Integrated universal power-on tool

By designing an integrated universal electric-mounted equipment, using magnet adsorption and elastic copper column connection, the problems of cumbersome and risk of traditional wiring disassembly operations are solved, and the convenience and safety of power supply testing of air conditioners are achieved, which improves work efficiency and reduces operating risks.

CN222653055UActive Publication Date: 2025-03-21WUHAN WEISHENG ELECTRONIC TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420668787.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2025-03-21
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

In the traditional air conditioner external unit power supply test, wiring disassembly operation is cumbersome and inefficient, which increases the risk of manual operation, which may lead to slack or damage to the electrical connection, affecting the normal operation of the air conditioner and may cause safety accidents.

Method used

An integrated universal electric-on-mounted equipment is designed, including frames, elastic copper columns, magnets and fiberglass boards. It can achieve rapid power supply and power down through magnet adsorption and elastic copper columns. The fiberglass board provides insulation and thermal insulation effects.

Benefits of technology

It greatly simplifies the power supply and power-off process of the air conditioner external unit, improves operating efficiency, reduces manual operation risks, avoids the possibility of electrical connection damage and safety accidents, and extends the service life of the power-on equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222653055U_ABST
    Figure CN222653055U_ABST
Patent Text Reader

Abstract

The utility model discloses an integrated universal power-on tool, which comprises a frame and three elastic copper columns, a groove is arranged on the upper surface of the frame, the three elastic copper columns are arranged at the inner bottom end of the groove, a plurality of magnets are fixedly arranged on the side surface of the groove, and the elastic copper columns are arranged in the groove. According to the utility model, through the arrangement of the magnet and the elastic copper column, when a power supply test is carried out on the air conditioner outdoor unit in a factory, the power-on tool is attached to a wiring port of the air conditioner outdoor unit, and the wiring port of the air conditioner outdoor unit is connected with the wiring structure, so that the power supply test of the air conditioner outdoor unit is carried out. The power-on tool is attracted to the wiring port through the magnet, then the power line is connected through the elastic copper column to provide power for the air conditioner outdoor unit, the power-on tool is manually pulled out of the side surface of the air conditioner outdoor unit after the air conditioner outdoor unit is tested, and the power supply and power-off processes of the air conditioner outdoor unit are greatly facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of power-on tooling, and in particular relates to an integrated universal power-on tooling. Background Art

[0002] Testing the power supply to the air conditioner outdoor unit is an important step in the air conditioner installation or repair process to ensure that the power supply to the air conditioner outdoor unit is connected correctly and the circuit is operating normally.

[0003] In the current industrial environment, the operation process of power supply testing of air conditioner outdoor units is somewhat inconvenient. Usually, in order to perform power supply testing on air conditioner outdoor units, workers need to connect wires directly to the terminal posts of the air conditioner outdoor units. This step not only requires precise docking to avoid electrical failures, but also these connections must be re-disassembled once the test is completed, which undoubtedly increases the workload and consumes additional time and energy.

[0004] This traditional wiring and unwiring method is particularly cumbersome in actual operation, not only inefficient, but also increases the risk of manual operation. During frequent testing, repeated wiring and unwiring work not only reduces work efficiency, but may also cause electrical connections to loosen or become damaged due to improper operation, thus affecting the normal operation of the air conditioner outdoor unit and even causing safety accidents. Utility Model Content

[0005] The technical problem to be solved by the utility model is to overcome the existing defects and provide an integrated universal power-on tooling to solve the problem that the traditional wiring and disconnecting method proposed in the above background technology is particularly cumbersome in actual operation, which is not only inefficient, but also increases the risk of manual operation. In the frequent testing process, repeated wiring and disconnecting work not only reduces work efficiency, but also may cause the electrical connection to loosen or be damaged due to improper operation, thereby affecting the normal operation of the air conditioner outdoor unit, and may even cause safety accidents.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an integrated universal power-on tool, comprising a frame and an elastic copper column, the upper surface of the frame is provided with a groove, an elastic copper column is installed at the inner bottom end of the groove, three elastic copper columns are provided, a magnet is fixedly installed on the side surface of the groove, and a plurality of magnets are provided, a wiring structure is fixedly connected to the side surface of the frame away from the groove, a power cord plug is provided inside the wiring structure, and the power cord plug and the elastic copper column are electrically connected to each other through a wire.

[0007] Preferably, a wire clip is installed on the side surface of the wiring structure.

