Expansion joint with rapid drainage structure

By introducing rectangular grooves, drainage plates, mesh and rubber pads into the expansion joints, the problem of drainage in the existing technology is solved, and the expansion joint design with rapid drainage and stable structural structure is realized, ensuring the smooth flow of sewage and Filtering of garbage simplifies installation and disassembly.

CN222227595UActive Publication Date: 2024-12-24HEBEI QIRUI ROAD & BRIDGE ENGINEERING MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420748097.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2024-12-24
Estimated Expiration
2034-04-12

AI Technical Summary

Technical Problem

The existing expansion joints lack the rapid drainage function, making it difficult to effectively treat sewage in rainfall, resulting in inconvenience in drainage.

Method used

A expansion joint structure including a sleeve block and the main board body is designed. By setting up rectangular grooves, drainage plates, mesh and rubber pads inside the main board body, rapid drainage of rainwater and garbage filtration are achieved, combining slide rails and cards. Block design for easy installation and disassembly.

Benefits of technology

While achieving rapid drainage and structural stability, it avoids collisions between plates, ensures smooth flow of sewage and filtration of garbage, reduces the risk of blockage in the drainage passage, and simplifies the installation and disassembly of rubber pads.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222227595U_ABST
    Figure CN222227595U_ABST
Patent Text Reader

Abstract

The expansion joint with the rapid drainage structure comprises sleeve blocks and a main plate body, the sleeve blocks are connected to the two sides of the main plate body in a sleeved mode, rectangular grooves are transversely formed in the sleeve blocks, limiting blocks are welded to one sides of the interiors of the rectangular grooves, and frame bodies are arranged in the two sides of the main plate body. A connecting block is welded to the top of the sleeve block, and an F-shaped clamping sleeve is welded to one side of the connecting block. According to the expansion joint with the rapid drainage structure, the drainage plates are welded between the lower portions of the two sides of the middle clamping sleeve and the frame body, the inclined drainage plates are welded between the frame body and the middle clamping sleeve, the structure is squeezed in situ under the adjustment of thermal expansion and cold contraction, rainwater flows to the upper portions of the drainage plates along gaps between rubber sleeves and peripheral structures, and the drainage effect is improved. The sewage flows to the gauze after passing through the frame body, and is inserted into the sliding rails by virtue of the clamping blocks in advance, so that garbage can be filtered while the sewage is guided to flow, a sewer is prevented from being blocked, and the problem of inconvenience in drainage is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of expansion joints, in particular to an expansion joint with a quick drainage structure. Background Art

[0002] Expansion joints are a type of building structure installed between wall panels and bridge panels. If the temperature difference in the environment is large, the building components will inevitably produce reactions such as thermal expansion and contraction. If adjacent panels are directly fixed and connected, accidents such as extrusion and collision will inevitably occur between expansion and contraction. Cracking of walls and bridge panels is even more common, so expansion joints are needed to connect the two.

[0003] In the past, expansion joints all used spliced ​​components to limit the displacement caused by plate collision, and the gaps inside the structure were filled with rubber pads to prevent the structure from breaking and separating, but they lacked the function of drainage. If the rainfall was too intensive, sewage mixed with leaves, stones and other objects would be difficult to flow away quickly through the expansion joints.

[0004] Now, a new expansion joint with a quick drainage structure is proposed to solve the above problems. Utility Model Content

[0005] The utility model aims to provide an expansion joint with a quick drainage structure to solve the problem of inconvenient drainage in the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an expansion joint with a quick drainage structure, comprising a sleeve block and a main board body, sleeve blocks are sleeved on both sides of the main board body, and a rectangular groove is horizontally arranged inside the sleeve block, a limiting block is welded on one side of the rectangular groove, a frame is arranged inside both sides of the main board body, a connecting block is welded on the top of the sleeve block, and an F-type clamping sleeve is welded on one side of the connecting block, an intermediate clamping sleeve is arranged at the center of the main board body, a transverse slot is arranged inside the F-type clamping sleeve and on both sides of the main board body, and a rubber sleeve is inserted in the slot, a rubber pad is fixed between one side of the rubber sleeve, a drainage plate is welded between the lower sides of the two sides of the intermediate clamping sleeve and the frame, a slide rail is arranged between the front and back of one side of the bottom of the sleeve block, and a card block is movably inserted in the slide rail, a gauze is fixedly connected between one side of the card block, and a standing foot is welded at the front and rear end of the bottom of the sleeve block.

[0007] Preferably, the clamping blocks are symmetrically fixed on both sides of the gauze mesh, and the clamping blocks can slide back and forth along the inner wall of the gauze mesh.

