the first plug-in rod, and the pull ring is connected between the first plug-in rod and the plug-in sleeve.
[0020] By adopting the above technical solution, the solution can facilitate users to connect to each other efficiently.
[0021] A further improvement of the technical solution of the utility model is that a first plug opening is opened on one side of the cylindrical connecting rod, and the first plug opening and the second plug rod are matched in size.
[0022] By adopting the above technical solution, the solution can facilitate users to perform efficient active plug-in use.
[0023] Due to the adoption of the above technical solution, the utility model has achieved the following technical progress compared with the prior art:
[0024] 1. The utility model provides a rigid connection structure between a prefabricated pipe pile and a prefabricated foundation, and through the mutual cooperation and use of the set object body, pipe pile, connecting ring, first plug rod, plug sleeve, cylindrical connecting rod, pull ring, first plug opening, second plug rod, sleeve ring, support block, plug block, second plug opening, fixed block, nut and threaded rod, it is convenient for users to use and connect the connection structure efficiently. When the user needs to connect, the user needs to plug the plug block into the plug sleeve, and then the user needs to plug the set first plug rod into the second plug opening through the pull ring, and the user needs to plug the cylindrical connecting rod into the sleeve, and the user needs to plug the second plug rod into the first plug opening, so that the user can efficiently connect the connection structure to each other, meeting the user's use needs of being able to efficiently connect to each other;
[0025] 2. The utility model provides a rigid connection structure between prefabricated pipe piles and prefabricated foundations, and through the pipe piles movably connected to one side of the object body, the fixed blocks, the nuts fixedly connected to one side of the pipe piles, and the threaded rods movably connected to one side of the nuts, after the user unscrews and removes the threaded rods, the user can efficiently adjust the height of the pipe piles on the object body, thereby meeting the user's demand for efficient adjustment of the pipe piles. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a structural front view of the utility model;
[0027] Figure 2 It is a top view of the structure of the utility model;
[0028] Figure 3 It is a structural side view of the utility model;
[0029] Figure 4 The structure of the utility model Figure 1 A magnified view of the structure at center;
[0030] Figure 5 It is a bottom view of the structure of the utility model.
[0031] In the figure: 1.1, object body; 2. pipe pile; 3. connecting ring; 4. first plug-in rod; 5. plug-in sleeve; 6. cylindrical connecting rod; 7. pull ring; 8. first plug-in opening; 9. second plug-in rod; 10. sleeve; 11. support block; 12. plug-in block; 13. second plug-in opening; 14. fixing block; 15. nut; 16. threaded rod. DETAILED DESCRIPTION
[0032] The present invention is further described in detail below in conjunction with the embodiments:
[0033] Example 1
[0034] like Figure 1-5 As shown, the utility model provides a rigid connection structure between prefabricated pipe piles and prefabricated foundations, including an object body 1, an inner ring of which is movably provided with pipe piles 2, one side of the object body 1 is fixedly connected to a connecting ring 3, one side of the connecting ring 3 is fixedly connected to a cylindrical connecting rod 6, and one side of the connecting ring 3 is fixedly connected to a plug sleeve 5.
[0035] In this embodiment, a cylindrical connecting rod 6 is fixedly connected to one side of the connecting ring 3, and the cylindrical connecting rods 6 are multiple in number and parallel to each other, which can facilitate the user to perform efficient limited plug-in connection. A second plug-in opening 13 is opened on one side of the plug-in block 12, and the structures between the second plug-in opening 13 and the first plug-in rod 4 fit together, which can facilitate the user to perform efficient and active use.
[0036] Example 2
[0037] like Figure 1-5 As shown, based on Example 1, the utility model provides a technical solution: preferably, one side of the plug sleeve 5 is movably connected to the first plug rod 4, one side of the connecting ring 3 is fixedly connected to the ring 10, and one side of the ring 10 is movably connected to the second plug rod 9.
[0038] In this embodiment, a threaded rod 16 is movably connected to one side of the nut 15, and the threaded rod 16 is connected between the nut 15 and the fixing block 14, which can facilitate the user to efficiently connect each other. The fixing block 14 connects the nut 15 and the object body 1, and the fixing block 14 is symmetrically arranged with the vertical midline of the nut 15 as the symmetry axis, which can facilitate the user to efficiently fix and connect.
