Jacking device for installing electromechanical pipeline in high and large space
By designing a hoisting device for a large space in steel structure buildings, the installation efficiency and safety of electromechanical pipelines in the prior art are solved, and a fast and safe installation effect is achieved.
Patent Information
- Application Number
- CN202420029512.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-05
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2034-01-05
AI Technical Summary
In the tall space of steel structure buildings, it is difficult for the existing technology to efficiently install electromechanical pipelines, resulting in construction safety and efficiency problems.
A hoisting device including a first sub-platform, a second sub-platform, a pipeline fixing assembly and a liftable support pole are designed. The installation of the electromechanical pipeline is quickly completed through the overall lifting method of ground assembly.
The work efficiency of mechanical and electrical pipeline installation is improved, the safety of construction is ensured, and safety hazards in construction are avoided through stable connections and safety design.
Smart Images

Figure CN222630957U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a jacking device for installing electromechanical pipelines in a tall and large space. Background Art
[0002] In today's steel structure buildings, large-scale mechanical and electrical pipeline construction in large spaces is usually carried out using large lifts. Each section of the pipeline needs to be raised to a high place for construction, lowered after completion, and then raised to a high place again. The personnel and pipelines are moved and installed by constantly moving the lift, which causes great troubles to the safety of personnel and work efficiency. Utility Model Content
[0003] In view of the deficiencies in the prior art, the utility model designs a lifting device for installing electromechanical pipelines in a tall and large space, comprising: a first sub-platform, a second sub-platform, a pipeline fixing assembly and a liftable supporting upright; wherein, the number of the second sub-platforms is multiple, and the multiple second sub-platforms are connected in sequence; the number of the first sub-platforms is two, and the two first sub-platforms are installed at both ends of the multiple second sub-platforms, and the first sub-platforms are slidably installed on the steel structure beam; the number of the liftable supporting uprights is multiple, and the multiple liftable supporting uprights are respectively supported below the two corners of the connection between adjacent second sub-platforms and below the four corners of the first sub-platform; the pipeline fixing assembly is fixed above the first sub-platform and the second sub-platform.
[0004] Preferably, the first sub-platform includes: a first combined plate, a first fixed steel plate, a first fixed bolt and an installation assembly; the first fixed steel plate and the first fixed bolt are installed at one end of the first combined plate, and the installation assembly is installed at the other end of the first combined plate; the first sub-platform is connected to the second sub-platform through the first fixed steel plate and the first fixed bolt; the first sub-platform is slidably installed on the steel structure beam through the installation assembly.
[0005] Preferably, the mounting assembly includes: a first sub-mounting assembly, a second sub-mounting assembly and a third sub-mounting assembly; one end of the first sub-mounting assembly is rotatably mounted on the first combination plate, and the other end of the first sub-mounting assembly is detachably mounted on the first combination plate; one end of the second sub-mounting assembly is fixed on the first sub-mounting assembly, and the other end of the second sub-mounting assembly is fixed on the first combination plate; the third sub-mounting assembly is fixedly mounted on the top of the first sub-mounting assembly, and the first sub-platform is slidably mounted on the steel structure beam through the third sub-mounting assembly.
[0006] Preferably, the first sub-mounting assembly includes: a first mounting plate, a rotating shaft and a mounting rod; one end of the first mounting plate is rotatably mounted on the first combination plate via the rotating shaft, and the other end of the first mounting plate is detachably mounted on the first combination plate via the mounting rod; the end of the second sub-mounting assembly is fixed on the first mounting plate; and the third sub-mounting assembly is fixedly mounted on the top of the first mounting plate.
[0007] Preferably, the second sub-mounting assembly includes: a U-shaped handle and a spring; wherein, there are two U-shaped handles, one of which is fixedly mounted on the first mounting plate, and the other is fixed on the first combination plate; the two ends of the spring are respectively detachably connected to the two U-shaped handles.
[0008] Preferably, the third sub-mounting assembly includes: a second mounting plate, an electronic control assembly and a first moving wheel; one end of the second mounting plate is fixedly mounted on the top of the first mounting plate, and the electronic control assembly and the first moving wheel are both fixed on the other end of the second mounting plate, wherein the first moving wheel is arranged below the second mounting plate; the first sub-platform is slidably mounted on the steel structure beam via the first moving wheel.
