In-place device suitable for high-altitude fish-bellied steel corridor of old renovation project

By designing a seating device suitable for high-altitude fish belly steel corridors, the power device and lifting device are used to achieve efficient installation of steel corridors, which solves the problems of insufficient equipment, difficulty in controlling accuracy and space limitations in traditional construction, and improves construction Safety and efficiency.

CN222525921UActive Publication Date: 2025-02-25GUANGZHOU NO 1 CONSTR ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421113667.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-21
Publication Date
2025-02-25
Estimated Expiration
2034-05-21

AI Technical Summary

Technical Problem

The high-altitude hoisting construction of traditional steel structure corridors has problems such as insufficient equipment, difficulty in controlling installation accuracy and limited space, especially in super-high-rise buildings and old-town renovation projects.

Method used

A positioning device suitable for high-altitude fish belly steel corridors is designed. By assembling fish belly steel corridors on the base tower floor, and using a power device to drive the guide beam to extend out along the pulley track direction, and the guide beam is maintained in combination with the lifting device. In horizontal state, the steel corridor is assembled and pushed to a predetermined position in the tower with the positioning device.

Benefits of technology

It effectively avoids the risks of traditional high-altitude lifting operations, solves the problem of space limitations, improves installation accuracy and construction safety, shortens the construction period, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222525921U_ABST
    Figure CN222525921U_ABST
Patent Text Reader

Abstract

An in-place device suitable for an old renovation project high-altitude fish-belly type steel corridor comprises the fish-belly type steel corridor, the fish-belly type steel corridor is assembled on a base tower floor, a guide beam is arranged at the extending front end of the fish-belly type steel corridor in the erecting opening direction in an extending mode, and pulley rails are arranged on floors of a base tower and a standard tower in the same direction; a power device for driving the guide beam to stretch out in the direction of the pulley track is arranged on a floor of the base tower, a lifting device for keeping the guide beam in a horizontal push-out state is arranged on the standard tower, and it is ensured that the pushed-out guide beam is in butt joint with the pulley track of the standard tower. The steel corridor and the in-place device are spliced together in the tower building and pushed to the preset position of the corridor through the power device, the risk of high-altitude hoisting operation of a traditional steel structure corridor is effectively avoided, and the problem that a traditional corridor overall climbing installation mode is limited by space, and the construction cost is low is solved. And integral construction of the corridor cannot be completed in an area with dense buildings or an old engineering building.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of high-altitude corridors, and in particular to a positioning device suitable for high-altitude fish-belly steel corridors in old renovation projects. Background Art

[0002] With the booming construction industry and the accelerating urban development, more and more high-rise buildings with corridors are widely used in various public and commercial buildings. Double-tower buildings and even multi-tower structures are becoming more and more common, and corridors are often used to connect multiple towers. Generally speaking, the height of steel structure corridors is very high and has a large span. Large-tonnage cranes can be used in combination with tower cranes to assemble various parts. Therefore, traditional steel structure corridor construction generally adopts the method of ground assembly, overall hydraulic lifting, and high-altitude extension installation.

[0003] Although this traditional installation system of the overall climbing of the corridor has been widely used in various engineering projects, it still has the following disadvantages:

[0004] (1) Super high-rise buildings are tall and steel corridors are heavy, so ordinary lifting equipment cannot be used for the construction of super high-rise corridors.

[0005] (2) The accuracy of the overall hoisting positioning of the steel corridor is difficult to control, which is not conducive to the later installation of the steel corridor supports. In addition, the fish-belly-shaped corridor structure is wide at the top and narrow at the bottom. The traditional corridor in-place construction method is difficult to meet the installation accuracy requirements of the support nodes.

[0006] (3) For large-scale super-high-rise building interior corridors and some super-large building renovation projects involving on-site installation of high-rise corridors, the traditional installation method of overall climbing of the corridor is limited by space, and large lifting equipment cannot complete the overall lifting construction of the corridor in areas with dense traffic or inside the building. Utility Model Content

[0007] The utility model proposes a positioning device for high-altitude fish-belly steel corridors in old renovation projects, which overcomes the space limitation problem in the installation system of high-rise corridors or indoor corridors in buildings in old renovation projects, simplifies the overall top-pushing and translational installation construction process of the corridor, reduces the amount of high-altitude operations, improves the safety of on-site construction, shortens the construction period, improves construction efficiency, and completes the installation of the steel corridor in one go.

