A molding preheating workbench for racket production
By using molded preheated workbenches in racket production, using hot air heating and positioning tube design, the embedding problem caused by the rebound of carbon fiber racket frame is solved, and the stability of racket structure is improved.
Patent Information
- Application Number
- CN202421237657.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-03
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2034-06-03
AI Technical Summary
During the racket production process, the carbon fiber racket is prone to rebound after being bent, resulting in the end not being embedded in sufficient depth, affecting the structural stability of the racket after forming.
A molded preheated workbench is designed to accelerate the solidification of the glue through hot air heating, and through the design of the positioning tube and the annular frame, the glue is evenly filled in the positioning tube.
The butt efficiency and butt quality of the carbon fiber rack frame and the annular frame are improved, and the structural stability of the racket after forming is enhanced.
Smart Images

Figure CN222695250U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of racket production, in particular to a forming preheating workbench used for racket production. Background Art
[0002] As we all know, a badminton racket is generally composed of a racket head, a racket shaft, a racket handle and the joint between the racket frame and the racket shaft. Most of the structure of a badminton racket is made of carbon fiber, which can greatly improve the batting performance of the badminton racket. In the manufacturing process of a badminton racket, a racket mold is needed to make the carbon fiber strips into a carbon fiber racket frame with a racket frame shape, and then a three-way joint is used to combine the carbon fiber racket frame and the carbon fiber racket shaft together to assemble a workpiece with the prototype of a racket.
[0003] Chinese Patent: CN202021173516.3 A racket frame stretching and forming machine, comprising a frame, a workbench fixed on the frame for processing the racket frame, a forming assembly installed on the workbench for stretching the racket frame and a pushing assembly for lifting the racket frame, the forming assembly comprising a fixed block fixedly installed on the workbench, a sliding block horizontally moving relative to the fixed block, and a driving cylinder driving the sliding block to move, the fixed block and the side walls of the sliding block form a forming surface that fits the inner wall of the racket frame after forming, the pushing assembly comprises a driving rod rotatably connected to the frame along a vertical plane, a connecting rod fixedly connected to the side wall of the driving rod, and a pushing rod rotatably connected to one end of the connecting rod away from the driving rod, the end of the driving rod away from the connecting rod and the pushing rod away from the end of the connecting rod both pass through the workbench, and the present application has the effect of facilitating unloading.
[0004] During the production process of the racket production equipment in the above patent and the prior art, it is necessary to manually connect the carbon fiber racket frame and the carbon fiber racket shaft to the three-way joint respectively and then use adhesive to fix them. However, since the curing of the adhesive takes a certain amount of time and the carbon fiber racket frame is prone to generate rebound force after bending, the end of the carbon fiber racket frame may be separated from the three-way joint and shrink outward under the action of the rebound force, so that the end of the carbon fiber racket frame cannot be embedded to a sufficient depth, which is likely to affect the stability of the racket structure after molding. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] In view of the deficiencies of the prior art, the utility model provides a molding preheating workbench for racket production.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a forming preheating workbench for racket production, comprising a bottom plate, a vertical rod and an annular frame, a positioning tube being provided at the upper end of the annular frame, the bottom end of the vertical rod being inserted into the interior of the positioning tube, a vertical plate being fixedly arranged at the upper end of the bottom plate, a hot air blower being provided at the rear end of the vertical plate, a positioning seat being fixedly arranged at the front end of the vertical plate, the annular frame being penetrated by the positioning seat, a protective shell for limiting the annular frame being provided on the positioning seat, a screw being inserted into the interior of the positioning seat being threadedly connected to the positioning seat, a U-shaped air outlet block being provided above the positioning seat, a plurality of air outlet holes being provided at both ends of the U-shaped air outlet block, and the air outlet end of the hot air blower being connected to the U-shaped air outlet block through a duct.
