Foldable pile foundation construction pore-forming detection device

The foldable pile foundation detection device addresses inefficiencies in existing methods by enabling quick and accurate hole measurements, enhancing construction efficiency and quality through telescopic rods and a wire take-up mechanism.

CN222253933UActive Publication Date: 2024-12-27CHINA GEZHOUBA GROUP NO 5 ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420970049.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2024-12-27
Estimated Expiration
2034-05-07

AI Technical Summary

Technical Problem

Existing pile foundation hole detection methods are cumbersome, risky, costly, and inefficient, requiring complex setups and lengthy data analysis, which affects construction efficiency and quality.

Method used

A foldable pile foundation construction hole detection device with a telescopic main and auxiliary rod, a centering device, and a wire take-up mechanism for quick and accurate measurement of hole diameter, depth, and inclination, allowing for easy operation and efficient data collection.

Benefits of technology

Facilitates fast and convenient detection, improving construction efficiency and hole quality by providing real-time measurement data for correction, reducing operational complexity and costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222253933U_ABST
    Figure CN222253933U_ABST
Patent Text Reader

Abstract

The utility model provides a foldable pile foundation construction pore-forming detection device which comprises a main measuring rod and an auxiliary rod, and the main measuring rod, the auxiliary rod and a centering device are connected into a whole through foldable shaft pins. The top of the main measuring rod and the top of the auxiliary rod are respectively provided with a water level used for judging the horizontal state. The centering device is composed of a base and a steering pulley, the measuring rope penetrates through the center point of the centering device, one end of the measuring rope is connected with the measuring hammer, the other end of the measuring rope is connected with the take-up device, the take-up device is fixed to the main measuring rod through a plug pin or a bolt, and the measuring hammer can move to a measuring face in the vertical direction by rotating the take-up device. The inclination and the hole diameter of the excavated hole are determined, and the depth of the excavated hole is determined through the scale change of the measuring rope. Rapid and convenient detection in the pile foundation construction process can be achieved, actual measurement analysis data are provided for deviation correction work in the construction process, the pile foundation hole forming quality is improved through process quality control, and the pile foundation construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation construction, in particular to a foldable pile foundation construction hole quality detection device, which can also be used as a centering and depth determination auxiliary device during excavation construction. Background Art

[0002] At present, pile foundation is a common foundation structure. The quality of pile foundation hole formation directly affects the safety and durability of the structure. In order to ensure that the quality of pile foundation construction meets the specifications and design requirements, the commonly used quality control methods are process detection and timely correction. During the construction process, the frequency of detection of hole diameter, hole depth and verticality is increased and assisted by correction methods to improve the quality of hole formation and reduce or avoid rework losses during the process. At present, the commonly used pile foundation hole formation detection methods include the cage method, the measuring rope or the hole formation detector, but these methods have the following disadvantages: First, the measuring rope method requires the establishment of an auxiliary construction platform and the use of cross control piles to measure verticality and hole diameter, which is complicated to operate and has high safety risks; second, the cage method requires the assistance of lifting equipment, and the detection time is long. The increase in the detection frequency not only increases the construction efficiency but also increases the cost; third, the hole formation detector has too large a one-time investment, which is suitable for underwater pile foundation detection, and the data analysis time after detection is long, and it is generally used for final hole detection. Utility Model Content

[0003] The purpose of the utility model is to provide a foldable pile foundation construction hole detection device to solve the above-mentioned problems. This device solves the problems of single detection means, complicated operation and low efficiency in the existing pile foundation construction process. The device is convenient for on-site storage and preservation, easy to operate, and can realize fast and convenient detection in the pile foundation construction process, provide measured analysis data for correction work in the construction process, improve the pile foundation hole quality through process quality control, and improve the pile foundation construction efficiency.

[0004] In order to realize the above-mentioned technical features, the purpose of the utility model is achieved as follows: a foldable pile foundation construction hole detection device, comprising a main measuring rod and an auxiliary rod, the main measuring rod and the auxiliary rod are connected to a centering device through a foldable axle pin to form a whole; the tops of the main measuring rod and the auxiliary rod are respectively provided with a level for judging the horizontal state; the centering device is composed of a base and a steering pulley, the measuring rope passes through the center point of the centering device, one end is connected to the measuring hammer, and the other end is connected to the wire take-up, the wire take-up is fixed to the main measuring rod by a pin or bolt, and rotating the wire take-up can make the measuring hammer move along the vertical direction to the measuring surface, and the inclination and aperture of the excavated hole are determined by measuring the position of the measuring hammer and the center point of the measuring section, and the depth of the excavated hole is determined by the scale change of the measuring rope.

