Compaction pile structure for foundation treatment
By introducing a protective mechanism and a fastening mechanism into the tight pile structure, the problem of soil falling due to no support on the inner wall of the tight pile hole is solved, and the high strength of the tight pile and the filling material are effectively combined, and the high strength of the tight pile is improved. Overall performance.
Patent Information
- Application Number
- CN202420823880.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-04-19
AI Technical Summary
There is no support protection structure installed in the inner wall of the existing tight pile hole, which causes the soil to fall off easily during the hammering operation, resulting in impurities in the molded tight piles, reducing the overall strength.
A tight pile structure including a protective mechanism and a fastening mechanism is designed. The protective mechanism consists of a bottom ring, a reinforcement rib strip, a stabilizing ring, a buffer table and a fastening mechanism. By fixing the reinforcement rib strip and the side wall of the pile hole, Reduce soil drops and fix the stability ring and buffer table through a fastening mechanism to ensure that the filling material is closely integrated with the reinforcement strips and improve overall strength.
It effectively reduces the probability of soil falling around the pile hole, ensures that there are no impurities in the squeezed pile, and improves the overall strength of the squeezed pile and the combination effect of the filling material.
Smart Images

Figure CN222252088U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of foundation treatment, in particular to a compaction pile structure used for foundation treatment. Background Art
[0002] Ground treatment is an engineering measure to improve the bearing capacity, deformation performance or impermeability of the foundation (soil or rock) supporting the building. Ground treatment includes a variety of methods, such as compaction, tamping, replacement, preloading and composite foundation, as well as grouting and micropiles, etc., with the aim of improving the stability and bearing capacity of the foundation, reducing deformation and uneven settlement, improving the compressibility, permeability and dynamic characteristics of the soil, and solving special problems of special soils.
[0003] Among them, compaction piles are also a common method for foundation treatment. It mainly forms pile holes in the soil, fills the holes with specific materials (such as plain soil, gray soil, sand and gravel, etc.), and then compacts them layer by layer to improve the density and bearing capacity of the soil. Compaction piles are suitable for a variety of soil conditions, especially in the treatment of soft soil foundations and collapsible loess foundations. Compared with the traditional excavation and soil replacement method, compaction pile technology does not require a large amount of excavation and backfilling, so it can save a lot of manpower and material resources, while shortening the construction period.
[0004] The existing compaction pile holes are generally formed by impact of a hammer. Since the inner walls of some compaction pile holes are not provided with supporting and protective structures, the soil around the pile holes is easily affected by the vibrations generated by the hammer and falls into the center of the pile hole, resulting in certain impurities in the compaction pile after forming, thereby reducing the overall strength of the compaction pile.
[0005] Therefore, there is an urgent need to redesign a new compaction pile structure for foundation treatment to solve the above problems. Utility Model Content
[0006] The utility model provides a compaction pile structure for foundation treatment to solve the technical problems raised in the above background technology.
[0007] The utility model provides a compaction pile structure for foundation treatment, which comprises a ground surface, a plurality of pile holes are excavated in the ground surface, compaction piles are arranged in the pile holes, and the compaction piles comprise a protection mechanism and a plurality of fastening mechanisms;
[0008] The protection mechanism is arranged in the pile hole, and comprises a bottom ring, and a plurality of reinforcing ribs evenly distributed around the circumference are connected to the bottom ring, and a stabilizing ring is connected to the end of the reinforcing rib away from the bottom ring, and a buffer platform is arranged at the end of the pile hole, and the stabilizing ring is connected to the buffer platform;
[0009] A number of fastening mechanisms are used to connect the stabilizing ring and the buffer table.
[0010] Optionally, a bottom ring is arranged at the bottom of the pile hole, and the maximum diameter of the bottom ring is equal to the diameter of the pile hole. The bottom ring serves to connect the reinforcing ribs and is also used to support the bottom of the pile hole.
[0011] Optionally, the reinforcing ribs are welded to the bottom ring to ensure the connection between the bottom ring and the reinforcing ribs, while also ensuring the fixing effect of the reinforcing ribs on the soil on the side walls of the pile hole, so that the soil on the side walls of the pile hole is not easy to fall into the center of the pile hole, thereby ensuring the overall strength of the compacted pile.
[0012] Optionally, a locking pin is threadedly connected between the reinforcing rib and the stabilizing ring, which is used to connect the reinforcing rib and the stabilizing ring, and also facilitates separation of the stabilizing ring from the reinforcing rib so that the stabilizing ring can be reused.
