Gas pollution volatilization prevention pipeline bonding operation box

By designing a volatile pipeline bonding operation box for anti-gas pollution, the vacuum extraction interface is used to connect with the vacuum pipeline in the workshop to form a negative pressure environment, solving the impact of VOC volatiles on production during construction, and achieving an efficient and safe construction process.

CN222511081UActive Publication Date: 2025-02-21CLASSIC ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421146402.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2025-02-21
Estimated Expiration
2034-05-23

AI Technical Summary

Technical Problem

In the clean room of electronic industrial factory buildings, the adhesive used during construction will produce a large amount of VOC volatiles, affecting the production process and product quality, and the high concentration of VOC will cause abnormal alarms on the production line and affecting normal production.

Method used

A volatile pipeline bonding operation box for anti-gas pollution is designed, including a hollow internal and transparent box. The box is equipped with temporary fixed end of the pipeline, a vacuum extraction interface and an operating hand hole, and the vacuum pipeline in the workshop is connected to the vacuum pipeline through the vacuum extraction interface. Connect to form a negative pressure environment to prevent VOC from evaporating.

Benefits of technology

Through the design of the operating box, VOC gas can be effectively prevented from evaporating into the production workshop, and continuous construction work is not restricted, construction progress is accelerated, staff health is protected, and equipment operation and product quality can be avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222511081U_ABST
    Figure CN222511081U_ABST
Patent Text Reader

Abstract

The utility model discloses a gas pollution volatilization prevention pipeline bonding operation box which comprises a box body which is hollow inside and integrally transparent, the box wall of the box body is provided with a pipeline temporary fixing end, a vacuum extraction connector and a set of operation hand holes, and the pipeline temporary fixing end enables a pipeline to be transversely arranged right in front of the operation hand holes. According to the utility model, through the connection design of the vacuum pipeline and the operation box in the workshop, a negative pressure environment can be formed in the operation box to prevent VOC gas from volatilizing into the production workshop, continuous construction operation can be realized without limitation, and the construction progress is accelerated; vOC volatilized in the gluing process can be extracted out in the first time, it is guaranteed that the volatile organic compounds cannot pollute the interior of an integrated circuit plant, and the physical health of workers is prevented from being damaged or equipment operation is prevented from being affected; the operation box can be suitable for pipelines with different pipe diameters and different materials, and the adaptability is high; the operation box is portable, small and exquisite, and high in economic applicability; the operation box is transparent and visible, and pipe construction is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of factory building pipeline bonding, and in particular relates to a gas pollution and volatilization-proof pipeline bonding operation box. Background Art

[0002] Clean rooms in electronic industrial plants strictly control AMC and VOC (volatile organic compounds). Relevant production plants need to upgrade and renovate production lines during normal production. During the renovation of production lines, construction should not affect normal production. For example, the partial renovation or expansion of integrated circuit plants is often carried out simultaneously without stopping production. This requires strict environmental control of the production area. The control of the construction process requires strict control of the VOC content. Normal materials with volatiles can be ventilated outdoors to control VOC volatilization within the control standard, but pipes bonded with glue during construction will produce a large amount of VOC volatiles (adhesives are organic solvents that volatilize VOCs), that is, pipe bonding work will inevitably produce VOCs during the glue brushing process. VOC pollutants have a bad impact on production processes and product quality, reducing product yields. In order to control the concentration of organic matter in the area, the daily construction volume can only be reduced to control the VOC content. In addition, the VOC online detector will detect a certain concentration of VOC, which will cause abnormal alarms on the production line, affecting normal production and possibly affecting the product yield. In order to improve economic benefits and construction efficiency, it is very meaningful to design an anti-VOC volatilization pipeline bonding operation box. Utility Model Content

[0003] In view of this, the purpose of the utility model is to provide a gas pollution-proof volatilization pipeline bonding operation box to solve the deficiencies in the prior art.