[0009] Preferably, the second sub-platform includes: a second combined plate, a second fixed steel plate and a second fixed bolt; the number of the second fixed steel plates and the second fixed bolts are two groups, the two groups of second fixed steel plates are respectively arranged at both ends of the second combined plate, and the second fixed steel plates at both ends are staggered, and the two groups of second fixed bolts are respectively arranged in the middle of the two ends of the second combined plate; adjacent second sub-platforms are connected by the second fixed steel plate and the second fixed bolts; the second sub-platform is connected to the first sub-platform through the second fixed steel plate and the second fixed bolts.
[0010] Preferably, the pipeline fixing assembly includes: a first self-locking part, a self-locking assembly and a pipeline bracket; the first self-locking part and the pipeline bracket are both fixed on the first sub-platform or the second sub-platform; the self-locking assembly is installed above the first self-locking part; the electromechanical pipeline is arranged on the self-locking assembly, and the electromechanical pipeline is connected to the pipeline bracket.
[0011] Preferably, the self-locking component includes: a second self-locking part, a support limit block and a limit plate; the limit plate is fixedly arranged on the top of the support limit block, the second self-locking part is installed below the support limit block, and the second self-locking part is installed on the first self-locking part; the electromechanical pipeline is arranged on the limit plate.
[0012] Preferably, the liftable support pole includes: a telescopic rod and a second movable wheel; wherein the second movable wheel is installed at the bottom of the telescopic rod; the top of the telescopic rod is supported below the two corners of the connection between adjacent second sub-platforms or below the four corners of the first sub-platform.
[0013] Compared with the closest prior art, the beneficial effects of the utility model are:
[0014] 1. The utility model assembles the first sub-platform and the second sub-platform into an integral jacking platform on the ground, fixes the entire row of electromechanical pipelines on the jacking platform through pipeline fixing components, and lifts the jacking platform up and down and moves horizontally through lifting support vertical rods. The jacking platform is assembled on the ground and lifted as a whole to quickly complete the installation of the entire row of electromechanical pipelines, thereby improving work efficiency.
[0015] 2. The first sub-platform and the second sub-platform of the utility model are connected by bolt connection and steel plate plug-in connection, which ensures the overall stability of the pipeline jacking platform and the safety of construction.
[0016] 3. Before jacking, the jacking device of the utility model first hangs the two ends of the spring on the two U-shaped handles respectively. After the jacking device is jacked to the installation height of the electromechanical pipeline, the spring is removed, and then the first sub-installation assembly is fixed by the installation rod, avoiding the collision of the third sub-installation assembly with the steel structure beam during the jacking process, thereby ensuring the safety of the construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of the jacking device of the utility model.
[0018] Figure 2 It is a structural schematic diagram of the first sub-platform of the utility model.
[0019] Figure 3 It is a structural schematic diagram of the first sub-mounting assembly of the utility model.
[0020] Figure 4 It is a structural schematic diagram of the second sub-mounting assembly of the utility model.
[0021] Figure 5 It is a structural schematic diagram of the third sub-installation assembly of the utility model.
[0022] Figure 6 It is a structural schematic diagram of the second sub-platform of the utility model.
[0023] Figure 7 It is a structural schematic diagram of the pipeline fixing assembly of the utility model.
[0024] Figure 8 It is a structural schematic diagram of the first self-locking member of the utility model.
[0025] Fig. 9 It is a structural schematic diagram of the self-locking component of the utility model.
[0026] Fig.10 It is a structural schematic diagram of the liftable support pole of the utility model.