[0008] In order to solve the above technical problems, the technical solution adopted by the utility model is:

[0009] A positioning device for a high-altitude fish-belly steel corridor suitable for an old renovation project is used to erect a steel corridor between a base tower and a standard tower, comprising a fish-belly steel corridor, which is assembled on the floor of the base tower, and an erection opening is relatively arranged between the base tower and the standard tower, a guide beam is arranged at the extended front end of the fish-belly steel corridor extending along the erection opening direction, pulley tracks are arranged in the same direction on the floors of the base tower and the standard tower, a power device for driving the guide beam to be extended along the pulley track direction is arranged on the floor of the base tower, and a lifting device for keeping the guide beam in a horizontally pushed-out state is arranged on the standard tower, so as to ensure that the pushed-out guide beam is connected to the pulley track of the standard tower.

[0010] Furthermore, the front and rear ends of the fish-belly steel corridor are vertically provided with reinforcing columns, the guide beam is horizontally arranged on the bottom side of the reinforcing columns of the front end of the fish-belly steel corridor, and the bottom side of the reinforcing columns of the rear end of the fish-belly steel corridor is provided with walking rollers that cooperate with the rolling of the floor.

[0011] Furthermore, the pulley track includes a plurality of transmission rollers which are evenly spaced and arranged in a straight line on the floors of the base tower and the standard tower, and a channel steel slide groove is arranged on the bottom side of the guide beam along its length direction, and the channel steel slide groove is in limited sliding cooperation with the transmission rollers.

[0012] Furthermore, the power device includes a first winch arranged on the base tower floor, and the first winch drives the fish-belly steel corridor to push out along the pulley track direction through a steel wire rope.

[0013] Furthermore, the lifting device includes a second winch arranged on the tower, and a fixed pulley matched with the second winch, and the wire rope is connected to the guide beam after being movably wound around the fixed pulley.

[0014] Furthermore, positioning steel plates are provided at both ends of the fish-belly steel corridor, and both ends of the positioning steel plates are fixedly connected to the base tower and the standard tower respectively.

[0015] Compared with the prior art, the utility model has the following beneficial effects:

[0016] The utility model proposes a positioning device for a high-altitude fish-belly steel corridor suitable for an old-building renovation project, which is used for erecting a steel corridor between a base tower and a target tower. When in use, the fish-belly steel corridor is assembled on the floor of the base tower, and the guide beam is driven by the power device to extend in the direction of the pulley track and to the erection opening position of the target tower, so that the fish-belly steel corridor is erected, wherein the lifting device keeps the guide beam in a horizontally pushed-out state, and makes the pushed-out guide beam connect with the pulley track of the target tower. The present invention assembles the steel corridor in the tower together with the positioning device, and pushes it to a predetermined position of the corridor through the power device, effectively avoiding the risks of high-altitude hoisting operations of traditional steel structure corridors, and solving the problem that the traditional overall climbing installation method of the corridor is limited by space and cannot complete the overall construction of the corridor in areas with dense buildings or in buildings of old-building renovation projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0018] Figure 1 This is a schematic diagram of the utility model in the assembly completion state;

[0019] Figure 2 This is a schematic diagram of the launch state of the utility model;

[0020] Figure 3 This is a schematic diagram of the utility model being in place;

[0021] Figure 4 This is a schematic diagram of the front end of the fish-belly steel corridor of the utility model;

[0022] Figure 5 This is a schematic diagram of the rear end of the fish-belly steel corridor of the utility model;

[0023] Figure 6 This is a side view of the rear end of the fish-belly steel corridor of the utility model;

[0024] Figure 7 It is a side view of the guide beam of the utility model. DETAILED DESCRIPTION

[0025] The examples are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the utility model.

[0026] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "vertical", "horizontal", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0027] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0028] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" and "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0029] like Figure 1-7 As shown, a positioning device for a high-altitude fish-belly steel corridor suitable for an old renovation project is used to erect a steel corridor between a base tower and a standard tower, comprising a fish-belly steel corridor 1, the fish-belly steel corridor 1 is assembled on the floor of the base tower, an erection opening is relatively arranged between the base tower and the standard tower, a guide beam 5 is extended along the erection opening direction at the extended front end of the fish-belly steel corridor 1, pulley tracks are arranged in the same direction on the floors of the base tower and the standard tower, a power device for driving the guide beam 5 to extend along the pulley track direction is arranged on the floor of the base tower, and a lifting device for keeping the guide beam 5 in a horizontally pushed-out state is arranged on the standard tower, to ensure that the pushed-out guide beam 5 is connected to the pulley track of the standard tower.

