Detachable air spraying pipe baking and hoisting frame

By designing the dismantled spray wind tube baking hanging frame, the problem of low production efficiency in the existing spray wind tube baking process is solved, and the rapid assembly and disassembly of the framework are achieved, which significantly speeds up the rotation speed of the spray tube. And baking production efficiency.

CN222410663UActive Publication Date: 2025-01-28ZHANGJIAGANG YOUCHENG HIGH-TECH MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421079130.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-01-28
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

The existing spray duct baking process has the problem of low production efficiency, which requires frequent stacking and lifting, resulting in cumbersome operation and inefficient efficiency.

Method used

Designed a detachable spray wind tube baking hanging frame, including the bottom support beam, top beam, bottom connection beam, top connecting beam and column, and the structural design of the card connection and the cable bars to achieve the stability and of the framework. Convenient assembly and disassembly.

Benefits of technology

This framework can quickly disassemble and assemble, reduce the area occupying the area, and use the overall lifting of multiple spray pipes to significantly accelerate the rotation speed and baking production efficiency of the air spray pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222410663U_ABST
    Figure CN222410663U_ABST
Patent Text Reader

Abstract

The utility model discloses a detachable air spraying pipe baking lifting frame which comprises two bottom supporting beams, two top cross beams, two bottom connecting beams, two top connecting beams and four stand columns. The detachable air spraying pipe baking and hoisting frame can be detached into two bottom supporting beams, two top cross beams, two bottom connecting beams, two top connecting beams and four stand columns, so that the occupied area can be reduced, and the detachable air spraying pipe baking and hoisting frame is easy to store; besides, a plurality of air spraying pipes can be integrally lifted through the detachable air spraying pipe baking lifting frame, so that the rotating speed of the air spraying pipes can be greatly increased, and the baking production efficiency of the air spraying pipes can be greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of transfer equipment, in particular to a detachable air jet pipe baking and hoisting frame. Background Art

[0002] The air spray pipes in the shaping machine need to be sent to the oven for baking after being sprayed with Teflon. Usually, the air spray pipes that need to be baked are stacked and placed on a trolley, and then sent to the oven for baking by the trolley. After baking, the trolley leaves the oven, and then the workers take down the air spray pipes that have been baked on the trolley, and then the workers stack the air spray pipes that need to be baked on the trolley again. Such a baking process for the air spray pipes has the disadvantage of low production efficiency. Utility Model Content

[0003] The technical problem to be solved by the utility model is to provide a detachable air jet pipe baking hoisting frame which can accelerate the production efficiency of air jet pipe baking.

[0004] In order to solve the above problems, the technical solution adopted by the utility model is: a detachable air jet tube baking and lifting frame, characterized in that it includes: two bottom support beams, two top cross beams, two bottom connecting beams, two top connecting beams, and four columns. The structure of the bottom support beam includes: a first square tube running left and right, on the upper surface of the first square tube, an angle steel buckled on the surface of the first square tube is welded along the direction of the square tube, a pair of clamping plates with respective clamping grooves are respectively arranged on the inner sides of the front and rear directions of both ends of the first square tube, and a vertically arranged plug-in tube is respectively arranged on the outer sides of the front and rear directions of both ends of the first square tube; the structure of the top cross beam includes: a second square tube running left and right, and a clamping column is respectively penetrated on both ends of the second square tube; the bottom The structure of the connecting beam includes: a third-party tube running forward and backward, the two ends of the third-party tube are respectively covered by welding cover plates, a clamping plate is respectively welded on the cover plates at both ends of the third-party tube, and a clamping column is penetrated on each clamping plate; the structure of the top connecting beam includes: a fourth square tube running forward and backward, the two ends of the fourth square tube are respectively covered by welding cover plates, a clamping plate is respectively welded on the cover plates at both ends of the fourth square tube, and a clamping column is penetrated on each clamping plate; the structure of the column includes: a vertical fifth square tube, a short tube is inserted in the lower port of the fifth square tube, the lower end of the short tube extends out of the fifth square tube, the short tube and the fifth square tube are tightened and fixed by bolts passing through them, and a pair of clamps with clamping grooves are provided on the inner side of the left and right directions of the top of the fifth square tube A connecting plate, a pair of connecting plates with respective connecting grooves are arranged on the inner side of the front and rear directions of the top of the fifth square tube, and a lifting ear is also arranged on the top of the fifth square tube; the two bottom support beams are parallel and arranged in front and rear alignment, the two top cross beams are parallel and arranged in front and rear alignment, the two top cross beams are respectively located above the two bottom support beams, the two bottom connecting beams are parallel and arranged in left and right alignment, the two bottom connecting beams are respectively located between the left and right ends of the two bottom support beams, and the connecting columns at both ends of each bottom connecting beam are respectively connected with the two pairs of connecting plates on the corresponding ends of the two bottom support beams, so that the two bottom support beams and the two bottom connecting beams can be connected and fixed into a square frame, the two top connecting beams are parallel and arranged in left and right alignment, and the two top connecting beams are located between the two bottom support beams. Between the top cross beams, the short tubes on the lower ends of the four columns are respectively inserted into the four plug-in tubes on the two bottom support beams, and are respectively connected and fixed by a pin shaft passing through them, and each pin shaft is inserted with a pin to prevent the pin shaft from withdrawing from the plug-in tube and the short tube; the clamping columns at both ends of a top cross beam are respectively clamped with two pairs of clamping plates between the tops of the two front columns, the clamping columns at both ends of another top cross beam are respectively clamped with two pairs of clamping plates between the tops of the two rear columns, the clamping columns at both ends of a top connecting beam are respectively clamped with two pairs of clamping plates between the tops of the two left columns, and the clamping columns at both ends of another top connecting beam are respectively clamped with two pairs of clamping plates between the tops of the two right columns;When clamping, each clamping column is located between the two clamping plates, and the two ends of the clamping column are respectively clamped into the two clamping grooves on the two clamping plates from top to bottom. ;

