Lifting device for vertical pipe of high-rise building engineering pipe well
By designing a hanging device for high -rise construction engineering wells, using push boards, support rollers, V -shaped splints, and lifting drive components to achieve automated lifting and positioning, solve the trouble and safety of engineering tube installation in the existing technologies, The problem of hidden dangers improves the quality and safety of installation.
Patent Information
- Application Number
- CN202421220567.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-30
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-30
AI Technical Summary
In the prior art, during the lifting of pipe wells of high-rise construction projects, engineering pipes are troublesome and have safety hazards. The lack of positioning measures may cause the engineering pipes to be skewed, affecting the installation quality.
A high -rise construction engineering manuscript is designed, including the concave frame and the dragon door frame. The support roller support engineering tube on the push board is used to clamp the V -splint to combine the lifting drive component and the synchronous cylinder to achieve automated lifting. And positioning.
Through automated lifting and positioning measures, the troubles and safety hazards of manual operations are solved, and the stability and precise installation of the engineering tube are ensured, and the installation quality is improved.
Smart Images

Figure CN222410665U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building engineering, in particular to a pipe shaft riser hoisting device for a high-rise building engineering. Background Art
[0002] The vertical installation method is usually used for the installation of duct risers in super high-rise buildings. The construction sequence is to connect and install them one by one from bottom to top. The duct sections need to be transported horizontally to the duct well on each floor. This vertical installation method requires multiple vertical and horizontal transportation of the ducts. During the docking construction between the risers, the upper and lower ducts are aligned and maintained vertically before connection and installation.
[0003] For example, Chinese patent authorization announcement number CN214031363U discloses a device for lifting pipe risers in high-rise building projects, the lifting device comprising: a support plate, an insertion rod, a top-pressing support frame and a top-pressing member; wherein the insertion rod is arranged above the support plate, and the insertion rod is detachably connected to the support plate, the insertion rod is used to penetrate the interior of the pipe riser to be lifted, so as to position and lift the pipe riser to be lifted supported by the support plate; the first end of the top-pressing support frame is connected to the upper part of the insertion rod; the top-pressing member is adjustably connected to the second end of the top-pressing support frame along the radial position of the insertion rod, so as to top-press the pipe riser to be lifted, so that the pipe riser to be lifted is fixed between the insertion rod and the top-pressing member. The utility model can lift the pipe riser to be lifted, i.e., the pipe riser of a high-rise building project, and can assist in installation on the pipe riser of a high-rise building project at the bottom, and the construction operation is very convenient;
[0004] By referring to the above comparative documents, it can be seen that the prior art still has the following deficiencies. In the process of lifting the engineering pipe, the engineering pipe is supported by a pallet. When the engineering pipe is installed, the pallet needs to be manually disassembled before the engineering pipe can be installed. However, the manual disassembly operation is more troublesome, and due to the high-altitude operation, there are certain safety hazards in the operation process. In addition, due to the lack of positioning measures, the engineering pipe may be skewed during the process below the engineering pipe, affecting the installation quality. Utility Model Content
[0005] In view of the deficiencies in the prior art, the utility model provides a pipe riser hoisting device for a high-rise building engineering pipe shaft to solve the problems of troublesome installation of engineering pipes and potential safety hazards during the installation process.
[0006] To achieve the above purpose, the utility model is implemented through the following technical solutions: a pipe shaft riser hoisting device for a high-rise building engineering, comprising a concave frame and a gantry frame, wherein the gantry frame is fixed to the upper end of the concave frame;
[0007] A through opening is opened in the middle of the concave frame, and push plates are provided on both sides of the lower end of the concave frame, and support plates are fixed to the lower ends of the push plates, and a plurality of support rollers are rotatably connected to the upper ends of the support plates, and a V-shaped clamping plate is fixed to the inner side wall of the push plate, and a first synchronous cylinder is connected between the inner side wall of the concave frame and the push plate;
[0008] A pressure plate is slidably sleeved on the periphery of the gantry, a positioning rod is fixed to the middle of the lower end of the pressure plate, second synchronous cylinders are fixed around the periphery of the positioning rod, positioning wheels are connected to the power ends of the second synchronous cylinders, and a lifting drive assembly is provided above the concave frame.