[0027] Reference numerals:
[0028] 1-first sub-platform, 11-first combination plate, 12-first fixed steel plate, 13-first fixing bolt, 14-first sub-mounting assembly, 141-first mounting plate, 142-rotating axis, 143-mounting rod, 15-second sub-mounting assembly, 151- U-shaped handle, 152-spring, 16-third sub-mounting assembly, 161-second mounting plate, 162-electric control assembly, 163-first moving wheel, 2-second sub-platform, 21-second combination plate, 22-second fixed steel plate, 23-second fixing bolt, 3-pipeline fixing assembly, 31-first self-locking piece, 32-self-locking assembly, 321-second self-locking piece, 322-support limit block, 323-limiting plate, 33-electromechanical pipeline, 34-pipeline bracket, 4-liftable support pole, 41-telescopic rod, 42-second moving wheel. DETAILED DESCRIPTION
[0029] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0030] Example 1
[0031] like Figure 1-Figure 10 As shown, the utility model provides a jacking device for installing electromechanical pipelines in a tall space, comprising: a first sub-platform 1, a second sub-platform 2, a pipeline fixing assembly 3 and a liftable support pole 4; wherein, the number of the second sub-platforms 2 is multiple, and the multiple second sub-platforms 2 are connected in sequence; the number of the first sub-platforms 1 is two, and the two first sub-platforms 1 are installed at the two ends of the multiple second sub-platforms 2, and the first sub-platform 1 is slidably installed on the steel structure beam; the number of the liftable support poles 4 is multiple, and the multiple liftable support poles 4 are respectively supported under the two corners of the connection of the adjacent second sub-platforms 2 and under the four corners of the first sub-platform 1; the pipeline fixing assembly 3 is fixed above the first sub-platform 1 and the second sub-platform 2. The first sub-platform and the second sub-platform are assembled into an integral jacking platform on the ground, and the whole row of electromechanical pipelines are fixed on the jacking platform through the pipeline fixing assembly, and the jacking platform is lifted up and down and moved horizontally through the lifting support poles, and the whole row of electromechanical pipelines is quickly installed by ground assembly and overall jacking, thereby improving work efficiency.
[0032] In a preferred embodiment, the first sub-platform 1 includes: a first combined plate 11, a first fixed steel plate 12, a first fixed bolt 13 and a mounting assembly; the first fixed steel plate 12 and the first fixed bolt 13 are installed at one end of the first combined plate 11, and the mounting assembly is installed at the other end of the first combined plate 11; the first sub-platform 1 is connected to the second sub-platform 2 through the first fixed steel plate 12 and the first fixed bolt 13; the first sub-platform 1 is slidably installed on the steel structure beam through the mounting assembly.
[0033] In a preferred embodiment, the mounting assembly includes: a first sub-mounting assembly 14, a second sub-mounting assembly 15 and a third sub-mounting assembly 16; one end of the first sub-mounting assembly 14 is rotatably mounted on the first combination plate 11, and the other end of the first sub-mounting assembly 14 is detachably mounted on the first combination plate 11; one end of the second sub-mounting assembly 15 is fixed on the first sub-mounting assembly 14, and the other end of the second sub-mounting assembly 15 is fixed on the first combination plate 11; the third sub-mounting assembly 16 is fixedly mounted on the top of the first sub-mounting assembly 14, and the first sub-platform 1 is slidably mounted on the steel structure beam through the third sub-mounting assembly 16.
[0034] In a preferred embodiment, the first sub-mounting assembly 14 includes: a first mounting plate 141, a rotating shaft 142 and a mounting rod 143; one end of the first mounting plate 141 is rotatably mounted on the first combination plate 11 through the rotating shaft 142, and the other end of the first mounting plate 141 is detachably mounted on the first combination plate 11 through the mounting rod 143; the end of the second sub-mounting assembly 15 is fixed on the first mounting plate 141; and the third sub-mounting assembly 16 is fixedly mounted on the top of the first mounting plate 141.
[0035] In a preferred embodiment, the second sub-installation assembly 15 includes: a U-shaped handle 151 and a spring 152; wherein, there are two U-shaped handles 151, one of which is fixedly mounted on the first mounting plate 141, and the other U-shaped handle 151 is fixed on the first assembly plate 11; and the two ends of the spring 152 are detachably connected to the two U-shaped handles 151. Before the jacking device is jacked, the two ends of the spring are first hung on the two U-shaped handles respectively, and after the jacking device is jacked to the installation height of the electromechanical pipeline, the spring is removed, and then the first sub-installation assembly is fixed by the installation rod, so as to avoid the third sub-installation assembly from colliding with the steel structure beam during the jacking process, and ensure the safety of the construction.
[0036] In a preferred embodiment, the third sub-mounting component 16 includes: a second mounting plate 161, an electronic control component 162 and a first moving wheel 163; one end of the second mounting plate 161 is fixedly mounted on the top of the first mounting plate 141, and the electronic control component 162 and the first moving wheel 163 are both fixed on the other end of the second mounting plate 161, wherein the first moving wheel 163 is arranged below the second mounting plate 161; the first sub-platform 1 is slidably mounted on the steel structure beam through the first moving wheel 163.
