Public area assembly type ceiling module structure

By adopting a prefabricated ceiling module structure in public areas and using customized card slots and hinged hardware connectors for combined installation, the problems of low construction efficiency, serious material waste, unstable quality and difficult maintenance are solved, and rapid installation, cost reduction and quality improvement are achieved.

CN222685868UActive Publication Date: 2025-03-28SHENZHEN HUAZHU TECH CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420885431.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-23
Publication Date
2025-03-28
Estimated Expiration
2034-04-23

AI Technical Summary

Technical Problem

The traditional ceiling construction technology has problems such as low construction efficiency, serious waste of materials, unstable quality and difficulty in maintenance.

Method used

The prefabricated ceiling module structure in public areas is adopted, and the centering equipment belt assembly and the edge light trough assembly are fixedly connected through ceiling hanging ribs. The customized slot connector and hinged hardware connector are used for combination installation to achieve rapid combined installation and disassembly.

Benefits of technology

It realizes rapid installation and disassembly, reduces overall overall cost, improves construction efficiency and quality stability, and reduces material waste and maintenance difficulties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222685868U_ABST
    Figure CN222685868U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of decoration construction, and particularly discloses a public area assembly type ceiling module structure which comprises a central equipment belt assembly and an edge lamp groove assembly which are fixedly connected through ceiling hanging bars, the edge lamp groove assembly is in an inverted L shape, and the central equipment belt assembly is connected with the lower end of the edge lamp groove assembly through a plurality of sets of ceiling material assemblies. One end of the ceiling material assembly is connected with the center equipment belt assembly through a customized clamping groove connecting piece, and the other end of the ceiling material assembly is connected with the edge lamp groove assembly through a hinge hardware connecting piece. Combined installation is adopted, the ceiling module structure is split into the center equipment belt assembly, the edge lamp groove assembly and the ceiling material assembly to be installed, all the assemblies are combined and installed through matching and customized clamping groove connecting pieces and hinge hardware connecting pieces, rapid combined installation and disassembly are achieved, and the installation efficiency is improved. And the overall comprehensive cost is reduced by repeated utilization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of decoration construction, in particular to a public area assembled ceiling module structure. Background Art

[0002] Traditional ceiling decoration is to construct the base plate + surface plate + surface leveling putty + surface paint or other finishes with the hanging rod + main keel + clamps + auxiliary keel. The following quality problems exist:

[0003] Low construction efficiency: Traditional ceiling construction technology often relies on manual operation and cumbersome construction steps, resulting in slow construction progress and low efficiency. This not only increases the construction period, but may also lead to an increase in labor costs.

[0004] Serious material waste: Traditional craftsmanship may not be precise enough in the use of materials, which may easily lead to material waste. This not only increases construction costs, but also creates an unnecessary burden on the environment.

[0005] Unstable quality: Since traditional craftsmanship relies on the skills and experience of construction workers, the construction quality is easily affected by human factors, resulting in unstable quality. This may cause problems in the flatness and firmness of the ceiling.

[0006] Difficulty in maintenance: Traditional ceiling construction may use some materials and structures that are difficult to disassemble and maintain, which leads to difficulties in later maintenance. For example, operations such as replacing lamps and repairing cracks may require destroying the original decorative layer, increasing the difficulty and cost of maintenance.

[0007] In view of this, from a practical point of view, a prefabricated ceiling module structure for public areas is proposed. Utility Model Content

[0008] The purpose of the utility model is to provide a public area assembled ceiling module structure to solve the problems raised in the above background technology.

[0009] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0010] A prefabricated ceiling module structure for a public area, characterized in that it includes a central equipment belt assembly and an edge light trough assembly fixedly connected by ceiling hanging rods, the edge light trough assembly is in an inverted L shape, the central equipment belt assembly is connected to the lower end of the edge light trough assembly through multiple groups of ceiling material assemblies, one end of the ceiling material assembly is connected to the central equipment belt assembly through a customized slot connector, and the other end of the ceiling material assembly is connected to the edge light trough assembly through a hinge hardware connector.

