Insulating tool for power construction detection
By designing a labor-saving mechanism in which a large gear drives a small gear in an insulating tool for electric power construction inspection, the problem of difficulty in shearing hard wires is solved, and efficient shearing of hard wires is achieved.
Patent Information
- Application Number
- CN202420845146.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2034-04-23
AI Technical Summary
Existing insulation tools for power construction inspection are difficult to successfully shear wires with strong shear hardness.
An insulating tool for electric power construction testing is designed. It uses a labor-saving mechanism in which a large gear drives a small gear. The fixed plate is driven to rotate through the rotating shaft and gear system, thereby achieving shearing of relatively hard wires.
It effectively solves the problem of difficulty in shearing hard wires and achieves efficient shearing of hard wires.
Smart Images

Figure CN222379733U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of insulating tools for electric power construction detection, in particular to an insulating tool for electric power construction detection. Background Art
[0002] Insulation tools are used in high-voltage lines. The insulation condition directly affects the stability and safety of the lines. Their function is to help users detect whether the insulation performance of electrical equipment meets safety standards, thereby reducing the occurrence of electrical accidents.
[0003] The existing patent CN217981583U discloses an insulating tool for power construction detection. When clamping or shearing is required, the inspector opens the clamp body by pressing the first handle and the second handle relatively inward, and then puts the object to be detected into the clamping part and the shearing part for processing. When current detection is required on the object to be detected, the front end of the current detection part is pressed against and lightly pressed, so that the shell retracts and the contacts of the Hall current sensor leak out and touch the object to be detected for detection, and the detection data is transmitted to the display screen through the internal signal line for the user to record the data.
[0004] When the existing device is cutting at a certain position, some wires are hard and difficult to be cut off. Utility Model Content
[0005] The utility model aims to provide an insulating tool for electric power construction detection in order to solve the problem that some electric wires are relatively hard and are difficult to be cut off during cutting.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an insulating tool for power construction inspection, a No. 1 fixing plate is fixed at one end of the inner side of the main body, a labor-saving component is arranged inside the No. 1 fixing plate, a No. 1 gear is fixed at the bottom of the rotating shaft, a pull ring is pulled to drive the wire, so that the wire pulls the rotating shaft to rotate, and the rotating shaft drives the No. 1 gear to rotate, both ends of the No. 1 gear are provided with meshing No. 2 gears, a No. 3 gear is fixed on the top of the No. 2 gear, the No. 1 gear drives the No. 2 gears at both ends to rotate, the No. 2 gear drives the No. 3 gear to rotate, a meshing No. 4 gear is arranged on the inner side of the No. 3 gear, a No. 1 groove is arranged on the top of the outer side of the rotating shaft, and a pull ring is arranged on the outer side of the No. 1 groove.
[0007] As a further solution of the utility model: a No. 2 groove is arranged in the middle of the outer side of the rotating shaft, and a spring is arranged on the outer side of the No. 2 groove.
[0008] As a further solution of the utility model: a No. 2 fixing plate is fixed to the other end of the inner side of the main body, and the No. 2 fixing plate is arranged at the top and bottom of the No. 1 fixing plate, and the rotating shaft runs through the No. 2 fixing plate and the No. 1 fixing plate, the No. 3 gear drives the No. 4 gear to rotate, and the No. 4 gear drives the No. 1 fixing plate to rotate, and the No. 3 fixing plate is fixed to the bottom of the No. 2 fixing plate, and the No. 3 fixing plate is rotatably connected to the bottom of the No. 2 gear.
[0009] As a further solution of the utility model: a display is provided at the handle of the main body.
[0010] As a further solution of the utility model: a protective component is arranged on the outside of the main body, the card slots are arranged at both ends of the main body, and a card block is arranged inside the card slot. When the main body is opened, the card block will slide into the transparent protective cover to pull the card block out of the card slot for disassembly.
[0011] As a further solution of the utility model: a transparent protective cover is slidably connected to the outer side of the clamping block, through which the wires to be cut in the main body can be protected from being wetted by rainwater when operating in rainy weather.
[0012] As a further solution of the utility model: a wire is fixed inside the No. 1 groove, and the end of the wire is fixedly connected to the pull ring.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] 1. Through the transparent protective cover, the card block is connected to the card slot, and the wires that need to be cut in the main body are protected by the transparent protective cover from top to bottom to prevent the cut wires from being wetted by rain during operations in rainy weather.
