Air bridge construction supporting structure

By designing the wind bridge construction support structure, using connecting ropes and steel mesh to form a slag-blocking net, combined with artificial walls and I-shaped steel support, the problems of wind bridge susceptibility and complex maintenance are solved, and the stability of the wind bridge is achieved and Improved safety extends service life and shortens maintenance cycle.

CN222253973UInactive Publication Date: 2024-12-27XINZHI COAL MINE OF HUOZHOU COAL & ELECTRICITY GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421190517.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2024-12-27
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During coal mining, the wind bridge is susceptible to deformation of the tunnel drum and impact of scum, resulting in cracks or collapse of the wind bridge wall, threatening the stability of the ventilation system and the safety of the mine. The traditional wind bridge is complex and time-consuming to maintain, and the rear bridge is removed. If the surface loses support, it is easy to cause scum to surge out of safety hazards.

Method used

Design a wind bridge construction support structure, including connecting ropes, steel bar mesh, artificial walls, bridge decks, ceiling ropes and I-shaped steel. The slag blocking net is formed through connecting ropes and steel bar mesh, and the slag is packed with woven bags, artificial walls Fixed scum, I-shaped steel supports the bridge deck, shorten the maintenance cycle, and improve the stability and safety of the wind bridge.

Benefits of technology

It improves the integrity and stability of the wind bridge, extends the service life, improves the construction safety factor, shortens the maintenance cycle, avoids the problem of scum gushing out, ensures that the wind bridge can be quickly removed and rebuilt after deformation, and enhances construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222253973U_ABST
    Figure CN222253973U_ABST
Patent Text Reader

Abstract

The utility model discloses an air bridge construction supporting structure, which belongs to the technical field of coal mining and comprises a connecting rope, a roadway, a reinforcing mesh, an artificial wall, a bridge floor, a ceiling rope, connecting channel steel and I-shaped steel. The slag blocking net is formed by combining the connecting ropes and the reinforcing mesh, the artificial wall is built in the slag blocking net, the wall body of the air bridge with the artificial wall does not make direct contact with scum, deformation and damage caused by extrusion of the scum are avoided, the complete stability of the air bridge is improved, the service life of the air bridge is prolonged, the safety coefficient of construction of the air bridge is improved, and the construction cost is reduced. After an artificial wall is built, two sets of ceiling ropes are constructed at the position, 0.5 m away from a bridge floor, of a roadway, connecting channel steel is fixed to the ceiling ropes through locks, then two pieces of I-shaped steel are fixed to the connecting channel steel, the locks are tensioned to hang the bridge floor, and the stability of the bridge floor is improved; the air bridge wall body can be directly and quickly dismounted and rebuilt, and the maintenance period is greatly shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of coal mining, in particular to a wind bridge construction support structure. Background Art

[0002] In the process of coal mining, wind bridges, as key nodes of the ventilation system, are often located at the intersection of tunnels and are easily affected by the deformation of the tunnel floor and the impact of slag, which can cause cracks in the wind bridge walls or even collapse, seriously threatening the stability of the ventilation system and mine safety. Traditional wind bridges are complex and time-consuming to repair, and after the wind bridge walls are removed, the bridge deck loses support, which can easily cause safety hazards such as slag outflow. Summary of the invention

[0003] The utility model aims to solve the problems raised in the background technology and provides a wind bridge construction support structure.

[0004] The technical solution of the utility model to achieve the above purpose is as follows:

[0005] A wind bridge construction support structure comprises a connecting rope, a lane, a steel mesh, an artificial wall, a bridge deck, a ceiling rope, a connecting channel steel and an I-beam; the two ends of the connecting rope are fixedly connected to the lane walls on both sides of the lane wind bridge, the connecting rope is fixedly connected to the steel mesh, the artificial wall is located in the lane and the upper end is fixedly connected to the bridge deck, the lower end of the artificial wall is fixedly connected to the bottom of the lane, the artificial wall is fixedly connected to the connecting rope, the artificial wall is fixedly connected to the steel mesh, the ceiling rope runs through the bridge deck and is fixedly connected to the connecting channel steel, and the I-beam is located between the bridge deck and the connecting channel steel and is fixedly connected to the connecting channel steel.

