By introducing adjustable formwork support frame and telescopic support rod assembly into the tunnel cable trench formwork walking device, the construction problem that cannot be adapted to cable trench of different widths in the prior art is solved, reducing costs and improving construction stability and forming quality .
Patent Information
- Application Number
- CN202421217266.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2034-05-31
AI Technical Summary
The existing tunnel cable trench formwork walking device cannot adapt to cable trench construction of different widths, the construction cost is high and the formwork installation is unstable, which affects the forming quality.
A device including a walking car body, a template support frame and a telescopic support rod assembly is designed. The spacing and support rod length of the template support frame are adjusted through a dual-axis motor and screw transmission, adapting to cable trenches of different widths, and locking the shrapnel and nut lock support rod assembly for improved stability.
It realizes flexible adaptation to cable trenches of different widths, reduces construction costs, and improves the stability and molding quality of cable trench formwork.
Smart Images

Figure CN222253987U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction, in particular to a tunnel cable trench template walking device. Background Art
[0002] The tunnel cable trench is set up to ensure the normal operation of the equipment inside the tunnel. Its main function is to provide a cable channel and ensure that the cable will not be affected by environmental factors such as traffic and water flow in the tunnel. The tunnel cable trench is usually placed on the top or side wall of the tunnel, and corresponding protection measures such as grounding copper wire and fire prevention equipment are set up. During the construction of the tunnel cable trench, it is necessary to set up a cable trench template and cast it into shape through concrete pouring.
[0003] In the prior art, for example, the utility model patent with application number CN202120235139.X discloses a combined tunnel cable trench template running device, which is formed by setting two main I-beams, two side I-beams and at least three bottom I-beams, and connecting them to each other through non-welding to form a running frame, and setting rollers on the bottom surface of the main I-beams, setting template mounting plates at both ends of the main I-beams, and fixing suitable cable trench templates on the template mounting plates, so that the entire running device can be pushed to perform cable trench construction, and the construction intensity is low. In this device, the cable trench template is installed on the template mounting plates on both sides, and the spacing between the cable trench templates on both sides is fixed, which cannot adapt to cable trenches of different widths, and the construction cost is relatively high.
[0004] Therefore, it is necessary to propose a tunnel cable trench template walking device to solve the problems existing in the prior art. Utility Model Content
[0005] A series of simplified concepts are introduced in the utility model content section, which will be further described in detail in the detailed implementation section. The utility model content section of the utility model does not mean to attempt to define the key features and essential technical features of the technical solution claimed for protection, nor does it mean to attempt to determine the scope of protection of the technical solution claimed for protection.
[0006] In order to solve the above problems, the utility model discloses a tunnel cable trench template walking device; the utility model comprises:
[0007] The walking trolley body has template support frames slidably arranged on both sides of the walking trolley body, the template support frames are connected to the tunnel cable trench template, a support rod assembly is hinged between the top of the walking trolley body and the top of the template support frame, and the support rod assembly is telescopically arranged.
[0008] Preferably, the walking trolley body includes two sets of frames arranged front and rear, and the frames include: a main beam, a center rod and a frame support rod, the center rod is connected to the center of the main beam, two frame support rods are symmetrically arranged on both sides of the center rod, and the frame support rods are obliquely connected between the main beam and the center rod; reinforcing rods are connected between the main beams and the center rods of the two sets of frames.
[0009] Preferably, the bottom of the main beam is connected with a traveling wheel.
[0010] Preferably, the formwork support frame includes: a transverse adjustment plate and a support plate, the transverse adjustment plate is slidably connected to the cavity of the main beam, and the two transverse adjustment plates are symmetrically arranged on both sides of the main beam and extend out of the main beam; the support plate is connected to the extended end of the transverse adjustment plate, and the support plate is simultaneously connected to the transverse adjustment plates on the same side of the two sets of frames.
[0011] Preferably, the support plate is provided with mounting holes for mounting the tunnel cable trench template.
[0012] Preferably, a dual-axis motor is arranged at the center of the cavity of the main beam, and two output ends of the dual-axis motor are symmetrically connected with screws. A threaded hole is opened at the end of the transverse adjustment plate, and the screw is screwed into the threaded hole.
[0013] Preferably, the support rod assembly includes: an upper support rod, a lower support rod and an adjustment tube. The top end of the upper support rod is hinged to the side of the support plate, and the bottom end of the lower support rod is hinged to the top surface of the main beam. The adjustment tube is simultaneously mounted on the upper support rod and the lower support rod without detachment.
