Pre-embedded steel bar positioning and restraining component for wall body after permanent and temporary combination of beam support
By combining beam support in civil construction, the wall embedded steel bar positioning constraint component is used to use the combination of steel bar positioning angle steel and connecting rods, the problem of embedded steel bar offset is solved, and construction efficiency and embedded steel bars are improved. stability.
Patent Information
- Application Number
- CN202421308547.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2034-06-11
AI Technical Summary
During the civil construction process, the embedded steel bars cannot be observed in real time at the bottom joint between the beam body and the top plate, resulting in the possible deviation of the embedded steel bars, affecting the later construction operation of the side walls and reducing construction efficiency.
After the beam brace is combined, the wall is positioned and restrained by the positioning and restraining components, including the restraining frame and connecting components. The constraint frame consists of steel bar positioning angle steel and connecting rods, and quickly connect and position through bolted connection holes and connecting components to ensure the stability of the embedded steel bars.
Through the mutual cooperation between the steel bar positioning angle steel and the connecting rod, the support positioning of the embedded steel bar is achieved, the possibility of the embedded steel bar offset is reduced, and the construction efficiency and stability of the embedded steel bar are improved.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of pre-embedded steel bar positioning, and in particular to a beam-support permanent-temporary combination used as a wall pre-embedded steel bar positioning constraint component. Background Art
[0002] The combination of permanent and temporary facilities is a construction method that aims to reduce repeated waste of materials through early planning and reasonable allocation and utilization of various resources. This method combines temporary facilities with permanent facilities in engineering construction for one construction, allowing some permanent facilities to be used during the construction process. The combination of permanent and temporary facilities has the advantages of improving material utilization and saving engineering costs.
[0003] During civil construction, it is sometimes necessary to make the top plate and top beam first, and then make the wall below. During the construction process, the steel bars need to be embedded in the top plate or top beam, and then peeled off from the concrete protective layer for connection after the earthwork is excavated in the later stage. However, since the joint position is embedded at the bottom of the beam and the top plate, it is impossible to observe whether the embedded steel bars are offset at any time during the pouring of the beam, resulting in the inability to correct the offset of the embedded steel bars in time, affecting the construction operation of the side wall in the later stage and reducing the construction efficiency. Utility Model Content
[0004] In order to improve the stability of the embedded steel bars and reduce the possibility of the embedded steel bars being offset, the present application provides a beam-support permanent and temporary combination to serve as a positioning and restraining component for the embedded steel bars in the wall.
[0005] The present application provides a beam-support permanent and temporary combination for wall embedded steel bar positioning and restraining components using the following technical solutions:
[0006] A beam-support permanent-temporary combination is used to form a wall pre-embedded steel bar positioning constraint component, comprising a constraint frame, the constraint frame comprising steel bar positioning angle steels and connecting rods, a plurality of steel bar positioning angle steels are arranged in parallel, both ends of the steel bar positioning angle steels are provided with bolt connection holes, two connecting rods are arranged in parallel, the two connecting rods are arranged in one-to-one correspondence with the two bolt connection holes on the steel bar positioning angle steels, the connecting rods pass through the bolt connection holes and are connected to the steel bar positioning angle steels through a connecting assembly, and a plurality of steel bar fixing holes are provided on the steel bar positioning angle steels.
[0007] By adopting the above technical solution, before pouring the ring frame beam, the constraint frame is placed inside the mold of the ring frame beam, and a number of embedded steel bars are passed through the corresponding steel bar fixing holes on the steel bar positioning angle steel. When pouring the ring frame beam, the steel bar positioning angle steel fixes the embedded steel bars to avoid the deflection of the embedded steel bars during the pouring process. Through the mutual cooperation of the steel bar positioning angle steel and the connecting rod, the support positioning of the embedded steel bars is achieved, which has the effect of improving the stability of the embedded steel bars and reducing the possibility of the embedded steel bars being offset.
[0008] Optionally, two constraint frames are arranged in parallel, the steel bar positioning angle steels in the two constraint frames are arranged in one-to-one correspondence, and a horizontal connecting steel sheet is connected between the two corresponding steel bar positioning angle steels.
