Air conditioner

By designing the first water connection part in the air conditioner to collect condensed water and reduce splashing, the problem of potential damage caused by condensed water to the internal electrical components of the air conditioner is solved, achieving more efficient condensed water collection and stable installation.

CN222378406UActive Publication Date: 2025-01-21WUHU MATY AIR CONDITIONING EQUIP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421244873.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2025-01-21
Estimated Expiration
2034-05-31

AI Technical Summary

Technical Problem

The multi-stage structural design of the heat exchanger in the air conditioner causes the condensate to sputter during the dripping process, which may contact the electrical components inside the air conditioner, resulting in short circuits, rust or other electrical failures.

Method used

An air conditioner is designed, which includes a first water receiving part, which is located on the windward side of the second heat exchange section and below the first heat exchange section. At the lower end, the path length of condensation water dripping is shortened to reduce splashing, and it is firmly installed on the support part through the connecting part.

Benefits of technology

It effectively reduces the sputtering of condensed water during the dripping process, improves the collection efficiency of condensed water, avoids potential damage to the internal components of the air conditioner, and simplifies the installation and disassembly process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222378406U_ABST
    Figure CN222378406U_ABST
Patent Text Reader

Abstract

The utility model discloses an air conditioner, and relates to the technical field of electric appliances. The air conditioner comprises a base plate, a heat exchanger and a first water receiving piece. The base plate comprises two supporting parts. The two ends of the heat exchanger are installed on the two supporting parts correspondingly. The heat exchanger comprises a first heat exchange section and a second heat exchange section which are arranged up and down. The first water receiving piece is located on the windward side of the second heat exchange section and below the first heat exchange section, the first water receiving piece comprises a rod body part and connecting parts at the two ends, and the connecting parts at the two ends are installed on the two supporting parts correspondingly; at least one connecting part is a first connecting part, a clamping groove is formed in the first connecting part, and a part of the supporting part is clamped in the clamping groove. According to the air conditioner, the collecting efficiency of condensate water can be improved, and the air conditioner is easy to install.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of electrical appliances, in particular to an air conditioner. Background Art

[0002] In the related art, a heat exchanger is provided in the air conditioner. In order to improve the heat exchange effect and reduce the space occupied, the heat exchanger needs to be designed as a multi-stage structure. However, condensed water will be generated between two adjacent heat exchangers. When the condensed water generated by the heat exchanger located in the upper section drips onto the water receiving tray at the bottom, the condensed water tends to splash around into tiny droplets. The splashed condensed water droplets may contact the electrical components inside the air conditioner, causing short circuits, rust or other electrical failures, thereby affecting the normal operation of the air conditioner.

[0003] Therefore, the water tray has room for improvement. Utility Model Content

[0004] The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, the purpose of the utility model is to provide an air conditioner, which can collect condensed water more effectively and is easy to install.

[0005] The air conditioner according to the embodiment of the utility model includes a chassis, a heat exchanger and a first water receiving member; the chassis includes two supporting parts; the two ends of the heat exchanger are respectively mounted on the two supporting parts, and the heat exchanger includes a first heat exchange section and a second heat exchange section arranged up and down; the first water receiving member is located on the windward side of the second heat exchange section and below the first heat exchange section, the first water receiving member includes a rod body and connecting parts at both ends, and the connecting parts at both ends are respectively mounted on the two supporting parts; at least one of the connecting parts is a first connecting part, a slot is formed on the first connecting part, and a part of the supporting part is stuck in the slot.

[0006] According to the air conditioner of the embodiment of the utility model, by providing a first water receiving member, the condensed water generated by the first heat exchange section can be received. By providing the first water receiving trough at the lower end of the first heat exchange section, the path length of the condensed water dripping can be shortened, and the splashing of the condensed water during the dripping process can be effectively reduced, thereby improving the collection efficiency of the condensed water and avoiding the condensed water from causing potential damage to other components inside the air conditioner. By providing connecting parts at both ends of the first water receiving member, the water receiving member can be firmly mounted on the support part, and it is also convenient for installation and disassembly. By forming a slot on the first connecting part and utilizing the cooperation between the slot and the support part, the first water receiving member can be quickly and accurately fixed in the desired position, thereby ensuring stability and reliability during long-term use.

