Cantilever crane adjusting device and construction trolley

By designing an armrest adjustment device including sliding orbit and sliding frame, the problem that cannot be grasped at the front and back of the tablet in the tunnel's insufficient space in the tunnel can be solved. Grasp the demand, simplify the structure design and improve the adaptability.

CN222414892UActive Publication Date: 2025-01-28SICHUAN LANHAI ENG EQUIP MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420965950.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2025-01-28
Estimated Expiration
2034-05-07

AI Technical Summary

Technical Problem

The existing arm frame cannot meet the gripping needs in front and rear of the bench at the same time when there is insufficient space in the tunnel.

Method used

Designed a brace adjustment device, including the first sliding orbit and the second sliding track. By the cooperation of sliding cars and sliding shelves, the arm movement moves before and after, and meets the demand for grabbing of different operating conditions.

Benefits of technology

In the case of insufficient space in the tunnel, this device can achieve the capture of the front and back of the tablet, simplify the structural design, avoid the risks of multiple institutional problems, and improve the adaptability of the product.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222414892U_ABST
    Figure CN222414892U_ABST
Patent Text Reader

Abstract

The utility model discloses a cantilever crane adjusting device and a construction trolley, and relates to the technical field of engineering machine.The cantilever crane adjusting device comprises a first sliding rail, a first sliding trolley, a second sliding rail, a second sliding trolley, a sliding frame and a grabbing arm; the first sliding trolley can reciprocate along the first sliding rail, a pitching-rotating mechanism is arranged on the first sliding trolley, the sliding frame is installed on the pitching-rotating mechanism, the second sliding rail is installed on the sliding frame, the second sliding trolley can reciprocate along the second sliding rail, and a rotating mechanism is installed on the second sliding trolley. The grabbing arm is installed on the swing mechanism. The vertical arch arm frame above the rack can meet the working condition that the arch frame is grabbed in front of or behind the rack at the same time, and the problem that the long arm frame cannot be grabbed front and back due to insufficient space in a tunnel is solved by arranging the second sliding rail.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of engineering machinery, and in particular to a boom adjustment device and a construction trolley. Background Art

[0002] During the process of erecting and supporting the gantry type construction trolley, due to the differences in arch types and erection working conditions, the erection arm above the gantry needs to grab the arch and other auxiliary materials in front of or behind the gantry. The existing arm cannot meet the requirements of both front and rear grabbing due to space problems in the tunnel. Utility Model Content

[0003] The main purpose of the present application is to provide a boom adjustment device and a construction trolley, aiming to solve the problem that the existing boom is affected by the space in the tunnel and cannot meet both the front and rear grabbing of the trolley.

[0004] The technical solutions adopted in this application are as follows:

[0005] An arm adjustment device, comprising:

[0006] A first sliding track;

[0007] A first sliding trolley, the first sliding trolley can reciprocate along the first sliding track, and the first sliding trolley is provided with a pitch-slewing mechanism;

[0008] a slide, the slide being hinged to the pitch-slew mechanism;

[0009] a second sliding track, the second sliding track being slidably mounted on the sliding frame;

[0010] a second sliding trolley, the second sliding trolley being capable of reciprocating along the second sliding track and having a slewing mechanism installed thereon; and,

[0011] A gripping arm is mounted on the rotating mechanism.

[0012] Optionally, the pitch-slew mechanism comprises:

[0013] A first rotary reducer, the first rotary reducer is installed on the first sliding trolley, and a first rotary support seat is provided on the first rotary reducer; and

[0014] A pitch cylinder, one end of a cylinder body of the pitch cylinder is hinged to the first slewing support seat through a pin.

[0015] Optionally, the slide is hinged to one end of the piston rod of the pitch cylinder and the first slewing support seat through a pin.

[0016] Optionally, the slewing mechanism includes a second slewing reducer, the second slewing reducer is provided with a second slewing support seat, and the second slewing support seat is movably hinged to the grab arm through a pin shaft.

[0017] Optionally, an angle adjustment cylinder is hinged on the second swivel support seat via a pin, and one end of the angle adjustment cylinder away from the second swivel support seat is movably hinged to the grab arm via a pin.

[0018] Optionally, the first sliding trolley is installed on the first sliding track through rollers.

[0019] Optionally, the second sliding trolley is installed on the second sliding track through rollers.

[0020] Optionally, the second sliding track is mounted on the sliding frame via rollers.

[0021] A construction trolley comprises a trolley frame and the arm frame adjusting device, wherein the arm frame adjusting device is installed on the trolley frame through the first sliding track.

