Filling equipment for preparing concrete from fly ash

By using the vibration discharge technology of the vibrating mechanism in the fly ash concrete pouring equipment, the problem of waste stone powder blocking the pipeline is solved, the filling efficiency is improved, automatic discharge is realized, and the demand for manual dredging is reduced.

CN222683405UActive Publication Date: 2025-03-28YANLING GUANGTAI CONCRETE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421314687.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2025-03-28
Estimated Expiration
2034-06-11

AI Technical Summary

Technical Problem

When using waste stone powder to prepare concrete, waste stone powder can easily block the pipelines of the filling equipment, resulting in poor discharge and affecting the filling efficiency. It requires manual dredging, which is very troublesome.

Method used

A fly ash preparation concrete pouring equipment is designed, and the vibrating mechanism includes a second rotating drive member, a cam, a guide wheel, a push rod, an oblique vibrating block and a spring. Through vibration, the waste stone powder inside the storage barrel is quickly discharged to reduce the blockage.

Benefits of technology

Through vibration discharge technology, the discharge pipe is blocked, the discharge smoothness of waste stone powder is improved, the filling efficiency is improved, and the need for manual dredging is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222683405U_ABST
    Figure CN222683405U_ABST
Patent Text Reader

Abstract

The utility model discloses a fly ash preparation concrete pouring device which comprises a device bottom plate, a machine frame is welded to one side of the top end of the device bottom plate, a material storage barrel is welded to the top end of the machine frame, an elevator is welded to the position, on one side of the material storage barrel, of the top end of the device bottom plate, and a material conveying auger is installed in the elevator through a bearing. A filling pipe is welded on the outer wall of the top of the elevator; the material vibrating device further comprises a material vibrating mechanism, the material vibrating mechanism is arranged below the rack, and the material vibrating mechanism comprises a second rotary driving piece, a cam, a guide wheel, a push rod and an inclined material vibrating block. According to the utility model, the blockage condition of the discharge pipe is reduced, manual dredging is not needed, the discharge smoothness of the waste stone powder is improved, the filling efficiency is improved, and the dustless filling function is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of concrete preparation, in particular to fly ash concrete pouring equipment. Background Art

[0002] Concrete is a general term for engineering composite materials that are cemented into a whole by cementitious materials. It usually refers to cement concrete obtained by mixing cement as cementitious material, sand and stone as aggregates, and water (which may contain admixtures and additives) in a certain proportion. It is widely used in civil engineering and other fields. Its main components include cement, sand, stone, water and possible admixtures. After hardening, concrete can form an artificial stone with strong compressive resistance and durability. It is one of the indispensable important materials in construction and civil engineering. However, the traditional concrete industry is struggling due to the consumption of non-renewable resources such as natural sand and stone and the environmental pollution caused by the cement production process. The stone industry often produces a lot of waste stone powder after processing. In order to effectively utilize the waste stone powder, stone powder can replace part of cement cementitious materials or be used as special aggregates, or minimize the use of other natural resources and industrial materials. It is an effective way to save resources and protect the green and friendly production environment.

[0003] At present, when waste stone powder is used to prepare concrete, the waste stone powder needs to be added to the pouring equipment first. The pouring equipment lifts the waste stone powder to the feeding port of the concrete preparation device through the auger elevator for pouring. However, when the waste stone powder is discharged into the auger elevator, the waste stone powder is prone to block the pipeline, resulting in poor discharge and affecting the pouring efficiency. It needs to be manually unblocked, which is very troublesome and therefore urgently needs improvement. Utility Model Content

[0004] The purpose of the utility model is to provide a fly ash concrete pouring device to solve the problems raised in the above background technology.

[0005] To achieve the above purpose, the utility model provides the following technical solution: a fly ash concrete pouring equipment, comprising:

[0006] The bottom plate of the equipment has a frame welded on one side of the top of the bottom plate of the equipment, and a material storage barrel is welded on the top of the frame, and a hoist is welded on the top of the bottom plate of the equipment on one side of the material storage barrel, and a conveying auger is installed inside the hoist through a bearing, and a perfusion pipe is welded on the outer wall of the top of the hoist;

[0007] A material vibrating mechanism, which is arranged below the frame and comprises a second rotary drive member, a cam, a guide wheel, a push rod, and an inclined vibrating block. The second rotary drive member is arranged at the top of the equipment bottom plate below the frame, and the cam is installed at the output end of the second rotary drive member;

[0008] The guide wheel is arranged above the cam, and the guide wheel is closely fitted with the cam, the push rod is fixed on the top end of the guide wheel, and the top end of the push rod passes through the frame, and the oblique vibration material block is fixed on the top end of the push rod.

