Spraying type dust suppression device for green building construction
By adopting the combination of water supply tank, circuit pipe, layered pipe, nozzle and water supply pipe and the reinforcement structure of fixed seat and fixed rod in the spray dust suppression device for green building construction, uneven water spraying and water waste are solved. The problem of this achieves the effect of uniform sprinkling and water saving, while enhancing the stability of the device.
Patent Information
- Application Number
- CN202420980533.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-05-08
AI Technical Summary
The existing green building construction spray-type dust suppression device has uneven water spraying, and the amount of water spray per unit time is large, resulting in waste of water and failing to effectively save water.
The combination of water supply tank, circuit pipe, layered pipe, spray head and water supply pipe is used to form a dense multi-point spraying mechanism, and a reinforcement structure is formed through a fixed seat and a fixed rod to ensure uniform water spraying and water saving.
It achieves uniform water sprinkling and dust suppression of the building, significantly saves water consumption, and improves the structural strength and stability of the device.
Smart Images

Figure CN222219045U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction dust removal, in particular to a spray type dust suppression device for green building construction. Background Art
[0002] When the existing spray dust suppression device for green building construction sprays water to suppress dust on the building, the water spraying position is single, the water spraying is uneven, the caliber of the water spray component is large, and the water spraying volume per unit time is large, which is not conducive to water conservation. A Chinese patent discloses a "multi-stage spray dust suppression and water-saving device for green building construction", and its application number is "CN202022064406.X", which includes a sprinkler box, the surface of the sprinkler box is detachably connected to the sprinkler bracket, the surface of the sprinkler bracket is detachably connected to the fixing bolt, the center of the top of the sprinkler box is fixedly connected to the telescopic rod bracket, the surface of the telescopic rod bracket is fixedly connected to the telescopic rod, one side of the fixing bolt is rotatably connected to the sprinkler, one side of the sprinkler is fixedly connected to the sprinkler vent, and the side of the sprinkler away from the sprinkler vent is fixedly connected to the sprinkler port. The utility model uses a water pump to transport water from the water tank to the nozzle, and atomizes the water through high pressure, which has good dust removal effect and high work efficiency. The fan increases the range and covers a larger area, which can save a lot of water. However, the water spraying of the device is uneven, and the water spraying volume per unit time of the water spraying component is large, which easily causes water waste and is not conducive to water conservation. Utility Model Content
[0003] The purpose of the utility model is to solve at least one of the technical problems existing in the prior art and to provide a spray dust suppression device for green building construction. A dense multi-point spraying mechanism is formed by the combination of a water supply box, a loop pipe, a layered pipe, a nozzle and a water supply pipe, which can evenly spray water on the building to effectively suppress dust. The water consumption is not large, which is beneficial to the economical use of water. A reinforcement structure is formed by the combination of a fixed seat and a fixed rod, which can enhance the structural strength of the device and is beneficial to the stable operation of the device.
[0004] The utility model also provides a spray dust suppression device for green building construction, comprising: a main box, the upper end of which is fixedly connected to a water supply tank; a loop pipe, a stratified pipe is fixedly connected inside the loop pipe, the side end of the stratified pipe is fixedly connected to the water supply tank through the water supply pipe, the side end of the stratified pipe is fixedly connected to a nozzle, and the nozzles are evenly distributed on the side ends of the stratified pipe.
[0005] According to the spray dust suppression device for green building construction described in the utility model, the lower end of the main box is fixedly connected with a base plate for easy support. The lower end of the base plate is fixedly connected with rollers to improve the flexibility of the device. The rollers are located at the four corners of the lower end of the base plate to make the device stable.
[0006] According to the spray dust suppression device for green building construction described in the utility model, the side end of the main box is fixedly connected with a mounting plate by bolts, which facilitates the fixing of the handle. The front end of the mounting plate is fixedly connected with a handle, which improves the convenience of using the device.