[0037] In a preferred embodiment, the second sub-platform 2 includes: a second combination plate 21, a second fixed steel plate 22 and a second fixed bolt 23; the number of the second fixed steel plate 22 and the second fixed bolt 23 are both two groups, the two groups of second fixed steel plates 22 are respectively arranged at the two ends of the second combination plate 21, and the second fixed steel plates 22 at the two ends are staggered, and the two groups of second fixed bolts 23 are respectively arranged in the middle of the two ends of the second combination plate 21; the adjacent second sub-platforms 2 are connected by the second fixed steel plate 22 and the second fixed bolt 23; the second sub-platform 2 is connected to the first sub-platform 1 by the second fixed steel plate 22 and the second fixed bolt 23. The first sub-platform and the second sub-platform are connected by bolt bolting and steel plate plug-in, which ensures the overall stability of the pipeline jacking platform and the safety of construction.
[0038] In a preferred embodiment, the pipeline fixing assembly 3 includes: a first self-locking component 31, a self-locking component 32 and a pipeline support 34; the first self-locking component 31 and the pipeline support 34 are both fixed on the first sub-platform 1 or the second sub-platform 2; the self-locking component 32 is installed above the first self-locking component 31; the electromechanical pipeline 33 is arranged on the self-locking component 32, and the electromechanical pipeline 33 is connected to the pipeline support 34.
[0039] In a preferred embodiment, the self-locking component 32 includes: a second self-locking component 321, a support limit block 322 and a limit plate 323; the limit plate 323 is fixedly arranged on the top of the support limit block 322, the second self-locking component 321 is installed below the support limit block 322, and the second self-locking component 321 is installed on the first self-locking component 31; the electromechanical pipeline 33 is arranged on the limit plate 323.
[0040] In a preferred embodiment, the liftable support pole 4 includes: a telescopic rod 41 and a second movable wheel 42; wherein the second movable wheel 42 is installed at the bottom of the telescopic rod 41; the top of the telescopic rod 41 is supported below the two corners of the connection between the adjacent second sub-platforms 2 or below the four corners of the first sub-platform 1.
[0041] The above are only preferred embodiments of the utility model and are not intended to limit the utility model. For those skilled in the art, the utility model may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the scope of the claims of the utility model to be approved.
Claims
1. A lifting device for installing electromechanical pipelines in a large space, characterized in that: include: A first sub-platform (1), a second sub-platform (2), a pipeline fixing assembly (3) and a liftable supporting pole (4); Wherein, the number of the second sub-platforms (2) is multiple, and the multiple second sub-platforms (2) are connected in sequence; The number of the first sub-platforms (1) is two, the two first sub-platforms (1) are installed at both ends of the plurality of second sub-platforms (2), and the first sub-platforms (1) are slidably installed on the steel structure beam; The number of the liftable support poles (4) is multiple, and the multiple liftable support poles (4) are respectively supported below two corners of the connection between adjacent second sub-platforms (2) and below four corners of the first sub-platform (1); The pipeline fixing assembly (3) is fixed above the first sub-platform (1) and the second sub-platform (2).
2. The lifting device for installing electromechanical pipelines in a tall and large space according to claim 1, characterized in that: The first sub-platform (1) comprises: a first combined plate (11), a first fixing steel plate (12), a first fixing bolt (13) and a mounting assembly; The first fixing steel plate (12) and the first fixing bolt (13) are mounted on one end of the first combined plate (11), and the mounting assembly is mounted on the other end of the first combined plate (11); The first sub-platform (1) is connected to the second sub-platform (2) via the first fixing steel plate (12) and the first fixing bolts (13); The first sub-platform (1) is slidably mounted on the steel structure beam via the mounting assembly.
