A crane capable of lifting materials across a span

By designing a crane that can lift materials through the cross-span, the efficient lifting and transport of materials is achieved using upper and lower rails and hook structures, the problem of low efficiency in transport of traditional materials is solved and human and material resources are saved.

CN222699870UActive Publication Date: 2025-04-01LIAONING HUAYUAN HEAVY EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420757085.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2025-04-01
Estimated Expiration
2034-04-12

AI Technical Summary

Technical Problem

In multi-link workshops, traditional forklifts, cars or rail ground flat trucks are used for material transfer inefficient, which affects other work processes and wastes manpower and material resources.

Method used

A crane that can lift materials through the span is designed, including the crane body, upper track, lower track and hook structure. The lower track is driven to move along the upper track through two operating mechanisms, and the hook structure moves along the lower track to realize the lifting of materials through the span.

Benefits of technology

It improves the work efficiency of material transportation, saves human and material resources, and realizes efficient lifting and transport of materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222699870U_ABST
    Figure CN222699870U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of cranes, and in particular provides a crane capable of lifting materials across spans, comprising a crane body, an upper track fixedly connected below the main beam of the crane body, two ends of the upper track respectively close to the rail-bearing beams on both sides of the crane body, and a lower track slidably connected below the upper track through two operating mechanisms, one operating mechanism fixedly connected to one end of the upper track, and the other operating mechanism fixedly connected to the other end of the lower track, and a hook structure slidably connected to the lower track. When it is necessary to lift materials across spans, the utility model drives the lower track to move along the upper track through the two operating mechanisms, moves along the lower track through the hook structure, and finally crosses to between adjacent spans, thereby realizing lifting materials across spans, improving work efficiency, and saving manpower and material resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cranes, and in particular provides a crane capable of lifting materials across a span. Background Art

[0002] Many industries require the use of multi-span workshops. Therefore, during the work process, small materials often need to be transferred to adjacent spans. Generally, they are transported by forklifts, cars or rail-mounted flat cars. This has low work efficiency, affects the progress of other work on the ground, and wastes manpower and material resources. In order to solve the above technical problems, a crane that can lift materials across spans is needed. Utility Model Content

[0003] In order to solve the above technical problems, the utility model provides a crane capable of lifting materials across a span, thereby realizing lifting materials across a span.

[0004] The utility model is implemented in this way, providing a crane capable of lifting materials across a span, comprising a crane body, an upper track fixedly connected below the main beam of the crane body, two ends of the upper track respectively close to the track-bearing beams on both sides of the crane body, the lower part of the upper track is slidably connected to the lower track through two operating mechanisms, one operating mechanism is fixedly connected to one end of the upper track, the other operating mechanism is fixedly connected to the other end of the lower track, and a hook structure is slidably connected to the lower track.

[0005] Preferably, a limit baffle is fixedly provided on one side of the upper track, an upper limit block is fixedly provided in the middle section of the upper track, and a lower limit block is provided at one end of the lower track close to the limit baffle, and the sum of the heights of the upper limit block and the lower limit block is greater than the distance between the upper track and the lower track.

[0006] Further preferably, a supporting reverse roller is provided at the end of the lower rail on which the running mechanism is arranged, and the supporting reverse roller is in contact with the upper rail.

[0007] Further preferably, the upper rail is an H-shaped steel or an I-shaped steel; the lower rail is an H-shaped steel or an I-shaped steel or a welded box beam rail.

[0008] Further preferably, the hook structure is an electric hoist.

[0009] Compared with the prior art, the advantages of the utility model are:

[0010] The utility model provides a crane capable of lifting materials across spans. When it is necessary to lift materials across spans, two operating mechanisms are used to drive a lower track to move along an upper track, and a hook structure is used to move along the lower track, and finally the crane crosses between adjacent spans to lift materials across spans, thereby improving work efficiency and saving manpower and material resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The present invention is further described in detail below with reference to the accompanying drawings and implementation modes:

[0012] Figure 1 It is a schematic diagram of the structure of the utility model;

[0013] Figure 2 This is a schematic diagram of the structure of the utility model for lifting materials across a span;

