Temporary supporting and adjusting device for high-altitude horizontal pipeline installation
By designing a temporary support adjustment device that includes support components, lifting components, and adjustment components, the problem of poor stability in the high -altitude horizontal pipeline of existing technology is solved, and more efficient and secure pipeline installation operations are achieved.
Patent Information
- Application Number
- CN202421081301.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-17
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-17
AI Technical Summary
The existing temporary support devices are poorly stable and easily overturned when installed at high altitude horizontal pipes.
Design a temporary support adjustment device including chassis, support components, lifting components, and adjustment components. The support component forms a triangular support frame to increase stability; the lifting component can achieve the flexible lifting of the pipeline through the gear and the turntable; the adjustment component adjusts the angle of the nut and adjust the block.
It improves the stability of the device, reduces the risk of dumping and sliding, and achieves more efficient and secure operations of pipeline installation.
Smart Images

Figure CN222416381U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipeline installation, in particular to a temporary support and adjustment device for high-altitude horizontal pipeline installation. Background Art
[0002] Temporary support and adjustment devices can be used for the installation of various high-altitude horizontal pipelines, such as air-conditioning pipelines, gas pipelines and drainage pipelines. It can provide stable support and adjustment functions to help ensure the accuracy and safety of pipeline installation.
[0003] The utility model patent with patent application publication number CN211738214U discloses a temporary support device for pipeline installation, including a column and a base integrally formed at the bottom end of the column, a first threaded blind hole is vertically opened inside the column, a support rod is arranged in the first threaded blind hole and the support rod is connected to the first threaded blind hole by threaded screwing, first bolts are installed and connected on both sides of the hole opening of the first threaded blind hole, and installation and disassembly are convenient through the opening design of the base, the first bolt, the second blind hole and other structures and the screwing action of conventional connecting parts, while the plug-in action between the conical screw rod and the ground is utilized to make the device more stable, the opening direction of the arc plate can be quickly fixed by the second bolt and the nut after rotation adjustment, so as to facilitate the limitation of the position of the pipeline, and the overall height of the device can be adjusted according to the installation requirements by correspondingly twisting and adjusting the support rod in coordination with the further fixing operation of the two first bolts, which is more flexible and convenient for practical use.
[0004] However, the above device still has some disadvantages in actual use. The most obvious one is that when temporarily supporting, the supporting device needs to be fixed to the ground, but the stability is not good. When supporting, it is not firmly fixed and is easy to fall over.
[0005] Therefore, it is necessary to invent a temporary support and adjustment device for high-altitude horizontal pipeline installation to solve the above problems. Utility Model Content
[0006] The utility model aims to provide a temporary support and adjustment device for installing a high-altitude horizontal pipeline, which solves the problem of poor stability mentioned in the above-mentioned background technology by arranging a support component.
[0007] To achieve the above purpose, the utility model is implemented through the following technical solutions: a temporary support and adjustment device for high-altitude horizontal pipeline installation, comprising a chassis, the outer surface of the chassis is clamped with a support assembly, the number of the support assemblies is three, the middle of the upper surface of the chassis is fixedly connected with a lifting assembly, one end of the lifting assembly is fixedly connected with a connecting plate, and both sides of the upper surface of the connecting plate are fixedly connected with adjustment assemblies;
[0008] The lifting assembly includes a box body, the inner side wall of the box body is rotatably connected to a rotating rod through a rotating rod, the outer surface of the rotating rod is fixedly connected to a gear, the outer surface of the gear is meshed with a gear plate, and one end of the rotating rod is fixedly connected to a turntable.
[0009] Furthermore, the support assembly includes a card plate, the upper surface of the card plate is threadedly connected to the outer surface of the chassis through bolts, the bottom of the card plate is fixedly connected to a connecting rod, and the outer surface of the bolt is threadedly connected to an A nut.
[0010] Furthermore, the adjustment assembly includes an A adjustment block, the bottom of which is fixedly connected to the upper surface of the connecting plate, the surface of the A adjustment block is threadedly connected to the B adjustment block via a fixing bolt, and the outer surface of the fixing bolt is threadedly connected to the B nut.
[0011] Furthermore, a U-shaped support plate is fixedly connected to the upper surface of the adjustment component, and the number of the U-shaped support plates is two.
[0012] Furthermore, an anti-slip strip is fixedly connected to the inner side wall of the U-shaped support plate, and the material of the anti-slip strip is rubber.