[0039] Example 3
[0040] like Figure 1-5 As shown, based on Example 1 and Example 2, the utility model provides a technical solution: preferably, the upper surface of the second plug-in rod 9 is fixedly connected with a support block 11, one side of the object body 1 is fixedly connected with a fixing block 14, one side of the fixing block 14 is fixedly connected with a nut 15, and one side of the connecting ring 3 is fixedly connected with a plug-in block 12.
[0041] In this embodiment, a pull ring 7 is fixedly connected to one side of the first plug-in rod 4, and the pull ring 7 is connected between the first plug-in rod 4 and the plug-in sleeve 5, which can facilitate the user to make efficient connections with each other. A first plug-in opening 8 is opened on one side of the cylindrical connecting rod 6, and the first plug-in opening 8 and the second plug-in rod 9 are matched in size, which can facilitate the user to make efficient active plug-in uses. When the user needs to make a connection, the user needs to plug the plug block 12 into the plug-in sleeve 5, and then the user needs to plug the set first plug-in rod 4 into the second plug-in opening 13 through the pull ring 7, and the user needs to plug the cylindrical connecting rod 6 into the ring 10, and the user needs to plug the second plug-in rod 9 into the first plug-in opening 8, so that the user can efficiently connect the connecting structures to each other.
[0042] like Figure 1-5 As shown, when the user needs to use it, when the user needs to connect it, the user needs to plug the plug-in block 12 into the plug-in sleeve 5, and then the user needs to plug the set first plug-in rod 4 into the second plug-in opening 13 through the pull ring 7, and the user needs to plug the cylindrical connecting rod 6 into the ring 10, and the user needs to plug the second plug-in rod 9 into the first plug-in opening 8, so that the user can efficiently connect the connecting structures to each other, and through the set pipe pile 2 movably connected on one side of the object body 1 and the set fixed block 14 and the nut 15 fixedly connected on one side and the threaded rod 16 movably connected on one side of the nut 15, and after the user twists and removes the threaded rod 16, the user can efficiently adjust the up and down height of the pipe pile 2 on the object body 1.
[0043] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not deviate from the spirit of the present invention are within the scope of protection of the present invention.
Claims
1. A rigid connection structure between a prefabricated pipe pile and a prefabricated foundation, comprising a main body (1), Features: The inner circle of the object body (1) is movably provided with a pipe pile (2), and one side of the object body (1) is fixedly connected with a connecting ring (3); One side of the connecting ring (3) is fixedly connected to a cylindrical connecting rod (6), one side of the connecting ring (3) is fixedly connected to a plug sleeve (5), one side of the plug sleeve (5) is movably connected to a first plug rod (4), one side of the connecting ring (3) is fixedly connected to a sleeve (10), and one side of the sleeve (10) is movably connected to a second plug rod (9); The upper surface of the second plug-in rod (9) is fixedly connected to a support block (11), one side of the object body (1) is fixedly connected to a fixing block (14), one side of the fixing block (14) is fixedly connected to a nut (15), and one side of the connecting ring (3) is fixedly connected to a plug-in block (12).
2. The rigid connection structure between the prefabricated pipe pile and the prefabricated foundation according to claim 1, Features: A cylindrical connecting rod (6) is fixedly connected to one side of the connecting ring (3), and the cylindrical connecting rods (6) are multiple in number and parallel to each other.
3. The rigid connection structure between the prefabricated pipe pile and the prefabricated foundation according to claim 1, Features: A second plug-in opening (13) is provided on one side of the plug-in block (12), and the second plug-in opening (13) and the first plug-in rod (4) are structurally matched with each other.
4. The rigid connection structure between the prefabricated pipe pile and the prefabricated foundation according to claim 1, Features: A threaded rod (16) is movably connected to one side of the nut (15), and the threaded rod (16) is connected between the nut (15) and the fixing block (14).
5. The rigid connection structure between the prefabricated pipe pile and the prefabricated foundation according to claim 1, Features: The fixing block (14) connects the nut (15) and the object body (1), and the fixing block (14) is symmetrically arranged with the vertical center line of the nut (15) as the symmetry axis.
6. The rigid connection structure of the prefabricated pipe pile and the prefabricated foundation according to claim 2, Features: A pull ring (7) is fixedly connected to one side of the first plug-in rod (4), and the pull ring (7) is connected between the first plug-in rod (4) and the plug-in sleeve (5).
7. The rigid connection structure of prefabricated pipe pile and prefabricated foundation according to claim 1, Features: A first plug opening (8) is provided on one side of the cylindrical connecting rod (6), and the first plug opening (8) and the second plug rod (9) are matched in size.