Crushing and receiving device for pipe cutting

By designing pipe cutting, the fragmented seasoning device is used to solve the problem of lack of fragmented collection devices in the existing technology, realize the efficient collection and treatment of fragmented cutting during cutting, and reduce the amount of labor and environmental impact.

CN222404664UActive Publication Date: 2025-01-28ZHEJIANG SHANGJIAN PROTECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421220188.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2025-01-28
Estimated Expiration
2034-05-31

AI Technical Summary

Technical Problem

The lack of crushing and collection devices in existing pipe cutting equipment leads to the large amount of crushing during cutting that requires manual cleaning, increasing the amount of manual labor and having an impact on the environment.

Method used

A fragmented seasoning device is designed with a pipe cutting, including the front conveyor and processing racks. It uses vertical cockpit and seasoned car to collect the crushing during cutting and facilitate dumping to reduce the frequency of artificial cleaning.

Benefits of technology

Effectively collecting and processing crushing during cutting reduces the frequency and labor amount of manual cleaning, and reduces the impact on the surrounding environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222404664U_ABST
    Figure CN222404664U_ABST
Patent Text Reader

Abstract

The utility model discloses a chipping material receiving device for pipe cutting, which comprises a front conveying frame and a processing rack, the front conveying frame is arranged in front of the processing rack, and conveying roller bodies are arranged at the front part and the rear part of the top of the processing rack; a middle horizontal supporting plate is arranged in the middle of the top of the machining rack, and two clamping blocks corresponding left and right are installed on the top face of the middle horizontal supporting plate. A middle supporting block is arranged in the middle of the machining rack, a containing groove extending forwards is formed in the left portion of the top face of the middle supporting block, the upper portion of the rear wall face of the containing groove is an inclined wall face, a vertical material guiding barrel is fixed to the top face of the middle supporting block, and the inclined wall face and the containing groove are located in the vertical material guiding barrel. The left side wall and the right side wall of the vertical material guiding barrel are tightly attached to the inner side walls of the left side plate and the right side plate of the machining rack. According to the cutting device, chippings generated during cutting can be collected and conveniently dumped, the effect is good, manual cleaning is not needed in the later period, and the manual labor amount is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0001] The utility model relates to the technical field of hardware processing equipment, and more specifically to a chipping and joining device for pipe cutting. Background technology:

[0002] In the existing pipe cutting equipment, saw blade cutting or cutting disc is generally used for cutting, and a large amount of debris will be generated during cutting. However, the existing cutting equipment does not have a debris collection device, so a large amount of debris is accumulated on the cutting frame and the ground. Later, manual cleaning is required frequently, which increases the labor workload and also affects the surrounding environment. Utility model content:

[0003] The purpose of the utility model is to overcome the deficiencies of the prior art and provide a chip collecting device for pipe cutting, which can collect a large amount of chippings during cutting and conveniently dump them, thereby reducing the frequency of later manual cleaning and greatly reducing the amount of manual labor.

[0004] The solution of the utility model to solve the technical problem is:

[0005] A chipping and material receiving device for pipe cutting comprises a front conveying frame and a processing frame, wherein the front conveying frame is located in front of the processing frame, and conveying rollers are provided at the front and rear of the top of the processing frame;

[0006] An intermediate horizontal support plate is provided in the middle of the top of the processing frame, and two corresponding clamping blocks are installed on the top surface of the intermediate horizontal support plate;

[0007] An intermediate support block is provided in the middle of the processing frame, and a placement groove extending forward is formed on the left part of the top surface of the intermediate support block, and the upper part of the rear wall of the placement groove is an inclined wall. The vertical material guide cylinder is fixed on the top surface of the intermediate support block, and the inclined wall and the placement groove are located in the vertical material guide cylinder. The left and right side walls of the vertical material guide cylinder are close to the inner side walls of the left and right side plates of the processing frame, and the intermediate horizontal support plate and the front conveying roller are located directly above the vertical material guide cylinder.

[0008] A discharge groove is formed at the lower part of the left side plate of the vertical material guiding cylinder, and a horizontal support frame is installed at the front wall surface of the lower part of the processing frame. The top surface of the horizontal support frame and the bottom surface of the placement groove are on the same horizontal plane, and a material receiving trolley is placed on the top surface of the top plate of the horizontal support frame. The middle part of the material receiving trolley is inserted into the discharge groove, and the rear part of the material receiving trolley is in the placement groove, and the left and right side walls of the material receiving trolley are close to the left and right inner walls of the vertical material guiding cylinder.

