Auxiliary structure for adding circuit breaker

By introducing vertical mounting frame, oblique bracket and limit frame into the circuit breaker installation structure, combined with the design of pre-installed frame and rope pulley, the problem of inaccurate installation and safety hazards of circuit breaker is solved, and more stable and Efficient installation process.

CN222260889UActive Publication Date: 2024-12-27NINGBO TAINENG ELECTRIC POWER CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421038120.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-13
Publication Date
2024-12-27
Estimated Expiration
2034-05-13

AI Technical Summary

Technical Problem

The installation of circuit breakers in the prior art is inaccurate, with safety hazards and equipment damage risks, and the crane operation is complex, affecting installation efficiency.

Method used

An auxiliary structure for the circuit breaker is designed, including a vertically arranged mounting frame, a fixed-connected oblique bracket, a limit frame and a pre-installed rack. The circuit breaker is guided to fall through the limit frame, and the pre-installed rack simplifies the installation process. Use lead ropes and fixed pulleys to achieve a smooth improvement of the circuit breaker.

Benefits of technology

It improves the installation accuracy and stability of the circuit breaker, reduces safety hazards and equipment damage risks, simplifies the installation process, and improves the operational safety and installation efficiency of staff.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222260889U_ABST
    Figure CN222260889U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of electric power engineering installation, in particular to an additional installation auxiliary structure of a circuit breaker, which comprises an electric pole, an installation frame and an inclined strut frame, and is characterized in that the installation frame is vertically arranged at the upper part of the electric pole for installation of the circuit breaker; the inclined supporting frame is located below the mounting frame and fixedly connected with the electric pole and the mounting frame, a limiting frame used for guiding a circuit breaker to fall is arranged above the mounting frame, and the limiting frame is fixedly connected with the mounting frame and the electric pole. The problem that the installation position of the circuit breaker is not accurate is solved, and the stability of the circuit breaker is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power engineering installation, and in particular to an auxiliary structure for adding a circuit breaker. Background Art

[0002] Pole-mounted circuit breakers are outdoor circuit breakers installed on electric poles. With the advancement of the national power grid transformation project, a large number of pole-mounted circuit breakers need to be installed.

[0003] The pole is usually provided with a mounting frame for stably placing the circuit breaker, and the mounting frame is usually located at a position higher than the ground. The existing method of installing the circuit breaker on the mounting frame is usually to use a crane for hoisting, and the circuit breaker is lifted by the crane and placed on a fixed point from top to bottom.

[0004] However, when the circuit breaker is hoisted by a manually operated crane, the sling will inevitably shake, which may cause the circuit breaker to fall to a fixed point inaccurately, resulting in the subsequent installation of the circuit breaker not being firm and stable enough, which may affect the normal use of the circuit breaker and even pose a safety hazard of the circuit breaker falling. Utility Model Content

[0005] In order to improve the problem of inaccurate installation position of a circuit breaker and enhance the stability of the circuit breaker, the present application provides an auxiliary installation structure for a circuit breaker.

[0006] The auxiliary structure for adding a circuit breaker provided in the present application adopts the following technical solution:

[0007] An auxiliary structure for installing a circuit breaker comprises an electric pole, a mounting frame and an inclined support frame, wherein the mounting frame is vertically arranged on the upper part of the electric pole for installing the circuit breaker, the inclined support frame is located below the mounting frame and is fixedly connected to the electric pole and the mounting frame, a limit frame for guiding the circuit breaker to fall is arranged above the mounting frame, and the limit frame is fixedly connected to the mounting frame and the electric pole.

[0008] By adopting the above technical solution, the mounting frame is vertically set on the pole, and the diagonal support frame is fixedly connected between the pole and the mounting frame. The diagonal support frame increases the stability of the overall structure, making the mounting frame less susceptible to external forces and causing deviation or shaking, thereby improving the stability of the circuit breaker after installation. The setting of the limit frame can ensure that the circuit breaker is properly guided and controlled during the falling process, preventing it from suddenly falling or causing other dangers due to unexpected reasons. It protects the safety of the staff, reduces the risk of equipment damage, and effectively improves the installation accuracy and stability of the circuit breaker.