[0007] According to the air conditioner of some embodiments of the utility model, the first connecting portion includes: two baffles arranged at intervals along the length direction of the first water receiving member, and a slot is formed between the two baffles.

[0008] In the air conditioner according to some embodiments of the utility model, at least one of the baffles includes an expansion section, and the expansion section is extended in a direction away from the rod body and in a direction away from the slot.

[0009] According to some embodiments of the air conditioner of the present utility model, the supporting part on which the first connecting part is assembled is the first supporting part, and the first supporting part is provided with a first connecting port which passes through the length direction of the first water receiving part, and the first connecting port is open upward; one end of the rod body is located in the first connecting port, and two baffles are formed at the bottom of the rod body to constitute the first connecting part, and the two baffles are respectively an inner baffle and an outer baffle, and the outer baffle is located on the side of the clamped supporting part away from the other supporting part.

[0010] According to the air conditioner of some embodiments of the utility model, the lower end of the inner baffle forms a chamfer on the side facing the slot, and the lower end of the outer baffle is bent and extended in a direction away from the inner baffle.

[0011] According to some embodiments of the air conditioner of the present invention, the first connecting portion further includes an outer flange, the lower end of the outer flange is connected to the outer baffle, and the upper end of the outer flange extends to the upper end of the rod body.

[0012] According to some embodiments of the air conditioner of the present invention, the first support portion forms a hook above the first connecting port, and the hook is hooked above the rod body.

[0013] According to some embodiments of the air conditioner of the present invention, the supporting part includes a second supporting part, the second supporting part is provided with a second connecting port, the second connecting port is open in a direction toward the other supporting part, and the connecting part includes a second connecting part, and the second connecting part is inserted into the second connecting port from the side.

[0014] According to some embodiments of the air conditioner of the present utility model, the rod body portion includes: a water receiving bottom wall, a first water receiving side wall connected to the windward side of the water receiving bottom wall, and a second water receiving side wall connected to the leeward side of the water receiving bottom wall, and the first water receiving groove surrounded by the water receiving bottom wall, the first water receiving side wall and the second water receiving side wall is a V-shaped groove.

[0015] According to some embodiments of the air conditioner of the present invention, the first water receiving side wall includes at least two folded wall sections arranged in sequence from top to bottom, each of the folded wall sections is inclined away from the second water receiving side wall in an upward direction, and the inclination of one of the folded wall sections is greater than the inclination of the folded wall section below it.

[0016] According to some embodiments of the air conditioner of the present invention, the horizontal distance between the upper end of the first water receiving side wall and the water receiving bottom wall is greater than the horizontal distance between the upper end of the second water receiving side wall and the water receiving bottom wall; the upper end height of the first water receiving side wall is greater than the upper end height of the second water receiving side wall.

[0017] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0019] Figure 1 A perspective view of an air conditioner according to some embodiments of the present application;

[0020] Figure 2 A cross-sectional view of an air conditioner according to some embodiments of the present application;

[0021] Figure 3 This is a schematic structural diagram of a first water receiving member in some embodiments of the present application;

[0022] Figure 4 A schematic structural diagram of a first connection portion of a first water receiving member according to some embodiments of the present application;

[0023] Figure 5 This is a schematic structural diagram of the second connection portion of the first water receiving member in some embodiments of the present application;

[0024] Figure 6 A schematic diagram of the connection between the first water receiving member and the bottom plate in some embodiments of the present application;

[0025] Figure 7 This is a cross-sectional view of the first water receiving member of some embodiments of the present application.

[0026] Reference numerals:

[0027] Air conditioner 100,

[0028] chassis 1, support portion 10, first support portion 11, first connection port 111, hook 112, second support portion 12, second connection port 121,

[0029] Heat exchanger 2, windward side 20a, leeward side 20b, first heat exchange section 21, second heat exchange section 22,

[0030] The first water receiving member 3, the rod body 30, the first water receiving groove 300, the water receiving bottom wall 301, the first water receiving side wall 302, the folded wall section 3021, the second water receiving side wall 303,

[0031] The connecting portion 31 , the first connecting portion 311 , the slot 3110 , the inner baffle plate 3112 , the outer baffle plate 3113 , the expansion section 3113 a , the outer flange 3114 , and the second connecting portion 312 . DETAILED DESCRIPTION

[0032] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0033] In the description of the present utility model, it should be understood that the terms "longitudinal", "lateral", "length", "width", "up", "down", "front", "back", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.

