Walking type tower crane foundation on step

The walking tower crane foundation addresses flexibility and space issues by allowing crane movement on steps without drilling, facilitating easy assembly and disassembly, suitable for projects with changing construction grounds.

CN222252198UInactive Publication Date: 2024-12-27CHINA CONSTR THIRD ENG BUREAU GRP (ZHEJIANG) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421060907.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-15
Publication Date
2024-12-27
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing tower cranes face challenges in flexibility, space occupation, and complexity in assembly and disassembly, particularly in projects with changing construction grounds and limited carrying capacity.

Method used

A walking tower crane foundation on steps, comprising upper and bottom support seats, slide rails, and a mounting seat with rollers, allowing the crane to be installed without drilling into steps, enabling flexible movement and easy assembly/disassembly.

Benefits of technology

Enables flexible crane movement, saves construction space, and simplifies installation without damaging structures, suitable for projects with changing construction needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222252198U_ABST
    Figure CN222252198U_ABST
Patent Text Reader

Abstract

The utility model relates to a walking type tower crane foundation on a step, and relates to the technical field of building construction.The walking type tower crane foundation on the step comprises a plurality of high supporting bases arranged on a mounting step face, a plurality of bottom supporting bases arranged on a bottom mounting face, two sliding rails and a mounting base; the tops of the high supporting bases and the tops of the bottom supporting bases are located on the same horizontal plane. Wherein one sliding rail is arranged at the tops of the high supporting seats, the other sliding rail is arranged at the tops of the bottom supporting seats, a base section is arranged on the mounting seat, two sets of rollers are arranged on the side, away from the base section, of the mounting seat, and each set of rollers is located on one sliding rail. According to the walking type tower crane foundation, construction of the walking type tower crane foundation can be completed through cooperation of all the components, the tower crane installed on the walking type tower crane foundation can move on the steps through cooperation of the sliding rails and the installation bases, the tower crane can flexibly move according to construction requirements, use convenience is high, and the walking type tower crane foundation can be suitable for projects with frequently-changed construction grounds.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of building construction technology, and in particular to a walking tower crane foundation on steps. Background Art

[0002] Tower cranes are indispensable equipment in construction projects. They play an extremely important role in construction and are the most important vertical transportation machinery. They are often used in the construction sites of large buildings such as high-rise buildings, bridges, water conservancy projects and stadiums.

[0003] In high-rise buildings, tower cranes can help workers complete aerial work and carry construction materials and equipment; in bridge and water conservancy projects, tower cranes can be used for lifting heavy objects such as the lifting and assembly of bridge piers and the construction of water conservancy dams; in stadium projects, tower cranes can be used for the lifting and transportation of large components. Therefore, the reasonable choice of tower cranes will bring direct benefits to construction safety and progress, and can save secondary transportation and save costs.

[0004] In actual operations, common lifting and hoisting equipment include crawler tower cranes and fixed tower cranes. Fixed tower cranes have the advantages of good stability and strong carrying capacity, and are suitable for long-term operations in large projects. However, their disassembly and assembly are relatively complicated and cumbersome, and they are difficult to move. Holes need to be reserved at various implementation locations of the construction project, and thus they need to occupy a larger construction space. Crawler tower cranes have the advantage of high flexibility that fixed tower cranes do not have. They can be flexibly moved according to construction needs and are very convenient to use. Therefore, they are widely used in various construction projects. However, for full basement venues, on the one hand, the carrying capacity of the venue core is limited, and thus crawler tower cranes cannot be used. On the other hand, the venue stands have more stages, and crawler tower cranes are difficult to move flexibly on the stages. Utility Model Content

[0005] In order to improve the problems existing in the application of tower cranes in the prior art, the present application provides a walking tower crane foundation on steps.

