Engineering construction hanging basket with high stability

By setting components such as movable plates, vertical pulleys, transverse pulleys and gears in the suspension rack of the construction hanging basket, the problem of hindering the stable release and use of existing construction hanging baskets when encountering reserved holes on the wall is solved, and the hanging basket is realized Stable fit and effective adjustment to the wall.

CN222456747UActive Publication Date: 2025-02-11JIANGSU TIANCHENG MING ROAD CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421143704.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-24
Publication Date
2025-02-11
Estimated Expiration
2034-05-24

Smart Images

  • Figure CN222456747U_ABST
    Figure CN222456747U_ABST
Patent Text Reader

Abstract

The utility model discloses an engineering construction hanging basket with high stability, which comprises a hanging basket body and a suspension bracket, the suspension bracket is arranged on the rear side of an inner cavity of the hanging basket body, and movable plates are arranged on two sides of an inner cavity of the suspension bracket in a sliding manner. According to the engineering construction hanging basket high in stability, the movable plate slides in the hanging frame, and the vertical pulley and the transverse pulley are arranged on the rear side of the movable plate, so that the vertical pulley is easily and transversely adjusted through the transverse pulley, and the effect that the vertical pulley and a reserved hole are conveniently staggered, so that the hanging basket body is stably lowered is achieved; and secondly, the gear and the tooth plate are arranged between the vertical pulley and the transverse pulley, so that when the vertical pulley is transversely adjusted, the transverse pulley can replace the vertical pulley to be attached to the wall through meshing of the gear and the tooth plate, the effect of facilitating steering adjustment can be achieved, and friction caused by transverse movement of the vertical pulley is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction hanging baskets, in particular to an engineering construction hanging basket with high stability. Background Art

[0002] The construction hanging basket is a new type of reusable device for working on the exterior walls of multi-story buildings at high altitudes, which can replace the traditional steel pipe rack, reduce labor intensity, improve work efficiency, and is easy to operate and has advanced performance. The hanging basket is mainly composed of a suspension mechanism, a suspension platform, a hoist, a safety lock, an electrical control box, a steel wire rope, etc. The lifting and lowering of the hanging basket is controlled by the winding and releasing of the steel wire rope.

[0003] In the prior art, in order to facilitate the hanging basket to be placed close to the wall to achieve a stable placement effect, a vertical guide pulley is added to the side of the hanging basket close to the wall. Although this arrangement can facilitate the stable lowering and use of the hanging basket, it is inevitable that there are still some shortcomings in its actual use. For example, the device lacks an adjustment mechanism, so that when the hanging basket relies on the pulley to be stably lowered, there will be a reserved hole in the wall, which will hinder the stable lowering of the hanging basket and the pulley. In order to avoid such problems, a highly stable construction hanging basket is proposed to solve the existing problems. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a highly stable construction hanging basket, which solves the problem that the device lacks an adjustment mechanism, resulting in the hanging basket and the pulley being hindered from being stably lowered for use when encountering a reserved hole in the wall.

[0005] To achieve the above objectives, the utility model is implemented through the following technical solutions: a highly stable engineering construction hanging basket, comprising a hanging basket body and a suspension frame, the suspension frame is arranged on the rear side of the inner cavity of the hanging basket body, movable plates are slidably arranged on both sides of the inner cavity of the suspension frame, the interior of the movable plate is threadedly connected with a first threaded rod through a threaded through hole, one end of the first threaded rod is rotatably connected to a vertical pulley through a bearing, a transverse pulley is slidably arranged on the rear side of the movable plate and on one side of the vertical pulley, a gear is rotatably arranged on the rear side of the movable plate through a bracket, and a tooth plate meshing with the gear is fixedly connected to the opposite sides of the vertical pulley and the transverse pulley.

[0006] Preferably, a bidirectional threaded rod is rotatably connected between the two sides of the inner cavity of the suspension bracket via a bearing, threaded sleeves are threadedly connected to both sides of the surface of the bidirectional threaded rod, and the bottom of the threaded sleeve is fixedly connected to the top of the adjacent movable plate, a sliding groove is opened at the top of the inner cavity of the suspension bracket, and a slider slidably adapted to the sliding groove is fixedly connected to the top of the threaded sleeve.

[0007] Preferably, a second threaded rod is rotatably connected to the rear side of the inner cavity of the hanging basket body through a bearing, a threaded sleeve threadably matched with the second threaded rod is fixedly connected to the top of the suspension frame, limiting rods are fixedly connected to both sides of the top of the suspension frame, and limiting grooves slidably matched with the limiting rods are provided on both sides of the rear side of the inner cavity of the hanging basket body.