[0009] The processing frame includes a middle support block, and side panels are fixed to the left and right parts of the top surface of the middle support block. Two through grooves extending vertically downward are formed in the middle of the top surface of the side panel. The two through grooves separate the upper part of the side panel into a front connecting part, a middle connecting part and a rear connecting part. The left and right ends of the middle horizontal support plate are fixed to the top surfaces of the two middle connecting parts. A plurality of legs are fixed to the bottom surface of the middle support block, and the bottom ends of the legs are fixed to the ground.

[0010] A plurality of conveying rollers are provided at the upper parts of the front connecting part and the rear connecting part. The left and right ends of the conveying rollers are movably connected to the upper parts of the two side plates through bearings. The top surfaces of the conveying rollers are flush with or higher than the top surface of the middle horizontal support plate.

[0011] The front and rear parts of the top surface of the middle horizontal support plate are formed with long grooves extending left and right, the long movable guide rail is inserted into the long groove, the bottom surface of the long movable guide rail is fixed to the bottom surface of the long groove, and the bottom surfaces of the two clamping blocks are fixed with multiple lower guide blocks, which are inserted into the guide grooves of the corresponding long movable guide rails and matched with the guide grooves;

[0012] The top surface of the middle horizontal support plate between the two long movable guide rails is formed with two movable adjustment grooves with a convex cross-section extending left and right, and a plurality of connecting vertical through holes are formed on the horizontal plates of the two clamping blocks. The rotating part of the locking bolt is inserted into the corresponding connecting vertical through hole, and the top end of the screw part of the locking bolt extends out of the corresponding connecting vertical through hole and is inserted with a gasket and a locking nut threaded on it. The bottom surface of the locking nut is pressed against the top surface of the gasket, and the bottom surface of the gasket is pressed against the top surface of the horizontal plate of the clamping block. The top surface of the rotating part of the locking bolt is pressed against the top surface of the edge of the lower groove body of the movable adjustment groove, and the bottom surface of the clamping block is pressed against the top surface of the middle horizontal support plate.

[0013] The outstanding effects of the utility model are:

[0014] It can collect a large amount of debris during cutting and dump it conveniently, reducing the frequency of subsequent manual cleaning and greatly reducing manual labor. Description of the drawings:

[0015] Figure 1 It is a partial structural schematic diagram of the utility model;

[0016] Figure 2 yes Figure 1 A partial enlarged view of

[0017] Figure 3 yes Figure 1 a partial enlarged view of another part;

[0018] Figure 4 It is a partial structural diagram of the horizontal support frame and the material receiving trolley;

[0019] Figure 5 It is a schematic diagram of the local structure at the clamping block. Specific implementation method:

[0020] For example, see Figures 1 to 5 As shown, a chipping and receiving device for pipe cutting includes a front conveying frame 10 and a processing frame 20, wherein the front conveying frame 10 is located in front of the processing frame 20, and conveying rollers 21 are provided at the front and rear of the top of the processing frame 20; the front conveying frame 10 is a conventional roller conveying frame, which will not be described in detail here.

[0021] The processing frame 20 includes a middle support block 23, and side panels are fixed to the left and right parts of the top surface of the middle support block 23. Two through grooves extending vertically downward are formed in the middle of the top surface of the side panel. The two through grooves separate the upper part of the side panel into a front connecting part, a middle connecting part and a rear connecting part. The left and right ends of the middle horizontal support plate 22 are fixed on the top surfaces of the two middle connecting parts. A plurality of legs 25 are fixed to the bottom surface of the middle support block 23, and the bottom ends of the legs 25 are fixed to the ground.

[0022] Two conveying roller bodies 21 are provided at the upper parts of the front connecting part and the rear connecting part. The left and right ends of the conveying roller body 21 are movably connected to the upper parts of the two side plates through bearings. The top surface of the conveying roller body 21 is flush with or higher than the top surface of the middle horizontal support plate 22. The cutting tool moves downward from the upper part between the front connecting part and the middle connecting part to perform cutting.

[0023] A middle horizontal support plate 22 is provided in the middle of the top of the processing frame 20, and two clamping blocks 30 corresponding to the left and right are installed on the top surface of the middle horizontal support plate 22;

[0024] A placement groove 231 extending forward is formed on the left portion of the top surface of the intermediate support block 23, and the upper portion of the rear wall of the placement groove 231 is an inclined wall 232. The vertical material guide cylinder 40 is fixed on the top surface of the intermediate support block 23, and the inclined wall 232 and the placement groove 231 are located in the vertical material guide cylinder 40. The left and right side walls of the vertical material guide cylinder 40 are tightly attached to the inner side walls of the left and right side plates of the processing frame 20, and the intermediate horizontal support plate 22 and the front conveying roller body 21 are located directly above the vertical material guide cylinder 40.

