Channel side wall supporting device for hydraulic engineering construction
By designing a channel sidewall support device including a base, a mobile seat, a support seat and a fixing mechanism, the problems of high material costs and difficulty in adaptation in the prior art are solved, and stable reinforcement and covering of the channel sidewalls are achieved. Simplified construction operations and improved construction efficiency and safety.
Patent Information
- Application Number
- CN202420961776.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-07
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-05-07
AI Technical Summary
During the construction of existing water conservancy projects, the material cost of the channel side wall support device is high, it is difficult to quickly adapt to different channel specifications, and the coverage of the side wall after reinforcement is not strong, which affects construction operations.
A channel sidewall support device including a base, a moving seat, a support seat, a bidirectional screw, a lifting screw and a fixing mechanism is designed to achieve the bonding reinforcement of the inner sidewall of the channel through a rotating adjustment ring and a rotating plate, and through a slider Splicing with fixed columns achieves rapid splicing.
The stable reinforcement and cladding of the channel side walls is achieved, which reduces material costs, simplifies construction operations, and improves construction efficiency and safety.
Smart Images

Figure CN222227213U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of water conservancy project construction, in particular to a channel side wall supporting device for water conservancy project construction. Background Art
[0002] In water conservancy projects, channel sidewall support refers to the support measures taken during the construction of the channel sidewall to prevent the channel sidewall from collapsing, sliding or collapsing, and to ensure the stability and safety of the channel project. Common methods include setting up reinforced concrete retaining walls or masonry stone retaining walls on the channel sidewalls, or using geogrids or steel supports for reinforcement. Although these methods can effectively provide support, the required material costs are relatively high, and it is difficult to quickly adapt and adjust different channel specifications. In addition, after the reinforcement is completed, the sidewalls are not strongly covered, and operators are easily affected when they move.
[0003] Therefore, in view of the above problems, a channel side wall supporting device for water conservancy project construction is now developed. Utility Model Content
[0004] In order to overcome the shortcomings of existing devices, such as high material costs, difficulty in rapid adaptation and adjustment for different channel specifications, weak coverage of the side walls after reinforcement, and easy influence on operators during their actions, the utility model provides a channel side wall support device for water conservancy project construction.
[0005] The technical solution of the utility model is: a channel side wall support device for water conservancy project construction, comprising a base, a movable seat is slidably arranged on the upper sides of the left and right parts of the base, the outer sides of the movable seats are rotatably connected to support seats, a two-way screw is rotatably arranged on the base, the two-way screw is threadedly connected to the movable seat, a lifting screw is rotatably arranged on the upper side of the middle part of the base, a lifting frame is threadedly connected to the lifting screw, the front and rear parts of the lifting frame are slidably arranged with sliding frames, the upper sides of the movable seats are connected with pushing frames, the sliding frames are slidably connected to the adjacent pushing frames, the sliding frames are rotatably connected to the first connecting rods, the first connecting rods are rotatably connected to the adjacent support seats, and a fixing mechanism for reinforcing and stabilizing is arranged on the left and right support seats.
[0006] As a further preferred solution, the fixing mechanism includes a sliding block, and the sliding block is slidably arranged on the front and rear sides of the support seat, the sliding block is rotatably connected to a second connecting rod, and a rotating plate is rotatably connected between the front and rear adjacent second connecting rods.
[0007] As a further preferred embodiment, a splicing mechanism is also included, which includes a fixed column. The fixed column is arranged on the upper front side of the base, and a guide column is arranged on the upper rear side of the base. A sliding member is slidably connected to the guide column, and the sliding member is clamped with the fixed column.
[0008] As a further preferred solution, an adjusting ring is connected to the middle of the bidirectional screw rod.
[0009] As a further preferred solution, a rotary handle is provided on the top of the lifting screw rod.
[0010] As a further preferred solution, the rotating plates are all provided with mounting holes.
