Well drilling moving frame for geothermal well drilling
By designing counterweight balance components and adjustment components in geothermal well drilling equipment, the problem of position adjustment and center of gravity imbalance when drilling underground in geothermal well drilling equipment is solved, and the stability and safety of the equipment are improved, and the adaptability is multi-adapted. This type of drilling rig improves drilling efficiency.
Patent Information
- Application Number
- CN202422799343.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-18
- Publication Date
- 2024-12-20
- Estimated Expiration
- 2034-11-18
AI Technical Summary
Existing geothermal well drilling equipment needs to be frequently adjusted when drilling underground, and after being fixed to the rail car, the center of gravity is prone to imbalance, which has the potential for rollover and is low in safety.
A drilling mobile frame for geothermal well drilling is designed, using counterweight balance components, drive components and adjustment components. Through the adjustment of the mounting plate and the storage box, the motor and screw system ensure the balance of the track car, avoid rollover, and through The engagement assembly enables stable installation and adaptation of the drill rig to a variety of models.
It improves the drilling efficiency and equipment stability of the drilling rig, ensures the balance and safety of the railcar during the drilling process, and is adapted to various types of drilling rigs, reducing the difficulty of equipment moving in the tunnel.
Smart Images

Figure CN222207782U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geothermal well drilling equipment, in particular to a mobile drilling frame for geothermal well drilling. Background Art
[0002] Geothermal well drilling is an engineering technology specifically for the exploration and development of geothermal resources. This technology involves drilling deep wells in the earth's crust to reach the geological layers that store heat energy, thereby extracting geothermal resources for use.
[0003] Existing geothermal well drilling equipment is divided into two types: surface drilling and underground drilling. The advantage of underground drilling is that it reduces the drilling depth, thereby reducing the amount of work and the workload of the staff.
[0004] When drilling equipment is drilling underground, a rail car mobile frame is required to facilitate the movement or transfer of the entire equipment.
[0005] A rail vehicle disclosed in Chinese patent publication number CN221049679U can increase the overall structural strength and rigidity of the rail vehicle through a protective frame, thereby reducing deformation, distortion or vibration of the vehicle during operation and improving the stability and reliability of the transport vehicle.
[0006] However, compared with the existing technologies in related fields, drilling equipment needs to constantly adjust its position when drilling underground, and the existing drilling equipment is not convenient to adjust its position after being fixed on the rail car. At the same time, after the position is adjusted, it is easy to have an unbalanced center of gravity, there is a risk of rollover, and the safety is relatively low. Utility Model Content
[0007] The purpose of the utility model is to overcome the shortcomings of the prior art, solve the problems mentioned in the background technology, and provide a mobile drilling frame for geothermal well drilling.
[0008] The purpose of the utility model is achieved through the following technical solutions: a mobile drilling frame for geothermal well drilling, comprising a track member laid in a coal mine tunnel, a drilling rig and a track car for supporting the drilling rig, the track car moves on the track member, a mounting platform is rotatably provided on the top of the track car, a counterweight balancing assembly for mounting the drilling rig is provided on the top of the mounting platform, a driving assembly is provided at the center of the bottom of the mounting platform on the track car, and the driving assembly is used to control the rotation of the mounting platform; the counterweight balancing assembly comprises a mounting box fixedly mounted on the top of the mounting platform, a mounting plate for mounting the drilling rig is slidably provided on the front side of the top of the mounting box, a accommodating box is slidably provided on the rear side of the top of the mounting box, a plurality of counterweight blocks are placed inside the accommodating box, and an adjusting assembly is provided on the mounting box for controlling the mounting plate and the accommodating box to move closer to or farther away from each other.
[0009] Preferably, the adjustment component includes a first screw rotatably arranged inside the installation box, sliding rods are fixedly arranged on the left and right sides of the installation box, and sliding parts slidably connected to the positions of the two sliding rods corresponding to the installation plate and the receiving box are fixedly arranged, and the installation plate and the receiving box are both threadedly connected to the first screw through an engaging component.
[0010] Preferably, the engaging assembly includes a slider, and the two sliders are fixedly arranged at the bottom of the mounting plate and the containing box respectively. Engaging clamps are slidably arranged on the left and right sides of the slider, a second screw is rotatably arranged on the slider, and the two engaging clamps are threadedly connected to the second screw.
