Rapid warehousing device for thin-wall groove concrete
Through the design of the thin -wall groove concrete, the fast -entry device is designed, and the combination of drainage boards and outlet ports can be used to solve the problem of difficulty in entering the thin -walled drainage groove concrete and low construction efficiency, and realize the efficient and saved concrete pouring process.
Patent Information
- Application Number
- CN202420737787.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-04-10
AI Technical Summary
It is difficult to enter the warehouse for thin-walled drainage ditch concrete, low construction efficiency, and serious waste of finished materials.
Design a thin -walled groove concrete quickly entering the warehouse, including unloading tables, drainage boards, support components, vibration motors, and cardboards. Essence
It significantly improves the construction efficiency of the concrete pouring process, reduces the waste of finished concrete, saves production costs, and is suitable for continuous operations on various terrains.
Smart Images

Figure CN222391016U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of thin-wall concrete construction, in particular to a thin-wall groove concrete rapid storage device. Background Art
[0002] Drainage ditch is a facility used to drain rainwater, groundwater or other liquids, and plays an important role in urban construction and water conservancy projects. Drainage ditch is generally a thin-walled structure, with less concrete poured per unit length, low construction efficiency, and due to the influence of the drainage ditch cover, the width of the top of the drainage ditch is relatively narrow, which is not conducive to construction. Because of the installation of steel bars in the drainage ditch, the feeding port area at the top of the drainage ditch is further reduced, which greatly increases the difficulty of concrete storage.
[0003] At present, in the domestic water conservancy and hydropower engineering industry, drainage ditch concrete is usually poured directly into the warehouse using the "concrete mixer + chute" method. The concrete mixer cannot control the discharge volume. During the construction process, the concrete discharge volume is often too large at one time, resulting in over-pour of concrete or even overflow, causing serious waste of concrete materials. Utility Model Content
[0004] In order to solve the difficult problems of great difficulty in putting thin-walled concrete into warehouse, low construction efficiency and serious waste of finished products, the utility model provides a thin-walled groove concrete fast warehouse entry device, including a discharge platform, a drainage plate, a support assembly, a vibration motor and a clamping plate, etc. The device can accurately divert concrete to the discharge ports on both sides through the drainage plates, and send the concrete into the narrow casting warehouse surface through the discharge ports, thereby speeding up the construction efficiency in the concrete pouring process, reducing the waste of finished concrete materials and significantly saving production costs.
[0005] A device for quickly feeding thin-walled groove concrete into a silo comprises a discharge platform, the discharge platform comprises a bottom plate and surrounding side plates connected to each other, an open feed port is arranged on the top of the discharge platform, two discharge ports facing the casting silos on both sides of the groove are arranged on the bottom plate, two guide plates inclined toward the discharge ports are fixedly connected to the upper surface of the bottom plate between the two discharge ports, and the top ends of the two guide plates are fixedly connected to form an angle facing the feed port.
[0006] A further technical solution is: two guide plates and two discharge ports are symmetrically arranged.
[0007] A further technical solution is that: the edges on both sides of the discharge port are provided with clamping plates extending vertically toward the bottom of the bottom plate.
[0008] A further technical solution is that the length of the guide plate is the same as that of the bottom plate, and the height from the top of the guide plate to the bottom plate is not less than half of the height of the side plate.
[0009] A further technical solution is: multiple groups of support components are fixedly connected to the side of the two guide plates facing away from the feed port, the support components are arranged at equal intervals along the length direction of the guide plates, and the support components at both ends are fixedly connected to the side plates of the unloading platform respectively.
[0010] A further technical solution is: the support assembly includes a first support member and a second support member, the first support member is configured to have a "∧"-shaped structure with the same angle as the two guide plates, the top of the first support member is fixedly connected to the side of the guide plate away from the feed port, the second support member is a triangular column structure, the top of the second support member is fixedly connected to the bottom of the first support member, and the first support member and the second support member arranged at both ends are fixedly connected to the side plates of the unloading platform.
[0011] A further technical solution is: a third support member is fixedly connected between the bottom of the second support member and the bottom plate.
[0012] A further technical solution is: a vibration motor is fixedly connected to the outer wall of the side plate of the unloading platform.
[0013] A further technical solution is: the bottom plate and the plurality of side plates are made of wooden boards, the wooden boards are connected by steel nails and the outer walls are reinforced by winding iron wires.