[0007] According to the spray dust suppression device for green building construction described in the utility model, the upper end of the main box is fixedly connected with a water storage tank, which is convenient for timely supply of water. The upper end of the water storage tank is provided with a box cover for convenient sealing. The upper end of the box cover is provided with a water replenishment funnel for convenient water addition.
[0008] According to the spray dust suppression device for green building construction described in the utility model, a water pump is fixedly connected to the upper end of the main box, which is conducive to the rapid transportation of water. The input end of the water pump is fixedly connected to the water storage tank, which is convenient for the transportation of water. The output end of the water pump is fixedly connected to the water delivery tank through a conduit, which is convenient for the transportation of water. A pipeline valve is arranged in the conduit, which is conducive to the circulation control of the pipeline. A rotating handle is arranged at the side end of the pipeline valve, which is convenient for the adjustment of the pipeline valve.
[0009] According to the spray dust suppression device for green building construction described in the utility model, the upper end of the main box is fixedly connected with a fixing seat, which is convenient for fixing the fixing rod. The fixing seats are symmetrically distributed at the left and right ends of the main box to make the structure stable. The rear end of the fixing seat abuts against the front end of the water pump to make the structure compact.
[0010] According to the spray dust suppression device for green building construction described in the utility model, the side end of the water delivery box is fixedly connected to the side end of the fixing seat through a fixing rod, so that the structure is firm.
[0011] Beneficial Effects
[0012] 1. Compared with the prior art, the spray dust suppression device for green building construction forms a dense multi-point spraying mechanism through the combination of a water delivery box, a loop pipe, a layered pipe, a nozzle and a water delivery pipe, which can evenly spray water on the building to effectively suppress dust, and the water consumption is small, which is conducive to the conservation of water;
[0013] 2. Compared with the prior art, this spray dust suppression device for green building construction forms a reinforcement structure through the combination of a fixed seat and a fixed rod, which can enhance the structural strength of the device and is conducive to the stable operation of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The utility model is further described below in conjunction with the accompanying drawings and embodiments;
[0015] Figure 1 This is a schematic diagram of the structure of a spray-type dust suppression device for green building construction according to the utility model;
[0016] Figure 2 It is a schematic diagram of the top view of the structure of a spray-type dust suppression device for green building construction according to the utility model;
[0017] Figure 3 It is a schematic diagram of the transverse cross-sectional structure of a spray-type dust suppression device for green building construction according to the utility model;
[0018] Figure 4 The utility model is a schematic diagram of the longitudinal section structure of a spray dust suppression device for green building construction.
[0019] Legend:
[0020] 1. Base plate; 2. Bolts; 3. Mounting plate; 4. Handle; 5. Water storage tank; 6. Tank cover; 7. Turn handle; 8. Pipe valve; 9. Water supply funnel; 10. Conduit; 11. Water pump; 12. Water pipe; 13. Fixing rod; 14. Fixing seat; 15. Layered pipe; 16. Roller; 17. Loop pipe; 18. Water tank; 19. Nozzle; 20. Main box. DETAILED DESCRIPTION
[0021] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.
[0022] Reference Figure 1-4The utility model embodiment is a spray dust suppression device for green building construction, which includes: a main box 20, the lower end of the main box 20 is fixedly connected to a base plate 1 for support, the lower end of the base plate 1 is fixedly connected to a roller 16 for movement, the roller 16 is located at the four corners of the lower end of the base plate 1 for balance, the side end of the main box 20 is fixedly connected to a mounting plate 3 by a bolt 2 to fix the handle, the front end of the mounting plate 3 is fixedly connected to a handle 4, a moving device, the upper end of the main box 20 is fixedly connected to a water tank 5 for water storage and supply, the upper end of the water tank 5 is provided with a box cover 6 to seal the water tank, the upper end of the box cover 6 is provided with a water replenishment funnel 9 for water replenishment, the upper end of the main box 20 is fixedly connected to a fixing seat 14 to fix the fixing rod, and the fixing The seats 14 are symmetrically distributed at the left and right ends of the main case 20 to form a stable layout. The rear end of the fixed seat 14 abuts against the front end of the water pump 11 to form a compact structure. The upper end of the main case 20 is fixedly connected to a water delivery box 18 to form pressure inside for water spraying. The side end of the water delivery box 18 is fixedly connected to the side end of the fixed seat 14 through a fixing rod 13 to form a firm structure. The upper end of the main case 20 is fixedly connected to a water pump 11 to deliver water. The input end of the water pump 11 is fixedly connected to the water storage tank 5 to form a water delivery structure. The output end of the water pump 11 is fixedly connected to the water delivery box 18 through a conduit 10 to form a water delivery structure. A pipeline valve 8 is provided in the conduit 10 to control the circulation of the conduit. A rotating handle 7 is provided at the side end of the pipeline valve 8 for rotation adjustment.
