Novel drilling equipment for building materials

By using precision drive parts to drive the rotation of the placement bracket and the aggregate frame to collect waste in drilling equipment for building materials, the time-consuming and labor-intensive replacement of traditional equipment materials is solved, the work efficiency and production continuity are improved, and the work efficiency and production continuity are achieved. Cleanliness and resource utilization of construction sites.

CN222288858UActive Publication Date: 2025-01-03陈培康
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420571551.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-23
Publication Date
2025-01-03
Estimated Expiration
2034-03-23

AI Technical Summary

Technical Problem

Traditional building materials drilling equipment requires manual intervention when replacing materials, which is time-consuming and labor-intensive, affecting the work efficiency and continuity of the production line.

Method used

A new type of drilling equipment for building materials was designed, using precision drive parts to drive the placement bracket to rotate, and the materials can be quickly switched and precisely positioned through two independent placement grooves. The aggregate frame is used to collect waste, ensuring the cleanliness of the construction site. and resource utilization.

Benefits of technology

It significantly reduces downtime for material replacement, improves work efficiency and production rhythm, and realizes an integrated and efficient operation process of waste management through the design of aggregate frames.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222288858U_ABST
    Figure CN222288858U_ABST
Patent Text Reader

Abstract

The utility model provides novel drilling equipment for building materials, which relates to the field of drilling equipment and comprises an equipment body, a drilling head is arranged on the equipment body, and a material collecting frame and a fixing support are sequentially arranged on one side of the equipment body. The placing support on the top can be effectively controlled and driven to move accurately and stably, and the two independent placing grooves are formed in the top of the placing support so that it can be guaranteed that two to-be-processed materials can be contained and accurately positioned at the same time in the machining process. When the driving piece starts to work, the position of the containing support can be adjusted, so that the building materials in one containing groove can move downwards to the position below the working area of the drilling head at the right time point. In this way, after one building material is drilled, the building material can be rapidly switched to another building material for continuous operation, the downtime caused by replacement of the building material is greatly shortened, and the working efficiency and the production rhythm are remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of drilling equipment, in particular to a new type of drilling equipment for building materials. Background Art

[0002] The drilling device for precision processing of building materials is a modern mechanical equipment that combines high efficiency, precision and environmental protection. The device is ingenious and practical in its structural design, and the special support system at the bottom of the device is particularly noteworthy. This support system is carefully built with high-strength materials and has excellent load-bearing performance and stability. It can safely and reliably carry various types and sizes of building materials to be processed.

[0003] The bracket is carefully designed to provide an ideal positioning space for the building materials, ensuring that the materials are stable during the drilling process, thus ensuring the processing accuracy and quality. However, in the traditional operation mode, when the device completes the drilling operation of a piece of building material, manual intervention is required to replace the new material to be processed. This process is not only time-consuming and labor-intensive, but may also affect the work efficiency and continuity of the entire production line.

[0004] Therefore, it is necessary to provide a new novel building material drilling equipment to solve the above-mentioned technical problems. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides a new drilling device for building materials.

[0006] The new drilling equipment for building materials provided by the utility model includes an equipment body, a drilling head is arranged on the equipment body, an aggregate frame and a fixed bracket are arranged in sequence on one side of the equipment body, a fixed shell is arranged on the top of the fixed bracket, a placement bracket is arranged on the top of the fixed shell, placement grooves are respectively opened at both ends of the top of the placement bracket, and the aggregate frame and one of the placement grooves are located at the bottom of the drilling head, and a driving member for driving the placement bracket to rotate is arranged in the fixed shell.

[0007] Furthermore, the driving member includes a driving motor, and a fixed end of the driving motor is fixedly connected to an outer side wall of the fixed shell.

[0008] Furthermore, the output end of the driving motor movably passes through the fixed shell and is fixedly connected to a connecting rod, and the outer side wall of the connecting rod is cross-staggered with two connecting long rods and a connecting short rod, and the outer side walls of the two connecting short rods are fixedly connected to arc brackets.

[0009] Furthermore, a driven cylinder is coaxially connected to the center of the placement bracket inside the fixed shell.

