Tool lifting appliance for lifting pile barrel composite foundation

By designing tool slings for pile and barrel composite foundations, the combination of annular suspenders and wire ropes is used to solve the problem of poor position stability during barrel lifting, improving work efficiency and enhancing the overall structural stability of the sling.

CN222225728UActive Publication Date: 2024-12-24CRCC HARBOR & CHANNEL ENG BUREAU GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421134465.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2024-12-24
Estimated Expiration
2034-05-22

AI Technical Summary

Technical Problem

In the prior art, during the lifting process of pile barrel composite foundation, it is difficult to ensure position stability when the barrel body is directly lifted through a rope, resulting in low working efficiency.

Method used

A tool sling for pile barrel composite foundation is designed, including a load-bearing suspender plate and a sling body. The sling body is composed of a ring beam, a reinforcement beam and a connecting piece. The sling body is stablely lifted through an annular suspender and a wire rope. Evenly carry particulate force to ensure position stability.

Benefits of technology

The working efficiency of the barrel installation is improved, the position stability of the barrel during the lifting process is ensured, and the overall structural stability of the spreader is enhanced by the setting of reinforcement rods and connectors, and the overall structural stability of the spreader is facilitated for rapid installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222225728U_ABST
    Figure CN222225728U_ABST
Patent Text Reader

Abstract

The utility model discloses a tool lifting appliance for lifting a pile barrel composite foundation, and belongs to the technical field of foundation lifting, the tool lifting appliance comprises a bearing lifting plate and a lifting appliance body, the lifting appliance body comprises a ring beam and a reinforcing beam, the ring beam is in a regular hexagon shape, and the ring beam comprises six closed fixed beams which are sequentially connected end to end; the six reinforcing beams and the six fixing beams are arranged in a one-to-one correspondence mode, the two ends of each reinforcing beam are fixedly connected to every two adjacent fixing beams respectively, a connecting piece is fixedly arranged at the joint of every two adjacent fixing beams, the bottom of each connecting piece is connected with the barrel body through a steel wire rope, and the top of each connecting piece is connected with the bearing hanging plate through an annular hanging belt. Wherein three adjacent annular lifting belts are arranged close to one end of the bearing lifting plate in the length direction, and the other three adjacent annular lifting belts are arranged close to the other end of the bearing lifting plate in the length direction. The hoisting device has the effects that the stability of the position where the barrel body is located during hoisting is conveniently guaranteed, the inner barrel of the barrel body is conveniently and rapidly arranged outside the steel pipe pile, and the working efficiency during barrel body mounting is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of foundation hoisting, and in particular to a tooling hoist for hoisting a pile bucket composite foundation. Background Art

[0002] The pile-barrel composite foundation is a new type of foundation that combines a large-diameter single pile and a negative pressure barrel. It can effectively reduce the depth of the pipe pile into the soil, improve the foundation's ability to resist horizontal deformation, and obtain a foundation type with higher bearing capacity and stronger adaptability to the marine environment.

[0003] In the prior art, the pile-barrel composite foundation usually adopts the construction method of first driving piles and then sinking barrels during the construction process. The barrel body of the sinking barrel usually includes an inner barrel, an outer barrel, six bulkheads and a top cover plate, wherein the six bulkheads are evenly distributed between the inner barrel and the outer barrel, and the top cover plate is fixedly covered on the top surface between the inner barrel and the outer barrel. The main process of the pile-barrel composite foundation construction is to hoist the inner barrel of the barrel body and sleeve it on the steel pipe pile after the steel pipe pile is installed. At this time, the barrel body will first gradually insert downward into the seabed due to its own weight, and then the barrel body will continue to sink by extracting the air in the barrel. When the barrel body sinks to the seabed, it will sink into the seabed soil due to its own gravity, forming initial mud. At this time, the seawater and soil in the barrel are continuously sucked, so as to prompt the barrel body to further insert downward into the seabed to the designed penetration depth under the action of negative pressure.

[0004] With regard to the above-mentioned prior art, when the barrel body is directly hoisted by ropes, it is not convenient to ensure the stability of the position of the barrel body, and it is difficult to quickly place the inner barrel of the barrel body outside the steel pipe pile, and the work efficiency during the installation of the barrel body is low. Utility Model Content

[0005] In order to ensure the stability of the barrel body during hoisting, to facilitate the rapid placement of the inner barrel of the barrel body outside the steel pipe pile, and to improve the work efficiency during barrel body installation, the present application provides a tooling hoist for hoisting a pile-barrel composite foundation.

