Rapid installation structure for rural dwelling photovoltaic building integration

By designing a fast installation structure for photovoltaic architecture for rural residential residence, the problem of poor installation structure, photovoltaic board support, and lack of protection of component wires in existing technologies have been solved. The rapid positioning of the board and the effective protection of component wires improve the stability and safety of the overall structure.

CN222395601UActive Publication Date: 2025-01-24HENAN ZHIBO ARCHITECTURAL DESIGN
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421037992.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2025-01-24
Estimated Expiration
2034-05-14

AI Technical Summary

Technical Problem

The overall structure of the existing integrated photovoltaic building installation structure is poor, and the elastic clamping installation is easy to damage the support of the photovoltaic panels, and it cannot effectively protect components and wires, making it unsafe to use.

Method used

A rapid installation structure for rural residential photovoltaic building integration is designed. The installation racks are spliced ​​and connected in series through positioning installation grooves, locking knobs, positioning installation plates and connecting tubes to form an overall structure; photovoltaic panels are installed at limited positions through protective covers. The slot and splicing plug-in blocks are quickly positioned and installed in the splicing slot; the photovoltaic controller and connecting wires are protected by protective covers and sealing covers.

Benefits of technology

It achieves stable splicing of mounting frames, rapid positioning and convenient disassembly and assembly of photovoltaic panels, effective protection of photovoltaic controllers and connecting wires, and improves the stability and safety of the overall structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222395601U_ABST
    Figure CN222395601U_ABST
Patent Text Reader

Abstract

The utility model discloses a rural dwelling photovoltaic building integrated rapid installation structure which comprises a building body, a connecting cylinder is installed on the inner wall of an installation slot in an inserted mode, positioning installation plates are fixedly connected to the two sides of the outer wall of the connecting cylinder, and locking rotary knobs are installed on the positioning installation plates in an inserted mode. And the positioning mounting plate and the positioning mounting groove are mounted in an inserting manner. According to the rural dwelling photovoltaic building integrated rapid installation structure, the installation frames can be spliced and connected in series through the positioning installation grooves, the locking rotary knobs, the positioning installation plates and the connecting cylinders to form an overall structure which is more stable, and the photovoltaic panels can be rapidly positioned, inserted and installed in the limiting installation grooves through the protective covers and the splicing insertion blocks in the splicing insertion grooves; the photovoltaic controller is simple in structure and convenient to disassemble and assemble, the top of the photovoltaic controller can be supported to form a limiting structure, the photovoltaic controller can be covered and protected through the protective cover, and the connecting wire can be sleeved, sealed and protected through the connecting cylinder and the sealing cover to avoid damage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of photovoltaic building integration, in particular to a quick installation structure of photovoltaic building integration for rural residential buildings. Background Art

[0002] In today's era of pursuing green and sustainable development, building integrated photovoltaic (BIPV) technology is becoming a rising star in the field of green buildings with its unique installation form and high energy efficiency. By cleverly integrating photovoltaic modules into architectural design, BIPV not only improves the beauty and functionality of buildings, but also injects new vitality into the development of green buildings. It is also used in rural residential buildings.

[0003] The existing CN218912008U building photovoltaic integrated installation structure uses clamping components at both ends of color steel tiles to clamp frameless photovoltaic components. The upper pressure plate and the lower support plate form an installation groove to wrap and clamp the photovoltaic components, and the inclined upper pressure plate can improve the clamping effect. The structure is simple and easy to operate, but there are shortcomings. The overall structure of the existing equipment is not good, and its elastic clamping installation is easy to squeeze and damage the photovoltaic panel support, and it cannot effectively protect components and wires, and is unsafe to use. Therefore, a rapid installation structure for integrated photovoltaic buildings in rural residential buildings is needed to solve the above problems. Utility Model Content