[0013] Furthermore, a support plate is fixedly connected to the bottom of the support assembly, and an anti-slip pad is fixedly connected to the bottom of the support plate.
[0014] The utility model provides a temporary support and adjustment device for high-altitude horizontal pipeline installation, which has the following
[0015] Beneficial effects:
[0016] 1. By setting up the support assembly, when using temporary support, fix the support assembly on the chassis to form a triangular support frame. The triangular support is the most solid, increases stability, and is not easy to tip over or tilt during use.
[0017] 2. When lifting the pipeline, the pipeline needs to be lifted in the air by the lifting component. The pipeline is raised by the lifting component. During the lifting process, the pipeline can be lifted by rotating the turntable. The operation is simple and convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for the implementation or the prior art description. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.
[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0020] Figure 2 This is a schematic diagram of the structure of the lifting assembly of the utility model;
[0021] Figure 3 This is a schematic diagram of the structure of the support assembly of the utility model;
[0022] Figure 4 It is a structural schematic diagram of the adjustment component of the utility model.
[0023] Indicated in the figure:
[0024] 1. Chassis;
[0025] 2. Support assembly; 201. Clamp plate; 202. Bolt; 203. Connecting rod; 204. Nut A;
[0026] 3. Lifting assembly; 301. Box body; 302. Rotating rod; 303. Gear; 304. Gear plate; 305. Turntable;
[0027] 4. Support plate;
[0028] 5. Connecting plate;
[0029] 6. Adjustment assembly; 601. A adjustment block; 602. Fixing bolt; 603. B adjustment block; 604. B nut;
[0030] 7. U-shaped support plate. DETAILED DESCRIPTION
[0031] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure. Instead, they are merely examples of devices consistent with some aspects of the present disclosure as detailed in the appended claims.
[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0033] Embodiment 1:
[0034] like Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, this embodiment proposes a temporary support and adjustment device for high-altitude horizontal pipeline installation, including a chassis 1, a support assembly 2 is clamped on the outer surface of the chassis 1, and the number of the support assemblies 2 is three, including a chassis 1, a support assembly 2 is clamped on the outer surface of the chassis 1, and the number of the support assemblies 2 is three, a lifting assembly 3 is fixedly connected to the middle of the upper surface of the chassis 1, one end of the lifting assembly 3 is fixedly connected to a connecting plate 5, and both sides of the upper surface of the connecting plate 5 are fixedly connected to adjustment assemblies 6;
[0035] The lifting assembly 3 includes a box body 301, the inner wall of the box body 301 is rotatably connected to a rotating rod 302 through a rotating rod, the outer surface of the rotating rod 302 is fixedly connected to a gear 303, the outer surface of the gear 303 is meshed with a gear plate 304, and one end of the rotating rod 302 is fixedly connected to a turntable 305. When lifting the pipeline, it is necessary to lift the pipeline at a high altitude, and the lifting assembly 3 is used to lift the pipeline. During the lifting process, the turntable 305 can be rotated to lift the pipeline, and the operation is simple and convenient.
[0036] like Figure 1 and Figure 3 As shown, the support assembly 2 includes a card plate 201, the upper surface of the card plate 201 is threadedly connected to the outer surface of the chassis 1 through a bolt 202, the bottom of the card plate 201 is fixedly connected to a connecting rod 203, and the outer surface of the bolt 202 is threadedly connected to an A nut 204. When using temporary support, the support assembly 2 is fixed to the chassis 1 to form a triangular support frame. The triangular support is the most solid and increases stability. It is not easy to tip over or tilt during use.
[0037] Embodiment 2:
[0038] The solution in Example 1 is further introduced below in combination with a specific working method, as described below:
[0039] like Figure 1 and Figure 4 As shown, the adjustment component 6 includes an A adjustment block 601, the bottom of which is fixedly connected to the upper surface of the connecting plate 5, the surface of the A adjustment block 601 is threadedly connected to the B adjustment block 603 via a fixing bolt 602, the outer surface of the fixing bolt 602 is threadedly connected to the B nut 604, and the angle of the B adjustment block 603 on the A adjustment block 601 is adjusted. After the adjustment is completed, the fixing bolt 602 and the B nut 604 are used to fix it, thereby achieving the effect of angle adjustment.