[0006] The present application provides a tooling lifting device for lifting a pile bucket composite foundation, which adopts the following technical solution:

[0007] A tooling hoist for hoisting a pile barrel composite foundation comprises a load-bearing hanger plate and a hoist body, the hoist body comprises a ring beam and a reinforcement beam, the ring beam is a regular hexagon, the ring beam comprises six fixed beams which are connected end to end in a closed shape, six reinforcement beams and fixed beams are arranged in a one-to-one correspondence, the two ends of the reinforcement beam are respectively fixedly connected to two adjacent fixed beams, a connecting piece is fixedly arranged at the connection between two adjacent fixed beams, the bottom of the connecting piece is connected to the barrel body through a steel wire rope, and the top of the connecting piece is connected to the load-bearing hanger plate through an annular sling, wherein three adjacent annular slings are arranged near one end of the load-bearing hanger plate in the length direction, and the other three adjacent annular slings are arranged near the other end of the load-bearing hanger plate in the length direction.

[0008] By adopting the above technical scheme, when the barrel body needs to be hoisted and connected, the load-bearing hanging plate is hoisted first, and the load-bearing hanging plate realizes the hoisting of the hoisting device body through the annular hanging belts, and then the hoisting device body realizes the stable hoisting of the barrel body through the wire rope. The setting of the hoisting device body and the load-bearing hanging plate respectively evenly bears the component force received by the barrel body during hoisting, which is conducive to ensuring the stability of the position of the barrel body during hoisting, and is convenient for quickly placing the inner barrel of the barrel body outside the steel pipe pile, thereby improving the work efficiency during the installation of the barrel body. In addition, the setting of the reinforcement rod is conducive to ensuring the overall structural stability of the hoisting device body, and the connecting parts located at the connection of each fixed beam are convenient for realizing stable bearing of the barrel body.

[0009] Optionally, the fixed beam includes a first beam body and a second beam body, the first beam body and the second beam body are equal in length, one end of the first beam body is fixedly connected to a first flange, one end of the second beam body is fixedly connected to a second flange, the first flange and the second flange are fixed by bolts, and the two ends of the reinforcement beam are respectively fixedly connected to the first beam body and the second beam body of two adjacent fixed beams.

[0010] By adopting the above technical solution, the fixed beam is split into the first beam body and the second beam body, which facilitates the rapid realization of the overall structural forming of the ring beam. At the same time, when a single first beam body is damaged, it can be disassembled and replaced separately, which is convenient for the later inspection and maintenance of the ring beam.

[0011] Optionally, a positioning column is fixedly connected to a side of the first flange facing the second flange, and a positioning hole corresponding to the positioning column and plug-fitting therewith is formed on a side of the second flange facing the first flange.

[0012] By adopting the above technical solution, the cooperation of the positioning column and the positioning hole plays a positioning role when the first flange and the second flange are fixed by bolts, which facilitates the rapid and stable connection of the first flange and the second flange.

[0013] Optionally, a plurality of first reinforcing ribs distributed circumferentially around the axis of the first beam body are fixedly connected between the first flange and the first beam body, and a plurality of second reinforcing ribs distributed circumferentially around the axis of the second beam body are fixedly connected between the second flange and the second beam body.

[0014] By adopting the above technical solution, the provision of the first reinforcing rib and the second reinforcing rib is conducive to further ensuring the structural stability when the first flange and the second flange are connected to the first beam body and the second beam body respectively.

[0015] Optionally, the connecting part includes a connecting plate, a connecting screw, a connecting nut and a lifting ring, the lifting ring has two mounting ring bodies, the connecting screw is horizontally passed through one of the mounting ring bodies, the connecting plate, the other mounting ring body and the connecting nut in sequence, the connecting plate and the connecting nut are both threadedly matched with the connecting screw, one side of the connecting nut is pressed against the mounting ring body, the lifting ring, the connecting screw and the connecting nut are provided in two groups and are respectively provided close to the top and bottom of the connecting plate.

[0016] By adopting the above technical solution, the setting of the connecting screws and the connecting nuts makes the connection between the lifting ring and the connecting plate convenient and quick, and the tightening effect of the connecting nut on the mounting ring body is conducive to ensuring the stability of the position of the lifting ring when it is lifted by a ring sling or a wire rope.

