Building climbing frame net component capable of being rapidly fixed
By adopting a combined structure of clamping hoops, transverse fixtures and longitudinal fixtures in the building climbing frame net, the installation is time-consuming, labor-intensive and unstable, and rapid fixing and disassembly are achieved, reducing costs, and suitable for promotion and use.
Patent Information
- Application Number
- CN202421011253.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2024-12-24
- Estimated Expiration
- 2034-05-10
AI Technical Summary
The installation process of existing building climbing frame nets is time-consuming and labor-intensive, and there is a risk of installation instability and fall off. It also requires motors and ball screw equipment, which increases costs and limits promotion and use.
Using a structure including clamping hoops, transverse fixing, extrusion clamps and longitudinal fixing, the locking device and locking screws are used to achieve rapid fixing and disassembly, reducing installation costs and improving installation stability and convenience.
It realizes rapid disassembly and stable fixation of the climbing frame network, reduces installation costs, improves installation speed and safety, and is suitable for promotion and use.
Smart Images

Figure CN222227916U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building climbing frames, and more specifically, to a building climbing frame net component that can be quickly fixed. Background Art
[0002] Climbing nets, also known as building protection external steel nets, are often used in high-rise construction sites in various places. In particular, climbing nets are mostly used when building high-rise buildings. After the overall installation on the ground, they begin to climb up layer by layer. Workers work in the closed internal space of the climbing net, which prevents the risk of falling of people and objects and greatly improves safety. However, since the installation of climbing nets on construction sites is generally to fix two pieces of climbing nets on the climbing frame with the manufacturer's self-made connecting accessories, the existing climbing nets are installed by first fixing the accessories on the climbing frame round rods, and then installing the climbing net. Manual installation is not only time-consuming and labor-intensive, but also slow in installation speed. At the same time, there are risks such as unstable installation of the climbing net and the risk of falling off.
[0003] The document with the prior art announcement number CN 217106086 U provides a building climbing frame net component that can be quickly fixed. The device can flexibly disassemble and fix the device and the climbing frame round rod by setting a connecting component. By setting a motor and a ball screw, the climbing frame net is placed between the first fixed plate and the second fixed plate. The motor drives the ball screw to rotate, so that the second fixed plate can be driven to move toward the first fixed plate to achieve automatic fixation. Extrusion blocks are provided on the inner sides of the two fixed plates. The anti-slip teeth on the extrusion blocks can have an anti-slip effect on the climbing frame net. With the above structure, there is no need to install and fix them one by one manually, which saves time, and the installation is stable and prevents falling off. Secondly, by setting a connecting component, the connecting component is composed of multiple connecting parts, which can fasten the fixing rod and the climbing frame together, with high stability, and multiple connecting parts can be disassembled and assembled, so installation and disassembly are relatively convenient.
[0004] Although the above-mentioned prior art solution can achieve the relevant beneficial effects through the structure of the prior art, it still has the following defects: the component requires the cooperation of the motor and the ball screw device when in use, which increases the cost of the device during actual installation and is not conducive to promotion and use.
[0005] In view of this, we propose a building climbing frame net component that can be quickly fixed. Utility Model Content
[0006] 1. Technical issues to be solved
[0007] The purpose of the present application is to provide a building climbing frame net component that can be quickly fixed, which solves the technical problems in the above-mentioned background technology, achieves the technical effect of easy and quick disassembly and assembly, reduces costs and is conducive to popularization and use.
[0008] 2. Technical solution
[0009] The technical solution of the present application provides a quickly fixable building climbing frame net component, including a clamp fixed on the climbing frame, and also including a transverse clamp fixed on the clamp, the transverse clamp includes a fixed clamp fixed on the clamp and an extrusion clamp slidably connected to the fixed clamp, the extrusion clamp is vertically slidably connected to the longitudinal clamp, and a locker for locking the extrusion clamp and the longitudinal clamp is slidably inserted on one side of the extrusion clamp.