[0040] like Figure 1 As shown, a U-shaped support plate 7 is fixedly connected to the upper surface of the adjustment component 6, and the number of the U-shaped support plates 7 is two.
[0041] like Figure 1As shown, the inner wall of the U-shaped support plate 7 is fixedly connected with an anti-slip strip, the material of the anti-slip strip is rubber, and the anti-slip strip plays an anti-slip role, and is not easy to slide when the pipeline is raised or lowered.
[0042] like Figure 1 As shown, the bottom of the support assembly 2 is fixedly connected to a support plate 4, and the bottom of the support plate 4 is fixedly connected to an anti-skid pad to play a supporting role. The anti-skid pad plays an anti-skid role, fits the ground better, and is more stable.
[0043] Embodiment 3:
[0044] The schemes in Example 1 and Example 2 are further introduced below in combination with specific working methods, as described below for details:
[0045] Specifically, when the temporary support and adjustment device for high-altitude horizontal pipeline installation is working / in use:
[0046] First, use bolts 202 to fix the card plate 201 on the chassis 1, use A nut 204 to tighten the bolt 202 to prevent loosening, place the support plate 4 on the ground to improve stability, then adjust the angle of B adjustment block 603 on A adjustment block 601 according to the required angle, after the adjustment is completed, use fixing bolt 602 and B nut 604 to fix, finally, place the pipeline in the U-shaped support plate 7, the U-shaped support plate 7 has anti-slip strips to prevent sliding, then, when the pipeline needs to be lifted or lowered, turn the turntable 305, the turntable 305 drives the rotating rod 302 to rotate, the rotating rod 302 drives the gear 303 to rotate, the gear 303 engages with the gear plate 304, drives the gear plate 304 to move up and down, the gear plate 304 drives the connecting plate 5 and the U-shaped support plate 7 to move up and down, thereby driving the pipeline to move up and down.
[0047] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A temporary support and adjustment device for installing a high-altitude horizontal pipeline, comprising a chassis (1), characterized in that: The outer surface of the chassis (1) is clamped with a support assembly (2), the number of the support assemblies (2) is three, a lifting assembly (3) is fixedly connected to the middle of the upper surface of the chassis (1), one end of the lifting assembly (3) is fixedly connected to a connecting plate (5), and both sides of the upper surface of the connecting plate (5) are fixedly connected to adjusting assemblies (6); The lifting assembly (3) comprises a box body (301), the inner side wall of the box body (301) is rotatably connected to a rotating rod (302) via a rotating rod, the outer surface of the rotating rod (302) is fixedly connected to a gear (303), the outer surface of the gear (303) is meshed with a gear plate (304), and one end of the rotating rod (302) is fixedly connected to a rotating disk (305).
2. A temporary support and adjustment device for high altitude horizontal pipeline installation according to claim 1, characterized in that: The support assembly (2) comprises a clamping plate (201), the upper surface of the clamping plate (201) being threadedly connected to the outer surface of the chassis (1) via a bolt (202), the bottom of the clamping plate (201) being fixedly connected to a connecting rod (203), and the outer surface of the bolt (202) being threadedly connected to an A nut (204).
3. A temporary support and adjustment device for high altitude horizontal pipeline installation according to claim 1, characterized in that: The adjustment assembly (6) comprises an A adjustment block (601), the bottom of which is fixedly connected to the upper surface of the connecting plate (5), the surface of the A adjustment block (601) is threadedly connected to a B adjustment block (603) via a fixing bolt (602), and the outer surface of the fixing bolt (602) is threadedly connected to a B nut (604).
4. A temporary support and adjustment device for high altitude horizontal pipeline installation according to claim 1, characterized in that: A U-shaped support plate (7) is fixedly connected to the upper surface of the adjustment component (6), and the number of the U-shaped support plates (7) is two.
5. A temporary support and adjustment device for high altitude horizontal pipeline installation according to claim 4, characterized in that: The inner side wall of the U-shaped support plate (7) is fixedly connected with an anti-slip strip, and the material of the anti-slip strip is rubber.
6. A temporary support and adjustment device for high altitude horizontal pipeline installation according to claim 1, characterized in that: The bottom of the support assembly (2) is fixedly connected to a support plate (4), and the bottom of the support plate (4) is fixedly connected to an anti-slip pad.
Citation Information
Patent Citations
Temporary supporting device for pipeline installation
CN211738214U