[0006] The present application provides a walking tower crane foundation on steps using the following technical solution:

[0007] A walking tower crane foundation on a step comprises a plurality of upper support seats, a plurality of bottom support seats, two slide rails and a mounting seat, wherein the plurality of upper support seats are arranged on the structural column of the mounting step surface at intervals along the length direction of the mounting step surface, and the plurality of bottom support seats are arranged on the structural column of the bottom mounting surface at intervals along the length direction of the bottom mounting surface, and the tops of the plurality of upper support seats and the plurality of bottom support seats are in the same horizontal plane; one of the slide rails is arranged on the tops of the plurality of upper support seats, and the other slide rail is arranged on the tops of the plurality of bottom support seats; a base section for connecting to a tower crane is arranged on the mounting seat, and two groups of rollers are arranged on the side of the mounting seat away from the base section, and each group of rollers is located on a slide rail.

[0008] By adopting the above technical solution, when the walking tower crane foundation is used, first determine a step surface as the installation step surface, the bottom working surface as the bottom installation surface, there is a height difference between the installation step surface and the bottom installation surface, then arrange multiple high-part support seats on the installation step surface at intervals along the length direction of the installation step surface, each high-part support seat is arranged on the structural column of the installation step surface, and arrange multiple bottom support seats on the bottom installation surface at intervals along the length direction of the bottom installation surface, each bottom support seat is arranged on the structural column of the bottom installation surface, at this time, the tops of the multiple high-part support seats and the tops of the multiple bottom support seats are all in the same horizontal plane; when After the high support seat and the bottom support seat are installed, slide rails are installed on the top of multiple high support seats, and slide rails are installed on the top of multiple bottom support seats. The two slide rails are parallel and in the same horizontal plane. The high support seat and the bottom support seat serve as support points for the slide rails, so that there is a corresponding slide rail on the installation step surface and the bottom installation surface, and the slide rails are arranged along the length direction of the step surface; after this, the installation seat is overlapped on the support seat, and at this time, the two sets of rollers are respectively located on the corresponding slide rails, and the construction of the walking tower crane foundation is completed; when the walking tower crane foundation is installed, the tower crane is connected to the foundation section to complete the installation of the tower crane.

[0009] The cooperation of various components in the above process can complete the construction of the walking tower crane foundation. There is no need to drill holes on the steps during the construction process, thereby avoiding damage to the step structure. Through the cooperation of the slide rail and the mounting seat, the tower crane installed on the walking tower crane foundation can be moved on the steps. The tower crane can be flexibly moved according to construction needs. It is easy to use and has a wide range of uses. It can be applied to projects where the construction ground changes frequently. In addition, the overall structure of the walking tower crane foundation is simple, which can save construction space on the construction site and has the advantage of easy disassembly and assembly.

[0010] Optionally, a plurality of middle support seats are arranged at intervals along the length direction on the step surface between the mounting step surface and the bottom mounting surface, and two connecting rods are arranged on the middle support seat, and one end of the two connecting rods away from the middle support seat is respectively connected to the upper support seat and the bottom support seat.

[0011] By adopting the above technical scheme, after the positions of the installation step surface and the bottom installation surface are determined, a step surface between the installation step surface and the bottom installation surface is defined as an auxiliary step surface, and a plurality of middle support seats are arranged on the auxiliary step surface at intervals along the length direction, and connecting rods for connecting with the high support seat and the bottom support seat are installed on the middle support seat. The tightness of the connection between the high support seat and the bottom support seat is improved through the cooperation of the middle support seat and the connecting rod, thereby improving the overall strength of the walking tower crane foundation, and the middle support seat can provide auxiliary support for the installation seat, further improving the stability during subsequent tower crane operation.

[0012] Optionally, the middle support seat, the bottom support seat and the upper support seat are all provided with limit plates, and when the two ends of the connecting rod are respectively in contact with the two corresponding limit plates, the connecting rod is in a horizontal state.

[0013] By adopting the above technical scheme, the setting of the limit plate is conducive to the positioning of the connecting rod. When installing the middle support seat and the connecting rod, the position of the middle support seat can be determined first, and then the middle support seat can be installed, and then the connecting rod can be connected. When the two ends of the connecting rod are respectively abutted against the limit plates on the high support seat / bottom support seat and the limit plates on the middle support seat, the connecting rod is in a horizontal state. Subsequently, the two ends of the connecting rod are respectively fixed to the high support seat / bottom support seat and the middle support seat, and the connecting rod thereby stably connects the high support seat / bottom support seat and the middle support seat.