[0034] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0035] Reference below Figure 1-Figure 7 An air conditioner 100 according to an embodiment of the present invention is described.

[0036] like Figure 1 As shown, the air conditioner 100 according to the embodiment of the utility model includes a chassis 1 and a heat exchanger 2 .

[0037] The chassis 1 serves as a supporting base for the entire air conditioner 100 and includes two supporting parts 10 .

[0038] like Figure 1 As shown, both ends of the heat exchanger 2 are respectively mounted on the two supporting parts 10. This arrangement can ensure that the heat exchanger 2 maintains stable and safe operation during operation.

[0039] In order to improve the heat exchange efficiency and reduce the space occupied, in some embodiments, the heat exchanger 2 adopts a multi-stage structure design. Specifically, the heat exchanger 2 includes a first heat exchange section 21 and a second heat exchange section 22 arranged vertically, and the second heat exchange section 22 extends obliquely from top to bottom toward the leeward side 20b of the heat exchanger 2. Through this two-stage structure, the air can more fully exchange heat with the heat exchanger 2, thereby improving the cooling or heating effect of the air conditioner 100.

[0040] As mentioned in the background technology, for the heat exchanger 2 with a multi-stage structure design, condensed water will also be generated between the first heat exchange stage 21 and the second heat exchange stage 22 .

[0041] In order to solve the above problem, the air conditioner 100 of the present application further includes a first water receiving member 3. Figure 1-Figure 2 As shown, the first water receiving member 3 is located at the windward side 20a of the second heat exchange section 22 and below the first heat exchange section 21. In this way, the position of the first water receiving member 3 fully utilizes the characteristic that the second heat exchange section 22 is inclined from top to bottom toward the leeward side 20b, so that the second heat exchange section 22 can naturally avoid the first water receiving member 3 without affecting the flow of air and the heat exchange effect of the heat exchanger 2.

[0042] like Figure 3 As shown, the first water receiving member 3 includes a rod body portion 30 and connecting portions 31 at both ends.

[0043] In some optional embodiments, such as Figure 4 As shown, the rod body 30 is provided with a first water receiving groove 300 corresponding to the lower end of the first heat exchange section 21. This ensures that the condensed water dripping from the first heat exchange section 21 can directly flow into the first water receiving groove 300, reducing the possibility of condensed water splashing and improving the collection efficiency of condensed water.

[0044] The connecting parts 31 at both ends are respectively installed on the two supporting parts 10. By providing the connecting parts 31, the first water receiving member 3 can be firmly installed on the two supporting parts 10 of the chassis 1.

[0045] Among them, at least one connecting portion 31 adopts the design of the first connecting portion 311. Figure 4As shown, the first connecting portion forms a slot 3110, the size and shape of which can be customized according to the structure and size of the supporting portion 10 of the chassis 1, to ensure that a portion of the supporting portion 10 can be tightly and stably inserted into the slot 3110, thereby achieving rapid installation and disassembly of the first water receiving member 3.

[0046] like Figure 1 As shown, the chassis 1 supports the heat exchanger 2 through two side panels, and long-term operation or external force may cause the side panels to deform. By installing the first water receiving member 3, its connecting portion 31 can apply appropriate tension to the side panels with the help of the supporting portion 10, thereby effectively preventing the side panels from being overly opened or deformed due to force, thereby enhancing the structural stability and reliability of the air conditioner 100.

[0047] In some embodiments, the first connection portion 311 includes: two baffles spaced apart along the length direction of the first water receiving member 3. A clamping groove 3110 is formed between the two baffles. The clamping groove 3110 is suitable for cooperating with the support portion 10 to fix the first connection portion 311.

[0048] Optionally, an anti-slip layer is provided on the surfaces of the baffles facing each other.

[0049] According to some embodiments of the air conditioner 100 of the present invention, at least one baffle includes an expansion section 3113 a , and the expansion section 3113 a is extended in a direction away from the rod body 30 and in a direction away from the slot 3110 .