[0010] By adopting the above technical scheme, the clamp is fixed on the climbing frame, and the opening direction of the fixed clamp and the extrusion clamp can be adjusted by flipping the transverse clamp, and the side of the climbing frame net with the fixed frame is placed on the side of the longitudinal clamp, and the climbing frame net is clamped between the fixed clamp and the extrusion clamp, and the extrusion clamp is slid toward the fixed clamp to clamp and fix the climbing frame in the horizontal direction, and then the longitudinal clamp is longitudinally pressed toward the extrusion clamp to clamp and fix the fixed frame of the climbing frame net to prevent the climbing frame net from moving up and down, and the extrusion clamp and the longitudinal clamp can be fixed by the lock in this process, and the overall structure is convenient for quick disassembly and assembly, which reduces costs and is conducive to popularization and use.
[0011] As an optional solution to the technical solution of the present application document, the transverse clamp also includes a locking screw rotatably connected to the extrusion clamp and a support plate vertically fixed to one side of the extrusion clamp, the fixed clamp is provided with a mounting hole adapted to the support plate, and the locking screw is threadedly connected to the fixed clamp.
[0012] By adopting the above technical solution, the support plate is used to support the lower end of the climbing frame net, and is threadedly connected to the fixed clamping plate through the locking screw. The support plate is slid into the mounting hole, and when the locking screw is rotated clockwise, the extrusion clamping plate can be moved toward the fixed clamping plate.
[0013] As an optional scheme of the technical scheme of the present application document, the longitudinal clamp includes a longitudinal clamp plate and a positioning rod symmetrically fixed on the longitudinal clamp plate, the upper surface of the extrusion clamp plate is symmetrically provided with positioning holes adapted to the positioning rod, the locker includes a pull plate, an upper rectangular rod symmetrically fixed at one end of the pull plate, a lower rectangular rod at the other end and a tension spring fixed between the pull plate and the extrusion clamp plate, the ends of the upper rectangular rod and the lower rectangular rod away from the pull plate are both slope structures, the locking screw is annularly provided with a plurality of first slope grooves adapted to the lower rectangular rod, and the positioning rod on one side is vertically provided with a plurality of second slope grooves adapted to the upper rectangular rod, an upper rectangular hole adapted to the upper rectangular rod and vertically connected to the positioning hole is provided on one side of the extrusion clamp plate, and a lower rectangular hole parallel to the upper rectangular hole and adapted to the lower rectangular rod is provided on the extrusion clamp plate.
[0014] By adopting the above technical scheme, the slope of the upper rectangular rod faces upward and the slope of the lower rectangular rod faces downward. When the locking screw rotates clockwise, the first slope groove can make the lower rectangular rod and the upper rectangular rod slide back and forth horizontally under the action of the slope and the tension spring, so that the locking screw is locked by the lower rectangular rod being inserted into the corresponding first slope groove through the cooperation between the lower rectangular rod and the first slope groove. At the same time, when the longitudinal splint is pressed downward, the slope of the second slope groove vertically distributed on the left positioning rod squeezes the upper rectangular rod and the lower rectangular rod to slide outward, and under the action of the tension spring, the upper rectangular rod is inserted into the corresponding second slope groove to complete the fixation of the longitudinal splint and the extrusion splint, and when it is necessary to rotate the locking screw counterclockwise and lift the longitudinal splint upward, the pull plate is pulled outward at this time, so that the upper rectangular rod is disengaged from the second slope groove and the lower rectangular rod is disengaged from the first slope groove.
[0015] As an optional solution of the technical solution of the present application document, rubber pads are fixedly installed on opposite sides of the fixed clamping plate and the extrusion clamping plate.
[0016] By adopting the above technical solution, the friction between the fixed clamp and the extrusion clamp and the climbing frame net can be improved under the action of the rubber pad, while preventing the anti-rust paint on the surface of the climbing frame net from being damaged due to extrusion.