[0013] Optionally, a plurality of positioning holes are provided in the buffer platform, the positioning holes correspond to the fastening mechanisms, and the fastening mechanisms are inserted into the positioning holes to fix the stabilizing ring and the buffer platform;
[0014] A pair of engaging grooves are symmetrically cut on the side wall of the positioning hole to facilitate the insertion of the fastening column to ensure the fixing effect of the fastening mechanism on the stabilizing ring and the buffer platform.
[0015] Optionally, the fastening mechanism includes a fastening nail, which is inserted into the positioning hole. A pair of movable grooves are formed in the fastening nail, and the pair of movable grooves respectively correspond to the pair of engaging grooves.
[0016] Optionally, a fastening column is slidably provided in the movable groove, and one end of the fastening column is inserted into the engaging groove. The stabilizing ring and the buffer platform can be fixed by inserting the fastening column into the engaging groove, so as to ensure the stability of the bottom ring, the reinforcing ribs and the stabilizing ring, so that the reinforcing ribs can stably support the soil on the side wall of the pile hole, thereby reducing the probability of the soil entering the center of the pile hole;
[0017] A limit plate is installed in the movable groove, and the limit plate is used to limit the fastening column and also to install the spring;
[0018] A spring is provided between the fastening column and the limiting plate, and the spring is used to apply a force to the fastening column so that the fastening column can be inserted into the engaging groove in a natural state, so as to fix the stabilizing ring and the buffer table by means of the fastening mechanism.
[0019] Optionally, a linkage rope is connected between the pair of fastening columns, and a spring is arranged outside the linkage rope, so that the linkage of the pair of fastening columns can be achieved.
[0020] Optionally, a connecting buckle is connected at the center of the linkage rope, a movable groove matching the connecting buckle is provided in the fastening nail, the movable groove is connected to the movable groove, and the connecting buckle is used to connect the pull rope.
[0021] Optionally, a pull rope is connected to the connecting buckle, and a handle is connected to one end of the pull rope outside the fastening nail. By pulling the handle, the handle can pull the connecting buckle through the pull rope, and the connecting buckle can realize the linkage of a pair of fastening columns through the linkage rope.
[0022] The beneficial effects of the utility model are as follows:
[0023] This type of compaction pile structure used for foundation treatment can protect the inner wall of the pile hole of the compaction pile through the setting of corresponding structures, effectively reduce the probability of soil around the pile hole falling into the center of the pile hole, so that the compaction pile after forming does not contain impurities, thereby ensuring the overall strength of the compaction pile. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0025] Figure 1 It is a cross-sectional view of a compaction pile structure for foundation treatment provided by the utility model;
[0026] Figure 2 yes Figure 1 A partial enlarged view of the middle A area;
[0027] Figure 3 yes Figure 1 A partial enlarged view of the middle B area;
[0028] Figure 4 It is a partial structural schematic diagram of a compaction pile structure for foundation treatment provided by the utility model;
[0029] Figure 5 yes Figure 4 A partial enlarged view of the middle C area;
[0030] Figure 6 It is a partial structural front view of a compaction pile structure for foundation treatment provided by the utility model. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. It is understandable that the specific embodiments described herein are only used to explain the utility model, rather than to limit the utility model. It should also be noted that, for ease of description, only the parts related to the utility model rather than all structures are shown in the drawings. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0032] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0033] See also Figures 1 to 6 The utility model discloses a compaction pile structure for foundation treatment, comprising a ground surface 1, a plurality of pile holes are excavated in the ground surface 1, compaction piles are arranged in the pile holes, and the compaction piles comprise a protection mechanism 2 and a plurality of fastening mechanisms 3.
[0034] See also Figures 1 to 6 The protective mechanism 2 is arranged in the pile hole, and is used to reinforce the inner wall of the pile hole so that the soil on the inner wall of the pile hole is not easy to fall into the center of the pile hole, thereby reducing the impurities in the compacted pile. At the same time, the overall strength of the compacted pile can also be increased through the setting of the protective mechanism 2.
[0035] The protection mechanism 2 includes a bottom ring 201, which is arranged at the bottom of the pile hole. The maximum diameter of the bottom ring 201 is equal to the diameter of the pile hole. The bottom ring 201 serves to connect the reinforcing ribs 202 and is also used to support the bottom of the pile hole.
[0036] In addition, a plurality of circumferentially evenly distributed reinforcing ribs 202 are connected to the bottom ring 201, and the reinforcing ribs 202 are welded to the bottom ring 201 to ensure the connection effect between the bottom ring 201 and the reinforcing ribs 202, and also to ensure the fixing effect of the reinforcing ribs 202 on the side wall soil of the pile hole, so that the side wall soil of the pile hole is not easy to fall into the center of the pile hole, thereby reducing the impurities present in the compacted pile. At the same time, by providing a plurality of reinforcing ribs 202, the overall strength of the compacted pile can also be increased.
