Support structure facilitating movement of strap rope

By designing a bracket structure that facilitates the movement of the strap rope, it solves the problem of frequent replacement of strap rope attachments for high-altitude workers and improves production efficiency.

CN222375222UActive Publication Date: 2025-01-21GUIZHOU BRIDGE CONSTR GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421176622.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-28
Publication Date
2025-01-21
Estimated Expiration
2034-05-28

AI Technical Summary

Technical Problem

During bridge construction, high-altitude workers need to frequently replace the attachments of the strap rope, resulting in inconvenient operation and inefficient production efficiency.

Method used

Design a bracket structure that facilitates the movement of the strap rope, including an upper anchor plate, a lower anchor plate, a vertical rod and a ring. The bracket structure is fixed on the aerial work platform through a pull bolt and chute structure, and is connected through a pull rope. Two bracket structures allow the straps to move along the drawstring.

Benefits of technology

The bracket structure eliminates the need for frequent replacement of attachments of the strap rope, thereby improving the operating efficiency and production efficiency of high-altitude workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222375222U_ABST
    Figure CN222375222U_ABST
Patent Text Reader

Abstract

The support structure comprises an upper anchor plate and a lower anchor plate which are arranged on the top face and the bottom face of a platform main beam, the upper anchor plate and the lower anchor plate are locked and fixed through a plurality of split bolts, a vertical rod is vertically fixed to the center of the top face of the upper anchor plate, and a circular ring is arranged on the top of the vertical rod. Two support structures are arranged in one group, the number of the support structures is two, the two support structures in each group are arranged on the left side and the right side of the aerial work platform respectively, and the two support structures are arranged on the front side and the rear side of the aerial work platform respectively. The upper anchor plate, the lower anchor plate, the vertical rod and the circular rings form the support structure, the pull rope is connected between the circular rings of the two support structures, the two support structures in the same group are arranged at the left end and the right end of the aerial work platform, and one pull rope can cross the left side and the right side of the aerial work platform. Therefore, the attachments of the strap rope do not need to be frequently replaced, and the production efficiency is remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a bracket structure which is convenient for moving a shoulder strap rope and belongs to the technical field of bridge construction equipment. Background Art

[0002] During the construction of bridges, it is often necessary to work at high altitudes. For example, when constructing the cap beam and the middle tie beam, it is necessary to set up an aerial work platform on the pier, and then construct the cap beam and the middle tie beam on the aerial work platform. In order to ensure the safety of the workers during the construction process, each worker needs to wear a shoulder rope, and the other end of the shoulder rope is fixed to the transverse rod of the protective frame at the edge of the aerial work platform. Since the protective frame at the edge of the aerial work platform is formed by a number of vertical rods and transverse rods connected to each other, when the shoulder rope moves on the buckled transverse rod to the intersection of the transverse rod and the vertical rod, it is blocked by the vertical rod and cannot move further. In order to facilitate construction in other areas, the shoulder rope can only be removed and then hung on other transverse rods. Frequent replacement of the attachments of the shoulder rope not only affects the operation of the high-altitude workers, but also greatly affects the production efficiency. Utility Model Content

[0003] The purpose of the utility model is to provide a bracket structure that facilitates the movement of the shoulder strap rope. The bracket structure of the utility model solves the problem of high-altitude workers frequently replacing the attachments of the shoulder strap rope during the construction of the cap beam and the middle tie beam, thereby significantly improving the production efficiency.

[0004] The technical solution of the utility model: a support structure that is convenient for moving the shoulder strap rope, comprising an upper anchor plate and a lower anchor plate arranged on the top and bottom surfaces of the platform main beam, the upper anchor plate and the lower anchor plate are locked and fixed by a plurality of tension bolts, a vertical rod is vertically fixed to the center of the top surface of the upper anchor plate, and a circular ring is arranged on the top of the vertical rod; two of the support structures are arranged as a group, and two groups are arranged in total, the two support structures of each group are respectively arranged on the left and right sides of the aerial work platform, and the two groups of support structures are respectively arranged on the front and rear sides of the aerial work platform.

[0005] In the aforementioned support structure for facilitating the movement of the shoulder strap rope, the bottom edge of the vertical rod is welded and fixed to the upper anchor plate via a plurality of rib plates.

[0006] In the aforementioned support structure that facilitates the movement of the shoulder strap rope, the vertical rod includes a mother rod with a bottom, a child rod is movably inserted into the mother rod, and multiple groups of screw holes corresponding to the positions are arranged on the mother rod and the child rod. The telescopic control screw passes through the screw holes of the mother rod and the child rod to fix the two together.

[0007] In the aforementioned support structure for facilitating the movement of the shoulder strap rope, the upper anchor plate and the lower anchor plate are provided with sliding grooves corresponding to four positions, and the tension bolts are passed through the sliding grooves to lock and fix the upper anchor plate and the lower anchor plate.

[0008] In the aforementioned support structure for facilitating the movement of the shoulder strap rope, the inner wall spacing between the front and rear groups of slide grooves is greater than the width of the platform main beam.

[0009] The beneficial effects of the utility model: compared with the prior art, the utility model adopts upper and lower anchor plates, vertical rods and circular rings to form the support structure of the utility model, and a pull rope is connected between the circular rings of the two support structures. The two support structures of the same group are arranged at the left and right ends of the aerial work platform. One pull rope can cross the left and right sides of the aerial work platform. When workers work on the platform, there is no need to frequently replace the attachments of the shoulder strap rope, which significantly improves their production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a structural schematic diagram of the utility model;

[0011] Figure 2 It is a schematic diagram of the arrangement of the utility model on an aerial work platform;

[0012] Figure 3 It is a structural schematic diagram of an upper anchor plate or a lower anchor plate.