[0009] Preferably, two telescopic shafts are connected between the inner side wall of the concave frame and the push plate.
[0010] Preferably, the lower ends of the support plates are rotatably connected to a plurality of rotating rollers.
[0011] Preferably, a lifting ring is fixed at the middle part of the upper end of the gantry.
[0012] Preferably, the lifting drive assembly includes a forward and reverse motor and a screw rod, the forward and reverse motor is fixed to the upper end of the concave frame, one end of the screw rod is connected to the power end of the forward and reverse motor, and the other end of the screw rod is rotatably connected to the top end of the gantry, and the pressure plate is threadedly sleeved with the screw rod.
[0013] Preferably, a first battery is installed on the upper end of the concave frame, and the forward and reverse motors and the first synchronous cylinder are electrically connected to the first battery.
[0014] Preferably, a second battery is installed on the upper end of the pressure plate, and the second synchronous cylinder is electrically connected to the second battery.
[0015] The utility model provides a device for hoisting pipe risers in pipe wells of high-rise building projects, which has the following beneficial effects:
[0016] 1. The engineering pipe is supported by the support roller on the push plate, and then clamped by the clamping plate. At the same time, the pressing plate is pressed on the upper end of the engineering pipe, which is conducive to ensuring the stability of the engineering pipe during the lifting process. In addition, through the work of the first synchronous cylinder, the push plate can be easily and quickly moved away from the bottom of the engineering pipe, which effectively solves the trouble of manual operation and makes the installation process of the engineering pipe safer;
[0017] 2. The inner wall of the engineering pipe is supported by four positioning wheels. During the lowering of the engineering pipe, the four positioning wheels facilitate the smooth lowering and installation of the engineering pipe, avoiding the occurrence of skewness during the lowering and installation of the engineering pipe, and facilitating the accurate installation of the engineering pipe, effectively ensuring the installation quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0019] Figure 2 This is a schematic diagram of the push plate structure of the utility model;
[0020] Figure 3 This is a schematic diagram of the top view of the V-shaped splint structure of the utility model;
[0021] Figure 4 This is a schematic diagram of the positioning rod structure of the utility model;
[0022] Figure 5 This is a schematic diagram of the top view of the positioning rod of the utility model;
[0023] Figure 6 This is a schematic diagram of the overall lifting working structure of the utility model;
[0024] Figure 7 It is a schematic diagram of the overall external structure of the utility model.
[0025] Figure 1-7 Middle: concave frame 1, gantry 2, push plate 3, first synchronous cylinder 4, telescopic shaft 5, support roller 6, rotating roller 7, V-shaped clamping plate 8, lifting ring 9, pressure plate 10, positioning rod 11, second synchronous cylinder 12, positioning wheel 13, forward and reverse motor 14, screw 15, first battery 16, through port 17, second battery 18, support plate 19. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0027] See also Figure 1-7 The utility model provides a technical solution: a pipe riser hoisting device for a high-rise building engineering shaft, comprising a concave frame 1 and a gantry 2, wherein the gantry 2 is fixed to the upper end of the concave frame 1, a through opening 17 is opened in the middle of the concave frame 1, and push plates 3 are arranged on both sides of the lower end of the concave frame 1, support plates 19 are fixed to the lower ends of the push plates 3, a plurality of support rollers 6 are rotatably connected to the upper ends of the support plates 19, and a V-shaped clamping plate 8 is fixed to the inner side wall of the push plate 3, a first synchronous cylinder 4 is connected between the inner side wall of the concave frame 1 and the push plate 3, a first storage battery 16 is installed on the upper end of the concave frame 1, and the forward and reverse motors 14 and the first synchronous cylinder 4 are electrically connected to the first storage battery 16.