[0050] like Figure 4 As shown, the outer baffle 3113 on the first connecting portion 311 includes an expansion section 3113a. By setting up in this way, a flared slot 3110 can be formed, and when the first water receiving member 3 is installed, the support portion 10 can more easily enter the slot 3110. The flared structure provides a larger entry space for the support portion 10 of the chassis 1, reduces the resistance during the installation process, and enables the operator to easily install the first water receiving member 3 in place even without using tools, thereby reducing production time and improving production efficiency. At the same time, it can also reduce the operating space required for the installation process, so that the internal structure of the air conditioner 100 can be more compact, and other internal parts can be arranged more flexibly, thereby reducing the overall size of the air conditioner 100 while ensuring performance.

[0051] Similarly, during the disassembly process, the flared structure can also play a certain role. Due to the enlargement of the bayonet, the operator can easily put his fingers against the expansion section 3113a when disassembling the first water receiving member 3, which increases the contact area between the hand and the flared structure, allowing the operator to apply force more firmly. This can not only improve the disassembly efficiency, but also reduce the difficulty of operation.

[0052] According to some embodiments of the present invention, the air conditioner 100 is as follows: Figure 6 As shown, the support portion 10 assembled with the first connection portion 311 is the first support portion 11 , and the first support portion 11 is provided with a first connection port 111 penetrating along the length direction of the first water receiving member 3 , and the first connection port 111 is open upward.

[0053] Since the first connecting port 111 is open upward, the operator can conveniently place the first water receiving member 3 into the first connecting port 111 from above, thereby achieving rapid and accurate assembly.

[0054] In addition, when the first water receiving member 3 is installed in the first connecting port 111, Figure 6 As shown, it is effectively restricted in the width direction inside the first connection port 111. This restriction ensures the stability of the first water receiving member 3 in the lateral direction and prevents it from unnecessary displacement or shaking.

[0055] One end of the rod body 30 is located in the first connection port 111. Then, the first water receiving groove 300 formed on the rod body 30 can completely contain the dripping range of the first heat exchange section 21, and the end of the first heat exchange section 21 will not exceed the boundary of the first water receiving groove 300. This ensures that the condensed water generated by the first heat exchange section 21 during operation can be effectively collected and guided by the first water receiving groove 300, thereby avoiding the possibility of condensed water droplets generated at the end of the first heat exchange section 21 splashing or overflowing the first water receiving groove 300, thereby enhancing the overall reliability of the air conditioner 100.

[0056] like Figure 3-Figure 4 As shown, two baffles are formed at the bottom of the rod body 30 to constitute the first connecting portion 311, and the two baffles are respectively an inner baffle 3112 and an outer baffle 3113, and the outer baffle 3113 is located on the side of the clamped support portion 10 away from the other support portion 10. The inner baffle 3112 and the outer baffle 3113 are limited to prevent the first water receiving member 3 from moving in the longitudinal direction, and ensure that the first water receiving groove 300 on the rod body 30 is located below the first heat exchange section 21, so that condensed water can be effectively collected by the first water receiving groove 300, avoiding liquid overflow or dripping, thereby protecting other components of the air conditioner 100. At the same time, it can also reduce installation errors and improve installation accuracy.

[0057] According to the air conditioner 100 of some embodiments of the present invention, the lower end of the inner baffle 3112 is chamfered on the side facing the slot 3110. This can enlarge the opening of the slot 3110, which is convenient for installing the first water receiving member 3.

[0058] The lower end of the outer baffle 3113 is bent and extended in a direction away from the inner baffle 3112. This helps to further increase the opening of the slot 3110. During the installation process, the support part 10 can be more easily inserted due to the expansion of the slot 3110. The support part 10 can be smoothly inserted without precise alignment, thereby greatly simplifying the installation steps and improving the installation efficiency.

[0059] In some embodiments, Figure 4 As shown, the first connection portion 311 also includes an outer flange 3114, the lower end of the outer flange 3114 is connected to the outer baffle 3113, and the upper end of the outer flange 3114 extends to the upper end of the rod body 30. Specifically, in the installed state, the outer flange 3114 forms a close abutment relationship with the support portion 10 on the side facing the inner baffle 3112, forming an effective abutment surface. This abutment surface not only increases the connection area between the first connection portion 311 and the support portion 10, but also significantly enhances the connection stability between the two. Moreover, under the action of external force, the existence of the outer flange 3114 can expand the transmission effect of the external force, disperse the external force to a wider area, and effectively avoid the occurrence of stress concentration. The air conditioner 100 can be sturdy and durable, and can better cope with a variety of usage environments and transportation environments.