[0009] By adopting the above technical solution, the two sets of constraint frames are connected into a whole through the horizontal connecting steel plates, so that the overall structural strength of the frame is improved and the structural stability when supporting the constraint steel bars is enhanced.
[0010] Optionally, a plurality of support rings are connected to the steel bar positioning angle steel, and the plurality of support rings correspond to and are connected to the plurality of steel bar fixing holes one by one, and the central axis of the support ring is arranged parallel to the length direction of the connecting rod.
[0011] By adopting the above technical solution, the support ring supports the embedded steel bars, thereby reducing the possibility of bending of the embedded steel bars at the connection between the steel bar positioning angle steel.
[0012] Optionally, a connecting ring plate is connected to the outer ring wall of the support ring, the connecting ring plate is vertically arranged to the central axis of the support ring, the connecting ring plate is connected to the steel bar positioning angle steel via a connecting piece, and the support ring is provided with several ones with different diameters.
[0013] By adopting the above technical solution, the support ring is connected to the steel bar positioning angle plate through the connecting ring plate. Since the support rings are provided with several different diameters, the restraining member can be suitable for embedded steel bars of different diameters.
[0014] Optionally, the connecting assembly includes a connecting nut, the connecting rod is provided with a thread, the connecting nut is threadedly connected to the connecting rod, one connecting nut is provided on both sides of each of the steel bar positioning angle steels, and the connecting nut is tightly pressed against the steel bar positioning angle steels.
[0015] By adopting the above technical solution, the connecting nut is threadedly connected to the connecting rod, and two connecting nuts are arranged on both sides of the steel bar positioning angle steel, thereby realizing the positioning and fixing of the steel bar positioning angle steel.
[0016] Optionally, the connecting assembly includes an installation box, an abutment arc block and a plug-in rod, the installation box is connected to the bottom of the steel bar positioning angle steel, and connecting holes are opened on the opposite end surfaces of the installation box. A number of abutment arc blocks are arranged in the installation box, and the central axes of the abutment arc blocks coincide with the central axis of the installation box. A plug-in rod is connected to the side of the abutment arc block close to the inner arc wall of the installation box, and the plug-in rod is arranged along the radial direction of the installation box. The plug-in rod is slidably plugged into the installation box, and an adjusting member for driving the abutment arc block to move along the radial direction of the installation box is arranged in the installation box.
[0017] By adopting the above technical solution, when connecting the steel bar positioning angle steel and the connecting rod, the connecting rod is passed through the steel bar positioning angle steel through the bolt connection hole and connected to the installation below it. The abutment arc block is driven by the adjustment member to move along the radius direction of the installation box toward the direction of the connecting rod until the abutment arc blocks clamp the connecting rod, thereby realizing the rapid connection and fixation of the connecting rod and the steel bar positioning angle steel.
[0018] Optionally, the adjusting member includes an adjusting screw, an abutment ring and a connecting tension spring, the abutment ring is slidably arranged in the installation box, the adjusting screw is threadedly connected to the installation box, the length direction of the adjusting screw is arranged parallel to the central axis of the installation box, one end of the adjusting screw extends into the installation box and is rotatably connected to the abutment ring, a first abutment arc surface is circumferentially provided on the inner ring wall of the abutment ring close to the abutment arc block, a second abutment arc surface is provided on the abutment arc block close to the abutment ring, the first abutment arc surface and the second abutment arc surface are slidably fitted together, the connecting tension spring is sleeved on the plug-in rod, one end of the connecting tension spring is connected to the inner ring wall of the installation box, and the other end is connected to the abutment arc block.
[0019] By adopting the above technical solution, the adjusting screw is screwed, and the abutment ring moves in the installation box under the driving action of the adjusting screw, and the first abutment arc surface of the abutment ring and the second abutment arc surface of the abutment arc block slide relative to each other, and the abutment arc block moves toward the direction close to the central axis of the installation box under the push of the abutment ring, and the connecting tension spring stretches to accumulate elastic potential energy. The simultaneous synchronous driving of several abutment arc blocks is achieved by setting the abutment ring and the adjusting screw.
[0020] Optionally, the steel bar positioning angle steel includes two angle steel plates disposed perpendicular to each other, and a reinforcing rib is connected between the two angle steel plates.
