Device for precipitating and isolating building sand moisture and building stone powder
By designing a sedimentary isolation device that includes guided components, the problem of shovel and stone powder when the loading machine is on the loader, realize the ease of stable concrete, and improve the production efficiency and product quality.
Patent Information
- Application Number
- CN202421173996.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-27
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-27
AI Technical Summary
When loading the loader, it is easy to shovel the stone powder at the bottom of the silo silo with a large amount of stone powder and sand silo that contains more water and mud into the production silo, which affects the silo and the ease of concrete, resulting in low production efficiency and poor product quality. Stablize.
Designed a precipitated isolation device including multiple installation monomers. Each installation monitors include installation pads and multiple group -oriented components. The guide components include rail bars, guide plates, and fixed films. To the bottom of the touches to the bottom of the warehouse, the stone with a large powder or a sand containing a water content with a large amount of mud.
Effectively avoid fighting and shovel into bad sand and stone powder, reduce the difficulty of operation and quality control, ensure the harmony of concrete, and improve production efficiency and product quality.
Smart Images

Figure CN222413861U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a device for precipitating and isolating moisture in building sand and stone powder for building. Background Art
[0002] Sand and gravel are the main raw materials for the production of prefabricated concrete. They are used in large quantities in the production of prefabricated concrete. The existing technology has high technical standards for loader operators. Operators cannot control the bucket to keep a distance of more than 8CM from the ground of the silo based on their personal operating experience. When loading materials, production operators will inevitably shovel gravel with a large amount of stone powder at the bottom of the gravel silo and sand with a large amount of water and mud in the sand silo into the production silo. Since the stone powder content of gravel and the water and mud content of sand have a great influence on the workability of concrete, the state of prefabricated concrete production is unstable. Laboratory technicians need to optimize the proportion of each plate of concrete produced, which seriously affects production efficiency and the product quality of prefabricated components and construction products. Utility Model Content
[0003] The utility model aims to provide a device for precipitating and isolating moisture in construction sand and stone powder for construction, so as to solve the problem in the prior art that when loading materials, the loader is prone to shovel stones with a large amount of stone powder at the bottom of the stone silo and sand with a large amount of water and mud in the sand silo into the production silo, thus affecting the product quality.
[0004] To achieve the above-mentioned purpose, the utility model provides a device for precipitating and isolating moisture in construction sand and stone powder for construction, comprising a plurality of installation units, each of which comprises an installation pad, on which a plurality of guide assemblies are arranged, and between each group of guide assemblies, a passage groove is provided;
[0005] The guide assembly comprises a track rod, a guide plate and a fixing plate. The fixing plate is fixedly arranged on both sides of the track rod, and the guide plate is fixedly arranged on both ends of the track rod.
[0006] Preferably, the track rod comprises a connecting plate 1 and a connecting plate 2 which are obliquely fixedly connected, and both ends of the connecting plate 2 and the connecting plate 1 are provided with inclined edges; the guide plate is arranged as a triangular structure, and the guide plate is fixedly connected to the inclined edges.
[0007] Preferably, the fixing plates are provided with through holes, and the fixing members are passed through the through holes for fixing.
[0008] Preferably, both ends of the mounting pad are provided with mounting grooves, and a row of mounting holes are provided in the mounting grooves; a protective plate is clamped on the mounting grooves, and buckle grooves are provided on both sides of the protective plate, and the outer edges of the buckle grooves are set as rounded structures.
[0009] Preferably, a plug-in slot is provided at the upper end of the mounting pad, and a plug-in plate is fixedly provided at the lower end of the mounting pad.
[0010] Therefore, the utility model adopts a device of the above structure for precipitating and isolating moisture in construction sand and stone powder for construction. The structure is simple to manufacture, easy to install and use, safe and reliable, reduces the labor difficulty and quality control difficulty of operators and laboratory technicians, ensures the workability of concrete used for stable prefabricated components, improves work efficiency, effectively guarantees product quality, and improves production efficiency.
[0011] The technical solution of the utility model is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a structural schematic diagram of an embodiment of a device for precipitating and isolating moisture in building sand and building stone powder according to the utility model;
[0013] Figure 2 This is a schematic diagram of the use structure of a device for precipitating and isolating moisture in building sand and stone powder for building according to the utility model;
[0014] Figure 3 It is a side view of a device for precipitating and isolating moisture in building sand and stone powder for building according to the utility model;
[0015] Figure 4 It is a cross-sectional view of a protective plate of a device for precipitating and isolating moisture in building sand and stone powder for building according to the utility model;
[0016] Figure 5 This is a schematic structural diagram of a guide assembly of a device for precipitating and isolating moisture in building sand and stone powder for building according to the utility model;
[0017] Figure numerals: 1. Mounting pad; 2. Guide assembly; 3. Pass groove; 4. Track rod; 41. Connecting plate one; 42. Connecting plate two; 5. Guide plate; 6. Fixing plate; 7. Through hole; 8. Mounting groove; 9. Mounting hole; 10. Protective plate; 11. Buckle groove; 12. Plug-in groove; 13. Plug-in plate. DETAILED DESCRIPTION
[0018] The technical solution of the utility model is further described below through the accompanying drawings and embodiments.