[0015] 2. Through the provided rotating shaft, pull the pull ring to drive the wire, the rotating shaft drives the No. 4 gear to rotate, the No. 4 gear drives the No. 1 fixed plate to rotate, the No. 1 fixed plate drives the main body to shear, and the large gear drives the small gear to realize the labor-saving mechanism, so as to shear the wires with stronger hardness. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 It is a schematic diagram of the overall internal structure of the utility model;
[0018] Figure 3 This is a schematic diagram of the structure of the No. 1 and No. 2 fixing plates of the utility model;
[0019] Figure 4This is a schematic diagram of the labor-saving component structure of the utility model;
[0020] Figure 5 It is a schematic diagram of the pull ring structure of the utility model.
[0021] In the figure: 1. main body; 101. display; 2. fixing plate No. 1; 201. fixing plate No. 2; 202. fixing plate No. 3; 3. protective component; 301. transparent protective cover; 302. block; 303. slot; 4. labor-saving component; 401. shaft; 402. slot No. 1; 403. slot No. 2; 404. spring; 405. gear No. 1; 406. gear No. 2; 407. gear No. 3; 408. gear No. 4; 409. pull ring. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1 , 3 , 4, 5, in the embodiment of the utility model, an insulating tool for electric power construction detection includes a main body 1, a No. 1 fixing plate 2 is fixed at one end of the inner side of the main body 1, a labor-saving component 4 is arranged inside the No. 1 fixing plate 2, a No. 1 gear 405 is fixed at the bottom of the rotating shaft 401, a pull ring 409 is pulled to drive the wire, so that the wire pulls the rotating shaft 401 to rotate, the rotating shaft 401 drives the No. 1 gear 405 to rotate, both ends of the No. 1 gear 405 are provided with meshing No. 2 gears 406, a No. 3 gear 407 is fixed on the top of the No. 2 gear 406, the No. 1 gear 405 drives the No. 2 gears 406 at both ends to rotate, the No. 2 gear 406 drives the No. 3 gear 407 to rotate, a meshing No. 4 gear 408 is arranged on the inner side of the No. 3 gear 407, a No. 1 groove 402 is arranged on the top of the outer side of the rotating shaft 401, and a pull ring 409 is arranged on the outer side of the No. 1 groove 402;
[0024] The first gear 405 drives the second gear 406 at both ends to rotate, the second gear 406 drives the third gear 407 to rotate, and the third gear 407 drives the fourth gear 408 to rotate.
[0025] A second groove 403 is provided in the middle of the outer side of the rotating shaft 401, and a spring 404 is provided on the outer side of the second groove 403. A second fixing plate 201 is fixed to the other end of the inner side of the main body 1, and the second fixing plate 201 is provided at the top and the bottom of the first fixing plate 2. The rotating shaft 401 runs through the second fixing plate 201 and the first fixing plate 2. The third gear 407 drives the fourth gear 408 to rotate, and the fourth gear 408 drives the first fixing plate 2 to rotate. The bottom of the second fixing plate 201 is fixed with a third fixing plate 202, and the third fixing plate 202 is rotatably connected to the bottom of the second gear 406. A display 101 is provided at the handle of the main body 1.
[0026] The first fixing plate 2 drives the main body 1 to cut, and a labor-saving mechanism is implemented by driving the small gear through the large gear, so that the wire with stronger hardness can be cut.
[0027] In this embodiment: pulling the pull ring 409 drives the wire, so that the wire pulls the rotating shaft 401 to rotate, the rotating shaft 401 drives the No. 1 gear 405 to rotate, the No. 1 gear 405 drives the No. 2 gear 406 at both ends to rotate, the No. 2 gear 406 drives the No. 3 gear 407 to rotate, the No. 3 gear 407 drives the No. 4 gear 408 to rotate, the No. 4 gear 408 drives the No. 1 fixed plate 2 to rotate, the No. 1 fixed plate 2 drives the main body 1 to shear, and the labor-saving mechanism is realized by the large gear driving the small gear, so that the hardness of the wire can be sheared.