[0023] The loop pipe 17 has a layered pipe 15 fixedly connected inside it to form a layered structure. The side end of the layered pipe 15 is fixedly connected to the water tank 18 through the water pipe 12 to form a water supply structure. The side end of the layered pipe 15 is fixedly connected to a nozzle 19 for spraying water. The nozzles 19 are evenly distributed on the side ends of the layered pipe 15 to form a multi-point intensive layout.
[0024] Working principle: The spray dust suppression device of green building construction is used to spray water to suppress dust during construction. The water tank 18 transports water to the stratified pipe 15 through the water pipe 12. The water in the stratified pipe 15 will flow in the loop pipe 17. The nozzle 19 at the side end of the stratified pipe 15 will perform intensive multi-point water spraying, which can suppress the dust generated during construction and prevent the spread of dust.
[0025] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.
Claims
1. A spray dust suppression device for green building construction, characterized in that: include: A main box (20), the upper end of which is fixedly connected to a water delivery box (18); A loop pipe (17), wherein a stratified pipe (15) is fixedly connected inside the loop pipe (17), a side end of the stratified pipe (15) is fixedly connected to a water delivery tank (18) via a water delivery pipe (12), a nozzle (19) is fixedly connected to the side end of the stratified pipe (15), and the nozzles (19) are evenly distributed on the side ends of the stratified pipe (15).
2. A spray dust suppression device for green building construction according to claim 1, characterized in that: The lower end of the main chassis (20) is fixedly connected to a base plate (1), and the lower end of the base plate (1) is fixedly connected to a roller (16), and the roller (16) is located at the four corners of the lower end of the base plate (1).
3. A spray dust suppression device for green building construction according to claim 1, characterized in that: The side end of the main box (20) is fixedly connected to a mounting plate (3) via bolts (2), and the front end of the mounting plate (3) is fixedly connected to a handle (4).
4. A spray dust suppression device for green building construction according to claim 1, characterized in that: The upper end of the main housing (20) is fixedly connected to a water storage tank (5), the upper end of the water storage tank (5) is provided with a tank cover (6), and the upper end of the tank cover (6) is provided with a water replenishment funnel (9).
5. A spray dust suppression device for green building construction according to claim 1, characterized in that: A water pump (11) is fixedly connected to the upper end of the main housing (20); an input end of the water pump (11) is fixedly connected to a water storage tank (5); an output end of the water pump (11) is fixedly connected to a water delivery tank (18) via a conduit (10); a pipeline valve (8) is provided in the conduit (10); and a rotating handle (7) is provided at a side end of the pipeline valve (8).
6. A spray dust suppression device for green building construction according to claim 1, characterized in that: The upper end of the main case (20) is fixedly connected to a fixing seat (14), the fixing seat (14) is symmetrically distributed at the left and right ends of the main case (20), and the rear end of the fixing seat (14) abuts against the front end of the water pump (11).
7. A spray dust suppression device for green building construction according to claim 1, characterized in that: The side end of the water delivery box (18) is fixedly connected to the side end of the fixing seat (14) via a fixing rod (13).
Citation Information
Patent Citations
Multistage spraying type dust suppression and water saving device for green building construction
CN213314039U