[0028] When the engineering pipe is hoisted by the hoisting device, the engineering pipe is passed through the opening 17 and placed on two support plates 19. At this time, the engineering pipe is supported by the support rollers 6 on the support plates 19. Since the first battery 16 is electrically connected to the first synchronous cylinder 4, the extension of the first synchronous cylinder 4 drives the push plate 3 and the V-shaped clamping plate 8 to approach the outer wall of the engineering pipe. During this process, the support rollers 6 will rotate along the lower end of the engineering pipe, so that the V-shaped clamping plate 8 can smoothly clamp and fix the engineering pipe to prevent the engineering pipe from tipping over.
[0029] In this embodiment, two telescopic shafts 5 are connected between the inner side wall of the concave frame 1 and the push plate 3, and the lower end of the support plate 19 is rotatably connected to a plurality of rotating rollers 7.
[0030] When the rotating roller 7 is supported on the ground and the push plate 3 drives the rotating roller 7 to move along the ground, the rotation of the rotating roller 7 is conducive to ensuring the smoothness of the movement of the push plate 3, and a telescopic shaft 5 is arranged between the inner side of the concave frame 1 and the push plate 3. The telescopic shaft 5 will be extended and retracted along with the extension and retraction of the first synchronous cylinder 4, and the telescopic shaft 5 will share the bearing force of the first synchronous cylinder 4, thereby ensuring the stability of the push plate 3 when supporting the engineering pipe.
[0031] In this embodiment, a pressure plate 10 is slidably sleeved on the outer periphery of the gantry 2, and a lifting drive assembly is provided above the concave frame 1, and the lifting drive assembly includes a forward and reverse motor 14 and a screw rod 15, the forward and reverse motor 14 is fixed to the upper end of the concave frame 1, one end of the screw rod 15 is connected to the power end of the forward and reverse motor 14, and the other end of the screw rod 15 is rotatably connected to the top end of the gantry 2, the pressure plate 10 is threadedly sleeved with the screw rod 15, and a lifting ring 9 is fixed to the middle part of the upper end of the gantry 2.
[0032] And the screw rod 15 is driven to rotate through the work of the forward and reverse motor 14, and the screw rod 15 will drive the pressure plate 10 to slide downward along the gantry 2 until the pressure plate 10 is pressed on the engineering pipe, and the lifting ring 9 is lifted by a crane and the lifting device is driven to perform the lifting work. In summary, the engineering pipe is clamped and positioned from top to bottom during the lifting process, and is also clamped and positioned on both sides through the clamping of the V-shaped clamp plate 8, which is beneficial to ensure the stability of the engineering pipe during the lifting process.
[0033] In this embodiment, a positioning rod 11 is fixed in the middle of the lower end of the pressure plate 11, and second synchronous cylinders 12 are fixed around the periphery of the positioning rod 11. The power ends of the second synchronous cylinders 12 are connected to positioning wheels 13. A second battery 18 is installed at the upper end of the pressure plate 10, and the second synchronous cylinders 12 are electrically connected to the second battery 18.
[0034] When the pressure plate 10 is pressed on the engineering pipe, the positioning rod 11 will drive the second synchronous cylinder 12 and the positioning wheel 13 to insert into the inner periphery of the engineering pipe, and the second synchronous cylinder 12 will be powered by the second battery 18. The positioning wheel 13 will be driven to press against the inner wall of the engineering pipe through the extension of the first synchronous cylinder 4, and the four positioning wheels 13 will press against the inner wall of the engineering pipe at the same time. In the process of lowering the engineering pipe, the first synchronous cylinder 4 will be contracted to facilitate the convenient and quick driving of the push plate 3 away from the bottom of the engineering pipe, which effectively solves the trouble of manual operation and makes the installation process of the engineering pipe safer. When the support roller 6 no longer supports the engineering pipe, the V-shaped clamping plate 8 no longer clamps the engineering pipe. At this time, during the lowering and installation of the engineering pipe, the positioning wheel 13 rotates along the inner wall of the engineering pipe. Therefore, the four positioning wheels 13 are conducive to the smooth lowering and installation of the engineering pipe, avoiding the occurrence of skewness during the lowering and installation of the engineering pipe, and are conducive to the accurate installation of the engineering pipe, effectively ensuring the installation quality.