[0060] In some embodiments, Figure 6 As shown, the first support portion 11 forms a hook 112 above the first connection port 111, and the hook 112 is stuck above the rod body 30. The hook 112 cooperates with the rod body 30 to provide additional fixing force, so that the connection between the first water receiving member 3 and the first support portion 11 is more firm and reliable. In addition, the use of the hook 112 to limit the direction of the rod body 30 can also effectively prevent the first water receiving member 3 from moving in the vertical direction, and reduce the displacement of the first water receiving member 3 caused by vibration or external force. Therefore, the hook 112 can improve the position accuracy of the first water receiving member 3, thereby ensuring the collection effect of condensed water.

[0061] In some embodiments, Figure 1 , Figure 6 As shown, the support portion 10 includes a second support portion 12, and a second connection port 121 is provided on the second support portion 12. The second connection port 121 is open in a direction toward the other support portion 10, and the connection portion 31 includes a second connection portion 312, and the second connection portion 312 is inserted into the second connection port 121 from the side. The function of the second connection port 121 is to initially fix the position of the water receiving member so that it will not move or deviate during the subsequent installation process.

[0062] In some embodiments, Figure 3 , Figure 5 , Figure 7As shown, the two ends of the first water receiving member 3 are respectively the first connection part 311 and the second connection part 312. During installation, align the second connection part 312 on the first water receiving member 3 with the second connection port 121 and gently insert it. Then, the position of the first water receiving member 3 is preliminarily fixed so that it will not move or shift during the subsequent installation process, forming a pre-installation, and then the slot 3110 of the first connection part 311 is inserted into the first support part 11 on the chassis 1 to achieve the final installation. This installation method does not require other assembly parts and assembly tools, and the installation can be completed by simple insertion and clamping actions. At the same time, the cooperation between the slot 3110 and the support part 10 ensures the stability and accuracy of the installation, and even in the case of limited space, a precise installation effect can be achieved.

[0063] According to some embodiments of the present invention, the air conditioner 100 is as follows: Figure 7 As shown, the rod body 30 includes: a water receiving bottom wall 301, a first water receiving side wall 302 connected to the windward side 20a of the water receiving bottom wall 301, and a second water receiving side wall 303 connected to the leeward side 20b of the water receiving bottom wall 301. The first water receiving groove 300 surrounded by the water receiving bottom wall 301, the first water receiving side wall 302 and the second water receiving side wall 303 is a V-shaped groove.

[0064] Through the above structure, the first water receiving member 3 can quickly collect and guide the water drops to the bottom of the groove when receiving the dripping condensed water. The bottom of the V-shaped groove is the water receiving bottom wall 301, and its lower position helps the natural convergence of condensed water, reduces the diffusion and splashing of water flow, and thus improves the collection efficiency of condensed water.

[0065] According to some embodiments of the present invention, the air conditioner 100 is as follows: Figure 7 As shown, the first water receiving side wall 302 includes at least two folded wall sections 3021 arranged in sequence from top to bottom, each folded wall section 3021 is inclined upward away from the second water receiving side wall 303, and the inclination of one folded wall section 3021 is greater than the inclination of the folded wall section 3021 below it.

[0066] Firstly, the structural strength of the first water receiving trough 300 can be enhanced by providing two folded wall sections 3021 .

[0067] Secondly, each folded wall section 3021 is inclined upward away from the second water receiving side wall 303. This inclined setting helps the condensed water flow into the water receiving trough along the folded wall section 3021, thereby preventing the condensed water from overflowing or splashing.

[0068] Finally, the inclination of one of the folded wall sections 3021 is greater than the inclination of the folded wall section 3021 below it. This helps to form a wider opening at the top of the first water receiving trough 300, so that the condensed water can flow in more smoothly.

[0069] In some embodiments, the horizontal distance between the upper end of the first water receiving side wall 302 and the water receiving bottom wall 301 is greater than the horizontal distance between the upper end of the second water receiving side wall 303 and the water receiving bottom wall 301. Since the first water receiving side wall 302 is located on the windward side 20a, it is not restricted by other structures such as the second heat exchange section 22. Therefore, the water receiving area of ​​the first water receiving trough 300 can be increased by further expanding the outer contour of the first water receiving side wall 302. Specifically, this outwardly expanded shape enables the first water receiving trough 300 to cover a larger area, thereby more effectively capturing and collecting dripping condensed water.