[0017] As an optional solution to the technical solution of the present application document, the locking screw fixes a limiting ring.
[0018] By adopting the above technical solution, after the locking screw passes through the extrusion clamp, the limit ring is placed on the left side of the extrusion clamp to ensure the rotation of the locking screw and avoid axial movement.
[0019] 3. Beneficial effects
[0020] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
[0021] 1. The present application fixes the clamp on the climbing frame, and the opening direction of the fixed clamp and the extrusion clamp can be adjusted by flipping the transverse clamp, and the side of the climbing frame net with the fixed frame is placed on the side of the longitudinal clamp, the climbing frame net is clamped between the fixed clamp and the extrusion clamp, and the extrusion clamp is slid toward the fixed clamp to clamp and fix the climbing frame in the horizontal direction, and then the longitudinal clamp is longitudinally pressed toward the extrusion clamp to clamp and fix the fixed frame of the climbing frame net to prevent the climbing frame net from moving up and down, and the extrusion clamp and the longitudinal clamp can be fixed by the lock in this process. The overall structure is convenient for quick disassembly and assembly, which reduces costs and is conducive to popularization and use. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a schematic diagram of the overall structure of a quickly fixable building climbing frame net component disclosed in a preferred embodiment of the present application;
[0023] Figure 2 A schematic diagram of a fixing clamp structure of a building climbing frame net component that can be quickly fixed is disclosed in a preferred embodiment of the present application;
[0024] Figure 3 A schematic diagram of an extruded splint structure of a building climbing frame net component that can be quickly fixed is disclosed in a preferred embodiment of the present application;
[0025] Figure 4 A schematic diagram of a locking device structure of a building climbing frame net component that can be quickly fixed is disclosed in a preferred embodiment of the present application;
[0026] Figure 5 A schematic diagram of a locking screw structure of a building climbing frame net component that can be quickly fixed is disclosed in a preferred embodiment of the present application;
[0027] Figure 6 A schematic diagram of a longitudinal clamp structure of a building climbing frame net component that can be quickly fixed is disclosed in a preferred embodiment of the present application;
[0028] Explanation of the numbers in the figure: 1. Climbing frame; 2. Clamp; 3. Horizontal clamp; 301. Fixed splint; 3011. Mounting hole; 302. Extrusion splint; 3021. Positioning hole; 3022. Upper rectangular hole; 3023. Lower rectangular hole; 303. Support plate; 304. Locking screw; 3041. First slope groove; 3042. Limiting ring; 305. Rubber pad; 4. Longitudinal clamp; 401. Longitudinal splint; 402. Positioning rod; 4021. Second slope groove; 5. Locker; 501. Pull plate; 502. Upper rectangular rod; 503. Lower rectangular rod; 504. Tension spring. DETAILED DESCRIPTION
[0029] The present application is further described in detail below in conjunction with the accompanying drawings.
[0030] A quickly fixable building climbing frame net component includes a hoop 2 fixed on a climbing frame 1, and also includes a transverse clamp 3 fixed on the hoop 2, the transverse clamp 3 includes a fixed clamp 301 fixed on the hoop 2 and an extrusion clamp 302 slidably connected to the fixed clamp 301, a longitudinal clamp 4 is vertically slidably connected to the extrusion clamp 302, and a locker 5 for locking the extrusion clamp 302 and the longitudinal clamp 4 is slidably inserted on one side of the extrusion clamp 302.