[0017] Optionally, the connecting screw sleeve is provided with two buffer pads, and the two buffer pads are respectively located in the gap between the connecting plate and the two mounting ring bodies.

[0018] By adopting the above technical solution, the setting of the buffer pad is conducive to further limiting the position of the lifting ring, thereby further ensuring the stability of the lifting ring during lifting. At the same time, it makes the lifting ring and the connecting plate less prone to wear caused by mutual contact, which is conducive to ensuring the service life of the lifting ring and the connecting plate.

[0019] Optionally, two blocking blocks are fixedly connected to the top of the load-bearing hanger plate, and the two blocking blocks are respectively arranged near the two ends of the load-bearing hanger plate in the length direction, and the sides facing the two blocking blocks are provided with blocking grooves for placing the annular sling.

[0020] By adopting the above technical solution, the setting of the positioning groove plays a role in limiting the position of the annular sling, thereby facilitating the annular sling to further stabilize the lifting of the ring beam and the barrel body.

[0021] Optionally, two limit rings are provided for rotation at the top of the supporting hanger plate, and the two positioning blocks are respectively located in the enclosed area of ​​the two limit rings and the supporting hanger plate, and one end of the limit ring away from its own rotation point is fixed to the supporting hanger plate by bolts.

[0022] By adopting the above technical solution, the setting of the limit ring is conducive to further protecting the position of the annular sling, making it difficult for external components to interfere with the annular sling, thereby further ensuring the stability of the annular sling when hoisting the ring beam and the barrel body.

[0023] In summary, the present application includes at least one of the following beneficial technical effects:

[0024] 1. The setting of the hoist body and the load-bearing hanging plate uniformly bears the force component of the barrel during hoisting, which is conducive to ensuring the stability of the barrel during hoisting, facilitating the rapid placement of the inner barrel of the barrel outside the steel pipe pile, and improving the work efficiency during barrel installation.

[0025] 2. The arrangement of splitting the fixed beam into the first beam body and the second beam body facilitates the rapid realization of the overall structural forming of the ring beam. At the same time, when a single first beam body is damaged, it can be disassembled and replaced separately, which is convenient for the later inspection and maintenance of the ring beam.

[0026] 3. The setting of the connecting screws and the connecting nuts makes the connection between the lifting ring and the connecting plate convenient and quick, and the tightening effect of the connecting nut on the mounting ring body is conducive to ensuring the stability of the position of the lifting ring when it is lifted by a ring sling or a wire rope. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a front schematic diagram of the overall structure of the embodiment of the present application.

[0028] Figure 2 It is a schematic diagram of the three-dimensional structure of the barrel body in the embodiment of the present application.

[0029] Figure 3 It is a schematic top view of the overall structure of the embodiment of the present application.

[0030] Figure 4 It is a schematic diagram of the three-dimensional structure of the ring beam in the embodiment of the present application.

[0031] Figure 5 yes Figure 4 A partial enlarged schematic diagram of part A.

[0032] Figure 6 It is a schematic diagram of the structure of the load-bearing hanging plate in an embodiment of the present application.

[0033] Description of reference numerals:

[0034] 1. Load-bearing hanging plate; 2. Ring beam; 201. Fixed beam; 2011. First beam body; 2012. Second beam body; 3. Reinforced beam; 4. First flange; 5. Second flange; 6. Positioning column; 7. Positioning hole; 8. First reinforcing rib; 9. Second reinforcing rib; 10. Connecting plate; 11. Connecting screw; 12. Connecting nut; 13. Lifting ring; 131. Lifting part; 132. Mounting ring body; 14. Buffer pad; 15. Annular sling; 16. Positioning block; 17. Positioning groove; 18. Limiting ring; 19. Lifting ring; 20. Inner barrel; 21. Outer barrel; 22. Bulkhead; 23. Top cover; 24. Lifting ring; 25. Wire rope. DETAILED DESCRIPTION

[0035] The following is combined with Figure 1-6 This application is described in further detail.

[0036] The embodiment of the present application discloses a tooling hoist for hoisting a pile bucket composite foundation.