[0011] Preferably, the first screw and the second screw are both left-handed threaded rods, the meshing clip is provided with a thread groove matching the first screw at a position corresponding to the first screw, and the meshing clip is provided with a thread hole matching the second screw at a position corresponding to the second screw.
[0012] Preferably, a motor is fixedly installed at the rear end of the installation box corresponding to the position of the first screw rod, the output end of the motor passes through the installation box and is connected to the first screw rod, and a knob is fixedly provided at one end of the second screw rod.
[0013] Preferably, the shape of the slider is T-shaped, and a sliding groove matching with the slider is provided at a position of the engaging clip corresponding to the slider.
[0014] Beneficial effects:
[0015] The mobile drilling frame for geothermal well drilling is provided with a counterweight balancing component, a driving component, an adjusting component and an engaging component. The driving component and the adjusting component can be used to facilitate the rapid alignment of the drilling rig on the mounting plate with the drilling point, thereby improving the drilling efficiency of the drilling rig. At the same time, the counterweight block inside the receiving box can be used to apply gravity to the other side of the rail car, thereby ensuring the balance of the rail car and preventing the rail car from tipping over. Then, the drilling rig can be used to drill in the tunnel. The engaging component can be used to separately adjust the position of the receiving box or the mounting plate, and the lever principle can be used to further ensure the balance of the rail car, so that the device can be adapted to various types of drilling rigs. At the same time, two engaging clamps can be used to clamp the first screw rod to limit the first screw rod, thereby ensuring the stability of the drilling rig when drilling in the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0017] Figure 1 It is a schematic diagram of the first axle side of the rail vehicle of the utility model;
[0018] Figure 2 It is a schematic diagram of the second axle side of the rail vehicle of the utility model;
[0019] Figure 3 It is a structural schematic diagram of the second working state of the mounting platform of the utility model;
[0020] Figure 4 This is a schematic diagram of the state in which the receiving box and the mounting plate of the utility model are away from each other;
[0021] Figure 5 It is a structural schematic diagram of the second working state of the mounting platform of the utility model;
[0022] Figure 6 It is a schematic diagram of the state when two adjacent meshing clips of the utility model are close to each other;
[0023] Figure 7 It is a schematic diagram of the state of two adjacent engagement clips of the utility model when they are away from each other.
[0024] In the figure: 1. track member; 2. track car; 3. mounting platform; 4. counterweight balancing assembly; 41. mounting box; 42. mounting plate; 43. containing box; 44. counterweight block; 5. driving assembly; 6. adjusting assembly; 61. first screw rod; 62. sliding rod; 63. sliding member; 7. engaging assembly; 71. sliding block; 72. engaging clamp; 721. threaded groove; 722. threaded hole; 723. sliding groove; 73. second screw rod; 731. knob; 8. motor. DETAILED DESCRIPTION
[0025] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0026] Additional aspects and advantages of the present invention will be further described below in conjunction with the accompanying drawings, and some will become apparent from the following description or be learned through practice of the present invention.
[0027] like Figures 1 to 7As shown, a mobile drilling frame for geothermal well drilling includes a track member 1 laid in a coal mine tunnel, a drilling rig and a track car 2 for supporting the drilling rig, the track car 2 moves on the track member 1, a mounting platform 3 is rotatably provided on the top of the track car 2, a counterweight balancing assembly 4 for mounting the drilling rig is provided on the top of the mounting platform 3, a driving assembly 5 is provided on the center of the bottom of the track car 2, and the driving assembly 5 is used to control the rotation of the mounting platform 3; the counterweight balancing assembly 4 includes a mounting box 41 fixedly mounted on the top of the mounting platform 3, a mounting plate 42 for mounting the drilling rig is slidably provided on the front side of the top of the mounting box 41, a receiving box 43 is slidably provided on the rear side of the top of the mounting box 41, a plurality of counterweight blocks 44 are placed inside the receiving box 43, and an adjusting assembly 6 for controlling the mounting plate 42 and the receiving box 43 to move closer to or away from each other is provided on the mounting box 41.