[0014] Preferably, both ends of the adjusting tube are provided with conically arranged open ring segments, and the diameter of one end of the open ring segment connected to the adjusting tube body is smaller than the diameter of the other end, and the open ring segment is formed with a plurality of locking springs arranged at intervals.
[0015] Preferably, a threaded tube is provided at the portion where the adjusting tube is connected to the locking spring sheet, and a locking nut is sleeved on the threaded tube.
[0016] Preferably, the outer wall of the locking nut is evenly provided with anti-slip patterns.
[0017] Compared with the prior art, the present invention has at least the following beneficial effects:
[0018] The tunnel cable trench formwork walking device provided in this embodiment can adjust the relative position of the formwork support frame and the walking trolley body during the construction of the tunnel cable trench formwork, adjust the spacing between the tunnel cable trench formwork, and thus adapt to the construction of cable trenches of different widths. It can be reused to reduce construction costs; adjust the length of the support rod assembly and lock it to provide support for the top of the formwork support frame, thereby improving the stability of the tunnel cable trench formwork and improving the casting quality of the cable trench.
[0019] The tunnel cable trench template walking device described in the utility model, other advantages, objectives and features of the utility model will be partially reflected through the following description, and partly will also be understood by technical personnel in the field through research and practice of the utility model. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 It is a schematic diagram of the structure of the utility model;
[0022] Figure 2 It is a schematic diagram of the cross-sectional structure of the utility model;
[0023] Figure 3 This is a schematic diagram of the installation structure of the support rod assembly in the utility model;
[0024] Figure 4 It is a schematic diagram of the end structure of the regulating tube in the utility model.
[0025] In the figure: 1. Walking trolley body; 2. Formwork support frame; 3. Support rod assembly; 4. Walking wheel; 11. Main beam; 12. Center rod; 13. Frame support rod; 14. Cavity; 15. Dual-axis motor; 16. Screw; 21. Horizontal adjustment plate; 22. Support plate; 23. Mounting hole; 24. Threaded hole; 31. Upper support rod; 32. Lower support rod; 33. Adjustment tube; 34. Locking spring; 35. Threaded tube; 36. Locking nut. DETAILED DESCRIPTION
[0026] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] Example
[0028] The utility model will be further described below in conjunction with the accompanying drawings.
[0029] like Figure 1-4 As shown, the tunnel cable trench template walking device provided in this embodiment includes:
[0030] A walking trolley body 1 has template support frames 2 slidably arranged on both sides of the walking trolley body 1, the template support frames 2 are connected to the tunnel cable trench template, a support rod assembly 3 is hinged between the top of the walking trolley body 1 and the top of the template support frame 2, and the support rod assembly 3 is retractable.
[0031] During the construction of the tunnel cable trench formwork, the formwork support frame 2 is slid on both sides of the walking trolley body 1, and the distance between the two formwork support frames 2 is adjusted to adapt to the construction of cable trenches of different widths; the length of the support rod assembly 3 is adjusted and locked to provide support for the top of the formwork support frame 2, thereby improving the stability of the tunnel cable trench formwork.
[0032] Among them, the walking trolley body 1 includes two sets of frames arranged front and back, and the frames include: a main beam 11, a center rod 12 and a frame support rod 13. The center rod 12 is connected to the center of the main beam 11, and two frame support rods 13 are symmetrically arranged on both sides of the center rod 12. The frame support rod 13 is obliquely connected between the main beam 11 and the center rod 12; reinforcing rods are connected between the main beams 11 and the center rods 12 of the two sets of frames.
[0033] The walking trolley body 1 is assembled by splicing steel structures. During assembly, the center rod 12 is first installed at the center of the main beam 11, and the frame support rod 13 is set between the main beam 11 and the center rod 12 to form a group of frames. Then, another group of frames is assembled in the same way, and a reinforcing rod is installed between the two groups of frames to fix the two groups of frames to form the walking trolley body 1. The installation is simple and convenient for assembly at the construction site.
[0034] Wherein, the bottom of the main beam 11 is connected with a running wheel 4. The running wheel 4 can push the running trolley body 1 to walk in the cable trench, which is convenient for the flexible movement of the cable trench template.
