Pipeline lifting equipment for water conservancy project
By introducing a coordination mechanism between adjustment screws and screw holes in the pipeline lifting equipment for water conservancy projects, the problem that fixed height equipment is difficult to adapt to the requirements of pipelines of different heights is solved, and flexible height adjustment and convenience of use are achieved.
Patent Information
- Application Number
- CN202421084396.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-17
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-05-17
AI Technical Summary
The existing water conservancy projects use pipeline lifting equipment to fix the height, which is difficult to meet the installation and maintenance needs of pipelines of different heights, and is inconvenient to use.
An adjustable lifting device including a support base, a moving wheel, a side plate, a load-bearing rod, a curved support plate and an adjustment screw is designed. The height of the arc-shaped support plate is adjusted by adjusting the coordination between the screw and the screw hole to realize lifting. Height adjustment of the device.
The height adjustable lifting equipment is achieved, adapting to different maintenance, repair or replacement needs, and improving the scope of application and convenience of use of the equipment.
Smart Images

Figure CN222222513U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy engineering equipment, in particular to a pipeline lifting device for water conservancy engineering. Background Art
[0002] Before constructing water conservancy pipelines, you first need to select suitable pipeline materials. Common pipeline materials include steel pipes, cast iron pipes, plastic pipes and concrete pipes. When selecting materials, factors such as the purpose of the pipeline, environmental conditions, load-bearing capacity and corrosion resistance should be considered. During the construction of water conservancy projects, the quality of the water conservancy pipeline connection can be improved by lifting the water conservancy pipeline to be connected to the connection position, thereby improving the sealing of the water conservancy pipeline;
[0003] The existing pipe lifting equipment for water conservancy projects includes a support base, on which a group of symmetrical arc-shaped support members are arranged. The pipes are placed in the arc-shaped support members to realize the lifting function, so that the water conservancy pipes can be connected or repaired. However, during the construction of water conservancy projects, there will be a need to install and repair pipes of different heights, and the arc-shaped support members of fixed height are difficult to move into the bottom of the pipe again to support and lift it after installation is completed or when maintenance is required. The application scope is narrow and it is inconvenient to use. Therefore, an adjustable pipe lifting equipment for water conservancy projects is needed. Utility Model Content
[0004] The technical problem to be solved by the utility model is that the height is fixed and cannot be adapted to different maintenance and installation requirements, and provides an adjustable pipeline lifting device for water conservancy projects.
[0005] The top of the support leg is provided with a toothed structure, and the toothed structure is designed so that the support leg can move freely in the rotation on the support leg, and the toothed structure can be adjusted accordingly.
[0006] As an improvement, a group of lifting rods extending to the bottom end of the support base are symmetrically and slidably provided on the support base, the moving wheels are rotatably set at the bottom ends of the lifting rods, the top ends of the lifting rods are connected to a lifting plate located between the side panels, and the center of the top surface of the support base is provided with a hydraulic telescopic rod fixedly connected to the lifting plate, which facilitates the stable placement and fixation of the equipment.
[0007] As an improvement, a limit plate fixedly connected to the slide rod is provided between the side plates, and the lifting plate is located below the limit plate, which can limit the adjustment process so that the adjustment process of the left and right side plates remains balanced.
[0008] As an improvement, a plurality of stabilizing columns are evenly arranged around the bottom surface of the support base, and the stabilizing columns are close to the ground to improve the stability of the device.
[0009] The advantage of the utility model over the prior art is that the height position of the adjusting plate can be adjusted by cooperating with the adjusting screw and the adjusting screw hole, thereby realizing the adjustment of the height of the arc-shaped support plate on the load-bearing plate, so that the lifting equipment can adjust the lifting height according to actual needs to adapt to the requirements of different maintenance, repair or replacement operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is the first stereoscopic diagram of a pipeline lifting device for water conservancy projects of the utility model.
[0011] Figure 2 It is a second stereoscopic view of the pipeline lifting device for water conservancy projects of the utility model.
[0012] Figure 3 The utility model is a cross-sectional stereoscopic diagram of a pipeline lifting device for water conservancy engineering.
