Anchor-pile combined compression-resistant static load device
By designing an anchor stack combined with compressive static load device for test piles, the problem of conducting static load experiments without destroying the foundation pile and main ribs around the test piles are solved, and the stability and cost-effectiveness of the device are improved.
Patent Information
- Application Number
- CN202421432787.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2034-06-21
AI Technical Summary
How to conduct static load experiments without destroying the foundation piles around the test piles and meeting the main ribs of the engineering piles that do not allow anchoring or welding.
An anchor stack combined anti-compression static load device is designed, including a secondary beam, an anchor mechanism, a foot box plate and a jack. Through the setting of the anchor mechanism, the relative stability between the foot box plate and the secondary beam is achieved, and the foot box plate supports the pressure weight parts by the foot box plate.
The static load test is realized without destroying the foundation piles and main reinforcement around the test pile, which improves the stability of the static load device, reduces the height and center of gravity of the test, reduces safety risks, and saves test costs.
Smart Images

Figure CN222666898U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of static load experimental tools, in particular to an anchor pile combined compression-resistant static load device. Background Art
[0002] The static load test by heap loading method is a commonly used test method to determine the bearing capacity of pile foundation or foundation. During the static load test, the load is applied step by step on the top of the pile or foundation through a hydraulic jack and a reaction device. The reaction device is a weight platform, and the weight is usually a cement block or an iron block.
[0003] In the prior art, anchor pile loading combined static load test often adopts anchor pile connection structure. However, in devices such as LNG tanks and cryogenic tanks, the foundation piles, main reinforcement and design around the test piles are not allowed to be damaged or destroyed, so anchoring or welding is impossible. Therefore, an anchor pile combined compressive static load device is proposed. Utility Model Content
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies in the prior art, the utility model provides an anchor-pile combined compressive static load device, which solves the problem of how to conduct static load tests without damaging the foundation piles around the test piles and satisfying the main reinforcement of the engineering piles that are not allowed to be anchored or welded in the design.
[0006] (II) Technical solution
[0007] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:
[0008] In the utility model, the anchor pile combined compression static load device is used for static load test of the test pile, and the static load device includes a subbeam, an anchor mechanism, a support box plate and a jack installed on the test pile;
[0009] There are multiple auxiliary beams, a loading platform is provided between adjacent auxiliary beams, a ballast is placed on the loading platform, at least two support foot box plates are provided, and the two support foot box plates support the ballast;
[0010] The movable end of the jack supports the plurality of auxiliary beams;
[0011] The anchoring mechanism comprises at least two lower pads, two anchoring cross beams and four tie rods, the lower pads are all located below the support box plate, and the anchoring cross beams are all located above the auxiliary beam and in contact with the auxiliary beam;
[0012] The anchoring beam is sleeved on two corresponding pull rods. The outer surface of the pull rod extending to the outside of the anchoring beam is provided with an external thread. An anchor nut is installed on the pull rod. The interior of the anchor nut is provided with an internal thread that matches the external thread.
[0013] Furthermore, the lower pads are all arranged perpendicularly to the support box plates, and the anchoring beams are all arranged perpendicularly to the lower pads.
[0014] Furthermore, the support foot box plate extends to the outside of the auxiliary beam, and support feet are placed on the support foot box plate located on the outside, and parts of the support feet are anchored inside the anchoring mechanism.
[0015] Furthermore, the side of the plurality of auxiliary beams close to the jack is connected to the jack through the main beam.
[0016] Furthermore, a gasket is provided between the anchor nut and the anchor beam.
[0017] Furthermore, one end of the jack close to the test pile is installed with the test pile through a bottom plate, and one end of the jack close to the main beam is installed with the main beam through a top plate.
[0018] (III) Beneficial effects
[0019] The utility model provides an anchor pile combined compressive static load device. Compared with the prior art, it has the following beneficial effects:
[0020] By setting up an anchoring mechanism, which is set in the form of at least two lower pads, two anchoring beams and four tie rods, relative stability is achieved between the support box plate and the auxiliary beam, so that the support box plate supports the weight piece, solving the problem of how to conduct static load tests without damaging the foundation piles, main reinforcement and design around the test piles. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 It is a three-dimensional diagram of an anchor pile combined compressive static load device;
[0023] Figure 2 for Figure 1 Enlarged view of point A in the middle.
