Chemical plant equipment bolt installation fixed-distance support

By introducing adjustment plates, anti-corrosion pipes and reinforced pad rings into the fixed-distance bracket of the bolt installation of chemical plant equipment, combined with fixed pins, springs and buckles, the problem of inconvenient adjustment and corrosion of bolts in the existing technology is solved, and flexible adaptation is achieved Different sizes require and improve stability and convenience.

CN222254651UActive Publication Date: 2024-12-27SHENYANG ANHAO SAFETY ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421198449.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2024-12-27
Estimated Expiration
2034-05-29

AI Technical Summary

Technical Problem

The installation of bolts in existing chemical plant equipment is not convenient for size adjustment, cannot meet the construction needs of different sizes, has low working efficiency, and the pre-embedded bolt fixing method has corrosion problems caused by welding, which affects the installation and service life of the equipment.

Method used

A bolt-mounted fixed-distance bracket including an anti-slip base plate, a fixed mounting assembly and an adjusting fixing assembly is designed. Through the combination of the adjustment plate, anti-corrosion pipe and reinforced pad ring, the distance between the installation plates is realized to prevent thread corrosion, and through The fit of the fixing pin, spring and buckle simplifies the adjustment process.

Benefits of technology

It achieves adaptability to installation requirements of different sizes, extends service life, improves installation stability and adjustment convenience, simplifies the operation process, and is convenient for widespread promotion and use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222254651U_ABST
    Figure CN222254651U_ABST
Patent Text Reader

Abstract

The utility model discloses a chemical plant equipment bolt installation distance fixing support, which relates to the technical field of bolt installation distance fixing, and comprises an anti-skid bottom plate, a fixed installation assembly is arranged at the top of the anti-skid bottom plate, the fixed installation assembly comprises an installation plate, and the installation plate is fixedly installed at the top of the anti-skid bottom plate. Wherein one end of one mounting plate is fixedly connected with a connecting assembly, the connecting assembly comprises a fixing plate, the fixing plate is fixedly connected to one end of the mounting plate, and an adjusting fixing assembly is fixedly mounted at the top of the fixing plate. The distance between the two mounting plates can be changed conveniently, mounting requirements of different sizes can be met, the anti-corrosion pipe is made of anti-corrosion materials, an internal thread structure can be prevented from being corroded and damaged, the situation that a threaded bolt to be mounted cannot be mounted is avoided, long-term use is facilitated, the service life is prolonged, friction force can be increased through the reinforcing backing ring, and the service life is prolonged. The to-be-mounted bolt is prevented from loosening, and the stability after mounting is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bolt installation spacing, in particular to a bolt installation spacing bracket for chemical plant equipment. Background Art

[0002] With the rapid development of my country's economy, the installation of chemical plants, power plants, and various large-scale new industrial equipment is increasing, and pre-embedded bolts of various foundations are widely used. Compared with traditional buildings, the pre-embedded bolts of the foundations of such buildings have many specifications, large quantities, and high construction precision requirements. Once a large deviation occurs in the pre-embedded bolts, it will directly affect the normal installation and commissioning of the equipment, which plays a key role in the entire project. The main method of fixing pre-embedded bolts in industrial buildings is the electric welding method of pre-embedded bolts. This method mainly uses welding to fix the pre-embedded bolts to the steel bars of the foundation short columns, and installs the steel structure after the pouring is completed. In order to improve the accuracy of bolt installation and positioning, this application provides a chemical plant equipment bolt installation spacing bracket. The following problems exist in the prior art:

[0003] 1. The existing bolt-mounted spacing brackets for chemical plant equipment are not easy to adjust in size, cannot meet the construction requirements of different sizes, have low work efficiency, and are not easy to promote and use widely. Utility Model Content

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is:

[0005] A distance bracket for bolt installation of chemical plant equipment comprises an anti-skid base plate, a fixed installation component is arranged on the top of the anti-skid base plate, the fixed installation component comprises a mounting plate, the mounting plate is fixedly installed on the top of the anti-skid base plate, one end of one of the mounting plates is fixedly connected with a connecting component, the connecting component comprises a fixing plate, the fixing plate is fixedly connected to one end of the mounting plate, an adjusting fixing component is fixedly installed on the top of the fixing plate, and one end of the fixing plate is slidably connected with an extension component.