[0010] Furthermore, an arc groove is provided on the outer side wall of the driven cylinder, and the upper and lower ends of the outer surface of the driven cylinder are respectively fixedly connected to limiting blocks, and limiting grooves are respectively provided through both ends of the limiting blocks.

[0011] Furthermore, the cross-sectional dimensions of the arc-shaped groove match those of the connecting long rod, the cross-sectional dimensions of the limiting groove match those of the arc-shaped bracket, and the limiting groove is connected to the arc-shaped groove.

[0012] Compared with the related art, the new drilling equipment for building materials provided by the utility model has the following advantages:

[0013] Beneficial effects:

[0014] This new type of drilling equipment for building materials, through the precision-designed drive, can effectively control and drive the top placement bracket to move accurately and stably. The top is equipped with two independent placement slots to ensure that two pieces of materials to be processed can be accommodated and accurately positioned at the same time during the processing. When the drive starts working, it will adjust the position of the placement bracket so that the building material in one of the placement slots can be moved down to the working area of ​​the drilling head at the right time. In this way, after completing the drilling process of one piece of building material, it can quickly switch to another piece of building material for continuous operation, greatly reducing the downtime caused by changing building materials and significantly improving work efficiency and production rhythm.

[0015] This new type of drilling equipment for building materials has an aggregate frame that not only has sufficient capacity to collect various waste materials and powders generated during the drilling process, but also has good sealing properties, thus ensuring the cleanliness of the construction site and the effective use of resources. Through such an integrated design, an integrated and efficient operation process from material handling to waste management is achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A schematic diagram of the overall structure of the new type of drilling equipment for building materials provided by the utility model;

[0017] Figure 2 A partial cross-sectional structural schematic diagram of a new type of drilling equipment for building materials provided by the utility model;

[0018] Figure 3 A schematic diagram of the structure of the driving member provided by the utility model;

[0019] Figure 4 This is a schematic diagram of the state structure of the driving member provided by the utility model.

[0020] Numbers in the figure: 1. Equipment body; 2. Drilling head; 3. Fixed bracket; 4. Fixed shell; 5. Driving motor; 6. Connecting rod; 7. Connecting long rod; 8. Connecting short rod; 9. Arc bracket; 10. Driven cylinder; 11. Arc groove; 12. Limit block; 13. Limit groove; 14. Placement bracket; 15. Placement groove; 16. Aggregate frame. DETAILED DESCRIPTION

[0021] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.

[0022] In the specific implementation process, Figures 1 to 4 As shown, the new drilling equipment for building materials includes an equipment body 1, a drilling head 2 is arranged on the equipment body 1, a collection frame 16 and a fixed bracket 3 are arranged in sequence on one side of the equipment body 1, a fixed shell 4 is arranged on the top of the fixed bracket 3, a placement bracket 14 is arranged on the top of the fixed shell 4, placement grooves 15 are respectively opened at both ends of the top of the placement bracket 14, and the collection frame 16 and one of the placement grooves 15 are located at the bottom of the drilling head 2, and a driving member for driving the placement bracket 14 to rotate is arranged in the fixed shell 4;

[0023] By providing two placement grooves 15, when the placement groove 15 at the bottom of the drilling head 2 is in a processing state, the processed building materials in the other placement groove 15 can be taken out or unprocessed materials can be placed. After the drilling head 2 processes the building materials at the bottom, the placement bracket 14 can be driven to rotate by the driving member, so as to drive the unprocessed materials to the bottom of the drilling head 2, thereby reducing the replacement time and placement time after the processing is completed, and improving the drilling efficiency;

[0024] By providing the aggregate frame 16, powder will be generated during the process of the drilling head 2 processing the building materials, and the powder can be collected by the aggregate frame 16, thereby improving the cleanliness of the environment.