[0019] Unless otherwise defined, the technical terms or scientific terms used in the present invention shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Words such as "include" or "comprise" and the like mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. Words such as "connect" or "connected" and the like are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0020] Example
[0021] See also Figure 1-5 The utility model provides a device for precipitating and isolating the moisture of building sand and the stone powder for building, comprising a plurality of installation units, each of which comprises an installation pad 1, on which a plurality of guide components 2 are arranged, and the height of the installation pad 1 and the guide components 2 is set to 8 cm, and such a height can prevent the bucket from shoveling the stone with a large amount of powder or the sand with a large amount of water and mud at the bottom of the silo. A passage groove 3 is provided between each group of guide components 2, and the passage groove 3 is arranged to facilitate the tires of the loader to pass through.
[0022] The guide assembly 2 includes a track rod 4, a guide plate 5 and a fixing plate 6. The fixing plate 6 is fixedly arranged on both sides of the track rod 4 by welding, and the guide plate is fixedly arranged on both ends of the track rod 4 by welding.
[0023] The track bar 4 includes a connecting plate 1 41 and a connecting plate 2 42 which are connected in an inclined and fixed manner, and both ends of the connecting plate 2 42 and the connecting plate 1 41 are provided with inclined edges. The guide plate 5 is provided in a triangular structure, and the guide plate 5 is fixedly connected to the inclined edge. The guide plate 5 guides the bucket of the loader so that the bucket is placed parallel to the track bar 4.
[0024] The fixing plates 6 are all provided with through holes 7 for fixing members to penetrate and fix. The fixing members are screws, and the guide assembly 2 is fixed to the mounting pad 1 by screws.
[0025] Both ends of the mounting plate 1 are provided with mounting grooves 8, and a row of mounting holes 9 are provided in the mounting grooves 8; a protective plate 10 is clamped on the mounting grooves 8, and buckle grooves 11 are provided on both sides of the protective plate 10, and the outer edges of the buckle grooves 11 are set as rounded structures. Some sand or gravel will fall during the transportation of the loader, and the protective plate 10 is set to prevent the sand or gravel from falling into the mounting grooves 8, which is difficult to clean and also affects the subsequent disassembly efficiency. By setting the anti-slip plate 10, after bolting and installing the mounting holes 9, the protective plate 10 can be installed in the mounting grooves 8. When it is necessary to disassemble the mounting plate 1, the protective plate 10 can be removed by buckling the fingers into the buckle grooves 11 and pulling them up.
[0026] The upper end of the mounting pad 1 is provided with a plug-in slot 12, and the lower end of the mounting pad 1 is fixedly provided with a plug-in plate 13. The plug-in plate 13 and the plug-in slot 12 are adapted to each other, and the mounting pad 1 is laid on the floor of the silo, and two mounting pads 1 in two adjacent rows are installed together, and the plug-in plate 13 of the mounting pad 1 in the first row is inserted into the plug-in slot 12 of the mounting pad 1 in the second row to be fully assembled until the entire silo is covered.
[0027] During specific use, the distance between the two track rods 4 is determined according to the size of the loader bucket. After the distance is selected, the track rods 4 are fixed to the mounting pad 1 by screws, and then a passage groove 3 is opened on the mounting pad 1 according to the size of the loader tire. After the installation unit is made, it is laid according to the size of the silo. During the laying process, the plug-in plate 13 of the upper row of mounting pads 1 is inserted into the plug-in groove 12 of the next row of mounting pads 1, and then fixing bolts are driven into the mounting holes 9 on both sides of each mounting pad 1. After fixing, the protective plate 10 is installed on the mounting groove 8. After paving the entire silo ground, the transportation operation can be started. When the loader is loading, the bucket is parallel to the track rod 4 to prevent the bucket from shoveling stones with a large amount of powder or sand with a large amount of water and mud at the bottom of the silo.
[0028] Therefore, the utility model adopts a device of the above structure for precipitating and isolating moisture in construction sand and stone powder for construction. The structure is simple to manufacture, easy to install and use, safe and reliable, reduces the labor difficulty and quality control difficulty of operators and laboratory technicians, ensures the workability of concrete used for stable prefabricated components, improves work efficiency, effectively guarantees product quality, and improves production efficiency.
[0029] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in this field should understand that they can still modify or replace the technical solution of the utility model with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the utility model.
Claims
1. A device for precipitating and isolating moisture in building sand and stone powder for building, characterized in that: It comprises a plurality of installation units, each of which comprises an installation pad, a plurality of guide components are arranged on the installation pad, and a passage groove is provided between each group of guide components; The guide assembly comprises a track rod, a guide plate and a fixing plate. The fixing plate is fixedly arranged on both sides of the track rod, and the guide plate is fixedly arranged on both ends of the track rod.
2. The device for precipitating and isolating moisture in building sand and stone powder for building according to claim 1, characterized in that: The track rod comprises a connecting plate 1 and a connecting plate 2 which are connected in an inclined and fixed manner, and both ends of the connecting plate 2 and the connecting plate 1 are provided with inclined edges; the guide plate is provided with a triangular structure, and the guide plate is fixedly connected to the inclined edges.
3. The device for precipitating and isolating moisture in building sand and building stone powder according to claim 2, characterized in that: The fixing plates are all provided with through holes, through which fixing members can pass and fix.
4. The device for precipitating and isolating moisture in building sand and building stone powder according to claim 3, characterized in that: Both ends of the mounting pad are provided with mounting grooves, and a row of mounting holes are provided in the mounting grooves; a protective plate is clamped on the mounting grooves, and both sides of the protective plate are provided with buckle grooves, and the outer edges of the buckle grooves are set as rounded structures.
5. The device for precipitating and isolating moisture in building sand and building stone powder according to claim 4, characterized in that: The upper end of the mounting pad is provided with a plug-in slot, and the lower end of the mounting pad is fixedly provided with a plug-in plate.