[0021] By adopting the above technical solution, the arrangement of the reinforced ribs increases the structural strength of the steel bar positioning angle plate, and improves its structural stability when supporting the embedded steel bars.
[0022] In summary, the present application includes at least one of the following beneficial technical effects:
[0023] 1. Through the cooperation of the steel bar positioning angle steel and the connecting rod, the support positioning of the embedded steel bar is realized, which has the effect of improving the stability of the embedded steel bar and reducing the possibility of the embedded steel bar being offset;
[0024] 2. The support ring supports the embedded steel bars, reducing the possibility of bending of the embedded steel bars at the connection with the steel bar positioning angle steel;
[0025] 3. The setting of the reinforced ribs increases the structural strength of the steel bar positioning angle plate and improves its structural stability when supporting the embedded steel bars. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application for reflecting a beam-support permanent and temporary combination to serve as a wall pre-embedded steel bar positioning and restraining component.
[0027] Figure 2 It is a structural schematic diagram used to reflect the bolt connection hole in the embodiment of the present application.
[0028] Figure 3 It is a structural schematic diagram used in Example 2 of the present application to embody a beam-support permanent and temporary combination to serve as a wall pre-embedded steel bar positioning and restraining component.
[0029] Figure 4 It is a partial cross-sectional view used to illustrate the connection component in Example 2 of the present application.
[0030] Figure 5 yes Figure 4 Enlarged view of part A in the middle.
[0031] Explanation of the reference numerals: 1. Steel bar positioning angle steel; 101. Bolt connection hole; 102. Steel bar fixing hole; 2. Connecting rod; 3. Connecting assembly; 31. Connecting nut; 32. Mounting box; 321. Connecting hole; 322. Plug-in hole; 33. Abutment ring; 34. Adjusting screw; 35. Abutment arc block; 36. Plug-in rod; 37. Connecting tension spring; 38. Connecting ear plate; 4. Embedded steel bar; 41. Joint; 5. Wall steel bar; 6. Support ring; 7. Connecting ring plate; 8. First abutment arc surface; 9. Second abutment arc surface; 10. Reinforcing rib; 11. Horizontal connecting steel sheet. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1-5 The present application is further described in detail. The embodiment of the present application provides a beam-support combination for a wall pre-embedded steel bar positioning and restraining component, which has the effect of improving the stability of the pre-embedded steel bar 4 and reducing the possibility of the pre-embedded steel bar 4 being offset.
[0033] Example 1
[0034] Reference Figure 1 and Figure 2 A beam support is combined with a permanent and temporary beam support to form a wall pre-embedded steel bar positioning constraint component, which includes a constraint frame and a connection component 3. The constraint frame includes a steel bar positioning angle steel 1 and a connection rod 2. The steel bar positioning angle steel 1 includes a vertical plate and a horizontal plate. The horizontal plate is vertically arranged on the bottom edge of the vertical plate. A bolt connection hole 101 is provided at both ends of the horizontal plate in the length direction. A plurality of steel bar fixing holes 102 are provided on the horizontal plate at equal intervals along the length direction. The spacing between the steel bar fixing holes 102 and the diameter of the steel bar fixing holes 102 are set according to actual construction needs.
[0035] Reference Figure 1 , a number of steel bar positioning angle steels 1 are arranged in parallel, and a connecting rod 2 is arranged at both ends of the steel bar positioning angle steel 1 in the length direction, and the connecting rod 2 is arranged perpendicular to the steel bar positioning angle steel 1. The two connecting rods 2 are arranged in a one-to-one correspondence with the two bolt connection holes 101 at both ends of the length direction of the steel bar positioning angle steel 1, and the connecting rod 2 passes through the horizontal plate through the bolt connection holes 101. The connecting assembly 3 is arranged on the connecting rod 2, and the connecting assembly 3 includes a connecting nut 31. A threaded section is arranged on the connecting rod 2, and the connecting nut 31 is threadedly connected to the connecting rod 2. One connecting nut 31 is arranged on both sides of each steel bar positioning angle steel 1, and the connecting nut 31 is arranged to fit the horizontal plate.