[0030] The utility model proposes a positioning device for a high-altitude fish-belly steel corridor suitable for an old-building renovation project, which is used for erecting a steel corridor between a base tower and a target tower. When in use, the fish-belly steel corridor 1 is assembled on the floor of the base tower, and the guide beam 5 is driven by the power device to extend in the direction of the pulley track and to the erection opening position of the target tower, so that the fish-belly steel corridor 1 is erected, wherein the lifting device keeps the guide beam 5 in a horizontally pushed-out state, and makes the pushed-out guide beam 5 connect with the pulley track of the target tower. The present invention assembles the steel corridor in the tower together with the positioning device, and pushes it to a predetermined position of the corridor through a power device, effectively avoiding the risks of high-altitude hoisting operations of traditional steel structure corridors, and solving the problem that the traditional overall climbing installation method of the corridor is limited by space and cannot complete the overall construction of the corridor in areas with dense buildings or in buildings of old-building renovation projects.

[0031] Specifically, as shown in the figure, the front and rear ends of the fish-belly steel corridor 1 are vertically downwardly provided with reinforcement columns 10, the guide beam 5 is horizontally arranged at the bottom side of the reinforcement columns 10 at the front end of the fish-belly steel corridor 1, and the bottom side of the reinforcement columns 10 at the rear end of the fish-belly steel corridor 1 is provided with walking rollers that cooperate with the floor rolling. The reinforcement columns 10 and walking rollers are arranged at the rear end of the fish-belly steel corridor 1, so that the fish-belly steel corridor 1 can be kept in a horizontal state while being convenient to push and extend.

[0032] Specifically, as shown in the figure, the pulley track includes a number of transmission rollers 2 that are evenly spaced and arranged in a straight line on the floors of the base tower and the standard tower. A channel steel slide groove 11 is provided on the bottom side of the guide beam 5 along its length direction. The channel steel slide groove 11 is in limited sliding cooperation with the transmission roller 2.

[0033] Specifically, as shown in the figure, the power device includes a first winch 3 arranged on the base tower floor, and the first winch 3 drives the fish-belly steel corridor 1 to perform a pushing action along the pulley track direction through a steel wire rope.

[0034] Specifically, as shown in the figure, the lifting device includes a second winch 6 arranged on the tower, and a fixed pulley 7 matched with the second winch 6, and a steel wire rope 8 is movably wound around the fixed pulley 7 and connected to the guide beam 5. When in use, as the guide beam 5 is continuously extended, the second winch 6 synchronously pulls the guide beam 5 and applies an upward force, so that the guide beam 5 maintains a horizontally pushed-out state.

[0035] Specifically, as shown in the figure, positioning steel plates 9 are provided at both ends of the fish-belly steel corridor 1, and both ends of the positioning steel plates 9 are fixedly connected to the base tower and the standard tower respectively.

[0036] Specifically, the specific implementation steps of the utility model are:

[0037] Step 1: Structural verification: Based on the construction drawing of the large-span fish-belly steel corridor, combined with the load conditions existing in the sliding process of the fish-belly steel corridor, an overall model of the fish-belly steel corridor 1, guide beam 5, and walking roller 4 is established, and the connection nodes between the guide beam 5 and the fish-belly steel corridor 1 and the stress conditions of the guide beam 5 are analyzed to verify whether the bearing capacity of the structure can meet the construction requirements.

[0038] Step 2: On the corresponding floors of the tower, the fish-belly steel corridor 1, the guide beam 5, and the walking roller 4 are assembled and connected on site. A positioning steel plate 9 is welded on the end of the steel corridor to ensure that the steel corridor reaches the position accurately. A channel steel slide 11 is welded at the lower end of the guide beam 5 to prevent the steel corridor from derailing and losing its position during the forward movement.

[0039] Step 3: According to Figure 1 The on-site surveyor accurately measured and located each point of the pulley track 2 of the towers on both sides and the installation position of the steel corridor, to ensure that after the guide beam passes through the hollow area between the towers, it accurately docks with the pulley track of the rear tower and moves forward smoothly to the installation area. After the positioning is completed, the pulley track 2 is laid on site and fixed to the floor.