3. The lifting device for installing electromechanical pipelines in a tall and large space according to claim 2, characterized in that: The mounting assembly comprises: a first sub-mounting assembly (14), a second sub-mounting assembly (15) and a third sub-mounting assembly (16); One end of the first sub-mounting assembly (14) is rotatably mounted on the first combined plate (11), and the other end of the first sub-mounting assembly (14) is detachably mounted on the first combined plate (11); One end of the second sub-mounting component (15) is fixed to the first sub-mounting component (14), and the other end of the second sub-mounting component (15) is fixed to the first combined board (11); The third sub-mounting assembly (16) is fixedly mounted on the top of the first sub-mounting assembly (14), and the first sub-platform (1) is slidably mounted on the steel structure beam via the third sub-mounting assembly (16).
4. The lifting device for installing electromechanical pipelines in a tall and large space according to claim 3, characterized in that: The first sub-mounting assembly (14) comprises: a first mounting plate (141), a rotating shaft (142) and a mounting rod (143); One end of the first mounting plate (141) is rotatably mounted on the first combined plate (11) via the rotating shaft (142), and the other end of the first mounting plate (141) is detachably mounted on the first combined plate (11) via the mounting rod (143); The end of the second sub-mounting assembly (15) is fixed on the first mounting plate (141); The third sub-mounting assembly (16) is fixedly mounted on the top of the first mounting plate (141).
5. The lifting device for installing electromechanical pipelines in a tall and large space according to claim 4, characterized in that: The second sub-mounting assembly (15) comprises: a U-shaped handle (151) and a spring (152); There are two U-shaped handles (151), one of which is fixedly mounted on the first mounting plate (141), and the other of which is fixedly mounted on the first assembly plate (11). Both ends of the spring (152) are detachably connected to the two U-shaped handles (151).
6. The lifting device for installing electromechanical pipelines in a tall and large space according to claim 4, characterized in that: The third sub-mounting assembly (16) comprises: a second mounting plate (161), an electric control assembly (162) and a first moving wheel (163); One end of the second mounting plate (161) is fixedly mounted on the top of the first mounting plate (141), and the electric control component (162) and the first moving wheel (163) are both fixed on the other end of the second mounting plate (161), wherein the first moving wheel (163) is arranged below the second mounting plate (161); The first sub-platform (1) is slidably mounted on the steel structure beam via the first moving wheels (163).
7. The lifting device for installing electromechanical pipelines in a tall and large space according to claim 1, characterized in that: The second sub-platform (2) comprises: a second combined plate (21), a second fixing steel plate (22) and a second fixing bolt (23); The number of the second fixing steel plates (22) and the number of the second fixing bolts (23) are both two groups, the two groups of the second fixing steel plates (22) are respectively arranged at the two ends of the second combined plate (21), and the second fixing steel plates (22) at the two ends are arranged in a staggered manner, and the two groups of the second fixing bolts (23) are respectively arranged in the middle of the two ends of the second combined plate (21); The adjacent second sub-platforms (2) are connected via the second fixing steel plates (22) and the second fixing bolts (23); The second sub-platform (2) is connected to the first sub-platform (1) via the second fixing steel plate (22) and the second fixing bolts (23).
8. The lifting device for installing electromechanical pipelines in a tall and large space according to claim 1, characterized in that: The pipeline fixing assembly (3) comprises: a first self-locking component (31), a self-locking assembly (32) and a pipeline support (34); The first self-locking member (31) and the pipeline support (34) are both fixed on the first sub-platform (1) or the second sub-platform (2); The self-locking component (32) is installed above the first self-locking component (31); The electromechanical pipeline (33) is arranged on the self-locking component (32), and the electromechanical pipeline (33) is connected to the pipeline support (34).
9. The lifting device for installing electromechanical pipelines in a tall and large space according to claim 8, characterized in that: The self-locking component (32) comprises: a second self-locking component (321), a supporting limit block (322) and a limit plate (323); The limiting plate (323) is fixedly arranged on the top of the supporting limiting block (322), the second self-locking member (321) is installed below the supporting limiting block (322), and the second self-locking member (321) is installed on the first self-locking member (31); The electromechanical pipeline (33) is arranged on the limiting plate (323).
10. The lifting device for installing electromechanical pipelines in a tall and large space according to claim 1, characterized in that: The liftable support pole (4) comprises: a telescopic rod (41) and a second movable wheel (42); Wherein, the second moving wheel (42) is installed at the bottom of the telescopic rod (41); The top of the telescopic rod (41) is supported below two corners of the connection between adjacent second sub-platforms (2) or below four corners of the first sub-platform (1).