[0013] Figure 4 The utility model is a front view of a pipeline lifting device for water conservancy projects.
[0014] Figure 5 yes Figure 3 Schematic diagram of the structure of part A.
[0015] As shown in the figure: 1. Support base; 2. Moving wheel; 3. Side panel; 4. Load-bearing rod; 5. Load-bearing plate; 6. Arc support plate; 7. Through groove; 8. Connecting groove; 9. Connecting rod; 10. Slide groove; 11. Slide rod; 12. Adjustment plate; 13. Adjustment screw; 14. Adjustment screw hole; 15. Lifting rod; 16. Lifting plate; 17. Hydraulic telescopic rod; 18. Limiting plate; 19. Stabilizing column. DETAILED DESCRIPTION
[0016] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0017] Embodiment 1
[0018] Combined with Figure 1-3 As shown in Figure 5, a pipeline lifting equipment for water conservancy projects includes a support base 1, a plurality of moving wheels 2 are provided at the bottom end of the support base 1, a group of side plates 3 are symmetrically provided on the top surface of the support base 1, a group of load-bearing rods 4 are symmetrically provided in the side plates 3, the tops of the load-bearing rods 4 are commonly connected with a load-bearing plate 5, the top surface of the load-bearing plate 5 is symmetrically provided with a group of arc-shaped support plates 6, a group of through grooves 7 symmetrically provided on the side plates 3 and slidably connected with the load-bearing rods 4, the through grooves 7 are connected with connecting grooves 8, and the load-bearing rods 4 are connected. A connecting rod 9 is connected between the side panels 3 and is slidably connected to the connecting groove 8. A sliding groove 10 that matches the connecting groove 8 is penetrated in the center of the side panel 3. A sliding rod 11 that is fixedly connected to the connecting rod 9 is slidably connected in the sliding groove 10. A limiting plate 18 that is fixedly connected to the sliding rod 11 is provided between the side panels 3. An adjusting plate 12 that is close to the outer wall of the side panel 3 is connected to one end of the sliding rod 11. A group of adjusting screws 13 are symmetrically provided on the adjusting plate 12. The outer wall of the side panel 3 is provided with multiple groups of adjusting screw holes 14 that are threadedly connected to the adjusting screws 13.
[0019] Through the above structure, the lifting height can be adjusted as needed, the adjusting screw 13 is taken out from the adjusting screw hole 14, and then the load-bearing plate 5 is pulled so that the load-bearing rod 4 moves up and down with the cooperation of the through groove 7, and the limit plate 18 maintains the balance of the lifting process of the load-bearing rods 4 on both sides. During the adjustment process, the adjustment plate 12 moves up and down until it is adjusted to the required height, and the adjusting screw 13 is connected to the corresponding adjusting screw hole 14 to complete the height adjustment process, and the pipe to be installed can be placed on the arc-shaped support plate 6 for lifting;
[0020] Embodiment 2
[0021] Based on the first embodiment, combined with the attached Figure 4 As shown, the support base 1 is symmetrically and slidably provided with a group of lifting rods 15 extending to the bottom end of the support base 1, the moving wheels 2 are rotatably arranged at the bottom ends of the lifting rods 15, the top ends of the lifting rods 15 are connected with lifting plates 16 located between the side plates 3, a hydraulic telescopic rod 17 fixedly connected to the lifting plates 16 is arranged in the center of the top surface of the support base 1, the lifting plates 16 are located below the limit plates 18, and a plurality of stabilizing columns 19 are evenly arranged around the bottom surface of the support base 1;
[0022] Through the above structure, when performing installation or maintenance work, after the water conservancy pipeline is located in the arc-shaped support plate 6, the hydraulic telescopic rod 17 pulls the lifting rod 15 to move upward, so that the moving wheel 2 continues to move away from the ground until the stabilizing column 19 is close to the ground, so that the device is placed stably.