[0011] The beneficial effects of the utility model: the utility model adopts a combined installation, dividing the ceiling module structure into three major parts for installation: a central equipment belt component, an edge light trough component and a ceiling material component. Each component is combined and installed through matching and customized card slot connectors and hinge hardware connectors, realizing fast combined installation and disassembly, and can be reused to reduce the overall comprehensive cost.

[0012] Preferably, the customized card slot connector is located in the middle of the ceiling material assembly and the centered equipment belt assembly, an extension plate is provided at the upper end of the customized card slot connector, matching screw holes are provided on the extension plate and the centered equipment belt assembly, first slots are provided inwardly at both ends of the ceiling material assembly, and flat-head self-tapping screws are fixed into the first slots through the screw holes.

[0013] Preferably, the centering device belt assembly includes a centering device belt, the centering device belt has a first edge inwardly at the lower edge of both ends, and the lower end of the customized slot connector is provided with a second slot, and the second slot is snap-connected with the first edge.

[0014] Preferably, the centering device belt assembly further comprises a centering device belt vent assembly, and the centering device belt vent assembly has second edges extending outwardly at both ends, and the second edges overlap the slots.

[0015] Preferably, the hinge hardware connection includes an upper hinge, a lower hinge and a connecting shaft, the upper hinge and the lower hinge are provided with screw holes matching with self-tapping screws, the self-tapping screws of the lower hinge are nailed into the first slot at one end of the ceiling material assembly through the screw holes, and the screws of the upper hinge are fixedly connected to the edge light trough assembly through the screw holes.

[0016] Preferably, there is a gap between the ceiling material assembly and the edge light trough assembly, and the connecting shaft is clamped in the gap.

[0017] Preferably, a centering equipment belt light box assembly and a centering equipment belt spray assembly are also provided above the centering equipment belt assembly.

[0018] Preferably, the upper surface of the central equipment belt is provided with ventilation holes, and the ventilation holes are connected to the ventilation ducts.

[0019] Preferably, an edge light trough light strip is provided in the inner corner of the edge light trough assembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a transverse cross-sectional view of the utility model;

[0021] Figure 2 It is a plan view of the utility model;

[0022] Figure 3 It is a cross-sectional view of the utility model;

[0023] Figure 4 It is a side view of the utility model;

[0024] Figure 5 A perspective view of the centering device belt of the utility model;

[0025] Figure 6 A perspective view of a centering device with a vent assembly of the present invention;

[0026] Figure 7 It is a perspective view of the custom slot connector of the utility model;

[0027] Figure 8 It is a partial three-dimensional effect diagram of the utility model;

[0028] Figure numerals: 1. Ceiling material assembly; 1.1. Close joints; 2. Centered equipment belt; 2.1. Centered equipment belt vent assembly; 2.1.1. First edge; 2.1.2. Second edge; 2.2. Centered equipment belt light box assembly; 2.3. Centered equipment belt spray assembly; 2.4. Vent duct; 3. Edge light trough assembly; 3.1. Edge light trough light strip; 4. Hinge hardware connector; 4.1. Self-tapping screw; 4.2. Upper hinge; 4.3. Connecting shaft; 4.4. Lower hinge; 5. Customized card slot connector; 5.1. Flat head self-tapping screw; 5.2. Extension plate; 5.3. Second slot. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] In the description of the present invention, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0031] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0032] See also Figure 1-Figure 2 , Figure 1 It is a transverse cross-sectional view of the utility model. Figure 2 It is a plan view of the utility model.

[0033] A prefabricated ceiling module structure for a public area, characterized in that it includes a central equipment belt assembly and an edge light trough assembly 3 fixedly connected by ceiling hanging rods, the edge light trough assembly 3 is in an inverted L shape, the central equipment belt assembly is connected to the lower end of the edge light trough assembly 3 through a ceiling material assembly 1, one end of the ceiling material assembly 1 is connected to the central equipment belt assembly through a customized card slot connector 5, and the other end of the ceiling material assembly 1 is connected to the edge light trough assembly 3 through a hinge hardware connector 4.

[0034] The utility model adopts a combined installation, dividing the ceiling module structure into three major parts for installation: a central equipment belt component, an edge light trough component 3 and a ceiling material component 1. Each component is combined and installed by matching and customizing a slot connector 5 and a hinge hardware connector 4, thereby achieving rapid combined installation and disassembly, and can be reused to reduce the overall comprehensive cost.