[0009] In order to facilitate the assembly of the U-shaped air outlet block, the utility model has the following improvements: two fixing plates are symmetrically arranged at the rear end of the U-shaped air outlet block, and the fixing plates are fixed to the rear end of the vertical plate by screws.
[0010] In order to place the vertical rod more firmly, the utility model has the following improvements: a lifter is fixedly arranged on the top of the vertical plate, and a limit plate is provided at the output end of the lifter.
[0011] Furthermore, the utility model is improved in that two thrusters are symmetrically arranged in the middle part of the vertical plate, and the output ends of the thrusters are provided with clamping blocks for limiting the position of the vertical plate.
[0012] Furthermore, the utility model has the following improvements: the lifter and the thruster both adopt telescopic cylinders.
[0013] Furthermore, the present invention is improved in that handles are provided on both sides of the protective shell.
[0014] (III) Beneficial effects
[0015] Compared with the prior art, the utility model provides a molding preheating workbench for racket production, which has the following beneficial effects:
[0016] The molding preheating workbench used for racket production takes the vertical rod and inserts the bottom end of the vertical rod into the positioning tube so that the bottom end of the vertical rod is bonded to the inside of the positioning tube. During this process, since the structure is placed vertically, the glue can be filled more evenly in the positioning tube. Further starting the hot air blower can blow hot air out at the air outlet, which can provide a hot air heating effect to the positioning tube, accelerate the solidification of the glue, and improve the docking efficiency and docking quality of the vertical rod and the annular frame. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the structure of the utility model Figure 1 ;
[0018] Figure 2 This is a schematic diagram of the structure of the utility model Figure 2 ;
[0019] Figure 3 This is a schematic diagram of the structure of the utility model Figure 3 ;
[0020] Figure 4 For this utility model Figure 1 A schematic diagram of the local enlarged structure at point A in the middle;
[0021] In the figure: 1, bottom plate; 2, vertical plate; 3, positioning seat; 4, ring frame; 5, protective shell; 6, screw; 7, vertical rod; 8, lifter; 9, limit plate; 10, thruster; 11, clamping block; 12, positioning tube; 13, U-shaped air outlet block; 14, hot air blower; 15, duct; 16, fixing plate. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1-4The utility model is a molding preheating workbench for racket production, comprising a bottom plate 1, a vertical rod 7 and an annular frame 4, a positioning tube 12 is provided at the upper end of the annular frame 4, the bottom end of the vertical rod 7 is inserted into the interior of the positioning tube 12, a vertical plate 2 is fixedly arranged at the upper end of the bottom plate 1, a hot air blower 14 is provided at the rear end of the vertical plate 2, a positioning seat 3 is fixedly arranged at the front end of the vertical plate 2, the annular frame 4 is penetrated by the positioning seat 3, a protective shell 5 for limiting the annular frame 4 is provided on the positioning seat 3, a screw 6 inserted into the interior of the positioning seat 3 is provided in the middle part of the protective shell 5, the screw 6 is threadedly connected to the positioning seat 3, a U-shaped air outlet block 13 is provided above the positioning seat 3, and multiple air outlet blocks 13 are provided at both ends of the U-shaped air outlet block 13. An air outlet hole is formed, and the air outlet end of the hot air blower 14 is connected with the U-shaped air outlet block 13 through a duct 15. The annular frame 4 is placed on the positioning seat 3, and then the protective shell 5 is fixed on the positioning seat 3, so that the annular frame 4 is fixed on the positioning seat 3, and glue is added to the inside of the positioning tube 12. The vertical rod 7 is taken, and the bottom end of the vertical rod 7 is inserted into the positioning tube 12, so that the bottom end of the vertical rod 7 is bonded to the inside of the positioning tube 12. In this process, since this structure is placed vertically, the glue can be filled more evenly in the positioning tube 12. Further starting the hot air blower 14 can make hot air blow out at the air outlet, which can provide a hot air heating effect to the positioning tube 12, accelerate the solidification of the glue, and improve the docking efficiency and docking quality of the vertical rod 7 and the annular frame 4;
[0024] When the vertical rod 7 is connected to the positioning tube 12, the screw rod 6 is rotated, and then the protective shell 5 can be disassembled on the positioning seat 3, so that the annular frame 4 can be easily removed from the positioning seat 3, with a simple structure and convenient operation.