[0008] Preferably, the power cord plug is snap-connected inside the wire buckle.

[0009] Preferably, a fiberglass board is fixedly connected to the inner bottom end of the groove.

[0010] Preferably, the glass fiber board is snap-connected to the side surface of the elastic copper column.

[0011] Preferably, the fiberglass board is made of fiberglass.

[0012] Preferably, the frame and wiring structure are both made of insulating plastic.

[0013] Compared with the prior art, the utility model provides an integrated universal power-on tooling, which has the following beneficial effects:

[0014] 1. The utility model provides structures such as magnets and elastic copper columns. When the power supply test of the air conditioner outdoor unit is carried out in the factory, the power-on tool is attached to the wiring port of the air conditioner outdoor unit, the power-on tool is adsorbed to the wiring port by the magnet, and the power line is connected to the air conditioner outdoor unit through the elastic copper column to provide power. After the test of the air conditioner outdoor unit is completed, the power-on tool is manually unplugged from the side surface of the air conditioner outdoor unit, which greatly facilitates the power supply and power-off process of the air conditioner outdoor unit and effectively avoids the traditional wiring and wiring removal method which is particularly cumbersome in actual operation, not only inefficient, but also increases the risk of manual operation. In the frequent testing process, repeated wiring and wiring removal work not only reduces work efficiency, but also may cause loose or damaged electrical connections due to improper operation, thereby affecting the normal operation of the air conditioner outdoor unit and even causing safety accidents.

[0015] 2. The utility model provides an elastic copper column, which can provide a buffer between the electrical tooling and the wiring port of the air conditioner outdoor unit, so as to more accurately connect the wiring port and the elastic copper column to each other. The wire buckle is provided to facilitate the use of the wire by clamping it on the wiring structure;

[0016] 3. The utility model provides a fiberglass board, which has insulation and heat-insulating effects when the power is turned on, to prevent the heat generated by the elastic copper column after power is turned on from melting the inside of the groove of the frame, thereby damaging the power-on tooling and making it unusable, thereby extending the service life of the power-on tooling. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0018] Figure 1 This is a three-dimensional schematic diagram of an integrated universal power-on tooling device proposed by the utility model;

[0019] Figure 2This is a three-dimensional schematic diagram from another angle of an integrated universal power-on tooling provided by the utility model;

[0020] Figure 3 This is a three-dimensional schematic diagram of the rear surface of an integrated universal power-on tooling device proposed by the utility model;

[0021] In the figure: 1. frame; 2. groove; 3. magnet; 4. elastic copper column; 5. fiberglass board; 6. wiring structure; 7. wire buckle. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-3 The utility model provides a technical solution: an integrated universal power-on tool, comprising a frame 1 and an elastic copper column 4, a groove 2 is provided on the upper surface of the frame 1, an elastic copper column 4 is installed at the inner bottom end of the groove 2, three elastic copper columns 4 are provided, a magnet 3 is fixedly installed on the side surface of the groove 2, a plurality of magnets 3 are provided, a wiring structure 6 is fixedly connected to the side surface of the frame 1 away from the groove 2, a power cord plug is provided inside the wiring structure 6, the power cord plug and the elastic copper column 4 are electrically connected to each other through a wire, and through the provided magnet 3 and elastic copper column 4 and other structures, when the power supply test of the air conditioner outdoor unit is carried out in the factory, the power-on tool is attached to the wiring port of the air conditioner outdoor unit, the power-on tool is adsorbed on the wiring port by the magnet 3, and then the elastic copper column 4 is used to connect the power supply to the power supply. Connect the power cord to provide power to the air-conditioning outdoor unit. After the air-conditioning outdoor unit test is completed, manually unplug the power-on tool from the side surface of the air-conditioning outdoor unit, which greatly facilitates the power supply and power-off process of the air-conditioning outdoor unit and effectively avoids the traditional wiring and wiring removal method. It is particularly cumbersome in actual operation, not only inefficient, but also increases the risk of manual operation. In the frequent testing process, repeated wiring and wiring removal work not only reduces work efficiency, but may also cause electrical connections to loosen or be damaged due to improper operation, thereby affecting the normal operation of the air-conditioning outdoor unit and may even cause safety accidents. Through the provision of the elastic copper column 4, the elastic copper column 4 can provide a buffer between the power-on tool and the wiring port of the air-conditioning outdoor unit, so as to more accurately connect the wiring port and the elastic copper column 4 to each other.