[0006] A further improvement of the technical solution of the utility model is that the extension component includes an adjustment plate, the adjustment plate slides inside the fixing plate, an adjustment fixing hole is opened on the top of the adjustment plate, and one end of the adjustment plate is fixedly connected to the limiting plate.

[0007] A further improvement of the technical solution of the utility model is that: one end of the fixing plate is fixedly connected with a welding plate, and the fixing plate is fixedly connected to the mounting plate through the welding plate.

[0008] A further improvement of the technical solution of the utility model is that an adjustment groove is integrally formed inside the fixing plate, and a through hole is opened on the top of the fixing plate.

[0009] A further improvement of the technical solution of the utility model is that an anti-corrosion pipe is installed through the interior of the installation plate, and a connecting thread is arranged inside the anti-corrosion pipe.

[0010] A further improvement of the technical solution of the utility model is that a reinforcing gasket is movably connected to the top of the anti-corrosion pipe, and the anti-corrosion pipe is threadedly connected to the bolts to be installed through connecting threads.

[0011] A further improvement of the technical solution of the utility model is that the adjustment and fixing assembly includes a fixing tube, the fixing tube is fixedly installed on the top of the fixing plate, the top of the fixing tube is slidably connected with a draw buckle, the bottom end of the draw buckle is fixedly connected with a fixing pin, and the fixing pin runs through the interior of the fixing tube.

[0012] A further improvement of the technical solution of the utility model is that a spring is fixedly installed inside the fixing tube, the top end of the spring is fixedly connected to the bottom of the buckle, the bottom of the buckle is fixedly connected to a limiting ring, and a pin hole is provided at the bottom of the fixing tube.

[0013] Due to the adoption of the above technical solution, the utility model has achieved the following technical progress compared with the prior art:

[0014] 1. The utility model provides a spacing bracket for bolt installation of chemical plant equipment. Through the joint action of an adjusting plate, an anti-corrosion pipe and a reinforcing gasket, the adjusting plate slides at one end of a fixed plate. The sliding of the adjusting plate can be telescopically adjusted, which is convenient for changing the distance between the two mounting plates and can meet installation requirements of different sizes. The anti-corrosion pipe is embedded and installed inside the mounting plate. The anti-corrosion pipe is made of anti-corrosion material, which can prevent the internal threaded structure from being corroded and damaged, and prevent the threaded bolts to be installed from being unable to be installed, which is convenient for long-term use and increases the service life. The reinforcing gasket is arranged on the top of the anti-corrosion pipe. The reinforcing gasket can increase friction, prevent the bolts to be installed from loosening, and improve stability after installation.

[0015] 2. The utility model provides a bolt-mounted spacing bracket for chemical plant equipment. Through the joint action of a fixing pin, a spring and a buckle, the buckle slides on the top of a fixing tube, and the fixing pin is fixedly connected to the bottom of the buckle. When in use, the fixing pin can be pulled out through the buckle. The fixing pin passes through the through hole and the inside of the adjustment fixing hole to fix the adjustment plate. The spring is fixedly connected between the fixing tube and the buckle. The buckle can return to the initial position under the action of the spring elastic force, thereby improving the convenience of adjusting and fixing the adjustment plate. The structure is simple and the operation is convenient, which is convenient for wide promotion and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the overall structure of a bolt-mounted spacing bracket for chemical plant equipment according to the utility model;

[0017] Figure 2 It is a structural schematic diagram of the adjustment and fixing assembly of the utility model;

[0018] Figure 3 It is a structural schematic diagram of the fixing assembly of the utility model;

[0019] Figure 4 It is a structural schematic diagram of the elongation component of the utility model;

[0020] Figure 5 It is a structural schematic diagram of the connection component of the utility model.