[0031] Reference Figure 1-Figure 6, fix the clamp 2 on the climbing frame 1, and adjust the opening direction of the fixed clamp 301 and the extrusion clamp 302 by flipping the horizontal clamp 3, place the side of the climbing frame net with the fixed frame on the side of the longitudinal clamp 4, and insert the climbing frame net between the fixed clamp 301 and the extrusion clamp 302, and slide the extrusion clamp 302 toward the fixed clamp 301 to clamp and fix the climbing frame in the horizontal direction, and then press the longitudinal clamp 4 longitudinally in the direction of the extrusion clamp 302 to clamp and fix the fixed frame of the climbing frame net to prevent the climbing frame net from moving up and down, and in this process, the extrusion clamp 302 and the longitudinal clamp 4 can be fixed by the lock 5, and the overall structure is convenient for quick disassembly and assembly, reduces costs and is conducive to popularization and use.
[0032] The transverse clamp 3 also includes a locking screw 304 rotatably connected to the extrusion clamp 302 and a support plate 303 vertically fixed to one side of the extrusion clamp 302. The fixed clamp 301 is provided with a mounting hole 3011 adapted to the support plate 303, and the locking screw 304 is threadedly connected to the fixed clamp 301.
[0033] Reference Figure 1-Figure 3 and Figure 5 The support plate 303 is used to support the lower end of the climbing frame net, and is threadedly connected to the fixed clamping plate 301 through the locking screw 304. The support plate 303 slides in the mounting hole 301. When the locking screw 304 is rotated clockwise, the extrusion clamping plate 302 can move toward the fixed clamping plate 301.
[0034] The longitudinal clamp 4 includes a longitudinal clamp plate 401 and a positioning rod 402 symmetrically fixed on the longitudinal clamp plate 401. The upper surface of the extrusion clamp plate 302 is symmetrically provided with positioning holes 3021 adapted to the positioning rod 402. The locker 5 includes a pull plate 501, an upper rectangular rod 502 symmetrically fixed at one end of the pull plate 501, a lower rectangular rod 503 at the other end, and a tension spring 504 fixed between the pull plate 501 and the extrusion clamp plate 302. The ends of the upper rectangular rod 502 and the lower rectangular rod 503 away from the pull plate 501 are both It is a slope structure, and the locking screw 304 is annularly distributed with a plurality of first slope grooves 3041 adapted to the lower rectangular rod 503, and the positioning rod 402 on one side is vertically distributed with a plurality of second slope grooves 4021 adapted to the upper rectangular rod 502. An upper rectangular hole 3022 adapted to the upper rectangular rod 502 and vertically connected to the positioning hole 3021 is opened on one side of the extrusion clamp 302, and the extrusion clamp 302 is parallel to the upper rectangular hole 3022 and adapted to the lower rectangular rod 503.
[0035] Reference Figure 3-Figure 6The slope of the upper rectangular rod 502 faces upward, and the slope of the lower rectangular rod 503 faces downward. When the locking screw 304 rotates clockwise, the first slope groove 3041 can make the lower rectangular rod 503 and the upper rectangular rod 502 slide back and forth horizontally under the action of the slope and the tension spring 504, so that the locking screw 304 is locked by the lower rectangular rod 503 being inserted into the corresponding first slope groove 3041 through the cooperation between the lower rectangular rod 503 and the first slope groove 3041. At the same time, when the longitudinal clamping plate 401 is pressed downward, the left positioning rod 402 is vertically distributed The slope surface of the second slope groove 4021 squeezes the upper rectangular rod 502 and the lower rectangular rod 503 to slide outward, and under the action of the tension spring 504, the upper rectangular rod 502 is inserted into the corresponding second slope groove 4021, completing the fixation of the longitudinal clamping plate 401 and the extrusion clamping plate 302, and when it is necessary to rotate the locking screw 304 counterclockwise and lift the longitudinal clamping plate 401 upward, the pulling plate 501 is pulled outward at this time, so that the upper rectangular rod 502 is disengaged from the second slope groove 4021, and the lower rectangular rod 503 is disengaged from the first slope groove 3041.
[0036] Rubber pads 305 are fixedly installed on opposite sides of the fixing clamp plate 301 and the pressing clamp plate 302 .
