Steel bar coupling in building field

By designing a steel bar coupling including frame, positioning block and bolt, the problem of expansion and distortion of the steel bar group after solidification of concrete is solved, and the stability of the structure is improved and the safety hazards are reduced.

CN222228028UActive Publication Date: 2024-12-24QINGDAO WENQUAN CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420425834.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-06
Publication Date
2024-12-24
Estimated Expiration
2034-03-06

AI Technical Summary

Technical Problem

After the concrete solidifies in existing buildings, the steel bar rings are often distorted and deformed due to expansion, resulting in poor overall stability and great safety hazards.

Method used

Design a steel bar coupling, including frame, positioning block, fixing block and bolts, which are connected to the outside of the steel bar through the frame, and use the coordination between the positioning block and the fixed block to fix the fixed block to avoid the steel bars being poured during cement. Distortion occurs.

Benefits of technology

It effectively avoids distortion and deformation of steel bars caused by expansion after concrete solidification, improves the stability of the overall structure, and reduces safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222228028U_ABST
    Figure CN222228028U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel bar coupling in the building field, which comprises a frame, the four corners of the frame are provided with mounting grooves, the inner walls of the mounting grooves are provided with positioning blocks, the side walls of the positioning blocks are provided with fixing blocks, connecting holes are arranged between the positioning blocks and the fixing blocks, and the connecting holes are communicated with the mounting grooves. Positioning holes are formed in the side walls of the multiple positioning blocks, and positioning rods are arranged on the side walls of the multiple fixing blocks. By means of the structure, the steel bars are sleeved with the frame, the fixing blocks and the positioning blocks are matched to fix the steel bars, expansion is avoided when cement is poured, and the steel bars are prevented from being twisted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction, in particular to a steel bar coupling in the construction field. Background Art

[0002] The steel cage mainly plays a tensile role. The compressive strength of concrete is high but the tensile strength is very low. During the construction of high-rise buildings, machine punching and water drilling are required, and the hole depth must meet the design requirements. Then the steel cage is lowered into the pile hole, and then the conduit is inserted for concrete pouring.

[0003] The lower ends of various types of cement piers are generally fixed by steel bar groups, which are composed of multiple steel bars distributed in an approximately square shape. Steel bar rings are used to fix the outside of the steel bars. However, after the poured cement solidifies, the inside expands and the fastened steel bar rings often twist and deform, resulting in poor overall stability and a major safety hazard. Utility Model Content

[0004] The purpose of the utility model is to provide a steel bar coupling in the construction field to solve the problem that in the prior art, a steel bar group is composed of multiple steel bars, and the multiple steel bars are distributed in an approximately square shape, and are fixed on the outside of the steel bars using steel bar rings, but after the poured cement solidifies, the inside expands, and the fastened steel bar rings often twist and deform, resulting in poor overall stability and a large safety hazard.

[0005] To achieve the above-mentioned purpose, a steel bar coupling for the construction field is provided, comprising: a frame, installation grooves are provided at the four corners of the frame, a plurality of inner walls of the installation grooves are provided with positioning blocks, a plurality of side walls of the positioning blocks are provided with fixing blocks, a plurality of connecting holes are provided between the positioning blocks and the fixing blocks, a plurality of side walls of the positioning blocks are provided with positioning holes, a plurality of side walls of the fixing blocks are provided with positioning rods, the frame is sleeved on the outside of the steel bar, and each steel bar is fixed by cooperating with the fixing block, so that it will not expand when pouring cement, thereby avoiding the steel bar from twisting.

[0006] According to the steel bar coupling in the construction field, bolts are arranged at the four corners of the frame, one end of a plurality of the bolts passes through the middle of the fixing block and extends to the outside, and a fixing nut is threadedly connected to the outside of the plurality of the bolts.

[0007] According to the steel bar coupling in the construction field, both ends of the plurality of connection holes pass through two sides of the frame.

[0008] According to the steel bar coupling in the construction field, the side walls of the plurality of fixing blocks and the positioning blocks are all in contact with the inner wall of the installation groove.

[0009] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention.