[0004] The purpose of the utility model is to provide a quick installation structure for integrated photovoltaic buildings in rural residences, so as to solve the problems mentioned in the above background technology that the integrated photovoltaic installation structure of buildings has a poor overall structure, its elastic clamping installation is easy to squeeze and damage the photovoltaic panel support, and it cannot effectively protect components and wires, making it unsafe to use.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a quick installation structure for integrated photovoltaic buildings in rural residences, comprising a building main body, a mounting frame installed at the upper end of the building main body, and a photovoltaic panel installed at the upper end of the mounting frame, a fixing bolt is inserted and installed at the lower end of the inner wall of the mounting frame, and a limited mounting groove is provided at the center position of the upper end of the mounting frame, a splicing slot is provided at the edge of the upper end of the mounting frame, and a splicing plug is inserted and installed on the inner wall of the splicing slot, the upper end of the splicing plug is fixedly connected to the lower end of the photovoltaic panel, and a photovoltaic controller is electrically connected to the center position of the lower end of the photovoltaic panel, a protective cover is installed on the outer wall of the photovoltaic controller, and the protective cover A magnetic buckle block is fixedly connected to the edge of one end, the magnetic buckle block is inserted and installed in the magnetic buckle groove, and the magnetic buckle groove is fixedly connected to the lower end of the photovoltaic panel, one side of the photovoltaic controller is electrically connected with a connecting wire, the protective cover is inserted and installed in the limit installation groove, one side of the mounting frame is provided with an installation slot, and the outer wall of one side of the installation slot is provided with a positioning installation slot, a connecting cylinder is inserted and installed on the inner wall of the installation slot, and positioning installation plates are fixedly connected to the outer walls of the connecting cylinder, a locking knob is inserted and installed on the positioning installation plate, and the positioning installation plate is inserted and installed in the positioning installation slot, the connecting wire is inserted and distributed in the connecting cylinder, and sealing covers are installed at both ends of the inner wall of the connecting cylinder.

[0006] Preferably, the mounting frame is fixed to the building main body bolts by fixing bolts, and the fixing bolts are distributed in a matrix position on the mounting frame. The mounting frames are fixed in parallel in the mounting slots by connecting tubes, and the mounting frames are locked and fixedly connected to the mounting frames on the positioning mounting plate by locking knobs.

[0007] Preferably, the photovoltaic panel is installed by positioning and pulling the splicing plug-in block in the splicing slot with the mounting frame.

[0008] Preferably, the photovoltaic panel is installed in a limited position splicing manner with the mounting frame in a limited position mounting groove through a protective cover.

[0009] Preferably, the protective cover is installed in a cover-fitting manner with the photovoltaic controller in the magnetic buckle groove through a magnetic buckle block, and the protective cover is made of heat-conductive material.

[0010] Preferably, the connecting wire is installed in a sealing manner with the connecting tube through a sealing cover, and the sealing cover is an elastic structure.

[0011] Compared with the prior art, the beneficial effects of the utility model are as follows: the integrated quick installation structure of the rural residential photovoltaic building can splice the mounting frame in series through the positioning mounting groove, locking knob, positioning mounting plate and connecting tube to form an overall structure, which is more stable, and the photovoltaic panel can be quickly positioned and plugged in the limiting mounting groove through the protective cover and the splicing plug-in block in the splicing slot, which is convenient for disassembly and assembly, and can be supported from the top to form a limiting structure, and the photovoltaic controller can be protected by the protective cover, and the connecting wires can be sealed and protected by the connecting tube and the sealing cover to avoid damage. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is a front view of a quick installation structure for photovoltaic building integration in rural residential buildings according to the utility model;

[0013] Figure 2 This is a cross-sectional view of a quick installation structure of a photovoltaic building integrated with a rural residence of the utility model;

[0014] Figure 3 This is a schematic diagram of the connection between a mounting frame and a mounting frame of a quick-installation structure integrated with a photovoltaic building for rural residences according to the utility model;

[0015] Figure 4 The utility model is a rapid installation structure for photovoltaic building integration in rural residential buildings Figure 2 Enlarged view of point A in the middle;

[0016] Figure 5 The utility model is a rapid installation structure for photovoltaic building integration in rural residential buildings Figure 2 Enlarged view of point B in the middle;

[0017] Figure 6 The utility model is a rapid installation structure for photovoltaic building integration in rural residential buildings Figure 2 Enlarged view of point C in the middle;

[0018] Figure 7 The utility model is a rapid installation structure for photovoltaic building integration in rural residential buildings Figure 3 Enlarged view of point D in the middle.