[0037] Specifically, the end of the reinforcing rib 202 away from the bottom ring 201 is connected to a stabilizing ring 203, and the stabilizing ring 203 is used to connect several reinforcing ribs 202, so that the bottom ring 201, the reinforcing ribs 202 and the stabilizing ring 203 can be connected into a whole, which can not only ensure the protective effect of the protection mechanism 2 on the soil on the inner wall of the pile hole, but also facilitate the addition of filling materials such as plain soil, ash soil, sand and gravel into the pile hole, so that the filling material can be tightly combined with the reinforcing ribs 202 to increase the overall strength of the compacted pile.
[0038] In addition, a locking pin 204 is threadedly connected between the reinforcing rib 202 and the stabilizing ring 203 for connecting the reinforcing rib 202 and the stabilizing ring 203 , and also facilitates separation of the stabilizing ring 203 from the reinforcing rib 202 so that the stabilizing ring 203 can be reused.
[0039] See also Figures 1 to 6 A buffer platform 205 is provided at the end of the pile hole, and the stabilizing ring 203 is connected to the buffer platform 205. The buffer platform 205 can protect the end of the pile hole, so that the soil at the end of the pile hole is not easy to loosen, and is also used to fix the stabilizing ring 203.
[0040] Among them, a plurality of positioning holes are provided in the buffer platform 205 , and the positioning holes correspond to the fastening mechanism 3 . The fastening mechanism 3 is inserted into the positioning holes to fix the stabilizing ring 203 and the buffer platform 205 .
[0041] In addition, a pair of engaging grooves 206 are symmetrically opened on the side wall of the positioning hole to facilitate the insertion of the fastening column 303 , so as to ensure the fixing effect of the fastening mechanism 3 on the stabilizing ring 203 and the buffer platform 205 .
[0042] See also Figures 1 to 6 , a plurality of fastening mechanisms 3 are used to connect the stabilizing ring 203 and the buffer platform 205 .
[0043] The fastening mechanism 3 includes a fastening nail 301 , which is inserted into the positioning hole. A pair of movable grooves 302 are formed in the fastening nail 301 , and the pair of movable grooves 302 correspond to the pair of engaging grooves 206 , respectively.
[0044] In addition, a fastening column 303 is slidably provided in the movable groove 302, and one end of the fastening column 303 is inserted into the engaging groove 206. The fastening column 303 is inserted into the engaging groove 206 to fix the stabilizing ring 203 and the buffer platform 205, so as to ensure the stability of the bottom ring 201, the reinforcing ribs 202 and the stabilizing ring 203, so that the reinforcing ribs 202 can stably support the soil on the side wall of the pile hole, and reduce the probability of the soil entering the center of the pile hole.
[0045] Specifically, a limiting plate 304 is installed in the movable groove 302, and the limiting plate 304 is used to limit the fastening column 303 and also to install a spring 305. A spring 305 is provided between the fastening column 303 and the limiting plate 304. The spring 305 is used to apply a force to the fastening column 303 so that the fastening column 303 can be inserted into the engaging groove 206 in a natural state, so as to fix the stabilizing ring 203 and the buffer platform 205 by using the fastening mechanism 3.
[0046] See also Figures 1 to 6 A linkage rope 306 is connected between the pair of fastening columns 303 , and a spring 305 is arranged on the outside of the linkage rope 306 , so as to realize the linkage of the pair of fastening columns 303 .
[0047] Among them, a connecting buckle 307 is connected to the center of the linkage rope 306, a movable groove matching the connecting buckle 307 is provided in the fastening nail 301, the movable groove 302 is connected to the movable groove, and the connecting buckle 307 is used to connect the pull rope 308.
[0048] In addition, a pull rope 308 is connected to the connecting buckle 307, and a handle 309 is connected to one end of the pull rope 308 outside the fastening nail 301. By pulling the handle 309, the handle 309 can pull the connecting buckle 307 through the pull rope 308, and the connecting buckle 307 can realize the linkage of a pair of fastening columns 303 through the linkage rope 306.
[0049] When used, a hammer is used to impact several pile holes on the ground 1. After the pile hole impact is completed, the hammer is first taken out and the depth of the pile hole is measured. According to the measurement result, a reinforcing rib 202 of a corresponding length is selected. One end of the reinforcing rib 202 is welded to the bottom ring 201, and the other end of the reinforcing rib 202 is connected to the stabilizing ring 203 through a locking nail 204.