[0028] As a preferred technical solution of the utility model, Figures 2 to 5 As shown, the adjusting component 6 includes a first screw rod 61 rotatably arranged inside the mounting box 41, and sliding rods 62 are fixedly arranged on the left and right sides inside the mounting box 41. The positions of the two sliding rods 62 of the mounting plate 42 and the accommodating box 43 are fixedly provided with sliding members 63 slidably connected thereto, and the mounting plate 42 and the accommodating box 43 are both threadedly connected to the first screw rod 61 through the meshing component 7. A motor 8 is fixedly installed at the rear end of the mounting box 41 corresponding to the position of the first screw rod 61, and the output end of the motor 8 passes through the mounting box 41 and is connected to the first screw rod 61. By using the driving component 5 and the adjusting component 6, it is convenient to quickly align the drilling rig on the mounting plate 42 with the drilling point and improve the drilling efficiency of the drilling rig. At the same time, gravity can be applied to the other side of the rail vehicle 2 through the counterweight block 44 inside the accommodating box 43 to ensure the balance of the rail vehicle 2 and prevent the rail vehicle 2 from tipping over.
[0029] As a preferred technical solution of the utility model, Figure 3 , Figure 6 and Figure 7As shown, the meshing assembly 7 includes a slider 71, and the two sliders 71 are fixedly arranged at the bottom of the mounting plate 42 and the accommodating box 43 respectively. The left and right sides of the slider 71 are slidably provided with a meshing clip 72, and the slider 71 is rotatably provided with a second screw rod 73. The two meshing clips 72 are both threadedly connected with the second screw rod 73. The first screw rod 61 and the second screw rod 73 are both left-handed and right-handed threaded rods. The meshing clip 72 has a thread groove 721 matching the first screw rod 61 at a position corresponding to the first screw rod 61, and a threaded hole 722 matching the second screw rod 73 at a position corresponding to the second screw rod 73. The slider 71 is in a T-shape, and the meshing clip 72 has a slide groove 723 matching the second screw rod 73 at a position corresponding to the slider 71. A knob 731 is fixedly provided at one end of the second screw rod 73. When the model or weight of the drilling rig changes, the second screw rod 73 is rotated by the knob 731, so that the two meshing clamps 72 move away from each other, and then the two meshing clamps 72 are separated from the first screw rod 61. At this time, the accommodating box 43 can be slid, so as to utilize the lever principle to ensure the balance of the rail vehicle 2. At the same time, when in use, the second screw rod 73 can be rotated in the opposite direction by the knob 731, so that the two meshing clamps 72 are close to each other, so that the two meshing clamps 72 clamp the first screw rod 61 to achieve the limitation of the first screw rod 61, and ensure the stability of the drilling rig when drilling in the tunnel, so that the device can be adapted to various models of drilling rigs.
[0030] The rail vehicle 2, motor 8 and drilling rig described in this application are well-known technologies in the technical field, so their specific structures and working principles are not described in detail.
[0031] The working process is as follows:
[0032] S1. When using, Figure 1 and Figure 2 As shown, the drilling rig is mounted on a mounting plate 42, and then a counterweight 44 of appropriate weight is selected according to the weight of the drilling rig, and then the counterweight 44 is placed inside a receiving box 43;
[0033] S2, such as Figures 2 to 5 As shown, after the equipment is installed, the drilling rig is transferred to the designated drilling point by the rail vehicle 2, and then the mounting platform 3 is controlled to rotate by the driving assembly 5 so that the drilling head of the drilling rig is close to the drilling point;
[0034] S3, such as Figure 2 , Figure 3 and Figure 4As shown, when the drilling head approaches the drilling point, the motor 8 controls the first screw 61 to rotate, so that the mounting plate 42 and the receiving box 43 move away from each other, so that the mounting plate 42 drives the drilling head of the drilling rig to align with the drilling point. At this time, the counterweight block 44 inside the receiving box 43 will apply gravity to the other side of the rail car 2 to ensure the balance of the rail car 2 and prevent the rail car 2 from tipping over. Then, the drilling rig can be used to drill in the tunnel;
[0035] S4, such as Figures 1 to 5 As shown, after the drilling is completed, the drilling head of the drilling rig is reset, and then the first screw 61 is controlled by the motor 8 to rotate in the opposite direction, so that the mounting plate 42 and the receiving box 43 are close to each other, thereby reducing the space occupied by the drilling rig and the receiving box 43, and facilitating the movement of the rail vehicle 2 in the tunnel;
[0036] S5, such as Figure 3 , Figure 6 and Figure 7 As shown, when the model or weight of the drilling rig changes, the second screw rod 73 is rotated by the knob 731, so that the two engaging clamps 72 move away from each other, and then the two engaging clamps 72 are separated from the first screw rod 61. At this time, the accommodating box 43 can be slid, so as to utilize the lever principle to ensure the balance of the rail vehicle 2. At the same time, when in use, the second screw rod 73 can be rotated in the opposite direction by the knob 731, so that the two engaging clamps 72 are close to each other, so that the two engaging clamps 72 clamp the first screw rod 61, so as to limit the first screw rod 61 and ensure the stability of the drilling rig when drilling in the tunnel.