[0011] By adopting the above technical solution, the utility model has the following advantages:
[0012] 1. The utility model adapts the movable seat to the channel width by rotating the adjustment ring, and after the adaptation is completed, the support seat can be flipped by rotating the lifting screw rod, so as to fit with the inner wall of the channel, reinforce and stabilize the inner wall of the channel, and after the fitting support, the rotating plate is fixedly connected to the ground outside the channel to further reinforce the channel side wall, and the channel side wall can also be covered to a certain extent. The operator can have space to stand and operate during the construction process to avoid affecting the channel construction.
[0013] 2. In the specific operation process of the utility model, the sliding part can be operated to engage with the fixed column, so that the devices can be quickly spliced together to achieve side wall support for the entire channel. The spliced devices are more stable and the splicing method is relatively simple. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a three-dimensional structural schematic diagram of the utility model.
[0015] Figure 2 It is a partial three-dimensional structural schematic diagram of the utility model.
[0016] Figure 3 It is a three-dimensional structural schematic diagram of the fixing mechanism of the utility model.
[0017] Figure 4 It is a three-dimensional structural schematic diagram of the splicing mechanism of the utility model.
[0018] Among them: 1-base, 2-moving seat, 3-support seat, 4-bidirectional screw, 5-adjusting ring, 6-lifting screw, 7-lifting frame, 8-sliding frame, 9-first connecting rod, 10-pushing frame, 11-fixing mechanism, 111-sliding block, 112-second connecting rod, 113-rotating plate, 12-splicing mechanism, 121-fixing column, 122-guide column, 123-sliding part. DETAILED DESCRIPTION
[0019] The present invention is further described below in conjunction with specific embodiments. It should also be noted that, unless otherwise clearly specified and limited, terms such as: setting, installing, connecting, and connecting should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0020] Example 1
[0021] A channel side wall support device for water conservancy project construction, such as Figure 1 and Figure 2 As shown, it includes a base 1, a movable seat 2 is slidably arranged on the upper sides of the left and right parts of the base 1, and a support seat 3 for supporting and reinforcing the channel side wall is rotatably connected to the outer side of the movable seat 2, a bidirectional screw rod 4 is rotatably arranged on the base 1, an adjusting ring 5 is connected to the middle of the bidirectional screw rod 4, and the bidirectional screw rod 4 is threadedly connected to the movable seat 2, a lifting screw rod 6 is rotatably arranged on the upper side of the middle part of the base 1, a rotary handle is arranged on the top of the lifting screw rod 6, and a lifting frame 7 is threadedly connected to the lifting screw rod 6, and a sliding frame 8 is slidably arranged on the front and rear parts of the lifting frame 7, a pushing frame 10 is connected to the upper side of the movable seat 2, and the sliding frame 8 is slidably connected to the adjacent pushing frame 10, and a first connecting rod 9 is rotatably connected to the sliding frame 8, and the first connecting rod 9 is rotatably connected to the adjacent support seat 3, and a fixing mechanism 11 for reinforcement and stability is arranged on the left and right support seats 3.
[0022] like Figure 1 , Figure 3 and Figure 4 As shown, the fixing mechanism 11 includes a sliding block 111, and the sliding blocks 111 are slidably arranged on the front and rear sides of the support seat 3, and the sliding blocks 111 are rotatably connected to the second connecting rods 112, and the front and rear adjacent second connecting rods 112 are rotatably connected with rotating plates 113, and the rotating plates 113 are provided with mounting holes, and the rotating plates 113 are used to connect and fix with the ground outside the channel.