[0004] In order to achieve the above object, the utility model is implemented by the following technical solutions:

[0005] Provided is a gas pollution-proof volatilization pipeline bonding operation box, comprising a hollow and transparent box body, wherein the box wall is provided with a pipeline temporary fixing end, a vacuum extraction interface and a group of operating hand holes, wherein the pipeline temporary fixing end enables the pipeline to be horizontally placed in front of the operating hand holes.

[0006] For example, in the gas pollution prevention volatilization pipe bonding operation box, the box body is a rectangular body, and the box body includes an upper cover body and a lower cover body that can be opened and closed in a flip manner. The operation hand hole is arranged on the surface where the upper cover body and the lower cover body of the box body are rotatably connected.

[0007] For example, in the gas pollution-proof volatilization pipeline bonding operation box, a sealing brush is provided at the end connection between the pipeline accommodating cavity and the box wall of the box body.

[0008] For example, in the gas pollution prevention volatilization pipe bonding operation box, the sealing brush is located at the opening and closing surfaces of the upper cover body and the lower cover body.

[0009] For example, in the gas pollution-proof volatilization pipeline bonding operation box, a glue bottle or a garbage bag collection port is provided on one side of the bottom of the box body.

[0010] The beneficial effects of the technical solution of the utility model are:

[0011] 1. Through the connection design of the vacuum pipe in the workshop and the operation box, a negative pressure environment can be formed in the operation box to prevent VOC gas from volatilizing into the production workshop, and continuous construction operations can be carried out without restrictions, thus speeding up the construction progress;

[0012] 2. VOCs emitted during the gluing process can be extracted immediately to ensure that volatile organic compounds will not pollute the integrated circuit factory, thereby avoiding damage to the health of workers or affecting equipment operation;

[0013] 3. The operation box can be used for pipes of different diameters and materials, and has strong adaptability;

[0014] 4. The operating box is portable and compact, economical and applicable;

[0015] 5. The operation box is transparent and visible, which is conducive to pipe construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] To further illustrate the above-mentioned purpose, structural features and effects of the present invention, the present invention will be described in detail below with reference to the accompanying drawings.

[0017] Figure 1 This is a three-dimensional diagram of a preferred embodiment of the utility model when it is closed;

[0018] Figure 2 This is a rear side view of a preferred embodiment of the utility model;

[0019] In the figure: 1. Box body; 2. Vacuum extraction interface; 3. Operation hand hole; 4. Upper cover body; 5. Lower cover body; 6. Hinge; 7. Lock; 8. Sealing brush; 9. Glue bottle; 10. UPVC pipe interface and straight pipe; 11. Construction pipe. DETAILED DESCRIPTION

[0020] The terms "utility model" and "the present utility model" used in this specification are intended to refer broadly to all subject matter of this specification and any patent claims below. Statements containing these terms should not be understood to limit the subject matter described herein or to limit the meaning or scope of any patent claim below. In addition, this specification does not attempt to describe or limit the subject matter covered by any claim of any specific component, paragraph, statement or figure of this application. The subject matter should be understood with reference to the entire specification, all drawings and any claims below. The present utility model may have other embodiments and be practiced or implemented in other ways. Moreover, it should be understood that the wording and terminology used herein are for illustrative purposes and should not be considered as limiting.

[0021] The details of the present invention will now be discussed with reference to the accompanying drawings which illustrate the present invention by way of example only. In the accompanying drawings, similar features or components may be marked with the same reference numerals.

[0022] The use of "including", "having" and "comprising" and variations thereof herein is meant to include the items listed thereafter and their equivalents and additional items. Although reference may be made to directions such as above, below, upward, downward, backward, bottom, top, front, back, etc. in describing the drawings, for convenience, reference is made relative to the drawings. These directions are not intended to literally accept or limit the present invention in any form. In addition, terms such as "first", "second", "third", etc. are used herein for illustrative purposes and are not intended to indicate or imply importance or significance.