[0036] Reference Figure 1 and Figure 2 Two constraint frames are arranged in parallel, and the plurality of steel bar positioning angle steels 1 in the two sets of constraint frames are arranged one by one. A horizontal connecting steel sheet 11 is connected between the corresponding steel bar positioning angle steels 1, and the horizontal connecting steel sheet 11 is arranged vertically with the steel bar positioning angle steels 1. Both ends of the horizontal connecting steel sheet 11 are sleeved on the connecting rod 2.
[0037] Reference Figure 1 and Figure 2Before pouring the ring frame beam, the two connected sets of constraint frames are placed in the mold of the ring frame beam, and the steel bar positioning angle steel 1 is connected to the internal steel bars of the ring frame beam (not shown in the attached figure). Two rows of vertically arranged embedded steel bars 4 are inserted into the corresponding steel bar fixing holes 102 on the steel bar positioning angle steel 1. The embedded steel bars 4 are connected to the internal steel bars of the ring frame beam, and a joint 41 is provided at the bottom of the embedded steel bars 4. When connecting with the wall steel bars 5, only the top of the wall steel bars 5 need to be inserted into the joint 41 at the bottom of the embedded steel bars 4. The constraint frame connects several embedded steel bars 4 into a whole, and the steel bar positioning angle steel 1 positions and supports the embedded steel bars 4, which reduces the possibility of deformation and tilting of the embedded steel bars 4 due to impact during the construction and pouring process, improves the anti-deviation ability of the embedded steel bars 4, and helps the construction and production of the lower wall in subsequent operations. In actual application, the number of layers of the steel bar positioning angle steel 1 of the overall constraint steel frame can be adjusted according to the embedded steel bars 4 of different lengths, which is simple to use.
[0038] The implementation principle of a beam support in Example 1 of the present application, which is a permanent and temporary combination and then used as a pre-embedded steel bar positioning and restraining component for the wall, is as follows: before pouring the ring frame beam, the restraining frame is placed in the mold of the ring frame beam, and the steel bar positioning angle steel 1 is connected to the internal steel bars. The two vertically arranged rows of embedded steel bars 4 are inserted into the corresponding steel bar fixing holes 102 on the steel bar positioning angle steel 1. The steel bar positioning angle steel 1 positions and supports the embedded steel bars 4, reducing the possibility of the embedded steel bars 4 being deformed and tilted by impact during the construction and pouring process, which is helpful for the construction and production of the lower wall in subsequent operations.
[0039] Example 2
[0040] Reference Figure 3 , the difference between Example 2 and Example 1 is that each steel bar positioning angle steel 1 is provided with a plurality of support rings 6, and the plurality of support rings 6 are arranged in one-to-one correspondence with the plurality of steel bar fixing holes 102. A connecting ring plate 7 is fixedly connected to the outer ring wall of the support ring 6, and the connecting ring plate 7 is connected to the horizontal plate of the steel bar positioning angle steel 1 by bolts. The support ring 6 is arranged in the steel bar fixing hole 102, and the central axis of the support ring 6 coincides with the central axis of the steel bar fixing hole 102. The support ring 6 has a plurality of different diameters. A reinforcing rib plate 10 for increasing the structural strength is fixedly connected between the horizontal plate and the vertical plate of the steel bar positioning angle steel 1, and the reinforcing rib plate 10 is arranged perpendicular to both the horizontal plate and the vertical plate.
[0041] Reference Figure 4 and Figure 5The connection assembly 3 includes a mounting box 32, an abutment ring 33, an adjusting screw 34, an abutment arc block 35, a plug-in rod 36, a connecting tension spring 37 and a connecting ear plate 38. Two mounting boxes 32 are arranged on the bottom surface of the steel bar positioning angle steel 1, and the two mounting boxes 32 are arranged in a one-to-one correspondence with the two bolt connection holes 101. The mounting box 32 is in a hollow cylindrical shape, and the central axis of the mounting box 32 is arranged to coincide with the central axis of the bolt connection hole 101. A connecting hole 321 is provided through the opposite end surfaces of the mounting box 32, and the connecting hole 321 is connected to the bolt connection hole 101. A plurality of connecting ear plates 38 are fixedly connected to one end of the mounting box 32 close to the steel bar.
