Overhanging type discharging platform

By setting guides on the U-ring, the problems of instability and low efficiency during the installation of traditional cantilever unloading platforms are solved, and more efficient installation process and stability are achieved.

CN222228020UActive Publication Date: 2024-12-24CHINA CONSTR SECOND ENG BUREAU LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420836283.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-22
Publication Date
2024-12-24
Estimated Expiration
2034-04-22

AI Technical Summary

Technical Problem

During the installation process, traditional cantilever unloading platforms have problems of instability and low assembly efficiency due to improper reservation of U-ring spacing.

Method used

A guide member is provided on the U-ring, and the main beam is initially defined by the first arm and the second arm to reduce shaking, and lock it with a wooden square plug into the inner side of the guide after the platform is stable.

Benefits of technology

Improves the stability and efficiency of the installation process, reduces the shaking range, and allows the platform to be easily aligned and stable installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222228020U_ABST
    Figure CN222228020U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, in particular to an overhanging type discharging platform. The overhanging type discharging platform comprises a container, a bottom beam, U-shaped rings and fulcrums. The bottom beam comprises a longitudinally arranged main beam and a transversely arranged secondary beam; the container is installed on the bottom beam, and the other end of the bottom beam is an extending end. The extending end penetrates through a U-shaped ring of the to-be-mounted layer, and the U-shaped ring limits the bottom beam; a plurality of hanging rings are arranged at one end of the bottom beam close to the container; the other end of the steel wire rope is connected with a fulcrum of the upper layer of the to-be-mounted layer; and the unloading platform is supported and fixed through the steel wire rope and the U-shaped ring. According to the utility model, enough space is reserved in the pre-embedded U-shaped ring, and the guide piece is arranged; connection between the main beam and the U-shaped ring is facilitated, and the shaking amplitude can be reduced after the platform is preliminarily fixed; and after the platform is completely adjusted to be horizontal, wood beams are stuffed into the platform for thorough fixation. The whole platform is convenient to align in the installation process, the stability is high, and the installation efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a cantilevered unloading platform. Background Art

[0002] At a building construction site, materials between floors are generally transported via tower cranes. The unloading platform is a transfer station for transferring materials from the lower floor to the upper floor. There are generally floor-mounted unloading platforms and cantilevered unloading platforms.

[0003] The traditional cantilever unloading platform uses welded channel steel or I-beam as the main beam (cantilever beam) and secondary beam, with pre-buried connectors on the main beam, connected to the building structure through steel wire ropes. Since the main beam needs to be connected to the U-shaped ring, the size of the pre-buried U-shaped ring is generally larger than the main beam. If the U-shaped ring spacing is too large during docking installation, it will be unstable during the installation process, and wooden squares must be used to fill the gaps after adjusting the level; if the U-shaped ring spacing is too small, it will be difficult to align during the hoisting docking process, affecting the assembly efficiency. Utility Model Content

[0004] The utility model aims to solve the problems existing in the background technology and proposes a cantilever unloading platform. A guide piece is arranged on a U-shaped ring to guide the main beam to be installed, and the main beam is initially limited by a first arm and a second arm to reduce shaking. After the entire platform is adjusted to be stable, wooden blocks are inserted into the inside of the guide piece to lock it.

[0005] The technical solution of the utility model is a cantilever unloading platform, comprising a cargo box, a bottom beam, a plurality of sets of U-shaped rings pre-buried in the layer to be installed, and a plurality of fulcrums pre-buried in the layer above the layer to be installed;

[0006] The bottom beam includes a main beam arranged longitudinally and a secondary beam arranged transversely; two sets of main beams are arranged in parallel, and multiple secondary beams are arranged at equal intervals and installed between the parallel main beams; the secondary beams are welded and fixed vertically to the main beams; the cargo box is installed on the bottom beam, and the other end of the bottom beam is an extended end; the extended end passes through the U-shaped ring of the layer to be installed, and the U-shaped ring limits the bottom beam;

[0007] Several lifting rings are set at one end of the bottom beam close to the cargo box; a steel wire rope is used to connect and fix the lifting ring, and the other end of the steel wire rope is connected to the fulcrum of the layer above the layer to be installed;

[0008] The unloading platform is supported and fixed by steel wire ropes and U-shaped rings; at least two groups of U-shaped rings are arranged at one end close to the end of the bottom beam, and at least one group is arranged at the contact position between the bottom beam and the building.