[0025] In this structure, two fixing plates 16 are symmetrically arranged at the rear end of the U-shaped air outlet block 13. The fixing plates 16 are fixed to the rear end of the vertical plate 2 by screws. The screw fixing method has the advantage of convenient assembly.
[0026] The lack of a limiting structure at the vertical rod 7 will make the vertical rod 7 not firmly placed on the front side of the vertical board 2. A lifter 8 is fixedly set on the top of the vertical board 2, and a limiting plate 9 is provided at the output end of the lifter 8. Two thrusters 10 are symmetrically arranged in the middle part of the vertical board 2, and a clamping block 11 for limiting the vertical board 2 is provided at the output end of the thruster 10. When the bottom end of the vertical rod 7 is inserted into the positioning tube 12, the lifter 8 is started, which can enable the lifter 8 to apply a pressure to the top end of the vertical rod 7, thereby limiting the top end of the vertical rod 7. Then, the thruster 10 is started, so that the two clamping blocks 11 clamp the vertical rod 7, thereby providing a limiting structure at the vertical rod 7, and making the vertical rod 7 more firmly placed on the front side of the vertical board 2.
[0027] Furthermore, the lifter 8 and the thruster 10 may both be telescopic cylinders.
[0028] Furthermore, handles are provided on both sides of the protective shell 5 to facilitate taking the protective shell 5 .
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A molding preheating workbench for racket production, comprising a bottom plate (1), a vertical rod (7) and an annular frame (4), wherein a positioning tube (12) is provided at the upper end of the annular frame (4), and the bottom end of the vertical rod (7) is inserted into the interior of the positioning tube (12), a vertical plate (2) is fixedly provided at the upper end of the bottom plate (1), and a hot air blower (14) is provided at the rear end of the vertical plate (2), characterized in that: A positioning seat (3) is fixedly arranged at the front end of the vertical plate (2), the annular frame (4) is penetrated by the positioning seat (3), a protective shell (5) for limiting the position of the annular frame (4) is provided on the positioning seat (3), a screw (6) inserted into the interior of the positioning seat (3) is provided at the middle part of the protective shell (5), the screw (6) is threadedly connected to the positioning seat (3), a U-shaped air outlet block (13) is provided above the positioning seat (3), a plurality of air outlet holes are provided at both ends of the U-shaped air outlet block (13), and an air outlet end of the hot air blower (14) is connected to the U-shaped air outlet block (13) via a duct (15).
2. A molding preheating workbench for racket production according to claim 1, characterized in that: Two fixing plates (16) are symmetrically arranged at the rear end of the U-shaped air outlet block (13), and the fixing plates (16) are fixed to the rear end of the vertical plate (2) by means of screws.
3. A molding preheating workbench for racket production according to claim 2, characterized in that: A lifter (8) is fixedly arranged on the top of the vertical plate (2), and a limit plate (9) is provided at the output end of the lifter (8).
4. A preheating workbench for racket production according to claim 3, characterized in that: Two thrusters (10) are symmetrically arranged in the middle part of the vertical plate (2), and a clamping block (11) for limiting the position of the vertical plate (2) is provided at the output end of the thruster (10).
5. A preheating workbench for racket production according to claim 4, characterized in that: The lifter (8) and the thruster (10) both use telescopic cylinders.
6. A preheating workbench for racket production according to claim 5, characterized in that: Handles are provided on both sides of the protective shell (5).
Citation Information
Patent Citations
Racket frame stretching forming machine
CN212528669U