[0009] Preferably, walking wheels are installed at the corner positions of the bottom end of the base plate of the equipment.

[0010] Preferably, a preparation device is provided on one side of the bottom plate of the equipment, and a feeding port is provided on the top of the preparation device.

[0011] Preferably, a feed port is provided on one side of the top of the storage barrel, and a discharge pipe is welded on the outer wall of the bottom of the storage barrel, a cover plate is provided at the top of the feed port, and a handle is installed at the top of the cover plate, one end of the cover plate is hinged to the storage barrel through a hinge shaft to cover the feed port and prevent dust generated by the waste stone powder from being blown away.

[0012] Preferably, a telescopic threaded tube is installed at the bottom end of the perfusion tube, and a second positioning ring is fixed on the outer wall of the telescopic threaded tube, so that the length of the perfusion tube can be adjusted, thereby making up for the gap between the perfusion tube and the feeding port.

[0013] Preferably, a first positioning ring is fixed on the outer wall of the bottom of the perfusion tube, and telescopic driving members are installed on both sides of the bottom end of the first positioning ring, and the output end of the telescopic driving member is fixedly connected to the second positioning ring, so as to facilitate the adjustment of the length of the telescopic threaded tube.

[0014] Preferably, the vibration mechanism also includes a spring, which is sleeved on the outer wall of the push rod, and the bottom end of the spring is welded to the push rod, and the top end of the spring is welded to the frame to provide elastic supporting force for the push rod.

[0015] Preferably, a first rotating driving member is installed at the bottom of the elevator, and an output end of the first rotating driving member is fixedly connected to the feeding auger.

[0016] Preferably, a dust cover is fixed on the outer wall of the telescopic threaded tube below the second positioning ring, which can block the dust generated during the pouring and prevent the dust from being blown out, thereby realizing the dust-free pouring function and reducing the pollution to the workshop air.

[0017] Compared with the prior art, the beneficial effects of the utility model are:

[0018] By providing a second rotating drive member, a cam, a guide wheel, a push rod, an oblique vibration block and a spring, the second rotating drive member is started to drive the cam to rotate. During the rotation of the cam, the guide wheel is continuously driven to move up and down. The guide wheel overcomes the elastic force of the spring and pushes the oblique vibration block through the push rod. The oblique vibration block knocks the bottom end of the storage barrel. The vibration generated by the knocking makes the waste stone powder inside the storage barrel quickly discharged into the elevator through the discharge pipe, reducing the blockage of the discharge pipe and eliminating the need for manual dredging, thereby improving the smoothness of the waste stone powder discharge and further improving the filling efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a cross-sectional structural schematic diagram of the utility model;

[0020] Figure 2 This is an enlarged structural diagram of the material storage barrel of the utility model;

[0021] Figure 3 It is an enlarged structural diagram of the vibrating material mechanism of the utility model;

[0022] Figure 4 For the utility model Figure 1 Enlarged structural diagram at A in the middle.

[0023] In the figure: 1. Equipment bottom plate; 2. Frame; 3. Storage barrel; 301. Feed inlet; 302. Discharge pipe; 4. Elevator; 5. Feeding auger; 6. Infusion pipe; 7. Preparation device; 701. Feeding inlet; 8. Traveling wheel; 9. First rotating drive member; 10. Vibrating mechanism; 1001. Second rotating drive member; 1002. Cam; 1003. Guide wheel; 1004. Push rod; 1005. Oblique vibrating block; 1006. Spring; 11. Cover plate; 12. Handle; 13. Articulated shaft; 14. First positioning ring; 15. Telescopic drive member; 16. Telescopic threaded tube; 17. Second positioning ring; 18. Dust cover. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. All other embodiments obtained by ordinary technicians in the field without creative work based on the embodiments of the utility model shall fall within the scope of protection of the utility model.