[0024] Reference numerals:
[0025] 10. Test pile; 20. Jack; 21. Bottom plate; 22. Top plate; 23. Main beam; 24. Sub-beam; 30. Support box plate; 301. Support foot; 31. Lower pad; 311. Pull rod; 32. Anchor beam; 321. External thread; 33. Anchor nut. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model is described clearly and completely. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] The embodiment of the present application provides an anchor-pile combined compressive static load device, which solves the problem of how to conduct static load tests without damaging the test piles, main reinforcement and design around the test piles, thereby facilitating the conduct of static load tests in different experimental environments.
[0028] The technical solution in the embodiment of the present application is to solve the above technical problems, and the overall idea is as follows:
[0029] like Figure 1-Figure 2 As shown, by setting an anchoring mechanism, the anchoring mechanism is set in the form of at least two lower pads, two anchoring beams and four tie rods, so as to achieve relative stability between the support box plate and the auxiliary beam, so that the support box plate supports the weight part, and solves the problem of how to conduct static load tests without damaging the foundation piles around the test piles and meeting the main reinforcement of the engineering piles that are not allowed to be anchored or welded in the design, which facilitates the static load tests in different experimental environments.
[0030] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0031] Example:
[0032] like Figure 1-Figure 2 As shown, an anchor-pile combined compression static load device is used for static load test of a test pile 10, and the static load device includes a subbeam 24, an anchoring mechanism, a support box plate 30 and a jack 20 installed on the test pile 10;
[0033] There are multiple sub-beams 24, and a loading platform is provided between adjacent sub-beams 24. A ballast is placed on the loading platform. There are at least two support foot box plates 30, and the two support foot box plates 30 support the ballast.
[0034] The moving end of the jack 20 supports a plurality of sub-beams 24;
[0035] The anchoring mechanism at least includes two lower pads 31, two anchoring cross beams 32 and four tie rods 311, the lower pads 31 are all located below the support box plate 30, and the anchoring cross beams 32 are all located above the sub-beam 24 and in contact with the sub-beam 24;
[0036] The anchoring beam 32 is sleeved on two corresponding tie rods 311 . The tie rods 311 extend to the outer side of the anchoring beam 32 and have external threads 321 on their outer surfaces. An anchoring nut 33 is installed on the tie rods 311 . The interior of the anchoring nut 33 is provided with internal threads that match the external threads 321 .
[0037] Specifically, a gasket is provided between the anchor nut 33 and the anchor beam 32 to enhance the friction between the anchor nut 33 and the anchor beam 32, thereby improving the stability of the anchoring mechanism.
[0038] By setting up an anchoring mechanism, which is set in the form of at least two lower pads 31, two anchoring beams 32 and four tie rods 311, relative stability is achieved between the support box plate 30 and the sub-beam 24, so that the support box plate 30 supports the weight part, which solves the problem of how to conduct static load tests without damaging the foundation piles around the test piles and meeting the main reinforcement of the engineering piles that are not allowed to be anchored or welded in the design, and facilitates the conduct of static load tests in different experimental environments.
[0039] The lower pads 31 are all arranged perpendicularly to the support box plates 30 , and the anchoring beams 32 are all arranged perpendicularly to the lower pads 31 .
[0040] By setting the installation position between the support box plate 30, the lower pad 31 and the anchoring beam 32, the stability between the anchoring mechanism and the auxiliary beam 24 and the support box plate 30 is further improved, which facilitates the stability of the entire static load device when the jack 20 drives the weight piece to move upward.
[0041] The support box plate 30 extends to the outside of the sub-beam 24, and support feet 301 are placed on the support box plate 30 located on the outside. Part of the support feet 301 is anchored inside the anchoring mechanism, and the anchoring mechanism is used to achieve the stability of the support feet 301. By setting the support box plate 30 and the support feet 301, the height of the test device is lowered and the stability of the device is maintained, thereby reducing safety risks and avoiding damage or destruction of the foundation piles around the test piles 10.
[0042] The side of the plurality of auxiliary beams 24 close to the jack 20 is connected to the jack 20 through the main beam 23, and the main beam 23 is used to distribute the weight of the stacked ballast pieces, thereby further improving the stability of the entire device during the test.