[0070] The height of the upper end of the first water receiving side wall 302 is greater than the height of the upper end of the second water receiving side wall 303. This is because the second water receiving side wall 303 is close to the second heat exchange section 22, and the upper end of the second heat exchange section 22 is close to the second water receiving side wall 303. Therefore, in order to ensure that there is no interference between the two, the upper end of the second water receiving side wall 303 is appropriately avoided.

[0071] The first water receiving side wall 302 is set higher so that it can more effectively catch the condensed water dripping from above and guide it into the first water receiving groove 300. At the same time, the higher first water receiving side wall 302 can reduce the splashing of condensed water when it flows into the first water receiving groove 300, thereby keeping the inside of the air conditioner 100 clean and dry. This arrangement ensures that the condensed water can flow smoothly into the first water receiving groove 300 while taking into account the spatial layout relationship between the second heat exchange section 22, thereby improving the overall performance and reliability of the air conditioner 100.

[0072] Below, refer to the attached Figure 1-Figure 7 , describing an air conditioner 100 according to a specific embodiment of the present application.

[0073] like Figure 1 As shown, the air conditioner 100 includes: a chassis 1, a heat exchanger 2, and a first water receiving member 3.

[0074] The chassis 1 comprises two support parts 10 .

[0075] The support portion 10 includes a first support portion 11 and a second support portion 12 .

[0076] The two ends of the heat exchanger 2 are respectively mounted on two supporting parts 10, referring to Figure 1-Figure 2 The heat exchanger 2 includes a first heat exchange section 21 and a second heat exchange section 22 arranged vertically. The second heat exchange section 22 extends obliquely from top to bottom toward the leeward side 20b.

[0077] Reference Figure 1-Figure 2 The first water receiving member 3 is located on the windward side 20 a of the second heat exchange section 22 and below the first heat exchange section 21 .

[0078] Reference Figure 3 The first water receiving member 3 includes: a rod body portion 30 and connecting portions 31 at both ends. The rod body portion 30 is provided with a first water receiving groove 300 corresponding to the lower end of the first heat exchange section 21, and the connecting portions 31 at both ends are respectively installed on the two supporting portions 10.

[0079] Reference Figure 7 The rod body 30 includes: a water receiving bottom wall 301, a first water receiving side wall 302 connected to the windward side 20a of the water receiving bottom wall 301, and a second water receiving side wall 303 connected to the leeward side 20b of the water receiving bottom wall 301.

[0080] The first water receiving groove 300 surrounded by the water receiving bottom wall 301, the first water receiving side wall 302 and the second water receiving side wall 303 is a V-shaped groove.

[0081] The first water receiving side wall 302 includes at least two folded wall sections 3021 arranged in sequence from top to bottom, each folded wall section 3021 is inclined upward away from the second water receiving side wall 303, and the inclination of one folded wall section 3021 is greater than the inclination of the folded wall section 3021 below it.

[0082] The horizontal distance between the upper end of the first water receiving side wall 302 and the water receiving bottom wall 301 is greater than the horizontal distance between the upper end of the second water receiving side wall 303 and the water receiving bottom wall 301. The upper end height of the first water receiving side wall 302 is greater than the upper end height of the second water receiving side wall 303.

[0083] Reference Figure 3-Figure 6 The connecting portion 31 includes: a first connecting portion 311 and a second connecting portion 312 .

[0084] Reference Figure 4 The first connecting portion 311 includes: two baffles arranged at the bottom of the rod body 30 and an outer flange 3114.

[0085] The two baffles are arranged at intervals along the length direction of the first water receiving member 3 , and a slot 3110 is formed between the two baffles. A portion of the support portion 10 is stuck in the slot 3110 .

[0086] The two baffles are respectively an inner baffle 3112 and an outer baffle 3113. The outer baffle 3113 is located at a side of the clamped support portion 10 that is away from the other support portion 10.

[0087] The lower end of the inner baffle 3112 is chamfered at a side facing the slot 3110 .

[0088] Reference Figure 4 The outer baffle 3113 includes an expansion section 3113 a. The expansion section 3113 a is extended in a direction away from the rod body 30 and in a direction away from the slot 3110 .