[0025] See also Figure 1-4 The utility model provides an embodiment: a fly ash concrete pouring equipment, comprising:

[0026] An equipment bottom plate 1 is provided, a frame 2 is welded on one side of the top of the equipment bottom plate 1, and a storage barrel 3 is welded on the top of the frame 2, a feeding port 301 is arranged on one side of the top of the storage barrel 3, and a discharge pipe 302 is welded on the outer wall of the bottom of the storage barrel 3, a hoist 4 is welded on the top of the equipment bottom plate 1 on one side of the storage barrel 3, the hoist 4 is connected with the discharge pipe 302, and a feeding auger 5 is installed inside the hoist 4 through a bearing, a first rotating drive member 9 is installed at the bottom of the hoist 4, and the output end of the first rotating drive member 9 is fixedly connected with the feeding auger 5, a perfusion pipe 6 is welded on the outer wall of the top of the hoist 4, walking wheels 8 are installed at the corner positions of the bottom end of the equipment bottom plate 1, a preparation device 7 is arranged on one side of the equipment bottom plate 1, and a feeding port 701 is arranged on the top of the preparation device 7;

[0027] It also includes a vibrating material mechanism 10, which is arranged below the frame 2. The vibrating material mechanism 10 includes a second rotating driving member 1001, a cam 1002, a guide wheel 1003, a push rod 1004, and an oblique vibrating material block 1005. The second rotating driving member 1001 is arranged at the top of the equipment bottom plate 1 below the frame 2, the cam 1002 is installed at the output end of the second rotating driving member 1001, the guide wheel 1003 is arranged above the cam 1002, and the guide wheel 1003 is tightly fitted with the cam 1002, the push rod 1004 is fixed at the top of the guide wheel 1003, and the top of the push rod 1004 passes through the frame 2, and the oblique vibrating material block 1005 is fixed at the top of the push rod 1004;

[0028] Specifically, the second rotary drive member 1001 is started to drive the cam 1002 to rotate. During the rotation of the cam 1002, the guide wheel 1003 is continuously driven to move up and down. The guide wheel 1003 overcomes the elastic force of the spring 1006 and pushes the oblique vibration block 1005 through the push rod 1004. The oblique vibration block 1005 knocks the bottom end of the storage barrel 3. The vibration generated by the knocking makes the waste stone powder inside the storage barrel 3 quickly pass through the discharge pipe 302 and be discharged into the elevator 4, thereby reducing the blockage of the discharge pipe 302 and eliminating the need for manual dredging, thereby improving the patency of the waste stone powder discharge and further improving the filling efficiency.

[0029] A cover plate 11 is provided at the top of the feed inlet 301, and a handle 12 is installed at the top of the cover plate 11 to cover the feed inlet 301 and prevent dust generated by the waste stone powder from being blown out;

[0030] A telescopic threaded tube 16 is installed at the bottom end of the perfusion tube 6, and a second positioning ring 17 is fixed on the outer wall of the telescopic threaded tube 16, so that the length of the perfusion tube 6 can be adjusted, thereby making up for the gap between the perfusion tube 6 and the feeding port 701;

[0031] A first positioning ring 14 is fixed on the outer wall of the bottom of the perfusion tube 6, and telescopic driving members 15 are installed on both sides of the bottom of the first positioning ring 14, and the output end of the telescopic driving member 15 is fixedly connected to the second positioning ring 17, so as to facilitate the adjustment of the length of the telescopic threaded tube 16;

[0032] The vibrating mechanism 10 further includes a spring 1006, which is sleeved on the outer wall of the push rod 1004, and the bottom end of the spring 1006 is welded to the push rod 1004, and the top end of the spring 1006 is welded to the frame 2, providing elastic support force for the push rod 1004;

[0033] One end of the cover plate 11 is hinged to the material storage barrel 3 via a hinge shaft 13, so that the cover plate 11 can rotate;

[0034] A dust cover 18 is fixed on the outer wall of the telescopic threaded tube 16 below the second positioning ring 17 to shield the dust generated during the pouring and prevent the dust from being blown out, thereby realizing the dust-free pouring function and reducing the pollution to the workshop air.