[0037] Reference Figure 1 and Figure 2 In the embodiment of the present application, the barrel body of the sink barrel includes an inner barrel 20, an outer barrel 21, six bulkhead plates 22 and a top cover plate 23, wherein the six bulkhead plates 22 are evenly distributed between the inner barrel 20 and the outer barrel 21 around the axis of the inner barrel 20, the top cover plate 23 is fixedly covered on the top surface between the inner barrel 20 and the outer barrel 21, and six groups of lifting rings 24 are evenly distributed around the axis of the top cover plate 23, each group of lifting rings 24 is provided with two, and the two lifting rings 24 are respectively arranged close to the inner barrel 20 and the outer barrel 21.

[0038] Reference Figure 1 and Figure 3 The tooling lifting device for lifting the pile barrel composite foundation includes a load-bearing lifting plate 1 and a lifting device body, and the lifting device body includes a ring beam 2 and a reinforcement beam 3, wherein the ring beam 2 is a regular hexagon, and the ring beam 2 includes six fixed beams 201 connected end to end in a closed shape, and the fixed beam 201 and the reinforcement beam 3 are both cylindrical.

[0039] Reference Figure 4 and Figure 5The fixed beam 201 includes a first beam body 2011 and a second beam body 2012. The first beam body 2011 and the second beam body 2012 are of equal length. A first flange 4 is fixedly connected to one end of the first beam body 2011, and a second flange 5 is fixedly connected to one end of the second beam body 2012. The first flange 4 and the second flange 5 are fixed by bolts to achieve the connection between the first beam body 2011 and the second beam body 2012. To further facilitate the fixation between the first flange 4 and the second flange 5, a plurality of positioning columns 6 uniformly distributed around the axis of the first flange 4 are fixedly connected to the side of the first flange 4 facing the second flange 5. A positioning hole 7 corresponding to the position of the positioning column 6 and plugged with the positioning column 6 is opened on the side of the second flange 5 facing the first flange 4, so as to play a positioning role when the first flange 4 and the second flange 5 are connected, which is conducive to ensuring the stability of the relative position of the first flange 4 and the second flange 5 when they are fixed by bolts.

[0040] Continue to refer to Figure 4 and Figure 5 A plurality of first reinforcing ribs 8 uniformly distributed around the axis of the first beam body 2011 are fixedly connected between the first flange 4 and the first beam body 2011, and a plurality of second reinforcing ribs 9 uniformly distributed around the axis of the second beam body 2012 are fixedly connected between the second flange 5 and the second beam body 2012. Specifically, the first reinforcing ribs 8 and the second reinforcing ribs 9 are both right-angled triangular plate structures in the embodiment of the present application, and the two right-angled sides of the first reinforcing rib 8 are respectively fixedly connected to the first flange 4 and the first beam body 2011, and the two right-angled sides of the second reinforcing rib 9 are respectively fixedly connected to the second flange 5 and the second beam body 2012. The provision of the first reinforcing ribs 8 and the second reinforcing ribs 9 is beneficial to further ensure the structural stability when the first flange 4 and the second flange 5 are respectively connected to the first beam body 2011 and the second beam body 2012.

[0041] Reference Figure 3 and Figure 4 The first beam body 2011 and the second beam body 2012 of the two adjacent fixed beams 201 are fixed as a whole by welding, and six reinforcement beams 3 are arranged in a one-to-one correspondence with the fixed beams 201. The two ends of the reinforcement beam 3 are respectively fixedly connected to the first beam body 2011 and the second beam body 2012 of the two adjacent fixed beams 201 by welding, and the two ends of the reinforcement beam 3 are respectively arranged close to the first flange plate 4 and the second flange plate 5 of the two adjacent fixed beams 201, and the distances from the two ends of the reinforcement beam 3 to the connection between the two adjacent fixed beams 201 are equal, so as to fully ensure the stability of the overall structure of the fixed beam 201 through the arrangement of the reinforcement beam 3.

[0042] Reference Figure 4 and Figure 5A connecting piece is fixedly provided at the connection of two adjacent fixed beams 201, and the connecting piece includes a connecting plate 10, a connecting screw 11, a connecting nut 12 and a lifting ring 13, wherein the connecting plate 10 is vertically fixedly installed on the two adjacent fixed beams 201 by welding, and the lifting ring 13 includes a lifting portion 131 arranged in a U shape and a mounting ring body 132 fixedly connected to the two ends of the lifting portion 131, and the mounting ring body 132 is a circular ring closed at both ends, and the connecting screw 11 is horizontally passed through one of the mounting ring bodies 132, the connecting plate 10, the other mounting ring body 132 and the connecting nut 12 in sequence, the connecting plate 10 and the connecting nut 12 are both threadedly matched with the connecting screw 11, and one side of the connecting nut 12 is pressed against the mounting ring body 132, so as to fully limit the position of the lifting ring 13 and ensure the stability of the position of the lifting ring 13.