[0010] The purpose of the utility model is to provide a steel bar coupling in the field of construction, the main innovation points are:

[0011] The utility model utilizes a frame to be sleeved on the outside of the steel bar, utilizes a positioning block to cooperate with a fixing block, utilizes a positioning rod to cooperate with a positioning hole, so that the fixing block and the positioning block cooperate with each other, and utilizes bolts to fix the fixing block, so as to prevent the steel bar from twisting and deforming when pouring cement. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The utility model is further described below in conjunction with the accompanying drawings and embodiments;

[0013] Figure 1 This is a three-dimensional diagram of a steel bar coupling in the construction field of the utility model;

[0014] Figure 2 This is a schematic diagram of a positioning block of a steel bar coupling in the construction field of the utility model;

[0015] Figure 3 This is a schematic diagram of a fixing block of a steel bar coupling in the construction field of the utility model;

[0016] Figure 4 For this utility model Figure 2 Enlarged view of point A in the middle.

[0017] Legend:

[0018] 1. Frame; 2. Bolts; 3. Fixing block; 4. Connecting hole; 5. Positioning block; 6. Positioning rod; 7. Fixing nut; 8. Positioning hole. DETAILED DESCRIPTION

[0019] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.

[0020] Reference Figure 1-4The utility model embodiment is a steel bar coupling in the construction field, which includes: a frame 1, the frame 1 is provided with installation grooves at four corners, the inner walls of multiple installation grooves are provided with positioning blocks 5, the side walls of multiple positioning blocks 5 are provided with fixing blocks 3, the fixing blocks 3 cooperate with the positioning blocks 5 to fix the steel bars, thereby fixing the frame 1, and the frame 1 is installed on the outside of the steel bars, connecting holes 4 are provided between the multiple positioning blocks 5 and the fixing blocks 3, the side walls of multiple positioning blocks 5 are provided with positioning holes 8, and the side walls of multiple fixing blocks 3 are provided with positioning rods 6, which are convenient for positioning the steel bars and preventing the positioning blocks 5 from loosening.

[0021] Bolts 2 are provided at the four corners of the frame 1 for installing the fixing block 3 inside the frame 1. One ends of multiple bolts 2 pass through the middle of the fixing block 3 and extend to the outside. The outsides of multiple bolts 2 are threadedly connected with fixing nuts 7. Both ends of multiple connecting holes 4 pass through both sides of the frame 1. The side walls of multiple fixing blocks 3 and positioning blocks 5 are in contact with the inner walls of the installation grooves.

[0022] Working principle: When in use, install the positioning block 5 inside the installation groove, pass the steel bar through the middle of the connecting hole 4 at the four corners of the frame 1, install the fixing block 3 inside the installation groove, make the positioning rod 6 cooperate with the positioning hole 8, so as to fix the steel bar, and then use the bolt 2 to pass through the middle of the frame 1 and the fixing block 3, and use the fixing nut 7 to fix the bolt 2, so that no deformation or distortion will occur when pouring cement.

[0023] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present invention.

Claims

1. A steel bar coupling in the construction field, characterized in that: include: A frame (1), wherein the frame (1) is provided with mounting grooves at four corners, the inner walls of the plurality of mounting grooves are provided with positioning blocks (5), the side walls of the plurality of positioning blocks (5) are provided with fixing blocks (3), connecting holes (4) are provided between the plurality of positioning blocks (5) and the fixing blocks (3), the side walls of the plurality of positioning blocks (5) are provided with positioning holes (8), and the side walls of the plurality of fixing blocks (3) are provided with positioning rods (6).

2. A steel bar coupling in the construction field according to claim 1, characterized in that: Bolts (2) are provided at the four corners of the frame (1), one end of each of the bolts (2) passes through the middle of the fixing block (3) and extends to the outside, and the outside of each of the bolts (2) is threadedly connected with a fixing nut (7).

3. A steel bar coupling in the construction field according to claim 1, characterized in that: Both ends of the plurality of connection holes (4) pass through two sides of the frame (1).

4. A steel bar coupling in the construction field according to claim 1, characterized in that: The side walls of the plurality of fixing blocks (3) and positioning blocks (5) are all fitted with the inner wall of the installation groove.