[0014] Optionally, a first reinforcing rod is provided between adjacent middle support seats.

[0015] By adopting the above technical solution, by installing the first reinforcing rod between adjacent middle support seats, adjacent middle support seats are connected to each other to form a whole, and multiple middle support seats can support each other, thereby improving the stability of multiple middle support seats when they are located on the auxiliary step surface, and further improving the overall strength of the walking tower crane foundation.

[0016] Optionally, a second reinforcing rod is arranged between adjacent bottom support seats.

[0017] By adopting the above technical solution, the bottom support seat is arranged on the bottom mounting surface. Due to the height difference between the bottom mounting surface and the mounting step surface, the height of the bottom support seat is relatively high. Therefore, a second reinforcing rod is arranged between adjacent bottom support seats, thereby improving the tightness of the connection between the bottom support seats. Adjacent bottom support seats can support each other, thereby improving the stability of multiple bottom support seats during use, and the overall strength of the walking tower crane foundation can be further improved.

[0018] Optionally, the mounting seat includes two mounting frames arranged opposite to each other, a mounting rod is arranged between the two mounting frames, the base section is arranged on the mounting rod, and rollers are arranged at both ends of each mounting frame.

[0019] By adopting the above technical solution, the mounting seat is composed of a mounting frame and a mounting rod, so that the mounting seat as a whole forms a frame structure formed by connecting the rod bodies, thereby reducing the deadweight of the mounting seat and improving the stability of the mounting seat when it is located on the track.

[0020] Optionally, a first connecting plate is provided at the bottom of the slide rail, and a second connecting plate is provided at the top of the upper support seat and the top of the bottom support seat, and connecting bolts are passed through both the first connecting plate and the second connecting plate.

[0021] By adopting the above technical solution, when the slide rail is connected to the upper support seat and the bottom support seat, the first connecting plate is fitted with the second connecting plate, the threaded holes on the first connecting plate are connected to the threaded holes on the second connecting plate, and then the bolts are passed through the threaded holes on the two connecting plates at the same time, and the two connecting plates are tightened by the bolts to tightly combine the two connecting plates, and then the slide rail is installed and fixed on the upper support seat and the bottom support seat. The connection method is simple and convenient, and it is easy to disassemble and assemble.

[0022] Optionally, the upper support seat includes a first support rod and a first base column, the first base column is arranged on the mounting step surface, and the first support rod is connected to the slide rail.

[0023] By adopting the above technical solution, the upper support seat as a whole is composed of two separate parts. When the upper support seat is installed to form the walking tower crane foundation as a whole, the first base column can be installed on the installation step surface first, and then the multiple first base columns can be checked to ensure the accuracy of the installation of the multiple first base columns. Then, the first support rod can be installed on the first base column. The walking tower crane foundation can be installed in a distributed manner, which makes it convenient to check and check the installation status of the walking tower crane foundation in time during the installation of the walking tower crane foundation. When the installation of the walking tower crane foundation deviates, it can be corrected in time.

[0024] Optionally, a first flange is provided on the first base column, a second flange is provided on the first support rod, and the first flange and the second flange are connected by bolts.

[0025] By adopting the above technical solution, when connecting the high support seat with the first base column, the first flange is fitted with the second flange, the threaded holes on the first flange and the second flange are connected, and the bolts are passed through the threaded holes on the first flange and the second flange at the same time. The two flanges are tightened by the bolts to tightly combine the two flanges. The connection method is simple and convenient, and easy to disassemble and assemble.

[0026] Optionally, the first base column is provided with a cover plate, and the first base column, the cover plate and the bottom of the first support rod are surrounded to form a pouring cavity for pouring concrete.

[0027] By adopting the above technical solution, when the upper support seat is connected to the first base column, a cover plate is laid on the first base column, and then the upper support seat is placed on the first base column. At this time, a casting cavity is formed between the first base column, the cover plate and the upper support seat. The upper support seat can be fixed to the first base column by pouring concrete into the casting cavity, so that the upper support seat and the first base column can form a stable connection.