[0009] Furthermore, the limit frame is symmetrically arranged on both sides of the mounting frame, and the limit frame includes a transverse rod and a longitudinal rod. The transverse rod and the longitudinal rod are arranged perpendicular to each other and the ends are fixedly connected. One end of the transverse rod away from the longitudinal rod is fixedly connected to the pole, and one end of the longitudinal rod away from the transverse rod is fixedly connected to the mounting frame.

[0010] By adopting the above technical solution, the symmetrically arranged limit frames can provide more balanced and stable support for the circuit breaker on both sides of the mounting frame, which helps to prevent the circuit breaker from tilting or shifting during installation and improves installation accuracy. The limit frame is composed of transverse rods and longitudinal rods that are perpendicularly arranged and fixedly connected to each other to form a stable frame, ensuring that the circuit breaker falls along a predetermined trajectory, avoiding accidental falling or shaking, thereby improving work safety.

[0011] Furthermore, the limiting frame also includes an inclined support rod, and both ends of the support rod are respectively fixedly connected to a side of the mounting frame close to the pole and at a corner position of the transverse rod and the longitudinal rod.

[0012] By adopting the above technical solution, the support rod is tilted on the mounting frame and at the corner position of the limit frame to form a triangular support structure with a stable mechanical structure, which can enhance the stability of the mounting structure and prevent the circuit breaker from shaking or tilting during installation or operation. The support rod can disperse and bear the impact force when the circuit breaker falls, avoid direct impact between the circuit breaker and the mounting frame and the pole, and help reduce the risk of damage to the circuit breaker.

[0013] Furthermore, it also includes a pre-installed frame for assisting the installation of the circuit breaker, the pre-installed frame is rotatably connected to the side of the mounting frame away from the pole, the side of the pre-installed frame away from the mounting frame is provided with a pull ring, the pole is provided with a fixed pulley, the fixed pulley is located above the limit frame, the pull ring is detachably connected with a guide rope for flipping the pre-installed frame, the guide rope passes over the fixed pulley and extends to the ground;

[0014] The mounting frame is provided with a placement slot for accommodating the pre-installed frame. When the pre-installed frame is flipped into the placement slot, the heights of the pre-installed frame and the mounting frame are flush with each other.

[0015] By adopting the above technical solution, after the circuit breaker is installed on the pre-installed frame, the circuit breaker is directly installed on the mounting frame on the pole by flipping the pre-installed frame. This method avoids the complicated installation operation of repeatedly aligning the crane. The staff only needs to operate the guide rope on the ground to complete the flipping of the pre-installed frame. The guide rope and fixed pulley make the process of flipping the pre-installed frame smoother and more controllable, simplifying the installation process. The flipped pre-installed frame is flush with the height of the mounting frame, so that the circuit breaker can remain horizontal during the installation process, avoiding the problem of inaccurate installation position of the circuit breaker.

[0016] Furthermore, the pre-installed frame includes a connecting rod, a supporting rod and a lifting assembly for lifting the circuit breaker, the number of the connecting rods is at least two and both are rotatably connected to the mounting frame, the supporting rod is vertically fixedly connected between the two connecting rods for supporting the circuit breaker, and the lifting assembly is arranged between the two connecting rods.

[0017] By adopting the above technical solution, the pre-installation frame is rotatably connected to the installation frame through at least two connecting rods, which improves the stability of the structure and ensures the stability of the pre-installation frame during the flipping process. The support rod is vertically fixedly connected between the two connecting rods to provide a placement platform for the circuit breaker. The setting of the lifting assembly enables the staff to lift the circuit breaker to the pre-installation frame on the ground, thereby simplifying the difficulty of high-altitude operations and improving installation efficiency.

[0018] Furthermore, the lifting assembly includes a reversing wheel, a sling and a pre-installed plate for pre-fixing the circuit breaker, the number of the sling and the reversing wheel is at least two, the two reversing wheels are respectively arranged on both sides of the supporting rod, the ends of the two slings are respectively connected to the two sides of the pre-installed plate, and the ends of the two slings away from the pre-installed plate respectively bypass the two reversing wheels and extend to the ground.