[0005] Furthermore, in the aforementioned detachable air jet tube baking hoisting frame, the two ends of each bottom connecting beam are respectively connected to the column close to it by an inclined tie plate for reinforcement.

[0006] Furthermore, the aforementioned detachable air jet pipe baking and lifting frame, wherein: a hook column is provided on each column, a hook groove is provided on the upper end of each inclined tie plate, the lower end of each inclined tie plate is hinged to the corresponding end of the bottom connecting beam, and after each inclined tie plate swings downward around the hinge point at its lower end, the hook groove on the upper end of each inclined tie plate can be hooked on the hook column on the corresponding column, so that the end of the bottom connecting beam can be connected to the column and strengthened.

[0007] Furthermore, in the aforementioned detachable air jet tube baking and lifting frame, among the square tubes, the first square tube has the largest cross-sectional area.

[0008] The advantages of the utility model are as follows: the detachable air jet tube baking lifting frame can be disassembled into two bottom supporting beams, two top cross beams, two bottom connecting beams, two top connecting beams and four columns, so that the occupied area can be reduced and it is easy to store; in addition, a plurality of air jet tubes can be lifted as a whole by the detachable air jet tube baking lifting frame, so that the rotation speed of the air jet tube can be greatly accelerated, thereby greatly accelerating the baking production efficiency of the air jet tube. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 It is a structural schematic diagram of the detachable air jet pipe baking and lifting frame described in the utility model.

[0010] Figure 2 for Figure 1 Schematic diagram of the enlarged structure at point A in the middle.

[0011] Figure 3 for Figure 1 Schematic diagram of the enlarged structure at point B in the middle.

[0012] Figure 4 This is a schematic diagram of the structure of the bottom support beam.

[0013] Figure 5 This is a schematic diagram of the structure of the top beam.

[0014] Figure 6 This is a schematic diagram of the structure of the bottom connecting beam.

[0015] Figure 7 This is a schematic diagram of the structure of the top connecting beam.

[0016] Figure 8 This is a schematic diagram of the structure of the column. DETAILED DESCRIPTION

[0017] The present invention will be described in further detail below in conjunction with specific embodiments and accompanying drawings.