[0028] In summary, the present application includes at least one of the following beneficial technical effects:

[0029] 1. The cooperation of various components in the present application can complete the construction of the walking tower crane foundation. During the construction process, it is not necessary to drill holes on the steps, thereby avoiding damage to the step structure. The cooperation of the slide rail and the mounting seat allows the tower crane installed on the walking tower crane foundation to move on the steps. The tower crane can be flexibly moved according to construction requirements. It is highly convenient to use and has a wide range of uses. It can be applied to projects where the construction ground changes frequently. In addition, the overall structure of the walking tower crane foundation is simple, which can save construction space on the construction site and has the advantage of convenient disassembly and assembly.

[0030] 2. After the positions of the installation step surface and the bottom installation surface are determined, a step surface between the installation step surface and the bottom installation surface is defined as an auxiliary step surface, and a plurality of middle support seats are arranged at intervals along the length direction on the auxiliary step surface, and a connecting rod for connecting with the high support seat and the bottom support seat is installed on the middle support seat. The tightness of the connection between the high support seat and the bottom support seat is improved through the cooperation of the middle support seat and the connecting rod, thereby improving the overall strength of the walking tower crane foundation. The middle support seat can provide auxiliary support for the installation seat, further improving the stability of the subsequent tower crane operation;

[0031] 3. By installing the first reinforcing rod between adjacent middle support seats, the adjacent middle support seats are interconnected to form a whole, and multiple middle support seats can support each other, thereby improving the stability of the multiple middle support seats when they are located on the auxiliary step surface, and further improving the overall strength of the walking tower crane foundation. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a schematic diagram of the overall structure of a walking tower crane foundation on a step in Example 1 of the present application;

[0033] Figure 2 yes Figure 1 Side view of

[0034] Figure 3 yes Figure 1 A top view of

[0035] Figure 4 yes Figure 1 A magnified schematic diagram of part A;

[0036] Figure 5 yes Figure 1 A magnified schematic diagram of part B;

[0037] Figure 6 It is a schematic diagram of the application of Example 1 of the present application;

[0038] Figure 7 yes Figure 2 A magnified schematic diagram of part C;

[0039] Figure 8 is a schematic diagram of Example 2 of the present application;

[0040] Fig. 9 It is a schematic diagram of Example 3 of the present application.

[0041] Explanation of the accompanying drawings: 1. high support seat; 2. bottom support seat; 3. slide rail; 31. track beam; 32. track; 4. mounting seat; 41. mounting frame; 42. mounting rod; 5. mounting step surface; 6. bottom mounting surface; 7. foundation section; 8. roller; 9. middle support seat; 10. connecting rod; 11. limit plate; 12. first reinforcing rod; 13. second reinforcing rod; 14. first connecting plate; 15. second connecting plate; 16. connecting bolt; 17. first support rod; 18. first bottom column; 19. first flange; 20. second flange; 21. cover plate; 22. casting cavity; 23. casting hole; 24. auxiliary step surface; 25. fixing rod; 26. movable rod; 27. first positioning hole; 28. positioning pin. DETAILED DESCRIPTION

[0042] The following is combined with Figure 1-8This application is described in further detail.

[0043] Example 1

[0044] Embodiment 1 of the present application discloses a walking tower crane foundation on a step. The walking tower crane foundation on a step is applied to a site with a stage. When applied, a step surface is first determined as an installation step surface 5, and the working surface at the bottom is the bottom installation surface 6. Figure 1 and Figure 2 The walking tower crane foundation includes multiple high-part support seats 1, multiple bottom support seats 2, two slide rails 3 and a mounting seat 4. Multiple high-part support seats 1 are arranged on the structural column of the mounting step surface 5 at intervals along the length direction of the mounting step surface 5, and multiple bottom support seats 2 are arranged on the structural column of the bottom mounting surface 6 at intervals along the length direction of the bottom mounting surface 6. The tops of the multiple high-part support seats 1 and the multiple bottom support seats 2 are in the same horizontal plane; one of the slide rails 3 is arranged on the top of the multiple high-part support seats 1, and the other slide rail 3 is arranged on the top of the multiple bottom support seats 2. A foundation section 7 for connecting with the tower crane is arranged on the mounting seat 4, and two groups of rollers 8 are arranged on the side of the mounting seat 4 away from the foundation section 7, and each group of rollers 8 is located on a slide rail 3.