[0022] Compared with the prior art, the beneficial effects of this application are:

[0023] First: An arm adjustment device proposed in an embodiment of the present application can move the grabbing arm to the front or rear of the platform through the forward and backward movement of the first sliding trolley and the second sliding trolley, thereby ensuring that the vertical arch arm above the platform can simultaneously meet the working conditions of grabbing the arch in front of or behind the platform. Compared with the traditional grabbing device, the need to set up an additional arch transfer mechanism for rear grabbing is reduced, the design of the overall structural parts is simplified, the risk of multiple mechanism problems is avoided, and a variety of working conditions can be met by one device, thereby improving the adaptability of the product.

[0024] Second: A boom adjustment device proposed in an embodiment of the present application, by setting a second sliding track, uses a sliding rail structure to replace the traditional boom form, changes the boom into a sliding rail form, and realizes the telescopic arm in a sliding form. This can solve the problem that the long boom cannot be grasped forward and backward due to insufficient space in the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 A schematic diagram of the structure of the arm adjustment device provided in an embodiment of the present application at a viewing angle;

[0026] Figure 2 A schematic diagram of the state of the arm adjustment device provided in an embodiment of the present application when the front arch frame is grasped;

[0027] Figure 3 A schematic diagram of the state of the arm adjustment device provided in an embodiment of the present application when grabbing the rear arch.

[0028] Description of the reference numerals in the accompanying drawings:

[0029] 1-first sliding track, 2-second sliding track, 3-grabbing arm, 4-second rotary reducer, 5-second sliding trolley, 6-pitch cylinder, 7-slide, 8-first rotary support seat, 9-third power box, 10-first rotary reducer, 11-first power box, 12-first sliding trolley. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0031] It should be noted that all directional indications in the embodiments of the present application (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0032] In this application, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0033] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present application, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0034] See attached Figure 1 The embodiment of the present application provides a boom adjustment device, including a first sliding track 1, a first sliding trolley 12, a pitch-slewing mechanism, a second sliding track 2, a second sliding trolley 5, a slide 7, a slewing mechanism, and a grab arm 3. The first sliding track 1 is fixedly mounted on the frame of the construction trolley; the first sliding trolley 12 reciprocates along the first sliding track 1 under the drive of the first power box 11, and the first sliding trolley 12 is provided with a pitch-slewing mechanism, the slide 7 is connected between the pitch-slewing mechanism and the second sliding track 2, the second sliding trolley 5 reciprocates along the second sliding track 2 under the drive of the second power box, the second sliding trolley 5 is provided with a slewing mechanism, and the grab arm 3 is installed on the slewing mechanism.

[0035] In the above description, the pitch-slewing mechanism includes a first slewing reducer 10 and a pitch cylinder 6 , and the slewing mechanism includes a second slewing reducer 4 .

[0036] Specifically:

[0037] See also Figure 1 As shown, the first sliding rail 1 is fixed to the stand by bolts, the first sliding trolley 12 is installed on the first sliding rail 1 by rollers, and the first power box 11 is fixed to the first sliding trolley 12 by bolts. It can move back and forth on the first sliding rail 1 with the first sliding trolley 12 and provide power for the first sliding trolley 12 to move back and forth, ensuring that the first sliding trolley 12 slides back and forth on the first sliding rail 1.

[0038] The first rotary reducer 10 is fixed to the first sliding trolley 12 by bolts, and the first rotary support seat 8 is fixed to the first rotary reducer 10 by bolts to adjust the operation, and the first rotary reducer 10 provides rotational power for the rotation of the first rotary support seat 8. The slide 7 is hinged on the first rotary support seat 8 by a pin shaft, and the pitch cylinder 6 is hinged on the slide 7 and the first rotary support seat 8 by a pin shaft, mainly adjusting the horizontal angle of the second sliding track 2. The second sliding track 2 is slidably mounted on the slide 7, and a third power box 9 is bolted on the second sliding track 2. The third power box 9 provides power for the second sliding track 2 to slide on the slide 7. It can be imagined that the slide 7 can implement a lifting effect on the second sliding track 2, and at the same time, the horizontal angle can be changed under the telescopic action of the pitch cylinder 6, driving the change of the horizontal angle of the second sliding track 2, and based on the relative displacement between the slide 7 and the second sliding track 2, the displacement compensation of the sliding trolley is realized.

[0039] The second sliding track 2 is mounted on the slide 7 through rollers and can slide forward and backward. The second sliding trolley 5 is mounted on the second sliding track 2 through rollers and can slide forward and backward on the second sliding track 2. A second power box is mounted on the second sliding trolley, and the second power box mainly provides power for the second sliding trolley 5 to slide forward and backward on the second sliding track 2. The second rotary reducer 4 is fixed to the second sliding trolley 5 by bolts, and a second rotary support seat is mounted on the second rotary reducer 4. The grab arm 3 is mounted on the second rotary support seat through a pin shaft, and the grab arm can be rotated 360° by the second rotary reducer 4. The second rotary support seat is also hinged with an angle adjustment cylinder through a pin shaft. The end of the angle adjustment cylinder away from the second rotary support seat is movably hinged with the grab arm 3 through a pin shaft. The angle between the grab arm 3 and the second rotary support seat can be adjusted through the angle adjustment cylinder to change the grabbing angle of the grab arm 3.