[0005] The main measuring rod and the auxiliary rod both adopt a telescopic structure, including a fixed section, one end of which is hinged to the centering device through a foldable shaft pin, and the other end of the fixed section is telescopically sleeved with a telescopic section, and a telescopic connector is provided between the fixed section and the telescopic section, and the length of the main measuring rod and the auxiliary rod can be changed to ensure that the length meets the measurement of pile foundations of different sizes and can achieve the control requirements of the relative movement of the telescopic section and the fixed section.

[0006] The leveler is fixedly arranged on the top of the fixed section.

[0007] The wire take-up device is installed at the end of the telescopic joint of the main measuring rod.

[0008] The ends of the telescopic joints of the main measuring rod and the auxiliary rod are positioned and supported inside the positioning slots of the drilling platform.

[0009] The measuring rope is marked with scale values ​​for displaying depth.

[0010] The utility model has the following beneficial effects:

[0011] 1. The device of the utility model is convenient for on-site storage and preservation, easy to operate, and can realize fast and convenient detection during pile foundation construction, provide measured analysis data for deviation correction work during construction, improve the quality of pile foundation hole formation through process quality control, and improve the efficiency of pile foundation construction.

[0012] 2. The utility model ensures that the main side rod and the auxiliary rod can be folded by arranging the main measuring rod and the auxiliary measuring rod to be hingedly connected with the centering device.

[0013] 3. The telescopic joint of the utility model can slide outwards relatively to the fixed energy saving, so as to ensure that the length of the auxiliary rod meets the measurement requirements of different pile diameters.

[0014] 4. The utility model wire take-up device is connected with a measuring rope with a scale. The length of the measuring rope can be changed by turning the handle of the wire take-up device, so as to ensure the measurement of pile diameters at different depths. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0016] Figure 1 It is a plan view of a foldable pile foundation construction hole detection device.

[0017] Figure 2 This is a schematic elevation diagram of a foldable pile foundation construction hole detection device.

[0018] Figure 3 This is a schematic diagram of the folded state of the foldable pile foundation construction hole detection device.

[0019] In the figure: main measuring rod 1, auxiliary rod 2, centering device 3, level 4; telescopic connector 5, wire take-up device 6, measuring rope with scale 7, telescopic section 8, fixed section 9, folding axle pin 10, base 11, steering pulley 12, measuring hammer 13, positioning slot 14, drilling platform 15, original ground 16. DETAILED DESCRIPTION

[0020] The embodiments of the present utility model are further described below in conjunction with the accompanying drawings.

[0021] See also Figure 1-3 A foldable pile foundation construction hole detection device comprises a main measuring rod 1 and an auxiliary rod 2, wherein the main measuring rod 1 and the auxiliary rod 2 are connected as a whole with a centering device 3 through a foldable shaft pin 10; a level 4 for judging the horizontal state is respectively arranged on the top of the main measuring rod 1 and the auxiliary rod 2; the centering device 3 is composed of a base 11 and a steering pulley 12, a measuring rope 7 passes through the center point of the centering device 3, one end is connected to a measuring hammer 13, and the other end is connected to a wire take-up device 6, the wire take-up device 6 is fixed to the main measuring rod 1 by a pin or a bolt, and the wire take-up device 6 can be rotated to move the measuring hammer 13 to the measuring surface in the vertical direction, and the inclination and the aperture of the excavated hole are determined by measuring the position of the measuring hammer 13 and the center point of the measuring section, and the depth of the excavated hole is determined by the scale change of the measuring rope 7. The above-mentioned detection device is convenient for on-site storage and preservation, easy to operate, and can realize fast and convenient detection during pile foundation construction, provide measured analysis data for correction work during construction, improve the quality of pile foundation holes through process quality control, and improve the efficiency of pile foundation construction.

[0022] Furthermore, the main measuring rod 1 and the auxiliary rod 2 both adopt a telescopic structure, including a fixed section 9, one end of the fixed section 9 is hinged to the centering device 3 through a foldable axle pin 10, and the other end of the fixed section 9 is telescopically sleeved with a telescopic section 8, and a telescopic connector 5 is provided between the fixed section 9 and the telescopic section 8, and the length of the main measuring rod 1 and the auxiliary rod 2 can be changed to ensure that the length meets the measurement of pile foundations of different sizes, and can also achieve the control requirements of the relative movement of the telescopic section and the fixed section.