[0008] Preferably, the guide plate is arranged in an inclined shape between the frame and the middle sleeve, and the guide plate is located below the rubber pads on both sides.

[0009] Preferably, two groups of inner cavities are provided at the front and rear of the main board body, two groups of cross bars are horizontally welded on the inner wall of the rectangular groove, and two groups of first balls are movably embedded on one side of the cross bar, and two groups of springs are respectively welded at the front and rear between the rectangular groove and the main board body.

[0010] Preferably, the cross bar is embedded in the inner cavity, and the first balls are distributed on the top and bottom of the cross bar.

[0011] Preferably, the spring is spirally wound around the outside of the cross bar, and the spring and the cross bar are arranged in concentric circles.

[0012] Preferably, a snap-in groove is provided between the two ends at the inner center of the main board body, and an I-shaped slide rod is transversely inserted in the snap-in groove, and second balls are movably embedded in the front and rear of both sides of the I-shaped slide rod, and a base plate is transversely welded between the middle sleeve and the I-shaped slide rod, and bolts are engaged and connected on both sides of the base plate.

[0013] Preferably, the bottom plate is fitted on the top of the clamping groove, and the I-shaped sliding bar can slide back and forth along the inner wall of the clamping groove.

[0014] Compared with the prior art, the utility model has the following beneficial effects: the expansion joint with the rapid drainage structure not only achieves rapid drainage and maintains structural stability, but also facilitates the installation and removal of the rubber pad;

[0015] (1) Drainage plates are welded between the frame and the bottom of the middle ferrule on both sides. After the middle ferrule is inserted and fixed, the inclined drainage plates are welded between the frame and the middle ferrule from the bottom of both sides. The top F-type ferrule and the middle ferrule both limit the sliding of the rubber pad with the rubber sleeve with slots. The sleeve blocks on both sides are used to connect the adjacent building panels. Under the adjustment of thermal expansion and contraction, the rainwater will flow along the gap between the rubber sleeve and the surrounding structure to the top of the drainage plate, and then flow to the gauze after passing through the frame. This object is pre-inserted into the slide rail with the help of the card block, which can filter out garbage while guiding the flow of sewage to avoid blockage of the sewer passage;

[0016] (2) Two sets of inner cavities are arranged at the front and rear of the main body, and the sides of the sleeve blocks are connected to the wall panels or bridge panels, and the two are adjacent to each other. During the process of thermal expansion and contraction, the sleeve blocks connected to the panels will slide left and right along the frames on both sides of the main body with the help of limit blocks, and both ends are supported by spring-wound cross bars. The inner groove of the cross bar is embedded in the inner cavity and can slide left and right along the inner cavity with the help of the first ball bearing, providing the limiting capacity of the expansion joint for the shaking between the panels, thereby alleviating the collision force between the panels;

[0017] (3) By inserting the I-shaped slide bar horizontally in the card slot, the middle card sleeve with the I-shaped slide bar is inserted into the card slot of the main body from the center of the rear. The lower part of both sides of this object is lubricated by the second ball bearings. After the middle card sleeve is located between the F-type card sleeves, it is locked and fixed with bolts to prevent the I-shaped slide bar from moving further. It is also very convenient to install and disassemble. With the F-type card sleeves on both sides, the rubber pad can be connected and fixed horizontally. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a front view cross-sectional structural schematic diagram of the utility model;

[0019] Figure 2 For the utility model Figure 1 A schematic diagram of the enlarged structure of the local section at point A in the middle;

[0020] Figure 3 This is a schematic diagram of the cross-sectional structure of the set block of the utility model;

[0021] Figure 4 For the utility model Figure 1 Schematic diagram of the enlarged structure of the local section at point B in the middle.

[0022] In the figure: 1. sleeve block; 2. rectangular groove; 3. cross bar; 4. spring; 5. bolt; 6. connection block; 7. F-type sleeve; 8. middle sleeve; 9. slot; 10. rubber pad; 11. rubber sleeve; 12. main board; 13. foot; 14. inner cavity; 15. first ball; 16. slide rail; 17. frame; 18. drainage plate; 19. clamping block; 20. mesh; 21. bottom plate; 22. clamping groove; 23. I-shaped slide bar; 24. second ball; 25. limit block. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] Example 1: Please refer to Figure 1-4, an expansion joint with a fast drainage structure, comprising a sleeve block 1 and a main board body 12, the sleeve blocks 1 are sleeved on both sides of the main board body 12, and a rectangular groove 2 is transversely arranged inside the sleeve block 1, a limited block 25 is welded on one side of the rectangular groove 2, a frame 17 is arranged inside both sides of the main board body 12, a connecting block 6 is welded on the top of the sleeve block 1, and an F-type clamping sleeve 7 is welded on one side of the connecting block 6, an intermediate clamping sleeve 8 is arranged at the center of the main board body 12, a transverse slot 9 is arranged inside the F-type clamping sleeve 7 and on both sides of the main board body 12, and a rubber sleeve 11 is inserted in the slot 9, a rubber pad 10 is fixed between one side of the rubber sleeve 11, a drainage plate 18 is welded between the lower part of both sides of the intermediate clamping sleeve 8 and the frame 17, a slide rail 16 is arranged between the front and back of one side of the bottom of the sleeve block 1, and a clamping block 19 is movably inserted in the slide rail 16, a gauze 20 is fixedly connected between one side of the clamping block 19, and a standing foot 13 is welded at the front and rear end of the bottom of the sleeve block 1;