[0019] In the figure: 1. building body, 2. mounting frame, 3. photovoltaic panel, 4. photovoltaic controller, 5. connecting tube, 6. fixing bolt, 7. protective cover, 8. limiting mounting groove, 9. magnetic buckle groove, 10. magnetic buckle block, 11. sealing cover, 12. connecting wire, 13. positioning mounting groove, 14. locking knob, 15. positioning mounting plate, 16. mounting slot, 17. splicing plug block, 18. splicing slot. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-7 The utility model provides a technical solution: a rapid installation structure of an integrated photovoltaic building for rural residences, including a building body 1, a mounting frame 2, a photovoltaic panel 3, a photovoltaic controller 4, a connecting tube 5, a fixing bolt 6, a protective cover 7, a limit mounting groove 8, a magnetic buckle groove 9, a magnetic buckle block 10, a sealing cover 11, a connecting wire 12, a positioning mounting groove 13, a locking knob 14, a positioning mounting plate 15, a mounting slot 16, a splicing plug-in block 17 and a splicing slot 18. A mounting frame 2 is installed on the upper end of the building body 1, and a photovoltaic panel 3 is installed on the upper end of the mounting frame 2. The mounting frame 2 is fixedly installed with the building body 1 by fixing bolts 6, and the fixing bolts 6 are distributed in a matrix position on the mounting frame 2. The mounting frames 2 are fixedly installed in parallel in the mounting slots 16 through the connecting tubes 5, and the mounting frame 2 is locked and fixedly connected with the mounting frame 2 on the positioning mounting plate 15 by the locking knob 14, so that the mounting frame 2 is convenient for overall splicing and installation, and more stable.

[0022] The photovoltaic panel 3 is positioned and pulled out and installed with the mounting frame 2 in the splicing slot 18 through the splicing plug-in block 17, which makes it easy to plug and splice the photovoltaic panel 3 for installation, and easy to disassemble and replace. The photovoltaic panel 3 is installed in the limited installation groove 8 with the mounting frame 2 through the protective cover 7, which makes it possible to provide limited support for the photovoltaic panel 3 to avoid shaking and damage and assist in fixation.

[0023] A fixing bolt 6 is installed at the lower end of the inner wall of the mounting frame 2, and a limited mounting groove 8 is provided at the center position of the upper end of the mounting frame 2. A splicing slot 18 is provided at the edge of the upper end of the mounting frame 2, and a splicing block 17 is installed on the inner wall of the splicing slot 18. The upper end of the splicing block 17 is fixedly connected to the lower end of the photovoltaic panel 3, and the photovoltaic controller 4 is electrically connected to the center position of the lower end of the photovoltaic panel 3. A protective cover 7 is installed on the outer wall of the photovoltaic controller 4 on a flip cover, and a magnetic buckle block 10 is fixedly connected to the edge of one end of the protective cover 7. The protective cover 7 is installed in a cover-fitting manner with the photovoltaic controller 4 in the magnetic buckle slot 9 through the magnetic buckle block 10, and the protective cover 7 is made of heat-conducting material, so that the protective cover 7 can be quickly flipped open and closed to play a protective role and can also perform heat dissipation treatment.

[0024] The magnetic buckle block 10 is installed by plugging into the magnetic buckle slot 9, and the magnetic buckle slot 9 is fixedly connected to the lower end of the photovoltaic panel 3. A connecting wire 12 is electrically connected to one side of the photovoltaic controller 4. The connecting wire 12 is sealed and installed with the connecting tube 5 through a sealing cover 11, and the sealing cover 11 is an elastic structure, so that the connecting wire 12 can be covered and protected by the sealing cover 11 and the connecting tube 5 to avoid damage.

[0025] The protective cover 7 is plugged into and installed in the limit mounting groove 8, a mounting slot 16 is provided on one side of the mounting frame 2, and a positioning mounting slot 13 is provided on the outer wall of one side of the mounting slot 16, a connecting tube 5 is plugged into and installed on the inner wall of the mounting slot 16, and positioning mounting plates 15 are fixedly connected to both sides of the outer wall of the connecting tube 5, a locking knob 14 is plugged into and installed on the positioning mounting plate 15, and the positioning mounting plate 15 is plugged into and installed in the positioning mounting groove 13, the connecting wire 12 is plugged and distributed with the connecting tube 5, and sealing covers 11 are installed at both ends of the inner wall of the connecting tube 5.