[0040] Based on the above content, it can be known that the embodiment of the present application provides an arm adjustment device, and its specific working process is:

[0041] like Figure 2 As shown in the figure, when the arch frame in front of the corresponding platform is being grabbed, the first sliding trolley 12 slides to the front of the first sliding track 1 under the action of the first power box 11, and the pitch cylinder 6 is extended to adjust the slide 7 to an angle that satisfies the arch frame grabbing. The second sliding track 2 is installed on the slide 7 through rollers, so that each structure above the slide 7 will tilt at a certain angle with the slide 7. The second sliding track 2 can slide into a Figure 2 The second sliding trolley 5 can slide on the second sliding track 2 under the action of the second power box, and slide to the position shown in FIG. Figure 2 The grab arm 3 as a whole can rotate 360 ​​degrees under the action of the second rotary reducer 4. When grabbing the arch, the first rotary support seat 8 swings left and right under the action of the first rotary reducer 10 according to different positions to meet the requirements of arch grabbing.

[0042] like Figure 3 As shown, when the arch frame behind the corresponding platform is grabbed, it is similar to grabbing the arch frame in front. The first sliding trolley 12 slides to the rear of the first sliding track 1 under the action of the first power box 11, and the pitch cylinder 6 is extended to adjust the slide 7 to an angle that meets the arch frame grabbing. The second sliding track 2 is installed on the slide 7 through rollers, so all structures above the slide 7 will tilt at a certain angle with the slide 7. The second sliding track 2 can slide into a Figure 3 The second sliding trolley 5 can slide on the second sliding track 2 under the action of the second power box, and slide to the position shown in FIG. Figure 3The position shown. The grab arm 3 as a whole can rotate 360 ​​degrees under the action of the second rotary reducer 4. When grabbing the arch frame, the first rotary support seat 8 swings left and right under the action of the first rotary reducer 10 according to different positions to meet the arch frame grabbing. In this process, due to the use of the second sliding track 2 to replace the traditional large arm form, the arm frame is changed into a slide rail form, and the telescopic arm frame is realized by sliding, which can avoid the influence of the long arm frame being unable to perform front and rear working condition grabbing due to insufficient space in the tunnel.

[0043] Of course, the embodiment of the present application also provides an excavation trolley, including a trolley frame and the above-mentioned arm adjustment device, the frame is installed on the trolley body, and the arm adjustment device is installed on the frame through a first sliding track. It can be imagined that based on the arm adjustment device, the excavation trolley can complete the front and rear grabbing of the arch frame in a tunnel with insufficient internal space, which is more practical.

[0044] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A boom adjustment device, characterized in that: include: A first sliding track; A first sliding trolley, the first sliding trolley can reciprocate along the first sliding track, and the first sliding trolley is provided with a pitch-slewing mechanism; a slide, the slide being hinged to the pitch-slew mechanism; a second sliding track, the second sliding track being slidably mounted on the sliding frame; a second sliding trolley, the second sliding trolley being capable of reciprocating along the second sliding track and having a slewing mechanism installed thereon; and, A gripping arm is mounted on the rotating mechanism.

2. The arm adjustment device according to claim 1, characterized in that: The pitch-slewing mechanism comprises: A first rotary reducer, the first rotary reducer is installed on the first sliding trolley, and a first rotary support seat is provided on the first rotary reducer; and A pitch cylinder, one end of a cylinder body of the pitch cylinder is hinged to the first slewing support seat through a pin.

3. The arm adjustment device according to claim 2, characterized in that: The slide is hinged to one end of the piston rod of the pitch cylinder and the first slewing support seat through a pin shaft.

4. The arm support adjustment device according to claim 1, characterized in that: The slewing mechanism comprises a second slewing reducer, on which a second slewing support seat is arranged, and the second slewing support seat is movably hinged to the grab arm via a pin shaft.

5. The arm support adjustment device according to claim 4, characterized in that: An angle adjustment oil cylinder is hinged on the second rotary support seat through a pin shaft, and one end of the angle adjustment oil cylinder away from the second rotary support seat is movably hinged to the grab arm through a pin shaft.

6. The arm support adjustment device according to claim 1, characterized in that: The first sliding trolley is installed on the first sliding track through rollers.

7. The arm support adjustment device according to claim 1, characterized in that: The second sliding trolley is installed on the second sliding track through rollers.

8. The arm support adjustment device according to claim 1, characterized in that: The second sliding track is installed on the sliding frame through rollers.

9. A construction trolley, characterized in that: It comprises a platform and the arm adjustment device according to any one of claims 1 to 8, wherein the arm adjustment device is installed on the platform through the first sliding track.