[0018] like Figure 1 , Figure 2 , Figure 3 As shown, the detachable air jet tube baking hoisting frame includes: two bottom support beams 1, two top cross beams 2, two bottom connecting beams 3, two top connecting beams 4, and four columns 5. Figure 4 As shown, the structure of the bottom support beam 1 includes: a first square tube 11 extending left and right, an angle steel 12 is welded on the upper surface of the first square tube 11 along the direction of the square tube, and a pair of clamping plates 13 with clamping grooves are respectively arranged on the inner sides of the two ends of the first square tube 11 in the front-back direction, and a vertically arranged plug-in tube 14 is respectively arranged on the outer sides of the two ends of the first square tube 11 in the front-back direction; Figure 5 As shown, the structure of the top crossbeam 2 includes: a second square tube 21 extending left and right, and a clamping column 22 is respectively provided on both ends of the second square tube 21; Figure 6 As shown, the structure of the bottom connecting beam 3 includes: a third-party tube 31 extending forward and backward, and the two ends of the third-party tube 31 are respectively covered by welding cover plates, and a clamping plate 33 is respectively welded on the cover plates at the two ends of the third-party tube 31, and each clamping plate 33 is penetrated with a clamping column 22; Figure 7 As shown, the structure of the top connecting beam 4 includes: a fourth square tube 41 extending forward and backward, and the two ends of the fourth square tube 41 are respectively covered by welding cover plates, and a clamping plate 33 is respectively welded on the cover plates at the two ends of the fourth square tube 41, and each clamping plate 33 is penetrated with a clamping column 22; Figure 8As shown, the structure of the column 5 includes: a vertical fifth square tube 51, a short tube 52 is inserted in the lower end of the fifth square tube 51, the lower end of the short tube 52 extends out of the fifth square tube 51, the short tube 52 and the fifth square tube 51 are tightened and fixed by bolts passing through them, a pair of clamping plates 13 with clamping grooves are arranged on the inner side of the top of the fifth square tube 51 in the left and right directions, a pair of clamping plates 13 with clamping grooves are arranged on the inner side of the top of the fifth square tube 51 in the front and back directions, and a lifting ear 53 is also arranged on the top of the fifth square tube 51; two bottom support beams 1 are connected to each other. The two top cross beams 2 are arranged parallel and aligned front and back, the two top cross beams 2 are arranged parallel and aligned front and back, the two top cross beams 2 are respectively located above the two bottom support beams 1, the two bottom connecting beams 3 are arranged parallel and aligned left and right, the two bottom connecting beams 3 are respectively located between the left and right ends of the two bottom support beams 1, and the clamping columns 22 at both ends of each bottom connecting beam 3 are respectively clamped with the two pairs of clamping plates 13 at the corresponding ends of the two bottom support beams 1, so that the two bottom support beams 1 and the two bottom connecting beams 3 can be connected and fixed into a square frame, and the two top connecting beams 4 are parallel The two top connecting beams 4 are arranged in a row and aligned left and right, the two top connecting beams 4 are located between the two top cross beams 2, the short tubes 52 on the lower ends of the four columns 5 are respectively inserted into the four plug-in tubes 14 on the two bottom support beams 1, and are respectively connected and fixed by a pin shaft 54 ​​passing through them, and each pin shaft 54 ​​is inserted with a pin 55 to prevent the pin shaft 54 ​​from withdrawing from the plug-in tube 14 and the short tube 52; the clamping columns 22 at both ends of one top cross beam 2 are respectively clamped with the two pairs of clamping plates 13 located between the tops of the two columns 5 in front, and the clamping columns 22 at both ends of the other ... The columns 22 are respectively clamped with the two pairs of clamping plates 13 located between the tops of the two rear columns 5, the clamping columns 22 on both ends of one top connecting beam 4 are respectively clamped with the two pairs of clamping plates 13 located between the tops of the two left columns 5, and the clamping columns 22 on both ends of the other top connecting beam 4 are respectively clamped with the two pairs of clamping plates 13 located between the tops of the two right columns 5; when clamped, each clamping column 22 is located between the two clamping plates 13, and the two ends of the clamping column 22 are respectively clamped into the two clamping grooves on the two clamping plates 13 from top to bottom.

[0019] In this embodiment, both ends of each bottom connecting beam 3 are connected to the adjacent columns 5 via an inclined tie plate 6 for reinforcement.

[0020] A hook column is provided on each column 5, and a hook groove 62 is provided on the upper end of each inclined rib plate 6. The lower end of each inclined rib plate 6 is hinged to the corresponding end of the bottom connecting beam 3. After each inclined rib plate 6 swings downward around the hinge point at its lower end, the hook groove 62 on the upper end of each inclined rib plate 6 can be hooked on the hook column on the corresponding column 5, so that the end of the bottom connecting beam 3 can be connected to the column 5 and strengthened.

[0021] In order to ensure the load-bearing capacity, among the square tubes, the first square tube 11 has the largest cross-sectional area.

[0022] When not in use, the detachable air jet tube baking hoisting frame will be disassembled into two bottom supporting beams 1, two top cross beams 2, two bottom connecting beams 3, two top connecting beams 4, and four columns 5, so that the space occupied is small and it is easy to store.