[0035] Working principle:
[0036] When the engineering pipe is hoisted by the hoisting device, the engineering pipe is passed through the through hole 17 and placed on the two push plates 3. At this time, the engineering pipe is supported by the support rollers 6 on the push plate 3, and the push plate 3 and the V-shaped clamping plate 8 are driven to approach the outer wall of the engineering pipe by the extension of the first synchronous cylinder 4 until the V-shaped clamping plate 8 clamps the engineering pipe and fixes it. Then, the screw rod 15 is driven to rotate by the work of the forward and reverse motor 14, and the screw rod 15 will drive the pressing plate 10 to slide downward along the gantry 2 until the pressing plate 10 is pressed on the engineering pipe. At the same time, the positioning rod 11 will drive the second synchronous cylinder 12 and the positioning wheel 13 to insert into the inner periphery of the engineering pipe, and then the positioning wheel 13 is driven to press against the inner wall of the engineering pipe by the extension of the first synchronous cylinder 4. When the engineering pipe is lowered and installed, the first synchronous cylinder 4 is first contracted to facilitate the convenient and quick driving of the push plate 3 away from the bottom of the engineering pipe. At the same time, the V-shaped clamping plate 8 no longer clamps the engineering pipe, and the positioning wheel 13 rotates along the inner wall of the engineering pipe until the engineering pipe is lowered and installed.
[0037] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A pipe hoisting device for a pipe shaft riser in a high-rise building engineering project, comprising a concave frame (1) and a gantry frame (2), wherein the gantry frame (2) is fixed to the upper end of the concave frame (1), and is characterized in that: A through opening (17) is opened in the middle of the concave frame (1), and push plates (3) are provided on both sides of the lower end of the concave frame (1), and a support plate (19) is fixed to the lower end of the push plate (3), and a plurality of support rollers (6) are rotatably connected to the upper end of the support plate (19), and a V-shaped clamping plate (8) is fixed to the inner side wall of the push plate (3), and a first synchronous cylinder (4) is connected between the inner side wall of the concave frame (1) and the push plate (3); The gantry (2) is slidably sleeved with a pressure plate (10), a positioning rod (11) is fixed in the middle of the lower end of the pressure plate (10), second synchronous cylinders (12) are fixed around the periphery of the positioning rod (11), and the power ends of the second synchronous cylinders (12) are connected to positioning wheels (13), and a lifting drive assembly is provided above the concave frame (1).
2. A device for hoisting pipe risers in a pipe well of a high-rise building project according to claim 1, characterized in that: Two telescopic shafts (5) are connected between the inner side wall of the concave frame (1) and the push plate (3).
3. A device for hoisting pipe risers in a pipe well of a high-rise building project according to claim 1, characterized in that: The lower ends of the support plates (19) are rotatably connected to a plurality of rotating rollers (7).
4. A device for hoisting pipe risers in a pipe well of a high-rise building project according to claim 1, characterized in that: A lifting ring (9) is fixed to the middle of the upper end of the gantry (2).
5. The device for hoisting pipe risers in a pipe well of a high-rise building project according to claim 1 is characterized in that: The lifting drive assembly comprises a forward and reverse motor (14) and a screw rod (15), wherein the forward and reverse motor (14) is fixed to the upper end of the concave frame (1), one end of the screw rod (15) is connected to the power end of the forward and reverse motor (14), and the other end of the screw rod (15) is rotatably connected to the top end of the gantry frame (2), and the pressure plate (10) is threadedly sleeved with the screw rod (15).
6. A device for hoisting pipe risers in a pipe well of a high-rise building project according to claim 5, characterized in that: A first storage battery (16) is installed on the upper end of the concave frame (1), and the forward and reverse motors (14) and the first synchronous cylinder (4) are both electrically connected to the first storage battery (16).
7. The device for hoisting pipe risers in a pipe well of a high-rise building project according to claim 1 is characterized in that: A second storage battery (18) is installed on the upper end of the pressing plate (10), and the second synchronous cylinder (12) is electrically connected to the second storage battery (18).