[0042] Reference Figure 4 and Figure 5 , the abutment ring 33 is slidably arranged in the installation box 32, and the outer ring wall of the abutment ring 33 is slidably fitted with the inner ring wall of the installation box 32. A plurality of abutment arc blocks 35 are arranged in the installation box 32, and the central axis of the abutment arc block 35 is arranged to coincide with the central axis of the installation box 32. A plug-in rod 36 is fixedly connected to the outer arc wall of the abutment arc block 35, and the plug-in rod 36 is arranged along the radial direction of the installation box 32. A plurality of plug-in holes 322 are provided on the inner ring wall of the installation box 32, and the plurality of plug-in holes 322 are arranged one by one with the plurality of plug-in rods 36, and the end of the plug-in rod 36 is slidably inserted into the plug-in holes 322. A connecting tension spring 37 is sleeved on the plug-in rod 36, and one end of the connecting tension spring 37 is fixedly connected to the inner ring wall of the installation box 32, and the other end is fixedly connected to the abutment arc block 35.
[0043] Reference Figure 4 and Figure 5 A first abutting arc surface 8 is provided on the inner ring wall of the abutting ring 33 near the abutting arc block 35, and a second abutting arc surface 9 is provided on the abutting arc block 35 near the abutting ring 33. The first abutting arc surface 8 and the second abutting arc surface 9 are slidably fitted. The adjusting screw 34 is threadedly connected to the installation box 32, and the length direction of the adjusting screw 34 is parallel to the central axis direction of the installation box 32. One end of the adjusting screw 34 extends into the installation box 32 and is rotatably connected to the abutting ring 33.
[0044] Reference Figure 3 For embedded steel bars 4 of different diameters, support rings 6 of corresponding diameters are connected to the steel bar positioning angle plate through connecting ring plates 7. The support rings 6 support and limit the embedded steel bars 4, further reducing the possibility of bending of the embedded steel bars 4, and also reducing the possibility of bending of the embedded steel bars 4 at the contact position with the steel bar positioning angle steel 1.
[0045] Reference Figure 4 and Figure 5When connecting the connecting rod 2 and the steel bar positioning angle steel 1, the connecting rod 2 is passed through the bolt connection hole 101 and the connecting hole 321. Move the steel bar positioning angle steel 1 to a suitable position on the connecting rod 2, screw the adjusting screw 34, and the abutment ring 33 moves along the central axis of the installation box 32 under the driving of the adjusting screw 34 and the limiting of the installation box 32. Under the pushing action of the abutment ring 33, a plurality of abutment arc blocks 35 simultaneously move along the radial direction of the installation box 32, and the connecting tension spring 37 stretches to accumulate elastic potential energy. A plurality of abutment arc blocks 35 simultaneously clamp the connecting rod 2, thereby realizing the rapid fixation of the steel bar positioning angle steel 1.
[0046] The implementation principle of the beam support permanent and temporary combination as the wall pre-embedded steel bar positioning and restraining member in Example 2 of the present application is: for pre-embedded steel bars 4 of different diameters, the support ring 6 of the corresponding diameter is connected to the steel bar positioning angle plate. The support ring 6 supports and limits the pre-embedded steel bars 4, further reducing the possibility of the pre-embedded steel bars 4 being bent.
[0047] When connecting the connecting rod 2 and the steel bar positioning angle steel 1, the connecting rod 2 is passed through the bolt connection hole 101 and the connecting hole 321. The steel bar positioning angle steel 1 is moved to a suitable position on the connecting rod 2, and the adjusting screw 34 is screwed, and the plurality of abutting arc blocks 35 simultaneously clamp the connecting rod 2, thereby realizing the rapid fixation of the steel bar positioning angle steel 1.
[0048] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A beam-support permanent and temporary combination is used as a wall pre-embedded steel bar positioning and restraining component, characterized by: The invention comprises a constraint frame, wherein the constraint frame comprises a steel bar positioning angle steel (1) and a connecting rod (2), wherein a plurality of steel bar positioning angle steels (1) are arranged in parallel, and bolt connection holes (101) are provided at both ends of the steel bar positioning angle steel (1), and two connecting rods (2) are arranged in parallel, and the two connecting rods (2) are arranged in a one-to-one correspondence with the two bolt connection holes (101) on the steel bar positioning angle steel (1), and the connecting rod (2) passes through the bolt connection holes (101) and is connected to the steel bar positioning angle steel (1) through a connecting assembly (3), and a plurality of steel bar fixing holes (102) are provided on the steel bar positioning angle steel (1).