[0035] Among them, the edge light trough assembly 3 is an inverted L-shape, and the upper part of the edge light trough assembly 3 has extended edges along both ends, one of which is fixedly connected to the ceiling hanging rod, and the other end is fixedly connected to the wall panel by screws. The connection and fixing methods are all commonly used methods and will not be described in detail here.

[0036] See also Figure 3 and Figure 7 , Figure 3 It is a cross-sectional view of the utility model. Figure 7 It is a perspective view of the customized slot connector of the present invention.

[0037] Furthermore, the customized card slot connector 5 is located in the middle of the ceiling material assembly 1 and the centered equipment belt assembly, an extension plate 5.2 is provided at the upper end of the customized card slot connector 5, matching screw holes are provided on the extension plate 5.2 and the centered equipment belt assembly, and first slots are provided inwardly at both ends of the ceiling material assembly 1, and flat-head self-tapping screws 5.1 are fixed into the first slots through the screw holes.

[0038] Among them, the customized slot connector 5 is firmly connected to the centering device belt assembly and the ceiling material assembly 1 by using flat head self-tapping screws 5.1.

[0039] The customized slot connector 5 is in the shape of a long strip, and the extension plate 5.2 is provided with evenly distributed matching screw holes so that the extension plate 5.2 is subjected to even force.

[0040] See also Figure 5-Figure 6 , Figure 5 It is a perspective view of the centering device belt of the utility model, Figure 6 It is a perspective view of the centering device with vent assembly of the present invention.

[0041] Furthermore, the centering device belt assembly includes a centering device belt 2, and the centering device belt 2 has a first edge 2.1.1 inwardly at the lower edge of both ends, and a second slot 5.3 is provided at the lower end of the customized slot connector 5, and the second slot 5.3 is snap-connected with the first edge 2.1.1.

[0042] Furthermore, the central device belt assembly further comprises a central device belt vent assembly 2.1, and both ends of the central device belt vent assembly 2.1 are provided with second edges 2.1.2 outwardly, and the second edges 2.1.2 are overlapped on the second slot 5.3.

[0043] The second slot 5.3 has serrated surfaces on its upper and lower surfaces, and the first edges 2.1.1 at both ends of the lower edge of the central device belt 2 are also serrated surfaces, which increases the friction of the contact surface and makes the connection more secure.

[0044] The upper and lower surfaces of the second slot 5.3 and the first edge 2.1.1 can also be configured as surfaces of any shapes such as concave-convex, wavy, etc. to achieve the effect of increasing friction.

[0045] See also Figure 4 , Figure 4 It is a side view of the utility model.

[0046] Furthermore, the hinge hardware connection part 4 includes an upper hinge 4.2, a lower hinge 4.4 and a connecting shaft 4.3. The upper hinge 4.2 and the lower hinge 4.4 are provided with screw holes matching the self-tapping screws 4.1. The self-tapping screws 4.1 of the lower hinge 4.4 are nailed into the first slot at one end of the ceiling material component 1 through the screw holes. The self-tapping screws of the upper hinge 4.2 are fixedly connected to the edge light trough component 3 through the screw holes.

[0047] The upper hinge 4.2 and the lower hinge 4.4 use the same type of self-tapping screws 4.1.

[0048] Furthermore, there is a gap between the ceiling material assembly 1 and the edge light trough assembly 3, and the connecting shaft 4.3 is clamped in the gap.

[0049] Further, see Figure 1-Figure 2 A centering device belt light box component 2.2 and a centering device belt spray component 2.3 are also arranged above the centering device belt component.

[0050] Furthermore, ventilation holes are provided on the upper surface of the central equipment belt 2, and the ventilation holes are connected to the ventilation ducts 2.4.

[0051] In the utility model, a series of public area standardized facilities such as lighting fixtures, audio speakers, air conditioning vents, etc. can be arranged above the central equipment belt assembly, so as to achieve beautiful design and convenient installation.

[0052] Furthermore, an edge light trough light strip 3.1 is provided in the inner corner of the edge light trough assembly 3.

[0053] Among them, Figure 1 As shown, the edge light trough assembly is a right-angle type, and the inner angle is the angle that is recessed downward and points inward.