[0025] Furthermore, a discharge groove 41 is formed at the lower portion of the left side plate of the vertical material guiding cylinder 40, and a horizontal support frame 50 is installed at the front wall surface of the lower portion of the processing frame 20. The top surface of the horizontal support frame 50 and the bottom surface of the placement groove 231 are on the same horizontal plane, and a material receiving trolley 60 is placed on the top surface of the top plate of the horizontal support frame 50. The middle part of the material receiving trolley 60 is inserted into the discharge groove 41, and the rear part of the material receiving trolley 60 is in the placement groove 231. The left and right side walls of the material receiving trolley 60 are close to the left and right inner walls of the vertical material guiding cylinder 40.

[0026] Furthermore, a positioning block 61 is fixed on the rear wall surface of the rear wall plate of the material receiving trolley 60, a positioning recessed hole is formed on the rear wall surface where the groove 231 is placed, a permanent magnet block 233 is fixed on the inner side wall of the positioning recessed hole, a positioning hole is formed in the middle of the front side wall of the permanent magnet block 233, the positioning block 61 is inserted into the positioning hole, and the side walls of the positioning block 61 are tightly attached to the corresponding side walls of the positioning hole and adsorbed to the permanent magnet block 233.

[0027] The material receiving trolley 60 is fixed by being adsorbed and connected with the positioning block 61 through the permanent magnet block 233 .

[0028] Furthermore, two guide rails 51 extending forward and backward are fixed from the middle to the rear of the top surface of the top plate of the horizontal support frame 50, the rear of the guide rails 51 extends out of the discharge slot 41 and is located in the placement groove 231, the rear bottom surface of the guide rails 51 is fixed to the bottom surface of the placement groove 231, and a plurality of wheels 62 are installed on the bottom surface of the bottom plate of the material receiving trolley 60, and the guide rails 51 are inserted into the annular guide grooves formed on the middle outer walls of the corresponding wheels 62.

[0029] The front and rear parts of the top surface of the middle horizontal support plate 22 are formed with long grooves extending left and right, the long movable guide rail 1 is inserted into the long groove, the bottom surface of the long movable guide rail 1 is fixed to the bottom surface of the long groove, and the bottom surfaces of the two clamping blocks 30 are fixed with multiple lower guide blocks 31, which are inserted into the guide grooves of the corresponding long movable guide rails 1 and matched with the guide grooves;

[0030] The top surface of the middle horizontal support plate 22 between the two long movable guide rails 1 is formed with two movable adjustment grooves with a convex cross-section extending left and right, and a plurality of connecting vertical through holes are formed on the horizontal plates of the two clamping blocks 30. The rotating part of the locking bolt 32 is inserted into the corresponding movable adjustment groove, and the top end of the screw part of the locking bolt 32 extends out of the corresponding connecting vertical through hole and is inserted with a gasket and threaded with a locking nut 33. The bottom surface of the locking nut 33 is pressed against the top surface of the gasket, and the bottom surface of the gasket is pressed against the top surface of the horizontal plate of the clamping block 30. The top surface of the rotating part of the locking bolt 33 is pressed against the top surface of the edge of the lower groove body of the movable adjustment groove, and the bottom surface of the clamping block 30 is pressed against the top surface of the middle horizontal support plate 22.

[0031] When in use, all locking nuts 33 can be loosened and the two clamping blocks 30 can be moved so that the pipe to be processed can be placed between the two clamping blocks 30 to achieve position limiting. After the adjustment is completed, the locking nuts 33 can be tightened, which is convenient for adjustment.

[0032] When the embodiment is in use, the tube body moves backward along the front conveying frame 10 and the two clamping blocks 20 move backward, and the corresponding parts of the tube body are cut by saw blades or cutting discs. Most of the scraps generated during cutting will fall into the vertical material guide cylinder 40, part of which will be in the material receiving trolley 60, and part of which will fall into the material receiving trolley 60 along the inclined wall 232;

[0033] When a certain amount of material is received, the material receiving trolley 60 can be moved forward to be removed from the discharge channel 41 until it is removed from the guide rail 51. It can then be manually removed from the horizontal support frame 50 for subsequent dumping operations, which is easy to operate.

[0034] After tipping over, it can be installed again, which requires moving the wheel 62 along the guide rail 51 to ensure the accurate moving position, until the positioning block 61 is inserted into the positioning hole, the side wall of the positioning block 61 is tightly attached to the corresponding side wall of the positioning hole and adsorbed by the permanent magnet block 233, so that it can be fixed.