[0014] Beneficial effects of the utility model:
[0015] The utility model is simple and convenient to operate. When in use, it is placed on the casting bin surface, and concrete is poured into the discharge platform through the feed port. Under the guidance of the drainage plate, the concrete is diverted to the discharge port. The discharge port faces the casting bin surface on both sides of the drainage ditch, and the concrete discharge amount and discharge position can be accurately controlled. After the pouring is completed, it can be easily pushed to the next casting bin. It is suitable for any terrain and can achieve continuous operation. It not only saves the amount of finished concrete, but also greatly improves the efficiency of drainage ditch pouring and reduces the labor of the operation. The vibration motor set on the side wall of the discharge platform can facilitate the smooth discharge of concrete and avoid the poor discharge caused by concrete accumulation.
[0016] The utility model has a simple structure, common materials, and is easy to manufacture, thus reducing production and maintenance costs, having significant economic benefits, and can be widely used in small-sized thin-walled concrete structures in various industries. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0018] In the figure: 1. unloading platform, 11. bottom plate, 12. side plate, 2. vibration motor, 3. guide plate, 4. feed port, 5. discharge port, 6. clamping plate, 7. support assembly, 71. first support member, 72. second support member. DETAILED DESCRIPTION
[0019] Now the utility model is further described in detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the utility model in a schematic manner, and therefore only show the components related to the utility model.
[0020] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.
[0021] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0022] The water retaining structure of the Jiayan Water Conservancy Project in Guizhou Province and the Northwest Guizhou Water Supply Project is a concrete face rockfill dam with a maximum dam height of 154.0m. A drainage ditch is set on the upstream side of the road behind the dam. The drainage ditch of the road behind the dam is the bottom bearing foundation of the frame beam of the slope behind the dam. The drainage ditch adopts a reinforced concrete structure with a concrete cover plate on the top. The top width is 10cm. The drainage ditch behind the dam is about 1245m long, and the concrete volume per linear meter is 0.34m 3 During the construction of drainage ditches, the thin-walled groove concrete quick-entry device of the utility model is used to assist in pouring, and the specific structure is as follows:
[0023] A thin-wall groove concrete rapid storage device, such as Figure 1 As shown, the material discharging platform 1 includes a bottom plate 11 and surrounding side plates 12 which are interconnected. An open feed port 4 is arranged on the top of the material discharging platform 1. Two discharge ports 5 facing the casting bins on both sides of the groove are provided on the bottom plate 11. Two guide plates 3 inclined toward the discharge ports 5 are fixedly connected to the upper surface of the bottom plate 11 between the two discharge ports 5. The top ends of the two guide plates 3 are fixedly connected to form an angle facing the feed port 4.
[0024] The two guide plates 3 and the two discharge ports 5 are symmetrically arranged, so as to evenly guide the concrete to the discharge ports 5 on both sides and realize synchronous discharge.
[0025] The edges of both sides of the discharge port 5 are provided with a card plate 6 extending vertically below the bottom plate 11. The top of the card plate 6 is fixedly connected to the lower surface of the bottom plate 11, which can be easily aligned with the casting warehouse surface feed port 4 to ensure that the concrete does not deviate during the pouring process.
[0026] The length of the guide plate 3 is the same as that of the bottom plate 11, and the height from the top of the guide plate 3 to the bottom plate 11 is not less than half the height of the side plate 12, so that the guide plate 3 can timely divide the concrete loaded into the unloading platform 1 and guide it to the discharge ports 5 on both sides. The guide plate 3 is made of wood or steel plate.
[0027] The two guide plates 3 are fixedly connected to the side away from the feed port 4 with a support assembly 7, and multiple groups of support assemblies 7 are arranged at equal intervals along the length direction of the guide plates 3, and the support assemblies 7 at both ends are respectively fixedly connected to the side plates 12 of the discharge platform 1. The support assembly 7 is provided to provide a stable support for the guide plates 3, so as to prevent the guide plates 3 from being washed off during the concrete pouring process.
[0028] Preferably, the support assembly 7 includes a first support member 71 and a second support member 72, the first support member 71 is a "∧"-shaped structure having the same angle as the two guide plates 3, the top of the first support member 71 is fixedly connected to the side of the guide plate 3 away from the feed port 4, the second support member 72 is a triangular prism structure, the top of the second support member 72 is fixedly connected to the bottom of the first support member 71, and the first support member 71 and the second support member 72 arranged at both ends are fixedly connected to the side plate 12 of the unloading platform 1. The first support member 71 and the second support member 72 are both made of square wood. More preferably, a third support member (not shown in the figure) is fixedly connected between the bottom of the second support member 72 and the bottom plate 11, and the third support member is made of square wood. The connection between the first support member 71, the second support member 72, the third support member, the guide plate 3 and the side plate 12 is a steel nail connection or a mortise and tenon connection.