[0023] Further, the level 4 is fixedly arranged on the top of the fixed section 9. Through the above installation method, it is ensured that the level 4 can be reliably installed on the top of the fixed section 9. And the position of the bubble in the level 4 is used to judge whether the rods are in the same plane.

[0024] Furthermore, the wire take-up device 6 is installed at the end of the telescopic section 8 of the main measuring rod 1. The wire take-up device 6 can move the measuring hammer 13 to the measuring surface along the vertical direction, and the inclination and the aperture of the excavated hole can be determined by measuring the position of the measuring hammer 13 and the center point of the measuring section, and the depth of the excavated hole can be determined by the scale change of the measuring rope 7.

[0025] Furthermore, the ends of the telescopic joints 8 of the main measuring rod 1 and the auxiliary rod 2 are positioned and supported inside the positioning slots 14 of the drilling platform 15. The positioning slots 14 ensure that the centralizer is located at the center of the drilling platform.

[0026] Furthermore, the measuring rope 7 is marked with scale values ​​for displaying the depth.

[0027] Furthermore, the solution described is composed of a main measuring rod 1 and a plurality of auxiliary rods 2, and the preferred solution is composed of a main measuring rod 1 and one auxiliary rod 2.

[0028] The specific implementation process and principle of this utility model:

[0029] Before starting the measurement, adjust the telescopic length of the main measuring rod 1 and the auxiliary rod 2 according to the size of the hole diameter to ensure that the length of the measuring rod meets the requirements of the pile diameter, and then install the measuring rod into the positioning card slot 14, ensure that the centering device is located at the center of the drilling platform, and ensure that the measuring rods are located in the same plane according to the indication of the bubble in the level 4;

[0030] Then rotate the rope collector to make the hammer move downward through the diverting pulley until it reaches the center point of the measuring surface, thus measuring the hole depth, hole diameter and inclination.

[0031] When the measurement is completed and the data is recorded, first rotate the handle of the wire take-up device 6 to complete the recovery of the hammer 13, then adjust the foldable shaft pin 10 to fold the measuring rod, adjust the telescopic connector 5 to adjust the length of the rod, and put the rod in the initial state. In this way, the folded device is convenient for on-site storage and preservation.

Claims

1. A foldable pile foundation construction hole detection device, characterized in that: The invention comprises a main measuring rod (1) and an auxiliary rod (2), wherein the main measuring rod (1) and the auxiliary rod (2) are connected to a centering device (3) via a foldable shaft pin (10) to form an integral body; a level (4) for judging the horizontal state is respectively arranged at the top of the main measuring rod (1) and the auxiliary rod (2); the centering device (3) comprises a base (11) and a steering pulley (12); a measuring rope (7) passes through the center point of the centering device (3), one end of the measuring rope is connected to a measuring hammer (13), and the other end is connected to a wire take-up device (6); the wire take-up device (6) is fixed to the main measuring rod (1) via a pin or a bolt; the measuring hammer (13) can be moved to the measuring surface along the vertical direction by rotating the wire take-up device (6); the inclination and the diameter of the excavated hole are determined by measuring the position of the measuring hammer (13) and the center point of the measuring section; and the depth of the excavated hole is determined by the scale change of the measuring rope (7).

2. A foldable pile foundation construction hole detection device according to claim 1, characterized in that: The main measuring rod (1) and the auxiliary rod (2) both adopt a telescopic structure, including a fixed section (9), one end of the fixed section (9) is hinged to the centering device (3) through a foldable shaft pin (10), the other end of the fixed section (9) is telescopically sleeved with a telescopic section (8), a telescopic connector (5) is provided between the fixed section (9) and the telescopic section (8), and the length of the main measuring rod (1) and the auxiliary rod (2) can be changed, ensuring that the length meets the measurement of pile foundations of different sizes, and the control requirement of relative movement of the telescopic section and the fixed section can be achieved.

3. A foldable pile foundation construction hole detection device according to claim 2, characterized in that: The leveler (4) is fixedly arranged on the top of the fixed section (9).

4. According to claim 2, a foldable pile foundation construction hole detection device is characterized in that: The wire take-up device (6) is installed at the end of the telescopic joint (8) of the main measuring rod (1).

5. According to claim 1, a foldable pile foundation construction hole detection device is characterized in that: The ends of the telescopic joints (8) of the main measuring rod (1) and the auxiliary rod (2) are positioned and supported inside the positioning slots (14) of the drilling platform (15).

6. A foldable pile foundation construction hole detection device according to claim 1, characterized in that: The measuring rope (7) is marked with scale values ​​for displaying the depth.