[0009] Preferably, a limiter is provided at the bottom of the main beam for abutting against the layer to be installed, so as to limit the distance that the bottom beam extends into the building.

[0010] Preferably, the total length of the bottom beam does not exceed 6m, and the length of the portion extending into the building is not less than 2m.

[0011] Preferably, multiple steel wire ropes are symmetrically arranged along both sides of the cargo box; the angle between the steel wire rope and the main beam is 45-60°.

[0012] Preferably, at least three rope clamps are provided after the wire rope is fixed to the lifting eye and the fulcrum.

[0013] Preferably, the bottom beam is fully covered with steel plates.

[0014] Preferably, the cargo box is formed by splicing a plurality of square tubes, and the square tubes are covered with a protective net.

[0015] Preferably, a scaffold is arranged along the outer side of the building, and the connection between the scaffold and the bottom beam is fixed by a hook.

[0016] Preferably, a connecting piece is arranged on the inner side of the top of the U-shaped ring, a rotatable shaft is mounted on the connecting piece, and a guide piece is rotatably connected to the shaft; when the main beam is inserted into the building and connected to the U-shaped ring, it contacts and guides the guide piece and passes through the U-shaped ring.

[0017] Preferably, the guide member comprises a first arm and a second arm; one end of the first arm is connected to the rotating shaft, and the other end is connected to the second arm, and forms an angle of no more than 30° with the second arm;

[0018] When the main beam enters the U-shaped ring, it first contacts the second arm on the guide member; the entire guide member rotates around the rotating axis and gradually compresses the angle between the first arm and the second arm until the second arm is completely in contact with the main beam and remains parallel to the ground of the building.

[0019] Compared with the prior art, the utility model has the following beneficial technical effects:

[0020] The utility model is a cantilever unloading platform. Sufficient space is reserved in the embedded U-shaped ring, and a guide is set to facilitate the connection between the main beam and the U-shaped ring. The guide plays a guiding role during the installation process. At the same time, the guide has a certain toughness and can be compressed after being subjected to pressure to reduce the angle. Thus, the platform is initially fixed to reduce the amplitude of shaking. After the platform is fully adjusted to the level, wooden squares are inserted to completely fix it. This makes the entire platform easy to align and highly stable during the installation process, which is conducive to improving installation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a schematic elevation view of a discharge platform in an embodiment of the utility model;

[0022] Figure 2 It is a plan view of the unloading platform in the embodiment of the utility model;

[0023] Figure 3 It is a cross-sectional view of part 1-1 in 2;

[0024] Figure 4 This is a schematic diagram of the structure of a U-shaped ring in an embodiment of the utility model;

[0025] Figure 5 It is a schematic diagram of the guide member rotating to a parallel state in the embodiment of the utility model.

[0026] Figure numerals: 1. cargo box; 11. main beam; 12. square tube; 13. lifting ring; 14. secondary beam; 15. steel plate; 2. scaffolding; 3. U-shaped ring; 31. connecting part; 32. rotating shaft; 33. guide part; 331. first arm; 332. second arm; 4. fulcrum; 5. wire rope. DETAILED DESCRIPTION

[0027] Example 1

[0028] like Figure 1-3 As shown, the utility model proposes a cantilever unloading platform, including a cargo box 1, a bottom beam, a plurality of sets of U-shaped rings 3 pre-buried in the layer to be installed, and a plurality of fulcrums 4 pre-buried in the layer above the layer to be installed;

[0029] The bottom beam includes a main beam 11 arranged longitudinally and a secondary beam 14 arranged transversely; two groups of main beams 11 are arranged in parallel, and a plurality of secondary beams 14 are arranged at equal intervals and installed between the parallel main beams 11; the secondary beams 14 are vertically welded and fixed to the main beams 11; the cargo box 1 is installed on the bottom beam, and the other end of the bottom beam is an extended end; the extended end passes through the U-shaped ring 3 of the layer to be installed, and the U-shaped ring 3 limits the bottom beam;