[0028] Please refer to Figure 1 , 2 , a protective component 3 is arranged on the outside of the main body 1, and a card slot 303 is arranged at both ends of the main body 1. A card block 302 is arranged inside the card slot 303. When the main body 1 is opened, the card block 302 will slide into the transparent protective cover 301, which is used to pull the card block 302 out of the card slot 303, so as to be disassembled. The transparent protective cover 301 is slidably connected to the outside of the card block 302. Through the transparent protective cover 301, the wires that need to be cut in the main body 1 are protected from being wetted by rainwater when operating in some rainy weather. A wire is fixed inside the No. 1 slot 402, and the end of the wire is fixedly connected to the pull ring 409;
[0029] The wires to be cut in the main body 1 are protected to prevent the cut wires from being wetted by rainwater during operation in rainy weather.
[0030] In this embodiment: through the transparent protective cover 301, the wires that need to be cut in the main body 1 are protected by observation from top to bottom to prevent the cut wires from being wetted by rain when working in rainy weather, and when the main body 1 is opened, the block 302 slides toward the inside of the transparent protective cover 301 to pull out the block 302 and make the block 302 leave the slot 303 for disassembly.
[0031] Working principle: The card block 302 is connected to the card slot 303, and the wires to be cut in the main body 1 are protected by the transparent protective cover 301 from top to bottom, so as to prevent the cut wires from being wetted by rainwater when working in rainy weather. When the main body 1 is opened, the card block 302 slides toward the inside of the transparent protective cover 301, so as to pull the card block 302 out of the card slot 303, so as to be disassembled;
[0032] Pulling the pull ring 409 drives the wire, so that the wire pulls the rotating shaft 401 to rotate, the rotating shaft 401 drives the No. 1 gear 405 to rotate, the No. 1 gear 405 drives the No. 2 gear 406 at both ends to rotate, the No. 2 gear 406 drives the No. 3 gear 407 to rotate, the No. 3 gear 407 drives the No. 4 gear 408 to rotate, the No. 4 gear 408 drives the No. 1 fixed plate 2 to rotate, the No. 1 fixed plate 2 drives the main body 1 to shear, and the labor-saving mechanism is realized by the large gear driving the small gear, so that the hardness of the wire can be sheared.
[0033] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An insulating tool for electric power construction detection, comprising a main body (1), characterized in that: A first fixing plate (2) is fixed to one end of the inner side of the main body (1), and a labor-saving component (4) is arranged inside the first fixing plate (2); The labor-saving component (4) comprises a rotating shaft (401), a first slot (402), a second slot (403), a spring (404), a first gear (405), a second gear (406), a third gear (407), a fourth gear (408), and a pull ring (409); A first gear (405) is fixed at the bottom of the rotating shaft (401), and a second gear (406) is provided at both ends of the first gear (405) to mesh with each other. A third gear (407) is fixed at the top of the second gear (406), and a fourth gear (408) is provided on the inner side of the third gear (407) to mesh with each other. A first groove (402) is provided at the top of the outer side of the rotating shaft (401), and a pull ring (409) is provided on the outer side of the first groove (402).
2. An insulating tool for electric power construction detection according to claim 1, characterized in that: A second groove (403) is provided in the middle of the outer side of the rotating shaft (401), and a spring (404) is provided on the outer side of the second groove (403).
3. An insulating tool for electric power construction detection according to claim 1, characterized in that: A second fixing plate (201) is fixed to the other end of the inner side of the main body (1), and the second fixing plate (201) is arranged at the top and bottom of the first fixing plate (2). The rotating shaft (401) passes through the second fixing plate (201) and the first fixing plate (2). A third fixing plate (202) is fixed to the bottom of the second fixing plate (201), and the third fixing plate (202) is rotatably connected to the bottom of the second gear (406).
4. The insulating tool for electric power construction detection according to claim 1, characterized in that: A display (101) is provided at the handle of the main body (1).
5. The insulating tool for electric power construction detection according to claim 1, characterized in that: A protective component (3) is provided on the outer side of the main body (1); The protective component (3) comprises a transparent protective cover (301), a card block (302), and a card slot (303); The card slots (303) are arranged at two ends of the main body (1), and a card block (302) is arranged inside the card slots (303).
6. An insulating tool for electric power construction detection according to claim 5, characterized in that: The outer side of the clamping block (302) is slidably connected to a transparent protective cover (301).
7. An insulating tool for electric power construction detection according to claim 1, characterized in that: A wire is fixed inside the first groove (402), and the end of the wire is fixedly connected to the pull ring (409).