[0008] Preferably, a guide rod is fixedly connected to the front side of the vertical pulley, and a guide sliding hole slidably matched with the guide rod is opened on the surface of the movable plate.

[0009] Preferably, a positioning slide rod is fixedly connected to the front side of the transverse pulley, and one end of the positioning slide rod is slidably extended to the front side of the movable plate.

[0010] Preferably, a positioning slide hole slidably matched with the positioning slide rod is opened on the front side of the movable plate.

[0011] Beneficial Effects

[0012] The utility model provides a construction hanging basket with high stability. Compared with the existing technology, it has the following beneficial effects: the utility model slides a movable plate inside the suspension frame, and sets a vertical pulley and a horizontal pulley on the rear side of the movable plate, so that the vertical pulley is easy to adjust horizontally through the horizontal pulley, so as to facilitate the staggered position with the reserved hole, so as to stabilize the lowering of the hanging basket body. Secondly, a gear and a tooth plate are set between the vertical pulley and the horizontal pulley, so that when the vertical pulley is adjusted horizontally, the gear and the tooth plate can be meshed to cause the horizontal pulley to replace the vertical pulley and fit the wall, which can not only achieve the effect of facilitating steering adjustment, but also avoid friction caused by the lateral movement of the vertical pulley;

[0013] Secondly, bidirectional threaded rods and threaded sleeves matched with the movable plates are arranged in the two suspension frames, so that the lateral movement of the vertical pulley can be easily and synchronously adjusted. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the external structure of the utility model;

[0015] Figure 2 It is a rear view of the main structure of the hanging basket of the utility model;

[0016] Figure 3 It is a schematic diagram of the suspension frame structure of the utility model;

[0017] Figure 4 It is a side view of the internal structure of the suspension frame of the utility model;

[0018] Figure 5 It is an expanded view of the internal structure of the movable plate of the utility model;

[0019] Figure 6For this utility model Figure 1 A partial enlarged view of point A in the middle.

[0020] In the figure: 1. hanging basket body; 2. hanging frame; 3. movable plate; 4. first threaded rod; 5. vertical pulley; 6. horizontal pulley; 7. gear; 8. tooth plate; 9. bidirectional threaded rod; 10. threaded sleeve; 11. slide groove; 12. slider; 13. second threaded rod; 14. threaded sleeve; 15. limit rod; 16. limit through groove; 17. guide rod; 18. guide slide hole; 19. positioning slide rod; 20. positioning slide hole. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0022] See also Figure 1-6 The utility model provides a technical solution: a construction hanging basket with high stability, comprising a hanging basket body 1 and a hanging frame 2, the hanging frame 2 is arranged at the rear side of the inner cavity of the hanging basket body 1, and movable plates 3 are slidably arranged on both sides of the inner cavity of the hanging frame 2, and the interior of the movable plate 3 is threadedly connected with a first threaded rod 4 through a threaded through hole, and one end of the first threaded rod 4 is rotatably connected with a vertical pulley 5 through a bearing, and a horizontal pulley 6 is slidably arranged on the rear side of the movable plate 3 and on one side of the vertical pulley 5, and the rear side of the movable plate 3 is threadedly connected with a first threaded rod 4 through a threaded through hole. A gear 7 is provided for rotation through the bracket, and a tooth plate 8 meshing with the gear 7 is fixedly connected to the opposite sides of the vertical pulley 5 and the transverse pulley 6. The front side of the vertical pulley 5 is fixedly connected to a guide rod 17, and the surface of the movable plate 3 is provided with a guide slide hole 18 slidably matched with the guide rod 17. The front side of the transverse pulley 6 is fixedly connected to a positioning slide rod 19, and one end of the positioning slide rod 19 slides and extends to the front side of the movable plate 3. The front side of the movable plate 3 is provided with a positioning slide hole 20 slidably matched with the positioning slide rod 19.

[0023] Furthermore, in order to facilitate the synchronous lateral adjustment of the two lateral pulleys 6, a bidirectional threaded rod 9 is rotatably connected between the two sides of the inner cavity of the suspension frame 2 through a bearing, and a threaded sleeve 10 is threadedly connected on both sides of the surface of the bidirectional threaded rod 9, and the bottom of the threaded sleeve 10 is fixedly connected to the top of the adjacent movable plate 3, and a slide groove 11 is opened at the top of the inner cavity of the suspension frame 2, and a slider 12 that is slidably adapted to the slide groove 11 is fixedly connected to the top of the threaded sleeve 10.