[0043] Reference Figure 5 The top and bottom of the connecting plate 10 are respectively located on both sides of the ring beam 2 in the vertical direction. Two groups of lifting rings 13, connecting screws 11 and connecting nuts 12 are respectively arranged near the top and bottom of the connecting plate 10, that is, the two groups of lifting rings 13, connecting screws 11 and connecting nuts 12 are respectively located on both sides of the ring beam 2 in the vertical direction. In order to prevent the lifting rings 13 and the connecting plate 10 from being easily worn due to mutual contact, two buffer pads 14 are provided on the outer sleeve of the connecting screw 11. The material of the buffer pads 14 is selected to be rubber. The two buffer pads 14 are respectively located in the gap between the connecting plate 10 and the two mounting ring bodies 132, and the two buffer pads 14 are respectively pressed against the two mounting ring bodies 132.

[0044] Reference Figure 1 and Figure 3 , the lifting rings 13 near the bottom of the connecting plate 10 are connected to the barrel body through the steel wire rope 25 passed through the lifting part 131. Specifically, the steel wire rope 25 is passed through one group of two lifting rings 24 of the barrel body, so as to ensure the stability of the barrel body when lifting. The lifting rings 13 near the bottom of the connecting plate 10 are connected to the load-bearing hanging plate 1 through the annular sling 15. The annular sling 15 is selected as a polymer annular sling 15 in the embodiment of the present application, so as to realize the stable load-bearing of the ring beam 2 and the barrel body. The load-bearing hanging plate 1 is in the shape of an elongated strip. When the barrel body is lifted, three adjacent annular slings 15 are arranged near one end of the length direction of the load-bearing hanging plate 1, and the other three adjacent annular slings 15 are arranged near the other end of the length direction of the load-bearing hanging plate, so as to further evenly disperse the force of the ring beam 2 and the barrel body when lifting through the load-bearing hanging plate 1.

[0045] Reference Figure 6, two positioning blocks 16 are fixedly connected to the top of the load-bearing hanger plate 1. The two positioning blocks 16 are respectively arranged near the two ends of the load-bearing hanger plate 1 in the length direction. Positioning grooves 17 for placing the annular slings 15 are provided on the side opposite to the two positioning blocks 16, so as to stably limit the positions of three adjacent annular slings 15 when they are hoisted. Two limiting rings 18 are rotatably arranged on the top of the load-bearing hanger plate 1. The limiting rings 18 are semicircular. The two positioning blocks 16 are respectively located in the enclosed area of ​​the two limiting rings 18 and the load-bearing hanger plate 1. The end of the limiting ring 18 away from its own rotation point is fixed to the load-bearing hanger plate 1 by bolts, so as to further protect the position of the annular sling 15, so that it is not easy for external components to interfere with the annular sling 15. In the embodiment of the present application, a lifting ring 19 is fixedly connected to the middle part of the top of the load-bearing hanger plate 1, so as to stably realize the lifting and transportation of the load-bearing hanger plate 1 through the lifting ring 19.

[0046] The implementation principle of a tooling hoist for hoisting a pile-barrel composite foundation in an embodiment of the present application is as follows: when the barrel body needs to be hoisted and connected, the load-bearing hanging plate 1 is hoisted first, and the load-bearing hanging plate 1 realizes the hoisting of the hoist body through each annular sling 15, and then the hoist body realizes stable hoisting of the barrel body through the wire rope 25. The setting of the hoist body and the load-bearing hanging plate 1 respectively evenly bears the component force received by the barrel body during hoisting, which is beneficial to ensure the stability of the position of the barrel body during hoisting, and facilitates the rapid placement of the inner barrel 20 of the barrel body outside the steel pipe pile, thereby improving the work efficiency during the installation of the barrel body. In addition, the setting of the reinforcement rod is beneficial to ensure the overall structural stability of the hoist body, and the connecting parts located at the connection of each fixed beam 201 facilitate the stable bearing of the barrel body.