[0013] Figure numerals: 1-platform main beam, 2-upper anchor plate, 3-lower anchor plate, 4-tension bolts, 5-vertical rod, 6-circular ring, 7-aerial work platform, 8-rib plate, 9-mother rod, 10-sub-rod, 11-telescopic control screw, 12-slide groove. DETAILED DESCRIPTION

[0014] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0015] Embodiment of the utility model: a support structure for facilitating the movement of a strap rope, such as Figure 1-3 The described structure comprises an upper anchor plate 2 and a lower anchor plate 3 arranged on the top and bottom surfaces of the platform main beam 1, the upper anchor plate 2 and the lower anchor plate 3 are locked and fixed by multiple tension bolts 4, a vertical rod 5 is vertically fixed to the center of the top surface of the upper anchor plate 2, and a circular ring 6 is arranged on the top of the vertical rod 5; the described support structure is set as a group of two, and a total of two groups are arranged, and the two support structures of each group are respectively arranged on the left and right sides of the aerial work platform 7, and the two groups of support structures are respectively arranged on the front and rear sides of the aerial work platform 7.

[0016] During the installation process, the upper anchor plate 2 and the lower anchor plate 3 are first locked and fixed together with the platform main beam 1 of the aerial work platform 7 by the tension bolts 4. After the aerial work platform 7 is erected, the vertical rod 5 is welded on the upper anchor plate 2. Finally, a pull rope is connected between the circular rings 6 of the two bracket structures at the left and right ends. When the workers are working at high altitudes, they can move back and forth along the pull rope by hooking the strap rope to the pull rope, and there is no need to frequently replace the fixings of the strap rope. When the construction on the front side is completed and needs to be moved to the back side for construction, the strap rope can be hooked to the pull rope on the back side.

[0017] The bottom edge of the vertical rod 5 is welded and fixed to the upper anchor plate 2 via a plurality of rib plates 8 to improve the stability of the vertical rod 5 .

[0018] The vertical rod 5 includes a mother rod 9 at the bottom, and a sub-rod 10 is movably inserted into the mother rod 9. The mother rod 9 and the sub-rod 10 are provided with multiple groups of screw holes corresponding to the positions. The telescopic control screw 11 passes through the screw holes of the mother rod 9 and the sub-rod 10 to fix the two together. According to the progress of construction, the telescopic length of the sub-rod 10 can be reasonably adjusted by the telescopic control screw 11. Through this structure, the vertical rod 5 can be adjusted to a suitable height.

[0019] The upper anchor plate 2 and the lower anchor plate 3 are provided with four corresponding slide grooves 12. After the tension bolts 4 pass through the slide grooves 12, the upper anchor plate 2 and the lower anchor plate 3 are locked and fixed. The slide grooves 12 are provided to allow the tension bolts 4 of various sizes to pass through, which is convenient for local material installation.

[0020] The inner wall spacing between the front and rear sets of slide grooves 12 is greater than the width of the platform main beam 1. The advantage of this arrangement is that when the tension bolts 4 are extended downward, they will not contact the platform main beam 1. The tension bolts 4 are respectively arranged on both sides of the platform main beam 1 to clamp it, and there is no need to open penetration holes for the tension bolts 4 on the platform main beam 1.

Claims

1. A support structure for facilitating the movement of a shoulder strap rope, characterized in that: It comprises an upper anchor plate (2) and a lower anchor plate (3) arranged on the top and bottom surfaces of the platform main beam (1); the upper anchor plate (2) and the lower anchor plate (3) are locked and fixed by a plurality of tension bolts (4); a vertical rod (5) is vertically fixed at the center of the top surface of the upper anchor plate (2); a circular ring (6) is arranged on the top of the vertical rod (5); two bracket structures are arranged as a group, and two groups are arranged in total; the two bracket structures of each group are respectively arranged at the left and right ends of the aerial work platform (7); and the two groups of bracket structures are respectively arranged at the front and rear sides of the aerial work platform (7).

2. A support structure for facilitating movement of a shoulder strap according to claim 1, characterized in that: The bottom edge of the vertical rod (5) is welded and fixed to the upper anchor plate (2) via a plurality of rib plates (8).

3. A support structure for facilitating movement of a shoulder strap according to claim 1, characterized in that: The vertical rod (5) comprises a mother rod (9) with a bottom, a sub-rod (10) being movably inserted into the mother rod (9), a plurality of groups of screw holes corresponding to positions being arranged on the mother rod (9) and the sub-rod (10), and a telescopic control screw (11) passing through the screw holes of the mother rod (9) and the sub-rod (10) fixes the two together.

4. A support structure for facilitating the movement of a shoulder strap according to claim 1, characterized in that: The upper anchor plate (2) and the lower anchor plate (3) are provided with four corresponding sliding grooves (12), and the tension bolts (4) are passed through the sliding grooves (12) to lock and fix the upper anchor plate (2) and the lower anchor plate (3).

5. A support structure for facilitating movement of a shoulder strap according to claim 4, characterized in that: The inner wall spacing between the front and rear groups of slide grooves (12) is greater than the width of the platform main beam (1).