[0040] Step 4: According to Figure 1 The installation device diagram shows that the pulley power device (winch) 3 is installed on the front tower, and the corridor installation lifting device 6 is installed on the rear tower. The pulley power device drives the floor pulley to rotate, thereby providing friction for the steel corridor to move forward. During the movement of the steel corridor, the corridor installation lifting device is gradually tightened, playing a certain supporting role, providing a certain safety margin for the structure, and neutralizing the downward deflection of the guide beam to ensure that the guide beam can smoothly enter the rear tower.

[0041] Step 5: The fish-belly steel corridor 1, pulled by the pulley power device (winch) 3, smoothly passes through the hollow area between the towers. According to the fixed point measured in the early stage, the steel corridor accurately reaches the installation position of the steel corridor support. After temporarily supporting the steel corridor by jack and lifting, the pulley track 2, the rear end walking roller of the fish-belly steel corridor and the guide beam 5 are removed to complete the installation of the foundation support of the steel corridor.

[0042] The installation of each component of the entire positioning system of the utility model is simple and convenient, and there is no need to assemble a tire frame for the steel beam corridor. The corridor is accurately positioned through a preset pulley track to ensure that the translation route of the steel corridor meets the accuracy requirements, and the pulley track is docked on the other side, which effectively shortens the construction period of the steel corridor, improves the safety of the steel corridor construction, and achieves good economic benefits. It effectively solves the problem that the fish belly steel corridor has an irregular structure and is difficult to move horizontally on the slide rail, and has a certain applicability to steel corridors of different structural forms.

[0043] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

[0044] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A positioning device for high-altitude fish-belly steel corridors in old renovation projects, which relates to the technical field of high-altitude corridors and is used to set up steel corridors between base towers and standard towers, and is characterized in that: The invention comprises a fish-belly steel corridor (1), which is assembled on the floor of a base tower, and an erection opening is arranged between the base tower and the target tower. A guide beam (5) is arranged at the protruding front end of the fish-belly steel corridor (1) extending in the direction of the erection opening. Pulley tracks are arranged in the same direction on the floors of the base tower and the target tower. A power device for driving the guide beam (5) to extend in the direction of the pulley track is arranged on the floor of the base tower. A lifting device for keeping the guide beam (5) in a horizontally pushed-out state is arranged on the target tower, so as to ensure that the pushed-out guide beam (5) is connected to the pulley track of the target tower.

2. The positioning device for high-altitude fish-belly steel corridors in old-town renovation projects according to claim 1 is characterized in that: The front and rear ends of the fish-belly steel corridor (1) are both vertically downwardly provided with reinforcement columns (10), the guide beam (5) is horizontally arranged on the bottom side of the reinforcement columns (10) extending from the front end of the fish-belly steel corridor (1), and the bottom side of the reinforcement columns (10) extending from the rear end of the fish-belly steel corridor (1) is provided with walking rollers that cooperate with the floor for rolling.

3. The positioning device for high-altitude fish-belly steel corridors in old-town renovation projects according to claim 2 is characterized in that: The pulley track comprises a plurality of transmission rollers (2) which are evenly spaced and arranged in a straight line on the floors of the base tower and the standard tower. A channel steel slide groove (11) is arranged on the bottom side of the guide beam (5) along its length direction. The channel steel slide groove (11) is in limited sliding cooperation with the transmission rollers (2).

4. The positioning device for high-altitude fish-belly steel corridors in old-town renovation projects according to claim 3 is characterized in that: The power device comprises a first hoist (3) arranged on the base tower floor, and the first hoist (3) drives the fish-belly steel corridor (1) to perform a pushing action along the pulley track direction through a steel wire rope.

5. The positioning device for high-altitude fish-belly steel corridors in old-town renovation projects according to claim 4 is characterized in that: The lifting device comprises a second hoist (6) arranged on the tower, and a fixed pulley (7) matched with the second hoist (6); a steel wire rope (8) is movably wound around the fixed pulley (7) and then connected to the guide beam (5).

6. The device for placing a high-altitude fish-belly steel corridor in an old-town renovation project according to claim 5 is characterized in that: Positioning steel plates (9) are provided at both ends of the fish-belly steel corridor (1), and both ends of the positioning steel plates (9) are fixedly connected to the base tower and the target tower respectively.