[0019] By adopting the above technical solution, the arrangement of the reversing wheel and the sling can lift the circuit breaker, and the pre-installed plate pre-fixes the circuit breaker before lifting to ensure that it will not slide or fall off during the lifting process, thereby improving the safety of the installation process. The staff only needs to fix the circuit breaker on the pre-installed plate on the ground and operate the sling to change the direction of the sling through the reversing wheel, so as to lift the pre-installed plate and the circuit breaker to abut against the supporting rod of the pre-installed frame. The number of slings and reversing wheels is at least two, which are respectively arranged on both sides of the supporting rod, ensuring the stability of the lifting process. Multiple slings and reversing wheels can evenly share the lifting force to prevent instability caused by excessive force on a single point.

[0020] Furthermore, the reversing wheel includes a reversing wheel body and a rotating shaft, the rotating shaft is fixedly connected between the two connecting rods and is perpendicular to the connecting rods, the reversing wheel body is rotatably connected to the middle position of the rotating shaft, and limit members are symmetrically arranged on both sides of the reversing wheel body to prevent the reversing wheel body from displacement.

[0021] By adopting the above technical solution, the rotating shaft is fixedly connected between the two connecting rods and is perpendicular to the connecting rods, which ensures the stable installation of the reversing wheel and can withstand the tension from the sling. The reversing wheel body is rotatably connected to the middle position of the rotating shaft, so that the sling can change direction smoothly when passing around the reversing wheel. The limiters are symmetrically arranged on both sides of the reversing wheel body, which can effectively prevent the reversing wheel body from being displaced during the rotation process, ensure the stability and safety of the lifting assembly, and reduce the risk caused by the displacement of the reversing wheel body.

[0022] Furthermore, the pre-installed plate is provided with a mounting hole for installing the circuit breaker, and a connecting piece for connecting with the circuit breaker is penetrated in the mounting hole;

[0023] When the pre-installed plate is lifted to abut against the supporting rod, two sides of the pre-installed plate are clamped and fixed between the two connecting rods.

[0024] By adopting the above technical solution, by opening a mounting hole on the pre-installed plate that matches the size of the circuit breaker, the accurate position of the circuit breaker on the pre-installed plate can be ensured, which helps to reduce errors during the installation process. The connector inserted in the mounting hole is connected to the circuit breaker, so that the circuit breaker can be firmly installed on the pre-installed plate, improving the stability of the circuit breaker during the lifting process and preventing it from sliding or falling. When the pre-installed plate is lifted to abut against the supporting rod, the two sides of the pre-installed plate are clamped and fixed between the two connecting rods to prevent the circuit breaker from falling during the flipping of the pre-installed frame, thereby improving the installation stability.

[0025] In summary, the present application includes at least one of the following beneficial technical effects:

[0026] 1. The mounting frame is vertically arranged on the upper part of the pole, and the diagonal support frame is fixedly connected between the pole and the mounting frame, providing a stable installation foundation for the circuit breaker. The setting of the limit frame can guide the falling trajectory of the circuit breaker, prevent the circuit breaker from shaking or even falling, and enhance the safety of the installation structure;

[0027] 2. The installation holes and connectors on the pre-installed plate allow the circuit breaker to be pre-installed on the ground. After the circuit breaker is fixedly connected to the pre-installed plate, it is lifted to the lower position of the pre-installed frame through the guide rope and fixed pulley. While improving the installation efficiency, the lifting assembly and reversing wheel make the lifting process of the circuit breaker more stable, reducing the risk of equipment damage caused by shaking or collision;

[0028] 3. The rotational connection between the pre-installed frame and the mounting frame allows the pre-installed frame to be flipped into the placement slot of the mounting frame. The limit frame has a limiting effect on the pre-installed frame and the circuit breaker, guiding the flipping of the pre-installed frame and the falling process of the circuit breaker to prevent the pre-installed frame and the circuit breaker from lateral shaking or even displacement, improving the problem of inaccurate installation position of the circuit breaker and improving the stability of the circuit breaker. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the overall structure of the circuit breaker in the lifting state in the embodiment of the present application.

[0030] Figure 2 It is a schematic diagram of the structure explosion of the pre-installed frame and the pre-installed plate in the embodiment of the present application.

[0031] Figure 3 yes Figure 2 The enlarged schematic diagram of the structure of the reversing wheel body, rotating shaft and limiting parts in part A.