[0035] The formwork support frame 2 includes: a transverse adjustment plate 21 and a support plate 22. The transverse adjustment plate 21 is slidably connected to the cavity 14 of the main beam 11. The two transverse adjustment plates 21 are symmetrically arranged on both sides of the main beam 11 and extend out of the main beam 11. The support plate 22 is connected to the extended end of the transverse adjustment plate 21. The support plate 22 is simultaneously connected to the transverse adjustment plates 21 on the same side of the two sets of frames. The support plate 22 connects the transverse adjustment plates 21 of the two sets of frames, expands the area of the support plate 22, and ensures the synchronous action of the formwork support frames 2 in the two sets of frames.
[0036] The support plate 22 is provided with mounting holes 23 for mounting the tunnel cable trench template.
[0037] Among them, a dual-axis motor 15 is arranged in the center of the cavity 14 of the main beam 11, and the two output ends of the dual-axis motor 15 are symmetrically connected with screws 16, and the end of the transverse adjustment plate 21 is provided with a threaded hole 24, and the screw 16 is screwed into the threaded hole 24. The two output ends of the dual-axis motor 15 can drive the screws 16 on both sides to rotate simultaneously, and the screws 16 and the threaded holes 24 of the transverse adjustment plate 21 are threadedly driven to synchronously adjust the extension length of the transverse adjustment plate 21, and then synchronously adjust the spacing of the support plates 22 to adapt to tunnel cable trenches of different widths.
[0038] The support rod assembly 3 includes: an upper support rod 31, a lower support rod 32 and an adjustment tube 33. The top end of the upper support rod 31 is hinged to the side of the support plate 22, and the bottom end of the lower support rod 32 is hinged to the top surface of the main beam 11. The adjustment tube 33 is sleeved on the upper support rod 31 and the lower support rod 32 at the same time without separation. The upper support rod 31, the lower support rod 32 and the adjustment tube 33 are connected to form a complete support rod structure, which can adapt to the position of the support plate 22 to extend or shorten the entire structure when the support plate 22 moves.
[0039] Among them, Figure 4 As shown, both ends of the adjusting tube 33 are provided with conical open ring segments, and the diameter of one end of the open ring segment connected to the main body of the adjusting tube 33 is smaller than the diameter of the other end, and the open ring segment is formed with a plurality of locking springs 34 arranged at intervals.
[0040] A threaded tube 35 is provided at the portion where the adjusting tube 33 and the locking spring piece 34 are connected, and a locking nut 36 is sleeved on the threaded tube 35 .
[0041] The outer wall of the locking nut 36 is evenly provided with anti-slip patterns.
[0042] The locking nut 36 is threadedly connected to the threaded tube 35. The locking nut 36 is rotated to move it toward the end of the locking spring plate 34, thereby generating pressure on the locking spring plate 34, and fastening the locking spring plate 34 to the upper support rod 31 and the lower support rod 32, thereby locking and limiting the upper support rod 31 and the adjusting tube 33, and between the lower support rod 32 and the adjusting tube 33.
[0043] The working principle of the utility model is:
[0044] The tunnel cable trench template walking device provided in this embodiment is first assembled on the construction site during tunnel construction. The specific assembly process is as follows: first, the center rod 12 is installed at the center of the main beam 11, and the frame support rod 13 is set between the main beam 11 and the center rod 12 to form a set of frames. Then, another set of frames is assembled in the same way, and a reinforcing rod is installed between the two sets of frames. The two sets of frames are fixed to form the walking trolley body 1; secondly, according to the width of the tunnel cable trench to be constructed, the dual-axis motor 15 is started to drive the two screw rods 16 to rotate synchronously, and the screw rod 16 is threadedly transmitted with the lateral adjustment plate 21 to make the lateral adjustment plate 21 rotate synchronously. The plate 21 is extended or retracted to adjust the distance between the two support plates 22, and the tunnel cable trench template installed on the support plate 22 is adjusted to a preset width; then, the locking nut 36 is rotated to move toward the end of the locking spring 34, and pressure is applied to the locking nut 36 to reduce the distance between adjacent locking nuts 36, and squeeze the upper support rod 31 and the lower support rod 32, and lock the upper support rod 31 and the adjustment tube 33, and the lower support rod 32 and the adjustment tube 33. At this time, the support rod assembly 3 can provide stable support for the support plate 22; finally, as the construction proceeds, the walking trolley body 1 is pushed to make it move along the cable trench.