[0050] First, install the buffer platform 205 at the end of the pile hole, and then pass the bottom ring 201 and the reinforcing ribs 202 through the buffer platform 205 and place them in the pile hole until the bottom ring 201 contacts the bottom of the pile hole. At this time, the stabilizing ring 203 can contact the buffer platform 205. Figure 1 Status shown.
[0051] First pull the handle 309, the handle 309 pulls the connecting buckle 307 through the pull rope 308, and the connecting buckle 307 can pull a pair of fastening columns 303 through the linkage rope 306, so that one end of the fastening column 303 shrinks in the movable groove 302, and the fastening nail 301 passes through the stabilizing ring 203 and is inserted into the positioning hole in the buffer platform 205.
[0052] By releasing the handle 309 , the fastening column 303 can be inserted into the engaging groove 206 under the cooperation of the movable groove 302 and the limiting plate 304 , and then the stabilizing ring 203 and the buffer platform 205 can be engaged and fixed, so that the stabilizing ring 203 and the buffer platform 205 are connected as a whole.
[0053] Filling materials such as soil, ash, sand and gravel are added into the pile hole through the buffer platform 205 and compacted by a hammer. When the filling material reaches the end of the buffer platform 205, the locking nail 204 is loosened to separate the stabilizing ring 203 from the reinforcing rib 202, and then the buffer platform 205 is taken out so that the stabilizing ring 203 and the buffer platform 205 can be used again.
[0054] The present application, through the provision of a plurality of reinforcing ribs 202, can not only protect the soil on the inner wall of the pile hole and reduce the probability of soil entering into the filling material of the compacted pile so that there are no impurities in the compacted pile, but also can combine the filling material with the reinforcing ribs 202 to increase the overall strength of the compacted pile.
[0055] The above description is only an implementation method of the present utility model, and does not limit the patent scope of the present utility model. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present utility model, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present utility model.
Claims
1. A compaction pile structure for foundation treatment, comprising a ground surface, a plurality of pile holes are excavated in the ground surface, and compaction piles are arranged in the pile holes, characterized in that: The compacted pile comprises A protection mechanism is arranged in the pile hole, the protection mechanism comprises a bottom ring, a plurality of reinforcing ribs evenly distributed around the circumference are connected to the bottom ring, a stabilizing ring is connected to one end of the reinforcing ribs away from the bottom ring, a buffer platform is arranged at the end of the pile hole, and the stabilizing ring is connected to the buffer platform; A plurality of fastening mechanisms are used to connect the stabilizing ring and the buffer platform.
2. A compaction pile structure for foundation treatment according to claim 1, characterized in that: The bottom ring is arranged at the bottom of the pile hole, and the maximum diameter of the bottom ring is equal to the diameter of the pile hole.
3. The compaction pile structure for foundation treatment according to claim 2, characterized in that: The reinforcing ribs are connected to the bottom ring by welding.
4. The compaction pile structure for foundation treatment according to claim 3, characterized in that: A locking nail is threadedly connected between the reinforcing rib and the stabilizing ring.
5. The compaction pile structure for foundation treatment according to claim 1, characterized in that: A plurality of positioning holes are arranged in the buffer platform, the positioning holes correspond to the fastening mechanisms, and a pair of engaging grooves are symmetrically cut on the side walls of the positioning holes.
6. The compaction pile structure for foundation treatment according to claim 5, characterized in that: The fastening mechanism comprises a fastening nail, which is inserted into the positioning hole. A pair of movable grooves are formed in the fastening nail, and the pair of movable grooves respectively correspond to the pair of engaging grooves.
7. The compaction pile structure for foundation treatment according to claim 6, characterized in that: A fastening column is slidably arranged in the movable groove, one end of the fastening column is inserted in the engaging groove, a limiting plate is installed in the movable groove, and a spring is arranged between the fastening column and the limiting plate.
8. The compaction pile structure for foundation treatment according to claim 7, characterized in that: A linkage rope is connected between the pair of fastening columns, and the spring is arranged on the outside of the linkage rope.
9. The compaction pile structure for foundation treatment according to claim 8, characterized in that: A connecting buckle is connected at the center of the linkage rope, a movable groove matching the connecting buckle is arranged in the fastening nail, and the movable groove is communicated with the movable groove.
10. The compaction pile structure for foundation treatment according to claim 9, characterized in that: The connecting buckle is connected with a drawstring, and one end of the drawstring located outside the fastening nail is connected with a handle.