[0025] The blocks 19 are symmetrically fixed on both sides of the gauze 20. The blocks 19 can slide forward and backward along the inner wall of the gauze 20. The guide plates 18 are arranged in an inclined shape between the frame 17 and the middle sleeve 8. The guide plates 18 are located below the rubber pads 10 on both sides.

[0026] Specifically, Figure 1 and Figure 2 As shown, after the middle clamping sleeve 8 is inserted and fixed, the inclined drainage plate 18 is welded between the frame 17 and the middle clamping sleeve 8 from the bottom of both sides. The top F-type clamping sleeve 7 and the middle clamping sleeve 8 both limit the sliding of the rubber pad 10 with the rubber sleeve 11 with the slot 9. The sleeve blocks 1 on both sides are used to connect adjacent building panels, which are squeezed in situ under the adjustment of thermal expansion and contraction. At this time, the rainwater will flow along the gap between the rubber sleeve 11 and the surrounding structure to the top of the drainage plate 18, and then flow through the frame 17 to the gauze 20. This object is pre-inserted in the slide rail 16 by means of the clamping block 19, which can filter out garbage while guiding the flow of sewage.

[0027] Embodiment 2: Two sets of inner cavities 14 are provided at the front and rear of the main body 12, two sets of cross bars 3 are transversely welded on the inner wall of the rectangular groove 2, and two sets of first balls 15 are movably embedded on one side of the cross bar 3, and two sets of springs 4 are respectively welded at the front and rear between the rectangular groove 2 and the main body 12;

[0028] The crossbar 3 is embedded in the inner cavity 14, the first balls 15 are distributed on the top and bottom of the crossbar 3, the spring 4 is spirally wound on the outside of the crossbar 3, and the spring 4 and the crossbar 3 are arranged in concentric circles;

[0029] Specifically, Figure 1 and Figure 3As shown, the side of the sleeve block 1 is connected to the wall panel or bridge panel, and the two are adjacent to each other. In the process of thermal expansion and contraction, the sleeve block 1 connected to the panel will slide left and right along the frame 17 on both sides of the main board body 12 with the help of the limit block 25, and both ends are supported by the cross bar 3 wrapped with the spring 4, and the inner groove of the cross bar 3 is embedded in the inner cavity 14, and can slide left and right along the inner cavity 14 with the help of the first ball 15, providing the limiting ability of the expansion joint for the shaking between the panels.

[0030] Embodiment 3: A snap-fit ​​groove 22 is provided between the two ends at the center of the main body 12, and an I-shaped slide bar 23 is transversely inserted in the snap-fit ​​groove 22, and second balls 24 are movably embedded in the front and rear of both sides of the I-shaped slide bar 23, a bottom plate 21 is transversely welded between the middle clamping sleeve 8 and the I-shaped slide bar 23, and bolts 5 are meshed and connected on both sides of the bottom plate 21, the bottom plate 21 is attached to the top of the snap-fit ​​groove 22, and the I-shaped slide bar 23 can slide forward and backward along the inner wall of the snap-fit ​​groove 22;

[0031] Specifically, Figure 1 and Figure 4 As shown, the middle clamping sleeve 8 with the I-shaped slide bar 23 is inserted into the clamping groove 22 of the main board body 12 from the center of the rear, and the lower part of both sides of this object is lubricated by the second ball bearings 24. After the middle clamping sleeve 8 is located between the F-shaped clamping sleeves 7, it is locked and fixed with bolts 5 to prevent the I-shaped slide bar 23 from continuing to move, and it is also quite convenient to install and disassemble.