[0006] Preferably, a rope clip is provided on the connecting rope, and there are multiple connecting ropes respectively located on the sides of the laneway wind bridge, and the connecting ropes corresponding to the two laneways on each side of the laneway are fixedly connected by the rope clip.

[0007] Preferably, a reinforcement layer is provided on the bridge deck, the reinforcement layer is fixedly connected to the bridge deck, and the reinforcement layer is made of loess and cement.

[0008] Preferably, a clamping plate is provided on the I-beam, and the clamping plate is located between the I-beam and the bridge deck and is fixedly connected to the I-beam.

[0009] The utility model provides a wind bridge construction support structure, through its structural design, a slag retaining net is combined with a connecting rope and a steel mesh to form a buffer body, and slag or sand in a woven bag is used to build an artificial wall close to the slag retaining net in the slag retaining net formed by the connecting rope and the steel mesh. After the wind bridge is topped, the slag falls directly into the artificial wall, avoiding the cleaning of slag during the construction of the wind bridge wall. When the personnel build the wind bridge wall, they stand outside the slag retaining net to ensure safe operation. After the construction is completed, the wind bridge wall is blocked by the artificial wall so that it does not come into direct contact with the slag, avoiding deformation and damage due to the squeezing of the slag, thereby improving the integrity and stability of the wind bridge, extending the service life of the wind bridge, and improving the safety factor of the wind bridge construction. Two sets of ceiling ropes are constructed in the tunnel at a distance of 0.5m from the bridge deck, and the connecting channel steels are fixed to the ceiling ropes with locks. Then two I-beams are fixed to the connecting channel steels, and the locks are pulled and expanded to suspend the bridge deck, thereby improving the stability of the bridge deck. When the wind bridge wall needs to be repaired, since the bridge deck is supported by the I-beams, the wind bridge wall can be directly and quickly dismantled and rebuilt, greatly shortening the maintenance cycle. Compared with the prior art, the utility model improves the integrity and stability of the wind bridge, extends the service life of the wind bridge, and improves the safety factor of the wind bridge construction. At the same time, the wind bridge wall can be directly dismantled and rebuilt after the wind bridge wall is deformed, thereby avoiding the problem of the bridge deck being unable to support and slag gushing out after the traditional wind bridge wall is dismantled. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a structural schematic diagram of the wind bridge construction support structure described in the utility model.

[0011] Figure 2 It is a side structural schematic diagram of the wind bridge construction support structure described in the utility model.

[0012] Figure 3 yes Figure 2 Schematic diagram of the structure at A shown in FIG.

[0013] In the figure: 1. connecting rope; 2. tunnel; 3. steel mesh; 4. artificial wall; 5. bridge deck; 6. ceiling rope; 7. connecting channel steel; 8. I-beam; 9. rope clamp; 10. reinforcement layer; 11. plywood. DETAILED DESCRIPTION

[0014] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0015] In the description of the present invention, it should be noted that the terms "upper / lower end", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0016] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "setting / sleeving", "sleeve connection", "connection", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0017] like Figures 1 to 3 As shown, this embodiment provides a wind bridge construction support structure, including a connecting rope 1, a lane 2, a steel mesh 3, an artificial wall 4, a bridge deck 5, a ceiling rope 6, a connecting channel steel 7, and an I-beam 8; both ends of the connecting rope 1 are fixedly connected to the lane walls on both sides of the wind bridge of the lane 2, the connecting rope 1 is fixedly connected to the steel mesh 3, the artificial wall 4 is located in the lane 2 and the upper end is fixedly connected to the bridge deck 5, the lower end of the artificial wall 4 is fixedly connected to the bottom of the lane 2, the artificial wall 4 is fixedly connected to the connecting rope 1, the artificial wall 4 is fixedly connected to the steel mesh 3, the ceiling rope 6 runs through the bridge deck 5 and is fixedly connected to the connecting channel steel 7, and the I-beam 8 is located between the bridge deck 5 and the connecting channel steel 7 and is fixedly connected to the connecting channel steel 7.

[0018] In this embodiment, a rope clamp 9 is provided on the connecting rope 1. There are multiple connecting ropes 1 and they are respectively located on the sides of the tunnel 2 wind bridge. The connecting ropes 1 corresponding to the two sides of the tunnel 2 are fixedly connected by the rope clamp 9. By using the rope clamp 9 to connect the two connecting ropes 1, a more stable structural system can be formed to improve the overall stability.