[0023] It should be noted that when the inner wall of the construction channel is supported and stabilized, the device can be used for auxiliary operation. First, the base 1 is placed at the bottom of the channel, and then the position of the movable seat 2 is adjusted according to the width of the channel. The adjusting ring 5 is rotated to rotate the bidirectional screw rod 4, so that the movable seat 2 slides and unfolds to both sides along the base 1. During the movement of the movable seat 2, the pushing frame 10 will be driven to move synchronously, so that the sliding frame 8 will slide synchronously along the lifting frame 7 to both sides. After the adaptation and adjustment are completed, the rotary handle is turned to rotate the lifting screw rod 6, so that the lifting frame 7 drives the sliding frame 8 Sliding upward along the pushing frame 10, the first connecting rod 9 will rotate during the upward movement and lifting of the lifting frame 7, thereby pushing the support seat 3 to both sides and flipping it, so that the support seat 3 can contact and fit with the inner wall of the channel to achieve the effect of supporting and fixing, and then the second connecting rod 112 is rotated to make the rotating plate 113 fit with the ground outside the channel, and finally the fixing bolts are driven into the mounting holes on the rotating plate 113, so that the rotating plate 113 is fixed to the ground outside the channel, thereby achieving the effect of further reinforcing the device and improving the support stability of the channel side wall.
[0024] Example 2
[0025] On the basis of Example 1, Figure 1 , Figure 3 and Figure 4 As shown, it also includes a splicing mechanism 12, which includes a fixed column 121. The fixed column 121 is arranged on the upper front side of the base 1, and the guide column 122 is arranged on the upper rear side of the base 1. A sliding member 123 is slidably connected to the guide column 122, and the sliding member 123 is clamped with the fixed column 121.
[0026] It should be noted that, during the specific operation, the sliding member 123 can be operated to engage with the fixed column 121, so that the devices can be quickly spliced together to achieve side wall support for the entire channel, and the spliced devices are more stable. The splicing method is also relatively simple. During the splicing process, you only need to pull the sliding member 123 backwards first, then make the fixed column 121 located in the open groove of the sliding member 123, and then push the sliding member 123 forward to reset it, so that the sliding member 123 is engaged with the fixed column 121.
[0027] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A channel side wall support device for water conservancy project construction, characterized in that: The invention comprises a base (1), wherein a movable seat (2) is slidably arranged on the upper sides of the left and right parts of the base (1), and a support seat (3) is rotatably connected to the outer side of the movable seat (2), a bidirectional screw rod (4) is rotatably arranged on the base (1), and the bidirectional screw rod (4) is threadedly connected to the movable seat (2), a lifting screw rod (6) is rotatably arranged on the upper side of the middle part of the base (1), and a lifting frame (7) is threadedly connected to the lifting screw rod (6), and a sliding frame (8) is slidably arranged on the front and rear parts of the lifting frame (7), a pushing frame (10) is connected to the upper side of the movable seat (2), and the sliding frame (8) is slidably connected to the adjacent pushing frame (10), and a first connecting rod (9) is rotatably connected to the sliding frame (8), and the first connecting rod (9) is rotatably connected to the adjacent support seat (3), and a fixing mechanism (11) for reinforcement and stability is arranged on the left and right support seats (3).
2. A channel side wall support device for water conservancy project construction according to claim 1, characterized in that: The fixing mechanism (11) comprises a sliding block (111), the sliding blocks (111) are slidably arranged on both the front and rear sides of the support seat (3), the sliding blocks (111) are rotatably connected to second connecting rods (112), and a rotating plate (113) is rotatably connected between the second connecting rods (112) adjacent to each other.
3. A channel side wall support device for water conservancy project construction according to claim 2, characterized in that: The invention also comprises a splicing mechanism (12), wherein the splicing mechanism (12) comprises a fixing column (121), the fixing column (121) is arranged on the upper front side of the base (1), the guiding column (122) is arranged on the upper rear side of the base (1), a sliding member (123) is slidably connected to the guiding column (122), and the sliding member (123) is snap-fitted to the fixing column (121).
4. A channel side wall support device for water conservancy project construction according to claim 1, characterized in that: An adjusting ring (5) is connected to the middle of the bidirectional screw rod (4).
5. A channel side wall support device for water conservancy project construction according to claim 1, characterized in that: The top of the lifting screw rod (6) is provided with a rotary handle.
6. A channel side wall support device for water conservancy project construction according to claim 2, characterized in that: The rotating plates (113) are all provided with mounting holes.