[0030] A plurality of lifting rings 13 are provided at one end of the bottom beam close to the cargo box 1; a steel wire rope 5 is connected and fixed to the lifting ring 13, and the other end of the steel wire rope 5 is connected to the fulcrum 4 of the layer above the layer to be installed;

[0031] In this embodiment, the unloading platform is supported and fixed by the steel wire rope 5 and the U-shaped ring 3; two sets of U-shaped rings 3 are arranged at one end close to the end of the bottom beam, and one set is arranged at the contact part between the bottom beam and the building. A limiter is arranged at the bottom of the main beam 11 to abut against the layer to be installed and limit the distance that the bottom beam extends into the building, wherein the main beam 11 is 16# I-beam and the secondary beam 14 is 14# channel steel.

[0032] The total length of the bottom beam is 6m, and the length of the part extending into the building is 2m; two groups of steel wire ropes 5 are symmetrically arranged along the two sides of the cargo box 1; the angle between the steel wire rope 5 and the main beam 11 is 45-60°, and the steel wire rope 5 is of Φ20 specification; the outer steel wire rope 5 is 0.3m away from the end of the main beam 11, and the distance between the two steel wire ropes 5 is 2m.

[0033] At least three rope clamps are arranged after the steel wire rope 5 is fixed to the lifting ring 13 and the fulcrum 4. The bottom beam is fully covered with a 5 mm thick patterned steel plate.

[0034] The cargo box 1 is formed by splicing a plurality of square tubes 12, and the square tubes 12 are covered with a protective net, which is a 1.5 mm thick patterned steel plate; a guardrail is set on the side, and the height of the rail is 1500 mm; the front end of the platform is closed with a "notch".

[0035] In this embodiment, a scaffold 2 is arranged along the outer side of the building, and the scaffold 2 is connected and fixed to the bottom beam by hooks, which plays an auxiliary fixing role.

[0036] Example 2

[0037] like Figure 3-4 As shown, in this embodiment, a connecting member 31 is provided on the inner side of the top of the U-shaped ring 3, and a rotatable shaft 32 is installed on the connecting member 31, and the shaft 32 is rotatably connected to a guide member 33; when the main beam 11 is inserted into the building and connected to the U-shaped ring 3, it contacts and guides the guide member 33 and passes through the U-shaped ring 3.

[0038] The guide member 33 includes a first arm 331 and a second arm 332; one end of the first arm 331 is connected to the rotating shaft 32, and the other end is connected to the second arm 332, and forms an angle of no more than 30° with the second arm 332;

[0039] In the actual assembly process, the entire unloading platform is hoisted by a tower crane, and the flatness of the hoisting is adjusted within 1m from the ground and the positions of the balance lifting points at both ends are determined; after the unloading platform is hoisted to the specified height by the tower crane, it is docked and installed with the U-shaped ring 3 in the building;

[0040] When the main beam 11 enters the U-shaped ring 3, it first contacts the second arm 332 on the guide member 33; the entire guide member 33 rotates around the rotating shaft 32 and gradually compresses the angle between the first arm 331 and the second arm 332 until the second arm 332 is completely in contact with the main beam 11 and remains parallel to the ground of the building; the main beam 11 stops when the limiter at the bottom of the building contacts; at this time, the steel wire rope 5 is used to preliminarily bind with the lifting ring 13 and the fulcrum 4, and the flatness of the unloading platform is adjusted, the steel wire rope 5 is tensioned to ensure the flatness of the platform, and then the rope clip on the steel wire rope 5 is tightened, and a wooden square is used to insert the inner side of the angle of the guide member 33. If there is a gap between the side of the U-shaped ring 3 and the main beam 11, the same wooden square is used to insert and lock it.