[0021] In the figure: 1. Anti-slip base plate; 2. Fixed installation assembly; 21. Mounting plate; 22. Anti-corrosion pipe; 23. Connecting thread; 24. Reinforcement gasket; 25. Bolt to be installed; 3. Connecting assembly; 31. Fixing plate; 32. Welding plate; 33. Adjustment groove; 34. Through hole; 4. Adjustment fixing assembly; 41. Fixing pipe; 42. Buckle; 43. Limiting ring; 44. Fixing pin; 45. Spring; 46. Pin hole; 5. Extension assembly; 51. Adjustment plate; 52. Limiting plate; 53. Adjustment fixing hole. DETAILED DESCRIPTION

[0022] The present invention is further described in detail below in conjunction with the embodiments:

[0023] like Figure 1-5 As shown, the utility model provides a bolt installation spacing bracket for chemical plant equipment, including an anti-skid bottom plate 1, a fixed installation component 2 is arranged on the top of the anti-skid bottom plate 1, and the fixed installation component 2 includes a mounting plate 21, and the mounting plate 21 is fixedly installed on the top of the anti-skid bottom plate 1. One end of one of the mounting plates 21 is fixedly connected with a connecting component 3, and the connecting component 3 includes a fixing plate 31, and the fixing plate 31 is fixedly connected to one end of the mounting plate 21. The top of the fixing plate 31 is fixedly installed with an adjusting fixing component 4, and one end of the fixing plate 31 is slidably connected with an extension component 5, and the extension component Component 5 includes an adjustment plate 51, which can be slid to perform telescopic adjustment, so as to change the distance between the two mounting plates 21 and meet the installation requirements of different sizes. The adjustment plate 51 slides inside the fixed plate 31, and an adjustment fixing hole 53 is provided on the top of the adjustment plate 51. One end of the adjustment plate 51 is fixedly connected to a limiting plate 52, and one end of the fixed plate 31 is fixedly connected to a welding plate 32. The fixed plate 31 is fixedly connected to the mounting plate 21 through the welding plate 32. An adjustment groove 33 is integrally formed inside the fixed plate 31, and a through hole 34 is provided on the top of the fixed plate 31.

[0024] like Figure 2 and Figure 3As shown, the utility model provides a technical solution: preferably, an anti-corrosion tube 22 is installed through the interior of the mounting plate 21. The anti-corrosion tube 22 is made of anti-corrosion material, which can prevent the internal threaded structure from being damaged by corrosion and prevent the threaded bolts 25 to be installed from being unable to be installed, so as to facilitate long-term use and increase the service life. A connecting thread 23 is arranged inside the anti-corrosion tube 22. A reinforcing gasket 24 is movably connected to the top of the anti-corrosion tube 22. The reinforcing gasket 24 can increase friction and prevent the bolts 25 to be installed from loosening, thereby improving the stability after installation. The anti-corrosion tube 22 is threadedly connected to the bolts 25 to be installed via the connecting thread 23. The adjusting and fixing assembly 4 includes a fixing tube 41. The fixing tube 41 is fixedly installed Installed on the top of the fixed plate 31, the top of the fixed tube 41 is slidably connected with a pull buckle 42, and the bottom end of the pull buckle 42 is fixedly connected with a fixing pin 44, and the fixing pin 44 can be pulled out through the pull buckle 42, and the fixing pin 44 passes through the inside of the through hole 34 and the adjustment fixing hole 53, so as to fix the adjustment plate 51, and the fixing pin 44 passes through the inside of the fixed tube 41, and a spring 45 is fixedly installed inside the fixed tube 41, and the pull buckle 42 can return to the initial position under the action of the elastic force of the spring 45, thereby improving the convenience of adjusting and fixing the adjustment plate 51, and the top end of the spring 45 is fixedly connected to the bottom of the pull buckle 42, and the bottom of the pull buckle 42 is fixedly connected to the limiting ring 43, and a pin hole 46 is provided at the bottom of the fixed tube 41.

[0025] The following is a detailed description of the working principle of the bolt installation distance bracket for the chemical plant equipment.