[0023] When the utility model is implemented in a specific way, when installing the water conservancy pipeline, the lifting height is first adjusted according to the needs, and the adjusting screw 13 is taken out from the adjusting screw hole 14, and then the load-bearing plate 5 is pulled to make the load-bearing rod 4 move up and down with the cooperation of the through groove 7, and the limit plate 18 keeps the balance of the lifting process of the load-bearing rods 4 on both sides. During the adjustment process, the adjusting plate 12 follows the up and down movement until it is adjusted to the required height, and the adjusting screw 13 is connected with the corresponding adjusting screw hole 14 to complete the height adjustment process. The pipeline to be installed can be placed on the arc-shaped support plate 6 for lifting, and the pushing device can be moved to the installation position with the cooperation of the moving wheel 2. Finally, the hydraulic telescopic rod 17 pulls the lifting rod 15 to move upward, so that the moving wheel 2 is continuously away from the ground until the stabilizing column 19 is close to the ground, so that the device is placed stably, and the lifting and installation operation of the water conservancy pipeline can be carried out.
[0024] When performing maintenance work, the equipment is moved so that the water conservancy pipeline is located in the arc-shaped support plate 6. The hydraulic telescopic rod 17 pulls the lifting rod 15 to move upward, so that the moving wheel 2 is continuously moved away from the ground until the stabilizing column 19 is close to the ground, so that the device is placed stably. Then the adjusting screw 13 is taken out from the adjusting screw hole 14, and then the load-bearing plate 5 is pulled so that the load-bearing rod 4 moves up and down with the cooperation of the through groove 7. The limit plate 18 maintains the balance of the lifting process of the load-bearing rods 4 on both sides. During the adjustment process, the adjusting plate 12 follows and moves up and down until the water conservancy pipeline is completely close to the arc-shaped support plate 6. The adjusting screw 13 is connected to the corresponding adjusting screw hole 14, and the pipeline lifted in the arc-shaped support plate 6 can be maintained.
[0025] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.
Claims
1. A pipe lifting device for a water conservancy project, comprising a support base (1), a plurality of movable wheels (2) being provided at the bottom end of the support base (1), a group of side plates (3) being symmetrically provided on the top surface of the support base (1), a group of load-bearing rods (4) being symmetrically provided inside the side plates (3), a load-bearing plate (5) being connected to the top ends of the load-bearing rods (4), a group of arc-shaped support plates (6) being symmetrically provided on the top surface of the load-bearing plate (5), and characterized in that: The side plate (3) is symmetrically provided with a group of through grooves (7) matched with the load-bearing rods (4) for sliding connection. The through grooves (7) are connected with connecting grooves (8). The load-bearing rods (4) are connected with connecting rods (9) for sliding connection with the connecting grooves (8). A sliding groove (10) matched with the connecting groove (8) is provided through the center of the side plate (3). A sliding rod (11) fixedly connected with the connecting rod (9) is provided in the sliding groove (10). An adjustment plate (12) tightly attached to the outer wall of the side plate (3) is connected to one end of the sliding rod (11). A group of adjustment screws (13) are symmetrically provided on the adjustment plate (12). The outer wall of the side plate (3) is provided with a plurality of adjustment screw holes (14) matched with the adjustment screws (13) for threaded connection.
2. The pipeline lifting equipment for water conservancy projects according to claim 1 is characterized in that: A group of lifting rods (15) extending to the bottom end of the support base (1) are symmetrically slidably provided on the support base (1); the moving wheels (2) are rotatably arranged at the bottom ends of the lifting rods (15); the top ends of the lifting rods (15) are connected to lifting plates (16) located between the side plates (3); and a hydraulic telescopic rod (17) fixedly connected to the lifting plates (16) is provided in the center of the top surface of the support base (1).
3. The pipeline lifting equipment for water conservancy projects according to claim 2 is characterized in that: A limiting plate (18) fixedly connected to the slide bar (11) is provided between the side plates (3), and the lifting plate (16) is located below the limiting plate (18).
4. The pipeline lifting equipment for water conservancy projects according to claim 1 is characterized in that: A plurality of stabilizing columns (19) are evenly arranged around the bottom surface of the support base (1).