[0035] When the embodiment of the present application is in use: first, the waste stone powder is poured into the storage barrel 3 through the feed port 301, and then the cover plate 11 is rotated around the hinge shaft 13 by the handle 12, and the cover plate 11 is rotated to the top of the feed port 301, and the cover plate 11 covers the feed port 301 to prevent the dust generated by the waste stone powder from being blown out. Then, the waste stone powder inside the storage barrel 3 is discharged into the elevator 4 through the discharge pipe 302. During this process, the second rotating drive member 1001 is started to drive the cam 1002 to rotate. During the rotation of the cam 1002, the guide wheel 1003 is continuously driven to move up and down. The guide wheel 1003 overcomes the elastic force of the spring 1006 and pushes the oblique vibration block 1005 through the push rod 1004. The oblique vibration block 1005 knocks on the bottom end of the storage barrel 3. The vibration generated by the knocking makes the waste stone powder inside the storage barrel 3 quickly pass through the discharge pipe 302 and be discharged into the elevator In the machine 4, the blockage of the discharge pipe 302 is reduced, and there is no need for manual dredging, thereby improving the smoothness of the waste stone powder discharge, and then improving the filling efficiency. The first rotating drive member 9 drives the feeding auger 5 to rotate, and the feeding auger 5 lifts the waste stone powder to the top of the elevator 4, and the waste stone powder is discharged through the filling pipe 6, and the filling pipe 6 fills the waste stone powder into the preparation device 7. At this time, the telescopic drive member 15 at the bottom end of the first positioning ring 14 drives the second positioning ring 17 to move downward, so that the telescopic threaded tube 16 is extended, and the length of the filling pipe 6 can be adjusted. The telescopic threaded tube 16 extends into the feeding port 701, making up for the gap between the filling pipe 6 and the feeding port 701. At the same time, the telescopic threaded tube 16 drives the dust cover 18 to move downward and cover the outside of the feeding port 701. The dust cover 18 can block the dust generated during filling to prevent dust from being blown out, thereby realizing a dust-free filling function and reducing pollution to the workshop air.

Claims

1. A fly ash concrete pouring equipment, comprising: A device bottom plate (1), a frame (2) is welded to one side of the top of the device bottom plate (1), and a material storage barrel (3) is welded to the top of the frame (2), a hoist (4) is welded to the top of the device bottom plate (1) on one side of the material storage barrel (3), and a feed auger (5) is installed inside the hoist (4) via a bearing, and a perfusion pipe (6) is welded to the outer wall of the top of the hoist (4); It is characterized by that it also includes A material vibrating mechanism (10), the material vibrating mechanism (10) being arranged below the frame (2), the material vibrating mechanism (10) comprising a second rotating driving member (1001), a cam (1002), a guide wheel (1003), a push rod (1004), and an inclined vibrating material block (1005), the second rotating driving member (1001) being arranged at the top of the equipment bottom plate (1) below the frame (2), and the cam (1002) being installed at the output end of the second rotating driving member (1001); The guide wheel (1003) is arranged above the cam (1002), and the guide wheel (1003) is tightly fitted with the cam (1002); the push rod (1004) is fixed to the top of the guide wheel (1003), and the top of the push rod (1004) passes through the frame (2); and the oblique vibration material block (1005) is fixed to the top of the push rod (1004).

2. The fly ash concrete pouring equipment according to claim 1, characterized in that: Travel wheels (8) are installed at the corner positions at the bottom end of the equipment base plate (1).

3. The fly ash concrete pouring equipment according to claim 1, characterized in that: A preparation device (7) is provided on one side of the equipment bottom plate (1), and a feeding port (701) is provided at the top of the preparation device (7).

4. The fly ash concrete pouring equipment according to claim 1, characterized in that: A feed port (301) is provided on one side of the top of the storage barrel (3), and a discharge pipe (302) is welded on the outer wall of the bottom of the storage barrel (3); a cover plate (11) is provided at the top of the feed port (301), and a handle (12) is installed at the top of the cover plate (11); one end of the cover plate (11) is hinged to the storage barrel (3) via a hinge shaft (13).

5. The fly ash concrete pouring equipment according to claim 1, characterized in that: A telescopic threaded tube (16) is installed at the bottom end of the perfusion tube (6), and a second positioning ring (17) is fixed on the outer wall of the telescopic threaded tube (16).

6. The fly ash concrete pouring equipment according to claim 1, characterized in that: A first positioning ring (14) is fixed on the outer wall of the bottom of the perfusion tube (6), and telescopic driving components (15) are installed on both sides of the bottom of the first positioning ring (14), and the output end of the telescopic driving component (15) is fixedly connected to the second positioning ring (17).

7. The fly ash concrete pouring equipment according to claim 1, characterized in that: The vibrating material mechanism (10) further comprises a spring (1006), wherein the spring (1006) is sleeved on the outer wall of the push rod (1004), and the bottom end of the spring (1006) is welded to the push rod (1004), and the top end of the spring (1006) is welded to the frame (2).

8. The fly ash concrete pouring equipment according to claim 1, characterized in that: A first rotary drive member (9) is installed at the bottom of the elevator (4), and the output end of the first rotary drive member (9) is fixedly connected to the feeding auger (5).

9. The fly ash concrete pouring equipment according to claim 5, characterized in that: A dust cover (18) is fixed on the outer wall of the telescopic threaded tube (16) below the second positioning ring (17).