[0032] Working principle: When the utility model is used, first insert the middle card sleeve 8 with the I-shaped slide bar 23 into the card slot 22 of the main body 12 from the center of the rear, and the lower part of the two sides of this object is lubricated by the second ball bearings 24 respectively. After the middle card sleeve 8 is located between the F-shaped card sleeves 7, it is locked and fixed with bolts 5 to prevent the I-shaped slide bar 23 from continuing to move. After the middle card sleeve 8 is inserted and fixed, the inclined guide plate 18 is welded between the frame 17 and the middle card sleeve 8 from the lower part of both sides. The top F-shaped card sleeve 7 and the middle card sleeve 8 both limit the sliding of the rubber pad 10 with the rubber sleeve 11 with the slot 9, and the sleeve blocks 1 on both sides are used to connect The adjacent building panels are connected and squeezed in situ under the regulation of thermal expansion and contraction. At this time, the rainwater will flow along the gap between the rubber sleeve 11 and the surrounding structure to the top of the drainage plate 18, and then flow to the top of the gauze 20 after passing through the frame 17. This object is pre-inserted into the slide rail 16 by means of the card block 19, which can filter out garbage while guiding the flow of sewage. In the process of thermal expansion and contraction, the sleeve block 1 connected to the panel will slide left and right along the frame 17 on both sides of the main body 12 by means of the limit block 25, and both ends are supported by the cross bar 3 wrapped with the spring 4, and the inner groove of the cross bar 3 is embedded in the inner cavity 14, which can be limited by the first ball 15 sliding left and right along the inner cavity 14.

[0033] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. An expansion joint with a rapid drainage structure, comprising a sleeve block (1) and a main plate body (12), characterized in that: Both sides of the main body (12) are sleeved with sleeve blocks (1), and a rectangular groove (2) is transversely arranged inside the sleeve block (1), and a limiting block (25) is welded on one side of the rectangular groove (2). Both sides of the main body (12) are provided with frame bodies (17). A connecting block (6) is welded on the top of the sleeve block (1), and an F-type clamping sleeve (7) is welded on one side of the connecting block (6). An intermediate clamping sleeve (8) is arranged at the center of the main body (12), and the inside of the F-type clamping sleeve (7) and both sides of the main body (12) are connected. A transverse slot (9) is provided, and a rubber sleeve (11) is inserted in the slot (9), a rubber pad (10) is fixed between one side of the rubber sleeve (11), a drainage plate (18) is welded between the lower part of both sides of the middle clamping sleeve (8) and the frame (17), a slide rail (16) is provided between the front and rear of one side of the bottom of the sleeve block (1), and a clamping block (19) is movably inserted in the slide rail (16), a gauze (20) is fixedly connected between one side of the clamping block (19), and a standing foot (13) is welded at the front and rear ends of the bottom of the sleeve block (1).

2. The expansion joint with a rapid drainage structure according to claim 1, characterized in that: The clamping blocks (19) are symmetrically fixed on both sides of the gauze mesh (20), and the clamping blocks (19) can slide forward and backward along the inner wall of the gauze mesh (20).

3. The expansion joint with a rapid drainage structure according to claim 1, characterized in that: The guide plate (18) is arranged in an inclined shape between the frame (17) and the middle sleeve (8), and the guide plate (18) is located below the rubber pads (10) on both sides.

4. The expansion joint with a rapid drainage structure according to claim 1, characterized in that: Two groups of inner cavities (14) are arranged at the front and rear of the main body (12), two groups of cross bars (3) are transversely welded on the inner wall of the rectangular groove (2), and two groups of first balls (15) are movably embedded on one side of the cross bars (3), and two groups of springs (4) are respectively welded at the front and rear between the rectangular groove (2) and the main body (12).

5. The expansion joint with a rapid drainage structure according to claim 4, characterized in that: The cross bar (3) is embedded in the inner cavity (14), and the first rolling balls (15) are distributed on the top and bottom of the cross bar (3).

6. The expansion joint with a rapid drainage structure according to claim 4, characterized in that: The spring (4) is spirally wound on the outside of the cross bar (3), and the spring (4) and the cross bar (3) are arranged in a concentric circle.

7. The expansion joint with a rapid drainage structure according to claim 1, characterized in that: A clamping groove (22) is provided between the two ends at the center of the main body (12), and an I-shaped slide bar (23) is transversely inserted in the clamping groove (22), and second balls (24) are movably embedded in the front and rear of both sides of the I-shaped slide bar (23), and a bottom plate (21) is transversely welded between the middle clamping sleeve (8) and the I-shaped slide bar (23), and bolts (5) are meshed and connected on both sides of the bottom plate (21).

8. The expansion joint with a rapid drainage structure according to claim 7, characterized in that: The bottom plate (21) is fitted on the top of the clamping groove (22), and the I-shaped sliding rod (23) can slide back and forth along the inner wall of the clamping groove (22).