[0037] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.
Claims
1. A mobile drilling frame for geothermal well drilling, characterized in that: The invention comprises a track member (1) laid in a coal mine tunnel, a drilling rig, and a track vehicle (2) for supporting the drilling rig, wherein the track vehicle (2) moves on the track member (1), a mounting platform (3) is rotatably provided on the top of the track vehicle (2), a counterweight balancing assembly (4) for mounting the drilling rig is provided on the top of the mounting platform (3), a driving assembly (5) is provided at the center of the bottom of the mounting platform (3), and the driving assembly (5) is used to control the rotation of the mounting platform (3), and the drilling rig is used to drill into soil or rock; The counterweight balancing assembly (4) comprises a mounting box (41) fixedly mounted on the top of the mounting platform (3); a mounting plate (42) for mounting the drilling rig is slidably provided on the front side of the top of the mounting box (41); a receiving box (43) is slidably provided on the rear side of the top of the mounting box (41); a plurality of counterweight blocks (44) are placed inside the receiving box (43); and an adjusting assembly (6) for controlling the mounting plate (42) and the receiving box (43) to move closer to or farther away from each other is provided on the mounting box (41).
2. The mobile drilling frame for geothermal well drilling according to claim 1, characterized in that: The adjustment component (6) comprises a first screw rod (61) rotatably arranged inside the installation box (41); slide rods (62) are fixedly arranged on the left and right sides inside the installation box (41); sliding members (63) slidably connected to the two slide rods (62) are fixedly arranged at the positions of the installation plate (42) and the storage box (43) corresponding to the two slide rods (62); and the installation plate (42) and the storage box (43) are both threadedly connected to the first screw rod (61) via a meshing component (7).
3. The mobile drilling frame for geothermal well drilling according to claim 2, characterized in that: The meshing assembly (7) comprises a slider (71), wherein two sliders (71) are fixedly arranged at the bottom of the mounting plate (42) and the accommodating box (43) respectively, and a meshing clamp (72) is slidably arranged on the left and right sides of the slider (71), and a second screw rod (73) is rotatably arranged on the slider (71), and the two meshing clamps (72) are threadedly connected to the second screw rod (73).
4. The mobile drilling frame for geothermal well drilling according to claim 3, characterized in that: The first screw rod (61) and the second screw rod (73) are both left-handed threaded rods, the meshing clamp (72) is provided with a thread groove (721) matching the first screw rod (61) at a position corresponding to the first screw rod (61), and the meshing clamp (72) is provided with a thread hole (722) matching the second screw rod (73) at a position corresponding to the second screw rod (73).
5. The mobile drilling frame for geothermal well drilling according to claim 4, characterized in that: A motor (8) is fixedly mounted at the rear end of the installation box (41) at a position corresponding to the first screw rod (61); an output end of the motor (8) passes through the installation box (41) and is connected to the first screw rod (61); and a knob (731) is fixedly mounted at one end of the second screw rod (73).
6. The mobile drilling frame for geothermal well drilling according to claim 3, characterized in that: The sliding block (71) is in a T-shape, and the engaging clamp (72) is provided with a sliding groove (723) matching with the sliding block (71) at a position corresponding to the sliding block (71).