[0032] Figure 4 It is a schematic diagram of the overall structure of the circuit breaker being lifted onto the pre-installed rack in the embodiment of the present application.

[0033] Figure 5 It is a schematic diagram of the overall structure of the pre-installed frame in the embodiment of the present application in a flipped state.

[0034] Figure 6 It is a schematic diagram of the overall structure of the pre-installed frame flipping into the installation frame in the embodiment of the present application.

[0035] Explanation of the reference numerals in the accompanying drawings: 0, circuit breaker; 1, pole; 2, mounting frame; 21, placement slot; 3, diagonal support frame; 4, limit frame; 41, transverse rod; 42, longitudinal rod; 43, support rod; 5, pre-installed frame; 51, pull ring; 52, connecting rod; 53, supporting rod; 54, lifting assembly; 541, reversing wheel; 5411, reversing wheel body; 5412, rotating shaft; 5413, limit piece; 542, sling; 543, pre-installed plate; 5431, hanging ring; 5432, mounting hole; 544, connecting piece; 6, fixed pulley; 61, guide rope. DETAILED DESCRIPTION

[0036] In order to make the purpose, technical solutions and advantages of this application more clear, the following Figure 1-6 And embodiments, the present application is further described in detail.

[0037] The present application embodiment discloses an auxiliary structure for installing a circuit breaker. Figure 1 The installation structure of the pole-mounted circuit breaker 0 includes a pole 1, a mounting frame 2, a diagonal support frame 3, a limiting frame 4 and a pre-installed frame 5.

[0038] The pole 1 is fixed vertically to the ground, and the mounting frame 2 is arranged horizontally and vertically fixedly connected to the pole 1 for installing the circuit breaker 0. An inclined support frame 3 is arranged below the mounting frame 2 to improve the support stability, and the inclined support frame 3 is fixedly connected to the pole 1 and the mounting frame 2. In this embodiment, the mounting frame 2 and the inclined support frame 3 are fixedly installed by clamps, and the installation method between the inclined support frame 3, the mounting frame 2 and the pole 1 can select other fixed connection methods according to actual conditions.

[0039] The limit frame 4 is located above the mounting frame 2. The limit frame 4 in this embodiment includes a transverse rod 41, a longitudinal rod 42 and a support rod 43. One end of the transverse rod 41 is fixedly connected to one end of the longitudinal rod 42. The transverse rod 41 and the longitudinal rod 42 are perpendicular to each other. One end of the transverse rod 41 away from the longitudinal rod 42 is fixedly connected to the pole 1, and one end of the longitudinal rod 42 away from the transverse rod 41 is fixedly connected to the mounting frame 2. The support rod 43 is arranged obliquely, and the two ends of the support rod 43 are respectively fixedly connected to the corner position of the transverse rod 41 and the longitudinal rod 42 and on the side of the mounting frame 2 close to the pole 1. The number of the limit frames 4 in this embodiment is two and they are symmetrically arranged on both sides of the mounting frame 2 to guide the downward trajectory of the circuit breaker 0.

[0040] Reference Figure 1 and Figure 2 The pre-installed frame 5 is rotatably connected to the mounting frame 2 on one side of the pole 1. The pre-installed frame 5 includes a connecting rod 52, a supporting rod 53 and a lifting assembly 54. There are two connecting rods 52 and both are rotatably connected to the mounting frame 2. There can be a plurality of supporting rods 53, each supporting rod 53 is vertically fixedly connected between two connecting rods 52 and arranged at intervals along the length direction of the connecting rods 52.

[0041] Reference Figure 2 and Figure 3 The lifting assembly 54 includes a reversing wheel 541, a sling 542 and a pre-installed plate 543, wherein the number of the reversing wheel 541 and the number of the sling 542 are both two, the reversing wheel 541 includes a reversing wheel 541 body and a rotating shaft 5412, the two rotating shafts 5412 are vertically fixedly connected between the two installation rods and are disposed on both sides of the supporting rod 53, and the two reversing wheel 541 bodies are respectively rotatably connected to the middle position of the two rotating shafts 5412. In order to prevent the reversing wheel 541 body from displacement along the length direction of the rotating shaft 5412, a limiting member 5413 is also fixedly connected to the rotating shaft 5412, and the number of the limiting members 5413 on each rotating shaft 5412 is two and is disposed on both sides of the reversing wheel 541 body.