[0054] In the present utility model, the installation method of the prefabricated ceiling module structure in the public area is as follows:

[0055] Step 1: Determine the positions of the three major components in the public area according to the design requirements, and fix the central equipment belt assembly and the edge light trough assembly 3 through the ceiling hanging rods so that the two are on the same horizontal line.

[0056] Step 2: Fix the hinge hardware connector 4 to the side plate of the edge light trough assembly 3 using self-tapping screws 4.1;

[0057] Step 3, fix the ceiling material assembly 1 with the hinge hardware connector 4 installed to the bottom edge of the edge light trough assembly 3 by using self-tapping screws 4.1 to ensure that it is firmly installed;

[0058] Step 4: buckle the customized slot connector 5 on the bottom edge of the center equipment belt 2, then lift the ceiling material assembly 1 and overlap it on the formed overlap. After adjusting the appropriate position, use the flat head self-tapping screws 5.1 to lock and fix the ceiling material assembly 1, the center equipment belt 2 and the customized slot connector 5 together;

[0059] Step 5. After completing the ceiling material assembly 1, the central equipment belt 2 and the edge light trough assembly 3, start installing the components above the central equipment belt 1, the central equipment belt vent assembly 2.1, the central equipment belt light box assembly 2.2 and the central equipment belt sprinkler assembly 2.3 to complete the installation of all equipment in the equipment belt;

[0060] Step 6: Finally, fix the edge light trough light strip 3.1 in the inner corner of the edge light trough assembly 3 to complete the overall installation.

[0061] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".

[0062] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A public area assembled ceiling module structure, characterized in that: It includes using ceiling hanging rods to fix the connection between the central equipment belt assembly and the edge light trough assembly, the edge light trough assembly is inverted L-shape, the central equipment belt assembly is connected to the lower end of the edge light trough assembly through multiple groups of ceiling material assemblies, one end of the ceiling material assembly is connected to the central equipment belt assembly through a customized slot connector, and the other end of the ceiling material assembly is connected to the edge light trough assembly through a hinge hardware connector.

2. The public area assembled ceiling module structure according to claim 1 is characterized in that: The customized card slot connector is located in the middle of the ceiling material assembly and the centered equipment belt assembly. An extension plate is provided at the upper end of the customized card slot connector. Matching screw holes are provided on the extension plate and the centered equipment belt assembly. First slots are provided inwardly at both ends of the ceiling material assembly, and flat-head self-tapping screws are fixed into the first slots through the screw holes.

3. The public area assembled ceiling module structure according to claim 2 is characterized in that: The centering device belt assembly comprises a centering device belt, the centering device belt has a first edge inwardly disposed at the lower edge of both ends, and a second slot is disposed at the lower end of the customized slot connector, and the second slot is engaged with the first edge.

4. The public area assembled ceiling module structure according to claim 3 is characterized in that: The centering device belt assembly also includes a centering device belt vent assembly, and the centering device belt vent assembly has second edges extending outwardly at both ends, and the second edges are overlapped on the slot.

5. The public area assembled ceiling module structure according to claim 1 is characterized in that: The hinge hardware connection includes an upper hinge, a lower hinge and a connecting shaft. The upper hinge and the lower hinge are provided with screw holes matching with self-tapping screws. The self-tapping screw of the lower hinge is nailed into the first slot at one end of the ceiling material assembly through the screw hole. The screw of the upper hinge is fixedly connected to the edge light trough assembly through the screw hole.

6. The public area assembled ceiling module structure according to claim 5 is characterized in that: There is a gap between the ceiling material component and the edge light trough component, and the connecting shaft is clamped in the gap.

7. The public area assembled ceiling module structure according to claim 1 is characterized in that: A centering equipment belt light box component and a centering equipment belt spray component are also arranged above the centering equipment belt component.

8. The public area assembled ceiling module structure according to claim 3 is characterized in that: The upper surface of the center equipment belt is provided with ventilation holes, and the ventilation holes are connected to the ventilation ducts.

9. The public area assembled ceiling module structure according to claim 1, characterized in that: An edge light trough light strip is arranged in the inner corner of the edge light trough assembly.