[0024] Furthermore, in order to facilitate the synchronous longitudinal adjustment of the two transverse pulleys 6 so that they can fit the wall in the initial state, a second threaded rod 13 is rotatably connected to the rear side of the inner cavity of the hanging basket body 1 through a bearing, and a threaded sleeve 14 threadedly matched with the second threaded rod 13 is fixedly connected to the top of the suspension frame 2. Limit rods 15 are fixedly connected to both sides of the top of the suspension frame 2, and limit grooves 16 slidably matched with the limit rods 15 are opened on both sides of the rear side of the inner cavity of the hanging basket body 1.

[0025] When in use, the steel cable is released through the lifting device, so that the hanging basket body 1 is lowered along the wall to the specified construction height, and then the second threaded rod 13 is screwed, so that the threaded sleeve 14 on the surface of the second threaded rod 13 drives the hanging frame 2 and the vertical pulley 5 to be close to the wall, so as to facilitate subsequent stable lifting and stable construction use;

[0026] If the vertical pulley 5 is about to encounter a reserved opening such as a window during the descent process, which affects the stable descent of the hanging basket body 1 by the vertical pulley 5, the operator screws the first threaded rod 4 to prompt the first threaded rod 4 to drive the vertical pulley 5 to withdraw forward, and the withdrawal of the vertical pulley 5 drives the tooth plate 8 to engage with the gear 7, so that the transverse pulley 6 replaces the vertical pulley 5 to slide in contact with the wall, and then screws the two-way threaded rod 9 to prompt the threaded sleeve 10 to drive the vertical pulley 5 and the transverse pulley 6 to move horizontally and adjust to the solid wall through the movable plate 3, so that the vertical pulley 5 can be reset, and then the stable lifting guide can be continued.

Claims

1. A construction hanging basket with high stability, comprising a hanging basket body (1) and a hanging frame (2), wherein the hanging frame (2) is arranged at the rear side of the inner cavity of the hanging basket body (1), characterized in that: A movable plate (3) is slidably arranged on both sides of the inner cavity of the suspension frame (2); a first threaded rod (4) is threadedly connected to the inside of the movable plate (3) by opening a threaded through hole; one end of the first threaded rod (4) is rotatably connected to a vertical pulley (5) via a bearing; a transverse pulley (6) is slidably arranged on the rear side of the movable plate (3) and located on one side of the vertical pulley (5); a gear (7) is rotatably arranged on the rear side of the movable plate (3) via a bracket; and a tooth plate (8) meshing with the gear (7) is fixedly connected to the opposite side of the vertical pulley (5) and the transverse pulley (6).

2. A construction hanging basket with high stability according to claim 1, characterized in that: A bidirectional threaded rod (9) is rotatably connected between the two sides of the inner cavity of the suspension frame (2) via bearings, and threaded sleeves (10) are threadedly connected to the two sides of the surface of the bidirectional threaded rod (9), and the bottom of the threaded sleeve (10) is fixedly connected to the top of the adjacent movable plate (3). A sliding groove (11) is opened at the top of the inner cavity of the suspension frame (2), and a sliding block (12) slidably matched with the sliding groove (11) is fixedly connected to the top of the threaded sleeve (10).

3. The construction hanging basket with high stability according to claim 1, characterized in that: A second threaded rod (13) is rotatably connected to the rear side of the inner cavity of the hanging basket body (1) via a bearing, a threaded sleeve (14) threadably matched with the second threaded rod (13) is fixedly connected to the top of the hanging frame (2), limiting rods (15) are fixedly connected to both sides of the top of the hanging frame (2), and limiting grooves (16) slidably matched with the limiting rods (15) are provided on both sides of the rear side of the inner cavity of the hanging basket body (1).

4. The construction hanging basket with high stability according to claim 1, characterized in that: A guide rod (17) is fixedly connected to the front side of the vertical pulley (5), and a guide sliding hole (18) slidably matched with the guide rod (17) is provided on the surface of the movable plate (3).

5. The construction hanging basket with high stability according to claim 1, characterized in that: A positioning slide bar (19) is fixedly connected to the front side of the transverse pulley (6), and one end of the positioning slide bar (19) slides and extends to the front side of the movable plate (3).

6. The construction hanging basket with high stability according to claim 5, characterized in that: The front side of the movable plate (3) is provided with a positioning sliding hole (20) which is slidably matched with the positioning sliding rod (19).