[0089] The lower end of the outer flange 3114 is connected to the outer baffle 3113 , and the upper end of the outer flange 3114 extends to the upper end of the rod body 30 .

[0090] Reference Figure 6 The first supporting portion 11 is used to assemble the first connecting portion 311 , and the second supporting portion 12 is used to assemble the second connecting portion 312 .

[0091] Reference Figure 6 The first supporting portion 11 includes: a first connecting port 111 and a hook 112 .

[0092] The first connection port 111 is through along the length direction of the first water receiving member 3 , and the first connection port 111 is open upward. One end of the rod body 30 is located in the first connection port 111 .

[0093] The hook 112 is hooked on the rod body 30 .

[0094] Reference Figure 6 The second supporting portion 12 includes: a second connecting port 121 .

[0095] The second connection port 121 is open in a direction toward the first support portion 11 , so that the second connection portion 312 can be inserted into the second connection port 121 from the side.

[0096] In the description of this specification, the description with reference to the terms "embodiment", "example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0097] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. An air conditioner, characterized in that: include: A chassis, including two support parts; A heat exchanger, wherein both ends of the heat exchanger are respectively mounted on the two supporting parts, and the heat exchanger comprises a first heat exchange section and a second heat exchange section arranged up and down; a first water receiving member, the first water receiving member being located on the windward side of the second heat exchange section and below the first heat exchange section, the first water receiving member comprising a rod body and connecting portions at both ends, the connecting portions at both ends being respectively mounted on the two supporting portions; At least one of the connecting parts is a first connecting part, a slot is formed on the first connecting part, and a part of the supporting part is stuck in the slot.

2. The air conditioner according to claim 1, characterized in that: The first connecting portion includes: two baffles arranged at intervals along the length direction of the first water receiving member, and the clamping groove is formed between the two baffles.

3. The air conditioner according to claim 2, characterized in that: At least one of the baffles includes an expansion section, and the expansion section is extended in a direction away from the rod body and in a direction away from the clamping slot.

4. The air conditioner according to claim 2, characterized in that: The support part for assembling the first connection part is a first support part, and the first support part is provided with a first connection port which runs through the length direction of the first water receiving member, and the first connection port is open upward; One end of the rod body is located in the first connecting port, and the bottom of the rod body forms two baffles to constitute the first connecting part. The two baffles are an inner baffle and an outer baffle respectively. The outer baffle is located on the side of the stuck support part away from the other support part.

5. The air conditioner according to claim 4, characterized in that: The lower end of the inner baffle forms a chamfer on a side facing the slot, and the lower end of the outer baffle is bent and extended in a direction away from the inner baffle.

6. The air conditioner according to claim 4, characterized in that: The first connection portion further includes an outer flange, the lower end of the outer flange is connected to the outer baffle, and the upper end of the outer flange extends to the upper end of the rod body.

7. The air conditioner according to claim 4, characterized in that: The first supporting portion forms a hook above the first connecting port, and the hook is clamped above the rod body.

8. The air conditioner according to claim 1, characterized in that: The support part includes a second support part, the second support part is provided with a second connection port, the second connection port is open in a direction toward the other support part, and the connection part includes a second connection part, and the second connection part is inserted into the second connection port from the side.

9. The air conditioner according to any one of claims 1 to 8, characterized in that: The rod body includes: a water receiving bottom wall, a first water receiving side wall connected to the windward side of the water receiving bottom wall, and a second water receiving side wall connected to the leeward side of the water receiving bottom wall. The first water receiving groove surrounded by the water receiving bottom wall, the first water receiving side wall and the second water receiving side wall is a V-shaped groove.

10. The air conditioner according to claim 9, characterized in that: The first water receiving side wall includes at least two folded wall sections arranged in sequence from top to bottom, each of the folded wall sections is inclined upward away from the second water receiving side wall, and the inclination of one of the folded wall sections is greater than the inclination of the folded wall section below it.

11. The air conditioner according to claim 9, characterized in that: The horizontal distance between the upper end of the first water receiving side wall and the water receiving bottom wall is greater than the horizontal distance between the upper end of the second water receiving side wall and the water receiving bottom wall; The height of the upper end of the first water receiving side wall is greater than the height of the upper end of the second water receiving side wall.