A steel sling mechanism for a bridge construction hanging basket
By designing a steel suspender mechanism for bridge construction hanging baskets, the sliding connection between the lifting components and the suspender is used to realize arbitrary adjustment of the elevation of the steel suspender, and the stability and wear-proof effect of the steel suspender are ensured through special structural design, solving the problems of insufficient adjustment accuracy and poor support stability in the prior art.
Patent Information
- Application Number
- CN202421165218.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-27
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2034-05-27
AI Technical Summary
During the existing bridge construction, the adjustment accuracy of the hanging basket steel suspenders is insufficient, and the distance between the locking pin holes limits the minimum adjustment stage, resulting in poor support stability and wear-proof effect of the steel suspenders.
A steel suspender mechanism for bridge construction hanging basket is designed, and the lifting component is used to drive the second cross beam to move, and is slidably connected to the first cross beam and the second cross beam through the suspender, so as to adjust the elevation of the steel suspender within any range. At the same time, through the connecting holes, fixing ear seats, connecting nails and mating holes, the support stability of the steel suspender is ensured, and the wear-proof effect is achieved through the rubber pads and fixing plates.
The elevation of the hanging basket steel suspender is adjusted within any range, ensuring the support stability of the steel suspender, and having an anti-wear effect, making it easy to replace the worn rubber pad.
Smart Images

Figure CN222700830U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge construction, in particular to a steel sling mechanism for a hanging basket in bridge construction. Background Art
[0002] At present, my country's bridge construction is developing very rapidly, and the bridge structures are also diverse. Due to the limitations of geographical environment and construction conditions, in most cases bridges are constructed using hanging basket suspended pouring.
[0003] As a major component of the hanging basket structure, the steel sling plays the role of bearing and transmitting construction loads. During the construction of the hanging basket, the elevation of the steel sling needs to be adjusted in real time according to the on-site measurement, and the adjustment accuracy is usually at the millimeter level. However, due to the structural characteristics and load-bearing requirements of the steel sling, the locking pin holes on the steel sling need to be arranged according to a certain spacing value. Therefore, the minimum adjustment level of the steel sling elevation adjustment by the locking pin is the locking pin hole spacing value. During the construction process, in order to achieve the purpose of fine-tuning the steel sling, the steel sling is usually adjusted steplessly by padding the steel plate at the steel sling locking pin position. However, the adjustment accuracy of this method still depends on the minimum thickness of a single steel plate, and multiple layers of steel plates need to be stacked to adjust the padding within the locking pin hole spacing range, and the support stability of the steel sling locking pin cannot be guaranteed. Utility Model Content
[0004] In view of the above situation, in order to overcome the defects of the prior art, the present invention provides a steel sling mechanism for a bridge construction hanging basket, which can realize the adjustment of the elevation of the hanging basket steel sling within any range, effectively solves the adjustment problem of the hanging basket steel sling, ensures the support stability of the steel sling, plays an anti-wear effect, and facilitates the replacement of worn rubber pads.
[0005] The technical solution adopted by the utility model is as follows: This solution provides a steel sling mechanism for a bridge construction hanging basket, including a first crossbeam, a second crossbeam, a sling and a lifting assembly, the second crossbeam is arranged above the first crossbeam, and the second crossbeam is opposite to the first crossbeam, the lifting assembly is symmetrically fixedly connected to both sides of the top of the first crossbeam, and the lifting assembly is slidably connected to the bottom of the second crossbeam, the sling is slidably connected to the first crossbeam and the second crossbeam, and the sling is arranged between the lifting assemblies on both sides.
[0006] Preferably, the lifting assembly includes a lifting motor, a bearing seat, a bidirectional screw, a first driving block, a second driving block, a first sliding block, a second sliding block, a first connecting rod and a second connecting rod, the bearing seat is symmetrically fixedly connected to both sides of the top of the first beam, the bidirectional screw is rotatably connected to the bearing seat, the first driving block is slidably connected to one side of the top of the first beam, the first driving block is threadedly connected to one side of the bidirectional screw, the second driving block is slidably connected to the other side of the top of the first beam, the second driving block is threadedly connected to the other side of the bidirectional screw, the first sliding block is slidably connected to one side of the bottom of the second beam, and the second sliding block is slidably connected to the other side of the bottom of the second beam, one end of the first connecting rod is hinged on the first sliding block, the other end of the first connecting rod is hinged on the second driving block, one end of the second connecting rod is hinged on the second sliding block, the other end of the second connecting rod is hinged on the first driving block, the intersection of the first connecting rod and the second connecting rod is hinged, the lifting motor fixedly connects to one side of the first beam, and the output end of the lifting motor is connected to the bidirectional screw.
[0007] Preferably, a motor frame is fixedly connected to one side of the first cross beam, and the lifting motor is fixedly connected to the motor frame.
[0008] Preferably, fixed ear seats are symmetrically fixedly connected to the top of the second cross beam, the fixed ear seats are arranged on both sides of the sling, and matching holes are provided on the fixed ear seats.
[0009] Preferably, the sling is evenly provided with connecting holes, the connecting holes are opposite to the matching holes, the fixing ear seat is pinned with connecting nails, and the connecting nails match with the connecting holes and the matching holes.
[0010] Preferably, rubber pads are provided on both sides of the bottom of the first cross beam, the rubber pads contact the sling, and fixing plates are fixedly connected on both sides of the rubber pads, fixing bolts are threadedly connected to the fixing plates, and the fixing bolts are threadedly connected to the first cross beam.