[0042] The pre-installed plate 543 is arranged below the pre-installed frame 5, and mounting holes 5432 are respectively provided on the plate surface of the pre-installed plate 543 at positions adjacent to the four corners, and connectors 544 are provided in the mounting holes 5432, and the operator can fix the circuit breaker 0 on the pre-installed plate 543 through the connectors 544. Hanging rings 5431 for connecting the slings 542 are symmetrically provided on both sides of the pre-installed plate 543, one end of the sling 542 is detachably connected to the hanging ring 5431, and the other end of the sling 542 passes around the reversing wheel 541 and extends to the ground.

[0043] Reference Figure 1 and Figure 4 The operator can lift the pre-installed plate 543 and the circuit breaker 0 to the position of the pre-installed frame 5 by pulling the sling 542. When the pre-installed plate 543 is lifted to abut against the supporting rod 53, the two sides of the pre-installed plate 543 are clamped between the two connecting rods 52 of the pre-installed frame 5.

[0044] Reference Figure 1 and Figure 5 The pole 1 is provided with a fixed pulley 6 and a guide rope 61 for flipping the pre-installed frame 5. The fixed pulley 6 is fixedly connected to the pole 1 and is located above the limit frame 4. There are two fixed pulleys 6 and they are symmetrically arranged on both sides of the pole 1. The center point connection line of the two fixed pulleys 6 is perpendicular to the length direction of the mounting frame 2.

[0045] A pull ring 51 is fixedly connected to the side of the pre-installation frame 5 away from the installation frame 2. The pull rings 51 are two and are arranged on both sides. The guide ropes 61 are two and are arranged parallel to each other. One end of the guide rope 61 is detachably connected to the pull ring 51, and the other end of the guide rope 61 passes over the movable pulley and extends to the ground.

[0046] Reference Figure 2 and Figure 6 The mounting frame 2 is provided with a placement groove 21 for the pre-installed frame 5 to be inserted into. When the pre-installed frame 5 is flipped into the placement groove 21 of the mounting frame 2, the heights of the pre-installed frame 5 and the mounting frame 2 are flush with each other.

[0047] The implementation principle of the auxiliary structure for adding a circuit breaker in the embodiment of the present application is as follows: first, the circuit breaker 0 is pre-installed on the ground, that is, the circuit breaker 0 is fixedly connected to the pre-installed plate 543 through the pre-installed plate 543 and the connecting piece 544. The ground personnel pull one end of the sling 542, so that the other end of the sling 542 passes around the reversing wheel 541, and the pre-installed plate 543 and the circuit breaker 0 are lifted to the position of the pre-installed frame 5. When the pre-installed plate 543 is lifted to abut against the supporting rod 53, the two sides of the pre-installed plate 543 are clamped between the two connecting rods 52 of the pre-installed frame 5, so that the pre-installed plate 543 and the pre-installed frame 5 are fixed. Secondly, a fixed pulley 6 is arranged on the pole 1, and the pull ring 51 on the pre-installed frame 5 is connected by a guide rope 61. The ground personnel pull the guide rope 61 to flip the pre-installed frame 5 from one side of the mounting frame 2. When the pre-installed frame 5 is flipped into the placement slot 21 of the mounting frame 2, the height of the pre-installed frame 5 and the mounting frame 2 are flush with each other, and the circuit breaker 0 is installed on the mounting frame 2. At this time, the connection between the guide rope 61 and the sling 542 can be released, and the circuit breaker 0 is finally fixed on the mounting frame 2 to complete the installation process of the entire circuit breaker 0. During the flipping process of the pre-installed frame 5, the limit frame 4 is used to guide the falling trajectory of the pre-installed frame 5 and the circuit breaker 0 to prevent the circuit breaker 0 from shaking and causing the installation position to be inaccurate, ensuring that the circuit breaker 0 can be accurately placed on the mounting frame 2 and improving the stability of the circuit breaker 0.