[0043] The end of the jack 20 close to the test pile 10 is installed with the test pile 10 through the bottom plate 21, and the end of the jack 20 close to the main beam 23 is installed with the main beam 23 through the top plate 22. The area of the bottom plate 21 and the top plate 22 is utilized to improve the stability of the moving end of the jack 20 when it moves upward, so as to facilitate the static load test.
[0044] Specifically, in actual application, the device is used to carry out a single pile vertical compressive static load test. During the test, the design parameters are verified, problems are found, the design is optimized, and the above work is repeated until an anchor pile combined compressive static load device with wide applicability, high convenience, low cost and high efficiency is developed.
[0045] In summary, compared with the prior art, the present invention has the following beneficial effects:
[0046] 1. By setting an anchoring mechanism, the anchoring mechanism is set in the form of at least two bottom pads 31, two anchoring beams 32 and four tie rods 311, which solves the problem of how to conduct static load tests without damaging the foundation piles around the test piles and satisfying the main reinforcement of the engineering piles that are not allowed to be anchored or welded in the design, and facilitates the static load test in different experimental environments.
[0047] 2. By setting the installation position between the support box plate 30, the lower pad 31 and the anchoring beam 32, the stability between the anchoring mechanism and the subbeam 24 and the support box plate 30 is further improved, which facilitates the stability of the entire static load device when the jack 20 drives the weight piece to move upward.
[0048] 3. The main beam 23 is used to distribute the weight of the stacked ballasts, further improving the stability of the entire device during the test.
[0049] 4. This method is highly practical and convenient, easy to operate, and can reduce the height and center of gravity of the static load test, which not only improves the stability of the device but also reduces safety risks.
[0050] 5. This utility model reduces costs and increases efficiency. By anchoring the support legs 301, the counterweight of the loading platform is reduced, the consumption of manpower and material resources in engineering inspection is reduced, the test cost is saved by about 20%, and the economic benefits of the company are improved.
[0051] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0052] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An anchor pile combined compressive static load device, characterized in that: Used for static load test of test pile (10), the static load device comprises a sub-beam (24), an anchoring mechanism, a support box plate (30) and a jack (20) installed on the test pile (10); A plurality of the auxiliary beams (24) are provided, a loading platform is provided between adjacent auxiliary beams (24), a ballast is placed on the loading platform, at least two support foot box plates (30) are provided, and the two support foot box plates (30) support the ballast; The movable end of the jack (20) supports a plurality of auxiliary beams (24); The anchoring mechanism comprises at least two lower pads (31), two anchoring cross beams (32) and four tie rods (311), the lower pads (31) are all located below the support box plate (30), and the anchoring cross beams (32) are all located above the auxiliary beam (24) and in contact with the auxiliary beam (24); The anchoring beam (32) is sleeved on two corresponding pull rods (311), and the outer surface of the pull rod (311) extending to the outside of the anchoring beam (32) is provided with an external thread (321), and the pull rod (311) is installed with an anchoring nut (33), and the interior of the anchoring nut (33) is provided with an internal thread that matches the external thread (321).
2. The anchor-pile combined compressive static load device according to claim 1, characterized in that: The lower pad (31) is vertically arranged with respect to the support box plate (30), and the anchoring cross beam (32) is vertically arranged with respect to the lower pad (31).
3. An anchor-pile combined compressive static load device as claimed in claim 1 or 2, characterized in that: The support foot box plate (30) extends to the outside of the auxiliary beam (24), and support feet (301) are placed on the support foot box plate (30) located on the outside, and parts of the support feet (301) are anchored inside the anchoring mechanism.
4. The anchor-pile combined compressive static load device according to claim 3, characterized in that: The side of the plurality of auxiliary beams (24) close to the jack (20) is connected to the jack (20) through the main beam (23).
5. The anchor-pile combined compressive static load device according to claim 1, characterized in that: A gasket is provided between the anchor nut (33) and the anchor cross beam (32).
6. The anchor-pile combined compressive static load device according to claim 4, characterized in that: One end of the jack (20) close to the test pile (10) is installed with the test pile (10) through a bottom plate (21), and one end of the jack (20) close to the main beam (23) is installed with the main beam (23) through a top plate (22).