[0019] In this embodiment, a reinforcement layer 10 is provided on the bridge deck 5. The reinforcement layer 10 is fixedly connected to the bridge deck 5. The reinforcement layer 10 is made of loess and cement. The reinforcement layer 10 on the bridge deck 5 can improve the thermal insulation performance of the tunnel 2 without affecting the strength of the bridge deck 5.

[0020] In this embodiment, a splint 11 is provided on the I-beam 8. The splint 11 is located between the I-beam 8 and the bridge deck 5 and is fixedly connected to the I-beam 8. The splint 11 on the I-beam 8 can increase the contact area between the I-beam 8 and the bridge deck 5, thereby increasing the bearing capacity of the bridge deck 5.

[0021] The construction method of the wind bridge construction support structure described in this embodiment is as follows:

[0022] When constructing the wind bridge top, firstly, multiple groups of connecting ropes 1 are constructed from top to bottom on the side of the roadway at the wind bridge of the roadway 2, and the connecting ropes 1 on the two sides of the roadway are connected in the middle with rope clamps 9. By connecting the two connecting ropes 1 with rope clamps 9, a more stable structural system can be formed to improve the overall stability. After the connection, the steel mesh 3 is fixed to the rope net composed of the connecting ropes 1 with steel wire to form a slag blocking net. After the slag blocking net is installed, slag or sand is filled in woven bags to build an artificial wall 4 close to the slag blocking net in the interception net, and then two groups of ceiling ropes 6 are constructed in the roadway at a distance of 0.5m from the bridge deck. , fix the connecting channel steel 7 to the ceiling rope 6 with a lock and fix two I-beams 8 to the connecting channel steel 7, pull the lock to suspend the bridge deck 5, and improve the stability of the bridge deck 5. The plywood 11 on the I-beam 8 can increase the contact area between the I-beam 8 and the bridge deck 5, and improve the bearing capacity of the bridge deck 5. The reinforcement layer 10 on the bridge deck 5 can improve the thermal insulation performance of the lane 2 without affecting the strength of the bridge deck 5. When the wind bridge wall needs to be repaired, since the bridge deck 5 is supported by the I-beam 8, the wind bridge wall can be directly and quickly dismantled and rebuilt, which greatly shortens the maintenance cycle.

[0023] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".

[0024] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A wind bridge construction support structure, characterized in that: The invention comprises a connecting rope (1), a lane (2), a steel mesh (3), an artificial wall (4), a bridge deck (5), a ceiling rope (6), a connecting channel steel (7), and an I-beam (8); the two ends of the connecting rope (1) are fixedly connected to the lane walls on both sides of the wind bridge of the lane (2); the connecting rope (1) is fixedly connected to the steel mesh (3); the artificial wall (4) is located in the lane (2) and its upper end is fixedly connected to the bridge deck (5); the lower end of the artificial wall (4) is fixedly connected to the bottom of the lane (2); the artificial wall (4) is fixedly connected to the connecting rope (1); the artificial wall (4) is fixedly connected to the steel mesh (3); the ceiling rope (6) runs through the bridge deck (5) and is fixedly connected to the connecting channel steel (7); the I-beam (8) is located between the bridge deck (5) and the connecting channel steel (7) and is fixedly connected to the connecting channel steel (7).

2. The wind bridge construction support structure according to claim 1 is characterized in that: A rope clamp (9) is provided on the connecting rope (1), and there are a plurality of connecting ropes (1) respectively located on the sides of the wind bridge of the lane (2), and the connecting ropes (1) corresponding to the two sides of the lane on each side of the lane (2) are fixedly connected by the rope clamp (9).

3. The wind bridge construction support structure according to claim 1 is characterized in that: A reinforcement layer (10) is provided on the bridge deck (5), the reinforcement layer (10) is fixedly connected to the bridge deck (5), and the reinforcement layer (10) is made of loess and cement.

4. The wind bridge construction support structure according to claim 1 is characterized in that: A clamping plate (11) is provided on the I-beam (8), and the clamping plate (11) is located between the I-beam (8) and the bridge deck (5) and is fixedly connected to the I-beam (8).