[0026] Working principle: When using the rapid installation structure of the integrated photovoltaic building for rural residences, first, the photovoltaic panel 3 of the device is installed with the mounting frame 2 through the protective cover 7 in the limited installation groove 8 and the splicing plug block 17 in the splicing slot 18, and then the connecting wire 12 is inserted into the connecting tube 5, and the sealing cover 11 is used for sealing and covering. Then the connecting tube 5 is respectively inserted into the mounting slot 16 on the side of the mounting frame 2 to perform two groups of splicing, and then locked and fixed through the positioning installation groove 13, the locking knob 14 and the positioning installation plate 15, and the mounting frame 2 on one side is fixed by the fixing bolts 6, and then the connecting wires 12 are connected to each other for use. When the photovoltaic panel 3 needs to be replaced, the mounting frame 2 on one side can be unlocked, and then the photovoltaic panel 3 can be pulled out. When in use, the connecting wire 12 can be covered and protected by the connecting tube 5, and the photovoltaic controller 4 can be covered and protected by the protective cover 7. This is the use process of the rapid installation structure of the integrated photovoltaic building for rural residences.

[0027] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A photovoltaic building integrated rapid installation structure for rural residential buildings, comprising a building main body (1), a mounting frame (2) being installed on the upper end of the building main body (1), and a photovoltaic panel (3) being installed on the upper end of the mounting frame (2), characterized in that: The lower end of the inner wall of the mounting frame (2) is plugged with a fixing bolt (6), and a limited position mounting groove (8) is provided at the center position of the upper end of the mounting frame (2). The upper edge of the mounting frame (2) is provided with a splicing slot (18), and a splicing plug-in block (17) is plugged with the inner wall of the splicing slot (18), the upper end of the splicing plug-in block (17) is fixedly connected to the lower end of the photovoltaic panel (3), and the center position of the lower end of the photovoltaic panel (3) is electrically connected to the photovoltaic controller (4), the outer wall of the photovoltaic controller (4) is flipped and installed with a protective cover (7), and the edge of one end of the protective cover (7) is fixedly connected with a magnetic buckle block (10), the magnetic buckle block (10) is plugged and installed with the magnetic buckle slot (9), and the magnetic buckle slot (9) is fixedly connected to the lower end of the photovoltaic panel (3). The photovoltaic controller (4) is electrically connected to a connecting wire (12) on one side, the protective cover (7) is plugged into and installed in the limit installation groove (8), a mounting slot (16) is provided on one side of the mounting frame (2), and a positioning installation groove (13) is provided on the outer wall of one side of the mounting slot (16), a connecting tube (5) is plugged into and installed on the inner wall of the mounting slot (16), and positioning installation plates (15) are fixedly connected to the outer walls of the connecting tube (5), a locking knob (14) is plugged into and installed on the positioning installation plate (15), and the positioning installation plate (15) is plugged into and installed in the positioning installation groove (13), the connecting wire (12) is plugged into and distributed with the connecting tube (5), and sealing covers (11) are installed at both ends of the inner wall of the connecting tube (5).

2. A rapid installation structure for photovoltaic building integration in rural residences according to claim 1, characterized in that: The mounting frame (2) is bolt-fixed to the building body (1) via fixing bolts (6), and the fixing bolts (6) are distributed in a matrix position on the mounting frame (2). The mounting frames (2) are fixedly installed in parallel in the mounting slots (16) via connecting tubes (5), and the mounting frames (2) are locked and fixedly connected to the mounting frames (2) on the positioning mounting plate (15) via locking knobs (14).

3. A rapid installation structure for photovoltaic building integration in rural residences according to claim 2, characterized in that: The photovoltaic panel (3) is installed by positioning and pulling it into position with the mounting frame (2) in the splicing slot (18) through the splicing plug block (17).

4. A rapid installation structure for photovoltaic building integration in rural residences according to claim 3, characterized in that: The photovoltaic panel (3) is installed in a limited position splicing manner with the mounting frame (2) in the limited position mounting groove (8) through the protective cover (7).

5. A rapid installation structure for photovoltaic building integration in rural residences according to claim 4, characterized in that: The protective cover (7) is installed in a cover-fitting manner with the photovoltaic controller (4) in the magnetic buckle groove (9) via a magnetic buckle block (10), and the protective cover (7) is made of a heat-conducting material.

6. A rapid installation structure for photovoltaic building integration in rural residences according to claim 5, characterized in that: The connecting wire (12) is installed in a sealed manner with the connecting tube (5) via a sealing cover (11), and the sealing cover (11) is an elastic structure.

Citation Information

Patent Citations

  • Building photovoltaic integrated installation structure

    CN218912008U