[0026] like Figure 1-5 As shown, the adjusting plate 51 slides at one end of the fixing plate 31, and the adjusting plate 51 can be adjusted by sliding to be telescopic, so as to change the distance between the two mounting plates 21 and meet the installation requirements of different sizes. The anti-corrosion pipe 22 is embedded and installed inside the mounting plate 21. The anti-corrosion pipe 22 is made of anti-corrosion material, which can prevent the internal thread structure from being corroded and damaged, and prevent the threaded bolts 25 to be installed from being unable to be installed, so as to facilitate long-term use and increase the service life. The reinforcing gasket 24 is arranged on the top of the anti-corrosion pipe 22, and the reinforcing gasket 24 can increase the friction force to prevent the bolts 25 to be installed from being damaged. There is no looseness, which improves the stability after installation. The buckle 42 slides on the top of the fixing tube 41, and the fixing pin 44 is fixedly connected to the bottom of the buckle 42. When in use, the fixing pin 44 can be pulled out through the buckle 42. The fixing pin 44 passes through the through hole 34 and the adjustment fixing hole 53, and can fix the adjustment plate 51. The spring 45 is fixedly connected between the fixing tube 41 and the buckle 42. The buckle 42 can return to the initial position under the action of the elastic force of the spring 45, which improves the convenience of adjusting and fixing the adjustment plate 51. The structure is simple and the operation is convenient, which is convenient for wide promotion and use.

[0027] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not deviate from the spirit of the present invention are within the scope of protection of the present invention.

Claims

1. A bolt-mounted spacing bracket for chemical plant equipment, comprising an anti-skid bottom plate (1), characterized in that: A fixed installation component (2) is arranged on the top of the anti-slip base plate (1), wherein the fixed installation component (2) comprises a mounting plate (21), wherein the mounting plate (21) is fixedly mounted on the top of the anti-slip base plate (1), wherein one end of one of the mounting plates (21) is fixedly connected to a connecting component (3), wherein the connecting component (3) comprises a fixing plate (31), wherein the fixing plate (31) is fixedly connected to one end of the mounting plate (21), wherein an adjusting fixing component (4) is fixedly mounted on the top of the fixing plate (31), and wherein one end of the fixing plate (31) is slidably connected to an extension component (5).

2. A bolt installation distance bracket for chemical plant equipment according to claim 1, characterized in that: The extension component (5) comprises an adjustment plate (51), the adjustment plate (51) slides inside the fixing plate (31), an adjustment fixing hole (53) is provided on the top of the adjustment plate (51), and one end of the adjustment plate (51) is fixedly connected to a limiting plate (52).

3. A bolt installation distance bracket for chemical plant equipment according to claim 1, characterized in that: One end of the fixing plate (31) is fixedly connected to a welding plate (32), and the fixing plate (31) is fixedly connected to the mounting plate (21) via the welding plate (32).

4. A bolt installation distance bracket for chemical plant equipment according to claim 1, characterized in that: An adjustment groove (33) is integrally formed inside the fixing plate (31), and a through hole (34) is provided on the top of the fixing plate (31).

5. A bolt installation distance bracket for chemical plant equipment according to claim 1, characterized in that: An anti-corrosion pipe (22) is installed through the interior of the installation plate (21), and a connecting thread (23) is provided inside the anti-corrosion pipe (22).

6. A bolt installation distance bracket for chemical plant equipment according to claim 5, characterized in that: The top of the anti-corrosion pipe (22) is movably connected with a reinforcing gasket (24), and the anti-corrosion pipe (22) is threadedly connected with a bolt (25) to be installed via a connecting thread (23).

7. A bolt installation distance bracket for chemical plant equipment according to claim 1, characterized in that: The adjusting and fixing assembly (4) comprises a fixing tube (41), wherein the fixing tube (41) is fixedly mounted on the top of the fixing plate (31), a buckle (42) is slidably connected to the top of the fixing tube (41), a fixing pin (44) is fixedly connected to the bottom end of the buckle (42), and the fixing pin (44) passes through the interior of the fixing tube (41).

8. A bolt installation distance bracket for chemical plant equipment according to claim 7, characterized in that: A spring (45) is fixedly installed inside the fixing tube (41), the top end of the spring (45) is fixedly connected to the bottom of the buckle (42), the bottom of the buckle (42) is fixedly connected to a limiting ring (43), and a pin hole (46) is provided at the bottom of the fixing tube (41).