[0045] Reference Figure 2 and Figure 3 The mounting seat 4 includes two mounting frames 41 arranged opposite to each other, a mounting rod 42 is arranged between the two mounting frames 41, the base section 7 is arranged on the mounting rod 42, and rollers 8 are arranged at both ends of each mounting frame 41; Figure 4 A first connecting plate 14 is provided at the bottom of the slide rail 3, and second connecting plates 15 are provided at the tops of the high support seat 1 and the bottom support seat 2. Connecting bolts 16 are passed through the first connecting plate 14 and the second connecting plate 15. When the slide rail 3 is connected to the high support seat 1 and the bottom support seat 2, the first connecting plate 14 is fitted with the second connecting plate 15, and the threaded holes on the first connecting plate 14 are butted with the threaded holes on the second connecting plate 15. Then, the bolts are passed through the threaded holes on the two connecting plates at the same time, and the two connecting plates are tightened by the bolts to tightly combine the two connecting plates.

[0046] Reference Figure 1 and Figure 2A step surface between the installation step surface 5 and the bottom installation surface 6 is defined as an auxiliary step surface 24. A plurality of middle support seats 9 are arranged on the auxiliary step surface 24 at intervals along the length direction. Two connecting rods 10 are arranged on the middle support seat 9. The ends of the two connecting rods 10 away from the middle support seat 9 are respectively connected to the high support seat 1 and the bottom support seat 2; one end of the connecting rod 10 is fixed to the middle support seat 9, and the other end is fixed to the high support seat 1 / bottom support seat 2. The tightness of the connection between the high support seat 1 and the bottom support seat 2 is improved through the cooperation between the middle support seat 9 and the connecting rod 10, thereby improving the overall strength of the walking tower crane foundation. The middle support seat 9 can improve the auxiliary support for the mounting seat 4, further improving the stability during subsequent tower crane operation.

[0047] In the embodiment of the present application, the middle support seat 9, the upper support seat 1 and the bottom support seat 2 are connected to the connecting rod 10 by welding.

[0048] Reference Figure 1 and Figure 5 The middle support seat 9, the bottom support seat 2 and the high support seat 1 are all fixed with limit plates 11. When the two ends of the connecting rod 10 are respectively in contact with the corresponding two limit plates 11, the connecting rod 10 is in a horizontal state, which is conducive to the positioning of the connecting rod 10 and facilitates the subsequent welding operation of the connecting rod 10.

[0049] Reference Figure 1 and Figure 3 A first reinforcing rod 12 is fixed between adjacent middle support seats 9. The first reinforcing rod 12 connects adjacent middle support seats 9 to form a whole. Multiple middle support seats 9 can support each other. Figure 1 A second reinforcing rod 13 is fixed between adjacent bottom support seats 2. Due to the height difference between the bottom mounting surface 6 and the mounting step surface 5, the height of the bottom support seat 2 is relatively high. Therefore, a second reinforcing rod 13 is installed between adjacent bottom support seats 2 to improve the tightness of the connection between the bottom support seats 2.

[0050] Reference Figure 1 and Figure 4 The high support seat 1 includes a first support rod 17 and a first base column 18. The first base column 18 is arranged on the mounting step surface 5. A first flange 19 is arranged on the first base column 18. A second flange 20 is arranged on the first support rod 17. When the high support seat 1 is connected to the first base column 18, the first flange 19 is fitted with the second flange 20, and the threaded holes on the first flange 19 and the second flange 20 are connected. Bolts are passed through the threaded holes on the first flange 19 and the second flange 20 at the same time, and the two flanges are tightened by the bolts to tightly combine the two flanges.

[0051] In the embodiment of the present application, the middle support seat 9 includes a second support rod and a second base column, the third support seat includes a third support rod and a third base column, the first support rod 17, the second support rod and the third support rod are all round tubes, the first support rod 17, the second support rod and the third support rod have different heights but similar structures, the structure of the second base column and the structure of the third base column are the same as the structure of the first base column 18, the connection method between the second support rod and the second base column, and the connection method between the third support rod and the third base column are the same as the connection method between the first support rod 17 and the first base column 18.