[0048] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A circuit breaker auxiliary structure, characterized in that: The invention comprises an electric pole (1), a mounting frame (2) and an inclined support frame (3); the mounting frame (2) is vertically arranged on the upper part of the electric pole (1) for mounting a circuit breaker; the inclined support frame (3) is located below the mounting frame (2) and is fixedly connected to the electric pole (1) and the mounting frame (2); a limit frame (4) for guiding the circuit breaker to fall is arranged above the mounting frame (2); the limit frame (4) is fixedly connected to the mounting frame (2) and the electric pole (1).

2. The auxiliary structure for installing a circuit breaker according to claim 1, characterized in that: The limit frame (4) is symmetrically arranged on both sides of the mounting frame (2), and the limit frame (4) comprises a transverse rod (41) and a longitudinal rod (42). The transverse rod (41) and the longitudinal rod (42) are arranged perpendicular to each other and the ends are fixedly connected. One end of the transverse rod (41) away from the longitudinal rod (42) is fixedly connected to the electric pole (1), and one end of the longitudinal rod (42) away from the transverse rod (41) is fixedly connected to the mounting frame (2).

3. The auxiliary structure for installing a circuit breaker according to claim 2, characterized in that: The limiting frame (4) also includes a support rod (43) arranged obliquely, and the two ends of the support rod (43) are respectively fixedly connected to a side of the mounting frame (2) close to the electric pole (1) and at the corner position of the transverse rod (41) and the longitudinal rod (42).

4. The auxiliary structure for installing a circuit breaker according to claim 1, characterized in that: It also comprises a pre-installed frame (5) for assisting the installation of a circuit breaker, the pre-installed frame (5) being rotatably connected to a side of the mounting frame (2) away from the electric pole (1), a pull ring (51) being provided on a side of the pre-installed frame (5) away from the side connected to the mounting frame (2), a fixed pulley (6) being provided on the electric pole (1), the fixed pulley (6) being located above the limiting frame (4), a guide rope (61) for flipping the pre-installed frame (5) being detachably connected to the pull ring (51), the guide rope (61) passing around the fixed pulley (6) and extending to the ground; The mounting frame (2) is provided with a placement groove (21) for accommodating the pre-installed frame (5); when the pre-installed frame (5) is flipped into the placement groove (21), the height of the pre-installed frame (5) and the mounting frame (2) are flush with each other.

5. The auxiliary structure for installing a circuit breaker according to claim 4, characterized in that: The pre-installed frame (5) comprises a connecting rod (52), a supporting rod (53) and a lifting assembly (54) for lifting the circuit breaker. The number of the connecting rods (52) is at least two and both are rotatably connected to the mounting frame (2). The supporting rod (53) is vertically fixedly connected between the two connecting rods (52) for supporting the circuit breaker. The lifting assembly (54) is arranged between the two connecting rods (52).

6. The auxiliary structure for installing a circuit breaker according to claim 5, characterized in that: The lifting assembly (54) comprises a reversing wheel (541), a sling (542) and a pre-installed plate (543) for pre-fixing the circuit breaker, the number of the sling (542) and the reversing wheel (541) is at least two, the two reversing wheels (541) are respectively arranged on both sides of the supporting rod (53), the ends of the two slings (542) are respectively connected to the two sides of the pre-installed plate (543), and the ends of the two slings (542) away from the pre-installed plate (543) respectively bypass the two reversing wheels (541) and extend to the ground.

7. The auxiliary structure for installing a circuit breaker according to claim 6, characterized in that: The reversing wheel (541) comprises a reversing wheel (541) body and a rotating shaft (5412); the rotating shaft (5412) is fixedly connected between the two connecting rods (52) and is perpendicular to the connecting rods (52); the reversing wheel (541) body is rotatably connected to the middle position of the rotating shaft (5412); and limiting parts (5413) are symmetrically arranged on both sides of the reversing wheel (541) body to prevent the reversing wheel (541) body from displacement.

8. The auxiliary structure for installing a circuit breaker according to claim 6, characterized in that: The pre-installed plate (543) is provided with an installation hole (5432) for installing the circuit breaker, and a connecting piece (544) for connecting to the circuit breaker is inserted into the installation hole (5432); When the pre-installed plate (543) is lifted to abut against the supporting rod (53), two sides of the pre-installed plate (543) are clamped and fixed between the two connecting rods (52).