[0025] The driving member includes a driving motor 5, a fixed end of the driving motor 5 is fixedly connected to the outer wall of the fixed shell 4, an output end of the driving motor 5 movably passes through the fixed shell 4 and is fixedly connected to a connecting rod 6, the outer wall of the connecting rod 6 is cross-staggered with two connecting long rods 7 and a connecting short rod 8, the outer walls of the two connecting short rods 8 are fixedly connected to an arc bracket 9, a driven cylinder 10 is coaxially connected to the center of the placement bracket 14 inside the fixed shell 4, an arc groove 11 is provided on the outer wall of the driven cylinder 10, and a limiting block 12 is fixedly connected to the upper and lower ends of the outer surface of the driven cylinder 10, and a limiting groove 13 is respectively penetrated at both ends of the limiting block 12, the cross-sectional size of the arc groove 11 matches the connecting long rod 7, the cross-sectional size of the limiting groove 13 matches the arc bracket 9, and the limiting groove 13 is connected to the arc groove 11.

[0026] The working principle provided by the utility model is as follows: when the utility model is implemented, the driving motor 5 is started to drive the connecting long rod 7 and the connecting short rod 8 through the connecting rod 6 to rotate. During the rotation of the connecting long rod 7, when it is in a nearly horizontal state, it will enter the arc groove 11 along the limiting groove 13, and drive the driven cylinder 10 to rotate a specified angle through its inclined trajectory, so that the placement bracket 14 connected to the driven cylinder 10 moves synchronously, thereby changing the relative position of the building materials in the two top placement grooves 15, which is convenient for the top drilling head 2 to process;

[0027] During the movement of the connecting rod 7 inside the arc groove 11, there is a certain gap. When the connecting rod 7 rotates to the horizontal state, the connecting rod 7 will be at the innermost side of the arc groove 11. When the connecting rod 7 is about to leave the arc groove 11, the connecting rod 7 is close to the outer side of the arc groove 11, so that there will be no movement interference.

[0028] When the connecting long rod 7 is about to disengage from the arc groove 11, the arc bracket 9 will fit into the limit groove 13 of the bottom limit block 12, and when the connecting long rod 7 is disengaged from the driven cylinder 10, the arc bracket 9 is located between the two limit grooves 13, thereby limiting the rotation angle of the driven cylinder 10 to prevent it from rotating during the processing. It is the same as above and no motion interference will occur.

[0029] The circuits and controls involved in the present invention are all prior art and will not be described in detail here.

[0030] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A new type of drilling equipment for building materials, characterized in that: The invention comprises an equipment body (1), wherein a drilling head (2) is arranged on the equipment body (1), a material collecting frame (16) and a fixed bracket (3) are arranged in sequence on one side of the equipment body (1), a fixed shell (4) is arranged on the top of the fixed bracket (3), a placement bracket (14) is arranged on the top of the fixed shell (4), placement grooves (15) are respectively provided at both ends of the top of the placement bracket (14), and the material collecting frame (16) and one of the placement grooves (15) are located at the bottom of the drilling head (2), and a driving member for driving the placement bracket (14) to rotate is arranged in the fixed shell (4).

2. The new drilling equipment for building materials according to claim 1 is characterized in that: The driving member comprises a driving motor (5), and a fixed end of the driving motor (5) is fixedly connected to an outer side wall of the fixed housing (4).

3. The new drilling equipment for building materials according to claim 2 is characterized in that: The output end of the driving motor (5) movably penetrates the fixed housing (4) and is fixedly connected to a connecting rod (6); the outer wall of the connecting rod (6) is cross-staggeredly provided with two connecting long rods (7) and connecting short rods (8); the outer walls of the two connecting short rods (8) are fixedly connected to arc-shaped brackets (9).

4. The new drilling equipment for building materials according to claim 3 is characterized in that: A driven cylinder (10) is coaxially connected to the center of the placement bracket (14) inside the fixed housing (4).

5. The new drilling equipment for building materials according to claim 4 is characterized in that: An arc groove (11) is provided on the outer wall of the driven cylinder (10), and the upper and lower ends of the outer surface of the driven cylinder (10) are respectively fixedly connected to limit blocks (12), and the two ends of the limit blocks (12) are respectively penetrated by limit grooves (13).

6. The new drilling equipment for building materials according to claim 5, characterized in that: The cross-sectional dimensions of the arc-shaped groove (11) match those of the connecting long rod (7), the cross-sectional dimensions of the limiting groove (13) match those of the arc-shaped bracket (9), and the limiting groove (13) is connected to the arc-shaped groove (11).