[0037] Reference Figure 1 and Figure 2 Under the action of the rubber pad 305, the friction between the fixed clamp plate 301 and the extrusion clamp plate 302 and the climbing frame net can be improved, while preventing the anti-rust paint on the surface of the climbing frame net from being damaged due to extrusion.
[0038] The locking screw 304 fixes the limiting ring 3042 .
[0039] Reference Figure 5 After the locking screw 304 passes through the extrusion clamp plate 302, the limiting ring 3042 is placed on the left side of the extrusion clamp plate 302 to ensure the rotation of the locking screw 304 and avoid axial movement.
[0040] Working principle: fix the clamp 2 on the climbing frame 1, place the side of the climbing frame net with the fixed frame on the side of the longitudinal clamp 401, clamp the climbing frame net between the fixed clamp 301 and the extrusion clamp 302 and support or press it on the support plate 303, then turn the locking screw 304 clockwise, and the locking screw 304, under the action of the threaded connection with the fixed clamp 301, makes the extrusion clamp 302 move toward the direction of the fixed clamp 301 to clamp the climbing frame net laterally, and then press the longitudinal clamp 401 downward, the upper rectangular rod 502 is clamped into the corresponding second slope groove 4021, and the lower rectangular rod 503 is clamped into the corresponding first slope groove 3041, so as to complete the locking of the longitudinal clamp 401 and the locking screw 304.
Claims
1. A quickly fixable building climbing frame net component, comprising a clamp (2) fixed on a climbing frame (1), characterized in that: It also includes a transverse clamp (3) fixed on the clamp (2), the transverse clamp (3) including a fixed clamp (301) fixed on the clamp (2) and an extrusion clamp (302) slidably connected to the fixed clamp (301), a longitudinal clamp (4) vertically slidably connected to the extrusion clamp (302), and a locker (5) for locking the extrusion clamp (302) and the longitudinal clamp (4) slidably inserted on one side of the extrusion clamp (302).
2. A rapidly fixable building climbing frame net component according to claim 1, characterized in that: The transverse clamp (3) also includes a locking screw (304) rotatably connected to the extrusion clamp (302) and a support plate (303) vertically fixed to one side of the extrusion clamp (302); the fixed clamp (301) is provided with a mounting hole (3011) adapted to the support plate (303); and the locking screw (304) is threadedly connected to the fixed clamp (301).
3. The quickly fixable building climbing frame net component according to claim 2, characterized in that: The longitudinal clamp (4) comprises a longitudinal clamp (401) and a positioning rod (402) symmetrically fixed on the longitudinal clamp (401); the upper surface of the extrusion clamp (302) is symmetrically provided with positioning holes (3021) adapted to the positioning rod (402); the locker (5) comprises a pull plate (501), an upper rectangular rod (502) symmetrically fixed at one end of the pull plate (501), a lower rectangular rod (503) at the other end, and a tension spring (504) fixed between the pull plate (501) and the extrusion clamp (302); the upper rectangular rod (502) and the lower rectangular rod (503) are away from the pull plate (501). One end of the extrusion clamp (302) is a slope structure, the locking screw (304) is annularly distributed with a plurality of first slope grooves (3041) adapted to the lower rectangular rod (503), and one side of the positioning rod (402) is vertically distributed with a plurality of second slope grooves (4021) adapted to the upper rectangular rod (502), and one side of the extrusion clamp (302) is provided with an upper rectangular hole (3022) adapted to the upper rectangular rod (502) and vertically connected to the positioning hole (3021), and the extrusion clamp (302) is provided with a lower rectangular hole (3023) parallel to the upper rectangular hole (3022) and adapted to the lower rectangular rod (503).
4. The quickly fixable building climbing frame net component according to claim 1, characterized in that: Rubber pads (305) are fixedly mounted on opposite sides of the fixed clamping plate (301) and the extrusion clamping plate (302).
5. The quickly fixable building climbing frame net component according to claim 2, characterized in that: The locking screw (304) fixes a limiting ring (3042).