[0023] See also Figure 1 As shown, the utility model anti-gas pollution volatilization pipeline bonding operation box includes a hollow and transparent box body 1. The transparent box body ensures that the internal operation can be observed, and can be made of transparent acrylic material. The box wall of the box body 1 is provided with a temporary fixed end of the pipeline, a vacuum extraction interface 2 and a group of operating hand holes 3. The vacuum extraction interface 2 is preferably arranged on the top of the box body 1. The vacuum extraction interface 2 is connected to the workshop reserved cleaning vacuum pipeline system through a pipeline, the purpose of which is to extract vacuum, thereby maintaining the negative pressure inside the box body 1. The temporary fixed end of the pipeline makes the pipeline horizontally placed in front of the operating hand hole 3, and the personnel's arm extends into the operation box through the operating hand hole 3 to perform the pipeline bonding operation.

[0024] In a preferred embodiment, the box body 1 is a rectangular body, and the box body 1 includes an upper cover body 4 and a lower cover body 5 that can be flipped open and closed, which can be realized by using hinges 6 and locks 7 that are relatively arranged as shown in the figure, and the operating hand hole 3 is provided on the surface where the upper cover body 4 and the lower cover body 5 of the box body 1 are rotatably connected. Before operation, open the transparent acrylic operating box cover to facilitate the entire pipe to enter the box.

[0025] Continuing to refer to the figure, a sealing brush 8 is provided at the temporary fixed end 1 of the pipeline, and a certain airtightness can be maintained by using the sealing brush 8 after the size of the pipeline changes. Further, the sealing brush 8 is located at the opening and closing surface of the upper cover body 4 and the lower cover body 5.

[0026] A glue bottle 9 or a garbage bag collection port is provided on one side of the bottom of the box body 1. The glue bottle 9 is opened in the operation box and a glue brush is used to perform pipe bonding construction. Specifically, a reserved interface can be used to connect with the glue bottle 9.

[0027] During operation, open the upper cover of the transparent acrylic operation box, place the UPVC pipe interface and straight pipe 10 to be bonded into the operation box, make it airtight with the sealing brush 8, then connect the reserved cleaning vacuum pipe in the workshop with the vacuum extraction interface 2, extract the vacuum to maintain the negative pressure inside the box, and then connect the reserved interface at the bottom of the box with the glue bottle 9. The construction worker's arm extends into the operation box through the operating hand hole 3, extends the glue brush into the glue bottle 9 to apply glue, and then directly bonds the construction pipe 11. After the pipe connection is completed, wipe off the excess glue with a dust-free cloth, place it in the box, and seal it out after the construction is completed. This can isolate the VOC volatiles generated during construction from the influence of the workshop environment.

[0028] The above are only preferred embodiments of the present invention, and do not limit the implementation mode and protection scope of the present invention. Those skilled in the art should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the description and illustrations of the present invention should be included in the protection scope of the present invention.

Claims

1. A gas pollution-proof volatilization pipeline bonding operation box, characterized in that: It comprises a hollow and transparent box body, wherein the box wall is provided with a temporary fixing end of a pipe, a vacuum extraction interface and a group of operating hand holes, wherein the temporary fixing end of the pipe enables the pipe to be horizontally placed in front of the operating hand holes.

2. The gas pollution-proof volatilization pipeline bonding operation box as claimed in claim 1, characterized in that: The box body is a rectangular body, and comprises an upper cover body and a lower cover body that can be opened and closed in a flipping manner. The operating hand hole is arranged on the surface where the upper cover body and the lower cover body of the box body are rotatably connected.

3. The gas pollution-proof volatilization pipeline bonding operation box as claimed in claim 2, characterized in that: A sealing brush is provided at the temporary fixing end of the pipeline.

4. The gas pollution-proof volatilization pipeline bonding operation box as claimed in claim 3, characterized in that: The sealing brush is located at the opening and closing surfaces of the upper cover body and the lower cover body.

5. The gas pollution-proof volatilization pipeline bonding operation box as claimed in claim 1, characterized in that: A glue bottle or garbage bag collecting opening is arranged on one side of the bottom of the box body.