[0045] When the width of the tunnel cable trench template needs to be adjusted again, the locking nut 36 is rotated in the opposite direction away from the end of the locking spring 34, so that the locking spring 34 loses pressure and resets, thereby releasing the lock on the upper support rod 31, the lower support rod 32 and the adjustment tube 33. The adjustment tube 33 can slide on the upper support rod 31 and the lower support rod 32 to adapt to the adjustment process.
[0046] The beneficial effects of the utility model are:
[0047] The tunnel cable trench formwork walking device provided in this embodiment can adjust the relative position of the formwork support frame 2 and the walking trolley body 1 during the construction of the tunnel cable trench formwork, adjust the spacing of the tunnel cable trench formwork, and thus adapt to the construction of cable trenches of different widths. It can be reused to reduce construction costs; adjust the length of the support rod assembly 3 and lock it to provide support for the top of the formwork support frame 2, thereby improving the stability of the tunnel cable trench formwork and improving the casting quality of the cable trench.
[0048] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0049] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. Tunnel cable trench template walking device, characterized in that: include: A walking trolley body (1) is provided with template support frames (2) slidably disposed on both sides of the walking trolley body (1), the template support frames (2) are connected to the tunnel cable trench template, a support rod assembly (3) is hinged between the top of the walking trolley body (1) and the top of the template support frame (2), and the support rod assembly (3) is telescopically disposed.
2. The tunnel cable trench template walking device according to claim 1 is characterized in that: The walking trolley body (1) comprises two sets of frames arranged front and rear, the frames comprising: a main beam (11), a center rod (12) and a frame support rod (13), the center rod (12) is connected to the center of the main beam (11), two frame support rods (13) are symmetrically arranged on both sides of the center rod (12), and the frame support rods (13) are obliquely connected between the main beam (11) and the center rod (12); reinforcing rods are connected between the main beams (11) of the two sets of frames and between the center rods (12).
3. The tunnel cable trench template walking device according to claim 2 is characterized in that: The bottom of the main beam (11) is connected with a traveling wheel (4).
4. The tunnel cable trench template walking device according to claim 2 is characterized in that: The formwork support frame (2) comprises: a transverse adjustment plate (21) and a support plate (22); the transverse adjustment plate (21) is slidably connected to the cavity (14) of the main beam (11); the two transverse adjustment plates (21) are symmetrically arranged on both sides of the main beam (11) and extend out of the main beam (11); the support plate (22) is connected to the extended end of the transverse adjustment plate (21); the support plate (22) is simultaneously connected to the transverse adjustment plates (21) on the same side of the two sets of vehicle frames.
5. The tunnel cable trench template walking device according to claim 4 is characterized in that: The support plate (22) is provided with a mounting hole (23) for mounting a tunnel cable trench template.
6. The tunnel cable trench template walking device according to claim 4 is characterized in that: A double-shaft motor (15) is arranged at the center of the cavity (14) of the main beam (11), two output ends of the double-shaft motor (15) are symmetrically connected with screw rods (16), a threaded hole (24) is opened at the end of the transverse adjustment plate (21), and the screw rod (16) is screwed into the threaded hole (24).
7. The tunnel cable trench template walking device according to claim 4 is characterized in that: The support rod assembly (3) comprises: an upper support rod (31), a lower support rod (32) and an adjustment tube (33); the top end of the upper support rod (31) is hinged to the side of the support plate (22); the bottom end of the lower support rod (32) is hinged to the top surface of the main beam (11); and the adjustment tube (33) is simultaneously sleeved on the upper support rod (31) and the lower support rod (32) without being detached.
8. The tunnel cable trench template walking device according to claim 7 is characterized in that: Both ends of the regulating tube (33) are provided with conical open ring segments, and the diameter of one end of the open ring segment connected to the regulating tube (33) body is smaller than the diameter of the other end, and the open ring segment is formed with a plurality of locking springs (34) arranged at intervals.
9. The tunnel cable trench template walking device according to claim 8, characterized in that: The portion where the adjusting tube (33) is connected to the locking spring sheet (34) is provided with a threaded tube (35), and a locking nut (36) is sleeved on the threaded tube (35).
10. The tunnel cable trench template walking device according to claim 9, characterized in that: The outer wall of the locking nut (36) is evenly provided with anti-slip patterns.