[0052] Reference Figure 6 For venues with steel roof structures, the roof plane is elliptical, and the walking tower crane foundation involved in this application can be selected as the roof steel structure installation equipment. The slide rail 3 of the walking tower crane is arranged along the long axis of the venue on the plane and as close to the main structure as possible to give full play to its lifting performance. Two parallel walking routes are set up on the inside of the venue, and the lower structure columns are selected as the track support points. The middle support seat 9 is arranged in the local area without structural columns, and the tower crane is installed on the walking tower crane foundation by means of a car crane.

[0053] In the embodiments of this application, refer to Figure 7 The slide rail 3 includes a track beam 31 and a track 32. The first connecting plate 14 is arranged on the bottom surface of the track beam 31. The track 32 is equal to the track beam 31 and is fixed parallel to the top surface of the track beam 31. The middle part of the roller 8 is concave. The track 32 is located in the concave shape and fits with the roller 8, thereby ensuring the stability of the roller 8 when rolling.

[0054] The implementation principle of a walking tower crane foundation on a step in Example 1 of the present application is as follows: when the walking tower crane foundation is used, first determine a step surface as the installation step surface 5, and the bottom working surface as the bottom installation surface 6. There is a height difference between the installation step surface 5 and the bottom installation surface 6. Then, a plurality of high-part support seats 1 are arranged at intervals along the length direction of the installation step surface 5 on the installation step surface 5, and each high-part support seat 1 is arranged on the structural column of the installation step surface 5. A plurality of bottom support seats 2 are arranged at intervals along the length direction of the bottom installation surface 6 on the bottom installation surface 6, and each bottom support seat 2 is arranged on the structural column of the bottom installation surface 6. At this time, the tops of the plurality of high-part support seats 1 and the tops of the plurality of bottom support seats 2 are all at In the same horizontal plane; when the high support seat 1 and the bottom support seat 2 are both installed, slide rails 3 are installed on the top of multiple high support seats 1, and slide rails 3 are installed on the top of multiple bottom support seats 2. The two slide rails 3 are parallel and in the same horizontal plane. The high support seat 1 and the bottom support seat 2 serve as support points for the slide rails 3, so that there is a corresponding slide rail 3 on the installation step surface 5 and the bottom installation surface 6, and the slide rails 3 are arranged along the length direction of the step surface; thereafter, the mounting seat 4 is overlapped on the support seat. At this time, the two sets of rollers 8 are respectively located on the corresponding slide rails 3, and the construction of the walking tower crane foundation is completed; when the walking tower crane foundation is installed, the tower crane is connected to the foundation section 7 to complete the installation of the tower crane.

[0055] The cooperation of various components in the above process can complete the construction of the walking tower crane foundation. There is no need to drill holes on the steps during the construction process, thereby avoiding damage to the step structure. Through the cooperation of the slide rail 3 and the mounting seat 4, the tower crane installed on the walking tower crane foundation can be moved on the steps. The tower crane can be flexibly moved according to construction needs. It is easy to use and has a wide range of uses. It can be applied to projects where the construction ground changes frequently. In addition, the overall structure of the walking tower crane foundation is simple, which can save construction space on the construction site and has the advantage of easy disassembly and assembly.

[0056] Example 2

[0057] The difference between Example 2 and Example 1 is that: referring to FIG. 8 , the first base column 18 is provided with a cover plate 21 , and the first base column 18 , the cover plate 21 and the bottom of the first support rod 17 are surrounded to form a pouring cavity 22 for pouring concrete.

[0058] The implementation principle of Example 2 is: when connecting the upper support seat 1 with the first base column 18, a cover plate is laid on the first base column 18, and then the upper support seat 1 is placed on the first base column 18. At this time, a casting cavity 22 is formed between the first base column 18, the cover plate and the upper support seat 1. By pouring concrete into the casting cavity 22, the upper support seat 1 can be fixed on the first base column 18, so that a stable connection is formed between the upper support seat 1 and the first base column 18.