[0023] During operation, two bottom support beams 1, two top cross beams 2, two bottom connecting beams 3, two top connecting beams 4 and four columns 5 are assembled into a detachable spray pipe baking and lifting frame. The spray pipes to be baked are stacked and placed on the two bottom support beams 1 by workers, and then the workers lift the detachable spray pipe baking and lifting frame onto a trolley, and then the trolley sends the spray pipes into the oven for baking; when the oven is working, workers fill another detachable spray pipe baking and lifting frame with the spray pipes to be baked. After the previous batch of spray pipes are baked, the baked spray pipes are directly lifted off the trolley by lifting the detachable spray pipe baking and lifting frame, and then another detachable spray pipe baking and lifting frame filled with the spray pipes to be baked is lifted onto the trolley, which can greatly speed up the production efficiency of spray pipe baking.

Claims

1. Removable air jet baking and lifting frame, characterized by: include: Two bottom support beams, two top cross beams, two bottom connecting beams, two top connecting beams, and four columns. The structure of the bottom support beam includes: a first square tube running left and right, on the upper surface of the first square tube, an angle steel buckled on the surface of the first square tube is welded along the direction of the square tube, a pair of clamping plates with respective clamping grooves are respectively provided on the inner sides of the front and rear directions of both ends of the first square tube, and a vertically arranged plug-in tube is respectively provided on the outer sides of the front and rear directions of both ends of the first square tube; the structure of the top cross beam includes: a second square tube running left and right, on both ends of the second square tube, a clamping column is respectively penetrated; the structure of the bottom connecting beam includes: a third party tube running front and back, the two ends of the third party tube are respectively covered by welding cover plates, and the two ends of the third party tube are respectively covered by welding cover plates. A clamping plate is welded to each cover plate, and a clamping column is passed through each clamping plate; the structure of the top connecting beam includes: a fourth square tube running forward and backward, and both ends of the fourth square tube are respectively sealed by welding cover plates, and a clamping plate is welded to the cover plates at both ends of the fourth square tube, and a clamping column is passed through each clamping plate; the structure of the column includes: a vertical fifth square tube, a short tube is inserted into the lower port of the fifth square tube, and the lower end of the short tube extends out of the fifth square tube, and the short tube and the fifth square tube are tightened and fixed by bolts passing through them, and a pair of clamping plates with clamping grooves are provided on the inner side of the top of the fifth square tube in the left and right directions, and a pair of clamping plates with clamping grooves are provided on the inner side of the top of the fifth square tube in the front and back directions, and a lifting ear is also provided on the top of the fifth square tube; The two bottom support beams are parallel and aligned front to back, the two top cross beams are parallel and aligned front to back, the two top cross beams are respectively located above the two bottom support beams, the two bottom connecting beams are parallel and aligned left to right, the two bottom connecting beams are respectively located between the left and right ends of the two bottom support beams, and the clamping columns at both ends of each bottom connecting beam are respectively clamped with the two pairs of clamping plates on the corresponding ends of the two bottom support beams, so that the two bottom support beams and the two bottom connecting beams can be connected and fixed into a square frame, the two top connecting beams are parallel and aligned left to right, the two top connecting beams are located between the two top cross beams, the short tubes on the lower ends of the four columns are respectively inserted into the four plug-in tubes on the two bottom support beams, and are respectively passed through one The clamping columns on both ends of a top crossbeam are respectively clamped with two pairs of clamping plates between the tops of the two front columns, and the clamping columns on both ends of another top crossbeam are respectively clamped with two pairs of clamping plates between the tops of the two rear columns, and the clamping columns on both ends of a top connecting beam are respectively clamped with two pairs of clamping plates between the tops of the two left columns, and the clamping columns on both ends of another top connecting beam are respectively clamped with two pairs of clamping plates between the tops of the two right columns; when clamping, each clamping column is located between the two clamping plates clamped in, and the two ends of the clamping column are respectively clamped into the two clamping grooves on the two clamping plates from top to bottom.

2. The detachable air jet tube baking and lifting frame according to claim 1 is characterized in that: Both ends of each bottom connecting beam are connected to the adjacent columns through an inclined tie plate for reinforcement.

3. The detachable air jet tube baking and lifting frame according to claim 2 is characterized in that: A hook column is provided on each column, a hook groove is provided on the upper end of each inclined tie plate, and the lower end of each inclined tie plate is hinged to the corresponding end of the bottom connecting beam. After each inclined tie plate swings downward around the hinge point at its lower end, the hook groove on the upper end of each inclined tie plate can be hooked on the hook column on the corresponding column, so that the end of the bottom connecting beam can be connected to the column and strengthened.

4. The detachable air jet tube baking and lifting frame according to claim 1, 2 or 3, characterized in that: Among the square tubes, the first square tube has the largest cross-sectional area.