[0041] The utility model reserves enough space in the U-shaped ring 3 and arranges a guide member, which is convenient for connecting the main beam 11 with the U-shaped ring 3. The guide member 33 plays a guiding role during the installation process. At the same time, the guide member 33 has a certain toughness and can be compressed after being subjected to pressure to reduce the angle, thereby preliminarily fixing the platform and reducing the amplitude of shaking. After the platform is fully adjusted to the level, wooden blocks are used to be inserted to completely fix it.

[0042] The implementation modes of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited thereto, and various changes can be made within the knowledge scope of technicians in the relevant technical field without departing from the purpose of the present invention.

Claims

1. A cantilever unloading platform, characterized in that: It comprises a cargo box (1), a bottom beam, a plurality of sets of U-shaped rings (3) pre-buried in the layer to be installed, and a plurality of supporting points (4) pre-buried in the layer above the layer to be installed; The bottom beam comprises a main beam (11) arranged longitudinally and a secondary beam (14) arranged transversely; two groups of main beams (11) are arranged in parallel, and a plurality of secondary beams (14) are arranged at equal intervals and installed between the parallel main beams (11); the secondary beams (14) are vertically welded and fixed to the main beams (11); the cargo box (1) is installed on the bottom beam, and the other end of the bottom beam is an extended end; the extended end passes through a U-shaped ring (3) of the layer to be installed, and the U-shaped ring (3) limits the bottom beam; A plurality of lifting rings (13) are arranged at one end of the bottom beam close to the cargo box (1); a steel wire rope (5) is used to connect and fix the lifting ring (13); the other end of the steel wire rope (5) is connected to a fulcrum (4) of a layer above the layer to be installed; The unloading platform is supported and fixed by means of steel wire ropes (5) and U-shaped rings (3); at least two groups of U-shaped rings (3) are arranged at one end close to the end of the bottom beam, and at least one group is arranged at the contact portion between the bottom beam and the building.

2. A cantilevered unloading platform according to claim 1, characterized in that: A limiting piece is arranged at the bottom of the main beam (11) for contacting with the layer to be installed, thereby limiting the distance that the bottom beam extends into the building.

3. The cantilever unloading platform according to claim 1, characterized in that: The total length of the bottom beam shall not exceed 6m, and the length of the part extending into the building shall not be less than 2m.

4. The cantilever unloading platform according to claim 1, characterized in that: A plurality of steel wire ropes (5) are symmetrically arranged along both sides of the cargo box (1); and the angle between the steel wire ropes (5) and the main beam (11) is 45-60 degrees.

5. The cantilever unloading platform according to claim 1, characterized in that: After the steel wire rope (5) is fixed to the lifting ring (13) and the fulcrum (4), at least three rope clamps are arranged.

6. The cantilever unloading platform according to claim 1, characterized in that: The bottom beam is fully covered with steel plates (15).

7. The cantilever unloading platform according to claim 1, characterized in that: The cargo box (1) is formed by splicing a plurality of square tubes (12), and a protective net is covered on the square tubes (12).

8. The cantilever unloading platform according to claim 1, characterized in that: A scaffold (2) is arranged along the outer side of the building, and the scaffold (2) is connected and fixed to the bottom beam by hooks.

9. The cantilever unloading platform according to claim 1, characterized in that: A connecting piece (31) is arranged on the inner side of the top of the U-shaped ring (3), a rotatable shaft (32) is mounted on the connecting piece (31), and the shaft (32) is rotatably connected to a guide piece (33); when the main beam (11) is inserted into the building and connected to the U-shaped ring (3), it contacts and guides the guide piece (33) and then passes through the U-shaped ring (3).

10. The cantilever unloading platform according to claim 9, characterized in that: The guide member (33) comprises a first support arm (331) and a second support arm (332); one end of the first support arm (331) is connected to the rotating shaft (32), and the other end is connected to the second support arm (332), and forms an angle of no more than 30° with the second support arm (332); When the main beam (11) enters the U-shaped ring (3), it first contacts the second arm (332) on the guide member (33); the entire guide member (33) rotates around the rotating shaft (32) and gradually compresses the angle between the first arm (331) and the second arm (332) until the second arm (332) and the main beam (11) are completely attached and maintained in a parallel state with the ground of the building.