[0014] Figure 3 for Figure 2 Enlarged view of part A. DETAILED DESCRIPTION

[0015] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0016] refer to Figure 1 , Figure 2 and Figure 3 The utility model provides a crane capable of lifting materials across a span, including a crane body 1, an upper rail 3 fixedly connected below a main beam 2 of the crane body 1, two ends of the upper rail 3 respectively close to rail-bearing beams 10 on both sides of the crane body 1, the lower part of the upper rail 3 is slidably connected to a lower rail 4 through two operating mechanisms, one operating mechanism is fixedly connected to one end of the upper rail 3, and the other operating mechanism is fixedly connected to the other end of the lower rail 4, and a hook structure 5 is slidably connected to the lower rail 4.

[0017] In this embodiment, the operating mechanism includes a left operating mechanism 11 and a right operating mechanism 12. The left operating mechanism 11 is installed on the upper track 3, and the right operating mechanism 12 is installed on the lower track 4. During the operation of the utility model, the operating mechanism drives the lower track 4 to move to the left, and the hook structure 5 is also connected to the lower track 4 through the operating mechanism. The hook structure 5 runs to the left on the lower track 4 until the hook structure 5 reaches the middle of the adjacent span to transport materials or hook up materials. After completion, it runs back to its original position in the opposite direction.

[0018] In order to limit the position, as an improvement of the technical solution, a limit baffle 6 is fixedly provided on the right side of the upper rail 3, an upper limit stopper 7 is fixedly provided in the middle section of the upper rail 3, and a lower limit stopper 8 is provided at one end of the lower rail 4 close to the limit baffle 6, and the sum of the heights of the upper limit stopper 7 and the lower limit stopper 8 is greater than the distance between the upper rail 3 and the lower rail 4.

[0019] When the lower track 4 moves to the right, the limit baffle 6 limits the extreme position of its right end. When the lower track 4 moves to the left, the lower limit block 8 moves to contact the upper limit block 7, limiting the extreme position of the left end of the lower track 4.

[0020] In order to support the end of the lower rail 4 away from the material during the process of lifting the material, as an improvement of the technical solution, a supporting reverse roller 9 is provided at the end of the lower rail 4 on one side of the running mechanism, and the supporting reverse roller 9 is in contact with the upper rail 3.

[0021] According to different required load-bearing capacity, as an improvement of the technical solution, the upper track 3 is an H-shaped steel or an I-shaped steel; the lower track 4 is an H-shaped steel or an I-shaped steel or a welded box beam track.

[0022] Preferably, the hook structure 5 is an electric hoist.

[0023] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of the present invention.

Claims

1. A crane capable of lifting materials across a span, characterized in that: The invention comprises a crane body (1), an upper rail (3) fixedly connected below a main beam (2) of the crane body (1), two ends of the upper rail (3) respectively close to rail-bearing beams (10) on both sides of the crane body (1), the lower part of the upper rail (3) being slidably connected to a lower rail (4) via two operating mechanisms, one operating mechanism being fixedly connected to one end of the upper rail (3), the other operating mechanism being fixedly connected to the other end of the lower rail (4), and a hook structure (5) being slidably connected to the lower rail (4).

2. The crane capable of lifting materials across a span according to claim 1, characterized in that: A limit baffle (6) is fixedly provided on one side of the upper track (3), an upper limit baffle (7) is fixedly provided in the middle section of the upper track (3), and a lower limit baffle (8) is provided at one end of the lower track (4) close to the limit baffle (6), wherein the sum of the heights of the upper limit baffle (7) and the lower limit baffle (8) is greater than the distance between the upper track (3) and the lower track (4).

3. The crane capable of lifting materials across a span according to claim 1, characterized in that: A supporting reverse roller (9) is provided at the end of the lower rail (4) on one side of the running mechanism, and the supporting reverse roller (9) is in contact with the upper rail (3).

4. The crane capable of lifting materials across a span according to claim 1, characterized in that: The upper track (3) is an H-shaped steel or an I-shaped steel; the lower track (4) is an H-shaped steel or an I-shaped steel or a welded box beam track.

5. The crane capable of lifting materials across a span according to claim 1, characterized in that: The hook structure (5) is an electric hoist.