[0035] This embodiment can collect a large amount of debris from the cutting of the pipe body, which is convenient for subsequent processing and reduces the impact on the surrounding environment, so that there are only a small amount of debris in the surrounding environment, thereby reducing the frequency of manual cleaning of the surrounding environment and greatly reducing manual labor.

Claims

1. A chipping and material receiving device for pipe cutting, comprising a front conveying frame (10) and a processing frame (20), characterized in that: The front conveying frame (10) is located in front of the processing frame (20), and conveying roller bodies (21) are provided at the front and rear of the top of the processing frame (20); A middle horizontal support plate (22) is provided in the middle of the top of the processing frame (20), and two clamping blocks (30) corresponding to the left and right are installed on the top surface of the middle horizontal support plate (22); The processing frame (20) is provided with an intermediate support block (23) in the middle part, and a placement groove (231) extending forward is formed on the left part of the top surface of the intermediate support block (23), and the upper part of the rear wall surface of the placement groove (231) is an inclined wall surface (232). The vertical material guide cylinder (40) is fixed on the top surface of the intermediate support block (23), and the inclined wall surface (232) and the placement groove (231) are located in the vertical material guide cylinder (40). The left and right side walls of the vertical material guide cylinder (40) are closely attached to the inner side walls of the left and right side plates of the processing frame (20), and the intermediate horizontal support plate (22) and the front conveying roller body (21) are located directly above the vertical material guide cylinder (40).

2. A chipping and splicing device for pipe cutting according to claim 1, characterized in that: A material discharging groove (41) is formed at the lower part of the left side plate of the vertical material guiding cylinder (40), and a horizontal support frame (50) is installed at the front wall surface of the lower part of the processing frame (20). The top surface of the horizontal support frame (50) and the bottom surface of the placement groove (231) are on the same horizontal plane. A material receiving trolley (60) is placed on the top surface of the top plate of the horizontal support frame (50). The middle part of the material receiving trolley (60) is inserted into the material discharging groove (41), and the rear part of the material receiving trolley (60) is in the placement groove (231). The left and right side walls of the material receiving trolley (60) are closely attached to the left and right inner side walls of the vertical material guiding cylinder (40).

3. A chipping and splicing device for pipe cutting according to claim 2, characterized in that: A positioning block (61) is fixed on the rear wall surface of the rear wall plate of the material receiving trolley (60), a positioning recessed hole is formed on the rear wall surface of the placement groove (231), a permanent magnet block (233) is fixed on the inner side wall of the positioning recessed hole, a positioning hole is formed in the middle of the front side wall of the permanent magnet block (233), the positioning block (61) is inserted into the positioning hole, and the side wall of the positioning block (61) is tightly attached to the corresponding side wall of the positioning hole and is adsorbed to the permanent magnet block (233).

4. A chipping and splicing device for pipe cutting according to claim 2, characterized in that: Two guide rails (51) extending forward and backward are fixed from the middle to the rear of the top surface of the top plate of the horizontal support frame (50); the rear of the guide rails (51) extends out of the material discharging slot (41) and is located in the placement groove (231); the rear bottom surface of the guide rails (51) is fixed to the bottom surface of the placement groove (231); a plurality of wheels (62) are installed on the bottom surface of the bottom plate of the material receiving trolley (60); the guide rails (51) are inserted into annular guide grooves formed on the middle outer side walls of the corresponding wheels (62).

5. The chipping and splicing device for pipe cutting according to claim 1, characterized in that: The processing frame (20) comprises an intermediate support block (23), the left and right parts of the top surface of the intermediate support block (23) are fixed with side plates, the middle part of the top surface of the side plate is formed with two through grooves extending vertically downward, the two through grooves divide the upper part of the side plate into a front connecting part, a middle connecting part and a rear connecting part, the left and right ends of the intermediate horizontal support plate (22) are fixed on the top surfaces of the two middle connecting parts, and the bottom surface of the intermediate support block (23) is fixed with a plurality of legs (25), and the bottom ends of the legs (25) are fixed on the ground.

6. A chipping and splicing device for pipe cutting according to claim 5, characterized in that: A plurality of conveying roller bodies (21) are provided at the upper parts of the front connecting part and the rear connecting part, and the left and right ends of the conveying roller bodies (21) are movably connected to the upper parts of the two side plates through bearings, and the top surface of the conveying roller bodies (21) is flush with or higher than the top surface of the middle horizontal support plate (22).