[0029] A vibration motor 2 is fixedly connected to the outer wall of the side plate 12 of the unloading platform 1. Preferably, the vibration motor 2 is a micro vibration motor, which is installed on the outer wall of the side plate 12 on both sides of the unloading platform 1. When concrete accumulates at the feed port 4 of the casting warehouse surface or does not slide into the warehouse surface smoothly, the micro vibration motor 2 is started to help the concrete slide down smoothly into the warehouse surface.
[0030] In one embodiment, the bottom plate 11 and the side plate 12 of the unloading platform 1 are made of wooden boards, which are 80 cm long, 40 cm wide, and 0.5 cm thick. The wooden boards are connected by steel nails, and the outer wall is reinforced by iron wire winding to prevent the "mold explosion" phenomenon during the concrete pouring process. The use of wooden boards has low production costs, common materials, and is easy to make, which is very suitable for construction sites. In another embodiment, the bottom plate 11 and the side plate 12 of the unloading platform 1 are made of steel plates, and the steel plates are welded and fixed.
[0031] The size of the discharge port 5 on the bottom plate 11 is matched with the size of the feed port of the casting bin, and the width and length of the discharge port 5 are adjusted according to the size of the drainage ditch trench casting bin.
[0032] The application effect of this embodiment is good. In the early stage, the construction time of drainage ditch in other parts of this project is about 30 minutes per linear meter. After adopting the device of the utility model, the construction time of drainage ditch is about 10 minutes per linear meter, which greatly improves the efficiency of drainage ditch pouring and reduces the labor of operation; and it can save finished concrete. In the early stage, each truck of finished concrete (about 8m 3 ) can construct a drainage ditch of 15 linear meters. After adopting the utility model device, each truck of finished concrete can construct a drainage ditch of 23.5 linear meters, which has significant economic benefits.
[0033] Based on the above ideal embodiments of the utility model, the relevant staff can make various changes and modifications without deviating from the technical concept of the utility model through the above description. The technical scope of the utility model is not limited to the content of the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. A device for quickly loading concrete into a thin-walled groove, characterized in that: The material discharging platform comprises a bottom plate and surrounding side plates which are interconnected. An open feed port is arranged on the top of the material discharging platform. Two discharge ports which are directly opposite to the casting bins on both sides of the groove are arranged on the bottom plate. Two guide plates which are inclined toward the discharge ports are fixedly connected to the upper surface of the bottom plate between the two discharge ports. The top ends of the two guide plates are fixedly connected to form an angle directly opposite to the feed port.
2. A thin-wall groove concrete rapid storage device according to claim 1, characterized in that: The two guide plates and the two discharge ports are arranged symmetrically.
3. A thin-walled groove concrete rapid storage device according to claim 1, characterized in that: The edges of both sides of the discharge port are provided with clamping plates extending vertically toward the bottom of the bottom plate.
4. A thin-walled groove concrete rapid storage device according to claim 1, characterized in that: The length of the guide plate is the same as that of the bottom plate, and the height from the top of the guide plate to the bottom plate is not less than half of the height of the side plate.
5. The device for rapid storage of thin-walled groove concrete according to claim 1, characterized in that: Multiple groups of support components are fixedly connected to the side of the two guide plates facing away from the feed port. The support components are arranged at equal intervals along the length direction of the guide plates, and the support components located at both ends are fixedly connected to the side plates of the unloading platform respectively.
6. A thin-walled groove concrete rapid storage device according to claim 5, characterized in that: The support assembly includes a first support member and a second support member. The first support member is configured to have a "∧"-shaped structure having the same angle as the two guide plates. The top of the first support member is fixedly connected to the side of the guide plate away from the feed port. The second support member is a triangular column structure. The top of the second support member is fixedly connected to the bottom of the first support member. The first support member and the second support member arranged at both ends are fixedly connected to the side plates of the unloading platform.
7. A thin-wall groove concrete rapid storage device according to claim 6, characterized in that: A third supporting member is fixedly connected between the bottom of the second supporting member and the bottom plate.
8. The device for rapid storage of thin-walled groove concrete according to claim 1, characterized in that: A vibration motor is fixedly connected to the outer wall of the side plate of the unloading platform.
9. A thin-walled groove concrete rapid storage device according to claim 1, characterized in that: The bottom plate and the side plates are made of wooden boards, the wooden boards are connected by steel nails and the outer walls are reinforced by winding iron wires.