2. According to claim 1, a beam-support permanent-temporary combination is used as a wall pre-embedded steel bar positioning and restraining component, characterized in that: Two restraining frames are arranged in parallel, the steel bar positioning angle steels (1) in the two restraining frames are arranged in one-to-one correspondence, and a horizontal connecting steel sheet (11) is connected between the two corresponding steel bar positioning angle steels (1).
3. According to claim 1, a beam-support permanent-temporary combination is used as a wall pre-embedded steel bar positioning and restraining component, characterized in that: A plurality of support rings (6) are connected to the steel bar positioning angle steel (1), and the plurality of support rings (6) correspond to and are connected to the plurality of steel bar fixing holes (102) one by one, and the central axis of the support ring (6) is arranged parallel to the length direction of the connecting rod (2).
4. According to claim 3, a beam-support permanent-temporary combination is used as a wall pre-embedded steel bar positioning and restraining component, characterized in that: A connecting ring plate (7) is connected to the outer ring wall of the support ring (6), the connecting ring plate (7) is arranged perpendicular to the central axis of the support ring (6), the connecting ring plate (7) is connected to the steel bar positioning angle steel (1) via a connecting piece, and the support ring (6) is provided with a plurality of different diameters.
5. According to claim 1, a beam-support permanent-temporary combination is used as a wall pre-embedded steel bar positioning and restraining component, characterized in that: The connection assembly (3) comprises a connection nut (31), the connection rod (2) is provided with a thread, the connection nut (31) is threadedly connected to the connection rod (2), one connection nut (31) is provided on both sides of each of the steel bar positioning angle steels (1), and the connection nut (31) is tightly pressed against the steel bar positioning angle steels (1).
6. According to claim 1, a beam-support permanent-temporary combination is used as a wall pre-embedded steel bar positioning and restraining component, characterized in that: The connection assembly (3) comprises an installation box (32), an abutting arc block (35) and a plug-in rod (36); the installation box (32) is connected to the bottom of the steel bar positioning angle steel (1); two opposite end surfaces of the installation box (32) are provided with connecting holes (321); a plurality of abutting arc blocks (35) are arranged in the installation box (32); the central axes of the plurality of abutting arc blocks (35) are arranged to coincide with the central axis of the installation box (32); a plug-in rod (36) is connected to one side of the abutting arc block (35) close to the inner arc wall of the installation box (32); the plug-in rod (36) is arranged along the radial direction of the installation box (32); the plug-in rod (36) is slidably plugged with the installation box (32); and an adjusting member for driving the abutting arc block (35) to move along the radial direction of the installation box (32) is arranged in the installation box (32).
7. The beam-support permanent-temporary combination as claimed in claim 6 is used as a pre-embedded steel bar positioning and restraining member for the wall, characterized in that: The adjusting member comprises an adjusting screw (34), an abutting ring (33) and a connecting tension spring (37); the abutting ring (33) is slidably arranged in the installation box (32); the adjusting screw (34) is threadedly connected to the installation box (32); the length direction of the adjusting screw (34) is arranged parallel to the central axis of the installation box (32); one end of the adjusting screw (34) extends into the installation box (32) and is rotatably connected to the abutting ring (33); the abutting ring (33) is close to the installation box (32); A first abutting arc surface (8) is provided on the inner ring wall on one side of the abutting arc block (35) along the circumferential direction, and a second abutting arc surface (9) is provided on the side of the abutting arc block (35) close to the abutting ring (33). The first abutting arc surface (8) and the second abutting arc surface (9) are slidably fitted together, and the connecting tension spring (37) is sleeved on the plug-in rod (36). One end of the connecting tension spring (37) is connected to the inner ring wall of the installation box (32), and the other end is connected to the abutting arc block (35).
8. According to claim 1, a beam-support permanent-temporary combination is used as a wall pre-embedded steel bar positioning and restraining component, characterized in that: The steel bar positioning angle steel (1) comprises two angle steel plates arranged perpendicular to each other, and a reinforcing rib plate (10) is connected between the two angle steel plates.