[0059] Example 3

[0060] The difference between Example 3 and Example 1 is that: Fig. 9 The bottom support seat 2 includes a fixed rod 25 and a movable rod 26, which are coaxially slidably connected. The movable rod 26 is provided with first positioning holes 27 spaced apart along the length direction. The fixed rod 25 is provided with a second positioning hole, and a positioning pin 28 is passed through the second positioning hole. The positioning pin 28 is simultaneously passed through any of the first positioning holes 27.

[0061] The implementation principle of Example 3 is: the cooperation of the fixed rod 25 and the movable rod 26 allows the height of the high-part support seat 1 to be adaptively adjusted, thereby making the traveling tower crane foundation more adaptable and applicable to more different construction requirements.

[0062] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A walking tower crane foundation on a step, characterized in that: The invention comprises a plurality of upper support seats (1), a plurality of lower support seats (2), two slide rails (3) and a mounting seat (4); the plurality of upper support seats (1) are arranged on a structural column of the mounting step surface (5) at intervals along the length direction of the mounting step surface (5); the plurality of lower support seats (2) are arranged on a structural column of the lower mounting surface (6) at intervals along the length direction of the lower mounting surface (6); the tops of the plurality of upper support seats (1) and the plurality of lower support seats (2) are in the same horizontal plane; one of the slide rails (3) is arranged on the tops of the plurality of upper support seats (1); the other slide rail (3) is arranged on the tops of the plurality of lower support seats (2); a base section (7) for connecting with a tower crane is arranged on the mounting seat (4); two groups of rollers (8) are arranged on a side of the mounting seat (4) away from the base section (7); each group of rollers (8) is located on a slide rail (3).

2. The walking tower crane foundation on steps according to claim 1, characterized in that: A plurality of middle support seats (9) are arranged at intervals along the length direction on the step surface between the installation step surface (5) and the bottom installation surface (6); two connecting rods (10) are arranged on the middle support seat (9); and the ends of the two connecting rods (10) away from the middle support seat (9) are respectively connected to the upper support seat (1) and the bottom support seat (2).

3. The walking tower crane foundation on steps according to claim 2, characterized in that: The middle support seat (9), the bottom support seat (2) and the upper support seat (1) are all provided with limit plates (11), and when the two ends of the connecting rod (10) are respectively in contact with the two corresponding limit plates (11), the connecting rod (10) is in a horizontal state.

4. The walking tower crane foundation on steps according to claim 2, characterized in that: A first reinforcing rod (12) is arranged between adjacent middle support seats (9).

5. The walking tower crane foundation on steps according to claim 1, characterized in that: A second reinforcing rod (13) is arranged between adjacent bottom support seats (2).

6. The walking tower crane foundation on steps according to claim 1, characterized in that: The mounting seat (4) comprises two mounting frames (41) arranged opposite to each other, a mounting rod (42) is arranged between the two mounting frames (41), the base section (7) is arranged on the mounting rod (42), and rollers (8) are arranged at both ends of each mounting frame (41).

7. The walking tower crane foundation on steps according to claim 1, characterized in that: A first connecting plate (14) is provided at the bottom of the slide rail (3), and a second connecting plate (15) is provided at the top of the upper support seat (1) and the bottom support seat (2), and connecting bolts (16) are simultaneously passed through the first connecting plate (14) and the second connecting plate (15).

8. The walking tower crane foundation on steps according to claim 1, characterized in that: The high support seat (1) comprises a first support rod (17) and a first base column (18), wherein the first base column (18) is arranged on the mounting step surface (5), and the first support rod (17) is connected to the slide rail (3).

9. The walking tower crane foundation on steps according to claim 8, characterized in that: A first flange (19) is arranged on the first base column (18), a second flange (20) is arranged on the first support rod (17), and the first flange (19) and the second flange (20) are connected by bolts.

10. The walking tower crane foundation on steps according to claim 8, characterized in that: The first base column (18) is provided with a cover plate (21), and the first base column (18), the cover plate (21) and the bottom of the first support rod (17) are surrounded to form a pouring cavity (22) for pouring concrete.