[0047] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A tooling lifting device for lifting a pile bucket composite foundation, characterized by: The invention comprises a load-bearing hanger plate (1) and a hanger body, wherein the hanger body comprises a ring beam (2) and a reinforcement beam (3), wherein the ring beam (2) is in a regular hexagonal shape, and the ring beam (2) comprises six fixed beams (201) which are connected end to end in a closed shape, and six reinforcement beams (3) are arranged in a one-to-one correspondence with the fixed beams (201), and the two ends of the reinforcement beam (3) are respectively fixedly connected to two adjacent fixed beams (201), and a connecting piece is fixedly arranged at the connection between two adjacent fixed beams (201), and the bottom of the connecting piece is connected to the barrel body through a steel wire rope (25), and the top of the connecting piece is connected to the load-bearing hanger plate (1) through an annular sling (15), wherein three adjacent annular slings (15) are arranged near one end of the load-bearing hanger plate (1) in the length direction, and the other three adjacent annular slings (15) are arranged near the other end of the load-bearing hanger plate (1) in the length direction.

2. The tooling lifting device for lifting a pile-bucket composite foundation according to claim 1 is characterized by: The fixed beam (201) comprises a first beam body (2011) and a second beam body (2012); the first beam body (2011) and the second beam body (2012) are of equal length; one end of the first beam body (2011) is fixedly connected to a first flange (4); one end of the second beam body (2012) is fixedly connected to a second flange (5); the first flange (4) and the second flange (5) are fixed by bolts; and the two ends of the reinforcement beam (3) are respectively fixedly connected to the first beam body (2011) and the second beam body (2012) of two adjacent fixed beams (201).

3. The tooling lifting device for lifting a pile-bucket composite foundation according to claim 2 is characterized by: A positioning column (6) is fixedly connected to the side of the first flange (4) facing the second flange (5), and a positioning hole (7) corresponding to and pluggably fitting with the positioning column (6) is provided on the side of the second flange (5) facing the first flange (4).

4. The tooling lifting device for lifting a pile-bucket composite foundation according to claim 2 is characterized by: A plurality of first reinforcing ribs (8) distributed circumferentially around the axis of the first beam body (2011) are fixedly connected between the first flange (4) and the first beam body (2011), and a plurality of second reinforcing ribs (9) distributed circumferentially around the axis of the second beam body (2012) are fixedly connected between the second flange (5) and the second beam body (2012).

5. The tooling lifting device for lifting a pile-bucket composite foundation according to claim 1 is characterized by: The connecting member comprises a connecting plate (10), a connecting screw (11), a connecting nut (12) and a lifting ring (13); the lifting ring (13) has two mounting ring bodies (132); the connecting screw (11) is horizontally passed through one of the mounting ring bodies (132), the connecting plate (10), the other mounting ring body (132) and the connecting nut (12) in sequence; the connecting plate (10) and the connecting nut (12) are both threadedly matched with the connecting screw (11); one side of the connecting nut (12) is pressed against the mounting ring body (132); the lifting ring (13), the connecting screw (11) and the connecting nut (12) are provided in two groups and are respectively provided close to the top and bottom of the connecting plate (10).

6. The tooling lifting device for lifting a pile-bucket composite foundation according to claim 5, characterized in that: The outer sleeve of the connecting screw (11) is provided with two buffer pads (14), and the two buffer pads (14) are respectively located in the gap between the connecting plate (10) and the two mounting ring bodies (132).

7. The tooling lifting device for lifting a pile-bucket composite foundation according to claim 1, characterized in that: Two positioning blocks (16) are fixedly connected to the top of the load-bearing hanging plate (1), and the two positioning blocks (16) are respectively arranged near the two ends of the load-bearing hanging plate (1) in the length direction, and positioning grooves (17) for placing the annular sling (15) are provided on the opposite sides of the two positioning blocks (16).

8. The tooling lifting device for lifting a pile-bucket composite foundation according to claim 7 is characterized by: The top of the supporting hanger plate (1) is rotatably provided with two limiting rings (18), and the two blocking blocks (16) are respectively located in the enclosed area of ​​the two limiting rings (18) and the supporting hanger plate (1), and one end of the limiting ring (18) away from its own rotation point is fixed to the supporting hanger plate (1) by bolts.