[0024] In the present invention, preferably, a wire buckle 7 is installed on the side surface of the wiring structure 6, and the wire buckle 7 is provided to facilitate the electric wire to be clamped on the wiring structure 6 for use.

[0025] In the present invention, preferably, the power cord plug is snap-connected inside the wire buckle 7 .

[0026] In the utility model, preferably, a glass fiber board 5 is fixedly connected to the inner bottom end of the groove 2. By setting the glass fiber board 5, when the power is turned on, the insulation and heat insulation effect of the glass fiber board 5 can prevent the heat generated by the elastic copper column 4 after power is turned on from melting the inside of the groove 2 of the frame 1, causing the power-on tooling to be damaged and unusable, thereby extending the service life of the power-on tooling.

[0027] In the present invention, preferably, the glass fiber board 5 is snap-connected to the side surface of the elastic copper column 4 .

[0028] In the present invention, preferably, the glass fiber board 5 is made of glass fiber.

[0029] In the present invention, preferably, the frame 1 and the wiring structure 6 are both made of insulating plastic materials.

[0030] The working principle and use process of the utility model: when in use, first, place the frame 1 of the power-on tooling close to the wiring port of the air conditioner outdoor unit, and this process is achieved through the adsorption effect of the magnet 3. The setting of the magnet 3 allows the power-on tooling to be easily adsorbed and disassembled, greatly improving the convenience of operation. Then, the power cord plug is connected to the wiring port of the air conditioner outdoor unit through the elastic copper column 4. The setting of the elastic copper column 4 makes the wiring process more accurate and stable, avoiding the cumbersomeness and risks of the traditional wiring method. At the same time, the elastic copper column 4 can also buffer the current to prevent equipment damage caused by excessive current. After the power cord plug is connected to the wiring port, the wire inside the power cord plug connects the power cord to the elastic copper column 4, thereby realizing power supply to the air conditioner outdoor unit. At this time, the fiberglass board 5 fixed at the bottom end of the groove 2 can effectively insulate and insulate, preventing the heat generated by the elastic copper column 4 after power is turned on from damaging the inside of the groove 2 of the frame 1, and extending the service life of the power-on tooling. After the air-conditioning outdoor unit is tested, it is only necessary to manually unplug the power-on tooling from the side surface of the air-conditioning outdoor unit. This process is also simple and convenient, avoiding the tediousness and risks of the traditional wiring removal method. During the entire working process, the structural design of the power-on tooling makes the power supply and power-off process simple and fast, greatly improving work efficiency. At the same time, its insulation and heat insulation effects also ensure the safety of operation, avoiding loose or damaged electrical connections caused by improper operation, as well as possible safety accidents. In general, this integrated universal power-on tooling realizes the convenience and safety of power supply testing of the air-conditioning outdoor unit through its unique structural design, greatly improving work efficiency and reducing operational risks.

[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An integrated universal power-on tool, comprising a frame (1) and an elastic copper column (4), characterized in that: The upper surface of the frame (1) is provided with a groove (2), the inner bottom end of the groove (2) is provided with an elastic copper column (4), three of the elastic copper columns (4) are provided, the side surface of the groove (2) is fixedly provided with a magnet (3), a plurality of the magnets (3) are provided, a side surface of the frame (1) away from the groove (2) is fixedly connected with a wiring structure (6), a power cord plug is provided inside the wiring structure (6), and the power cord plug and the elastic copper column (4) are electrically connected to each other via a wire.

2. The integrated universal power-on tooling according to claim 1 is characterized in that: A wire buckle (7) is installed on the side surface of the wiring structure (6).

3. The integrated universal power-on tooling according to claim 1 is characterized in that: The power cord plug is snap-connected to the inside of the wire buckle (7).

4. The integrated universal power-on tooling according to claim 1 is characterized in that: A glass fiber board (5) is fixedly connected to the inner bottom end of the groove (2).

5. The integrated universal power-on tooling according to claim 4 is characterized in that: The glass fiber board (5) is snap-connected to the side surface of the elastic copper column (4).

6. The integrated universal power-on tooling according to claim 4 is characterized in that: The glass fiber board (5) is made of glass fiber.

7. The integrated universal power-on tooling according to claim 1 is characterized in that: The frame (1) and the wiring structure (6) are both made of insulating plastic material.