[0011] The beneficial effects achieved by the utility model using the above structure are as follows:
[0012] 1. The lifting assembly drives the second crossbeam to move, so that the height of the steel sling of the hanging basket can be adjusted within any range, which effectively solves the adjustment problem of the steel sling of the hanging basket.
[0013] 2. The connection holes, fixing ears, connection nails and matching holes are used to ensure the stability of the steel sling support. The rubber pads have an anti-wear effect. The fixing plates and fixing bolts are used to facilitate the replacement of worn rubber pads. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic diagram of the overall structure of this scheme;
[0015] Figure 2 This is a schematic diagram of the three-dimensional structure of this scheme.
[0016] Among them, 1. the first crossbeam, 2. the second crossbeam, 3. the sling, 4. the lifting assembly, 5. the lifting motor, 6. the bearing seat, 7. the bidirectional screw, 8. the first driving block, 9. the second driving block, 10. the first sliding block, 11. the second sliding block, 12. the first connecting rod, 13. the second connecting rod, 14. the motor frame, 15. the connecting hole, 16. the fixing ear seat, 17. the connecting nail, 18. the matching hole, 19. the fixing plate, 20. the rubber pad, 21. the fixing bolt.
[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. They are used together with the embodiments of the present invention to explain the present invention and do not constitute a limitation to the present invention. DETAILED DESCRIPTION
[0018] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0019] like Figure 1-Figure 2 As shown, the present scheme is a steel sling mechanism for a bridge construction hanging basket, comprising a first crossbeam 1, a second crossbeam 2, a sling 3 and a lifting assembly 4, wherein the second crossbeam 2 is arranged above the first crossbeam 1, and the second crossbeam 2 is opposite to the first crossbeam 1, the lifting assembly 4 is symmetrically fixedly connected to both sides of the top of the first crossbeam 1, and the lifting assembly 4 is slidably connected to the bottom of the second crossbeam 2, the sling 3 is slidably connected to the first crossbeam 1 and the second crossbeam 2, the sling 3 is arranged between the lifting assemblies 4 on both sides, and the top of the second crossbeam 2 is symmetrically fixedly connected with a fixed ear seat 16 A fixing ear seat 16 is arranged on both sides of the sling 3, and a matching hole 18 is arranged on the fixing ear seat 16. The sling 3 is evenly provided with connecting holes 15, and the connecting holes 15 are opposite to the matching holes 18. A connecting nail 17 is pinned on the fixing ear seat 16, and the connecting nail 17 cooperates with the connecting hole 15 and the matching hole 18. Rubber pads 20 are arranged on both sides of the bottom of the first crossbeam 1, and the rubber pad 20 contacts the sling 3. Fixing plates 19 are fixedly connected on both sides of the rubber pad 20, and fixing bolts 21 are threadedly connected to the fixing plate 19, and the fixing bolts 21 are threadedly connected to the first crossbeam 1.
[0020] Among them, the lifting component 4 includes a lifting motor 5, a bearing seat 6, a bidirectional screw 7, a first driving block 8, a second driving block 9, a first sliding block 10, a second sliding block 11, a first connecting rod 12 and a second connecting rod 13. The bearing seat 6 is symmetrically fixedly connected to both sides of the top of the first beam 1, the bidirectional screw 7 is rotatably connected to the bearing seat 6, the first driving block 8 is slidably connected to one side of the top of the first beam 1, the first driving block 8 is threadedly connected to one side of the bidirectional screw 7, the second driving block 9 is slidably connected to the other side of the top of the first beam 1, and the second driving block 9 is threadedly connected to the other side of the bidirectional screw 7 Connection, the first sliding block 10 is slidably connected to one side of the bottom of the second beam 2, the second sliding block 11 is slidably connected to the other side of the bottom of the second beam 2, one end of the first connecting rod 12 is hinged to the first sliding block 10, the other end of the first connecting rod 12 is hinged to the second driving block 9, one end of the second connecting rod 13 is hinged to the second sliding block 11, the other end of the second connecting rod 13 is hinged to the first driving block 8, the intersection of the first connecting rod 12 and the second connecting rod 13 is hinged, the lifting motor 5 fixes the connecting body to one side of the first beam 1, and the output end of the lifting motor 5 is connected to the bidirectional screw 7.
[0021] A motor frame 14 is fixedly connected to one side of the first cross beam 1 , and the lifting motor 5 is fixedly connected to the motor frame 14 .
[0022] Embodiment 1: first place the device in a suitable position, set the sling 3 between the first beam 1 and the second beam 2, align the connecting hole 15 with the matching hole 18, connect the connecting nail 17 in the connecting hole 15 and the matching hole 18, so as to ensure the support stability of the steel sling 3. When the adjustment range exceeds the connecting hole 15, remove the connecting nail 17 and replace the corresponding connecting hole 15 for connection. At the same time, the rubber pad 20 is attached to the sling 3, and then the fixing plate 19 is attached to the bottom of the first beam 1, and then the fixing bolt 21 is turned, and the fixing thread presses the fixing plate 19 onto the bottom of the first beam 1.
[0023] Embodiment 2: This embodiment is adjusted based on the previous embodiment.
[0024] Specifically, when adjusting within the range of the connecting hole 15, the lifting motor 5 is started, and the lifting motor 5 drives the bidirectional screw 7 to rotate on the bearing seat 6, and the bidirectional screw 7 drives the first driving block 8 and the second driving block 9 to move, and the first driving block 8 and the second driving block 9 drive the first connecting rod 12 and the second connecting rod 13 to move, and the first connecting rod 12 and the second connecting rod 13 drive the first driving block 8 and the second driving block 9 to slide at the bottom of the second beam 2, thereby pushing the second beam 2, changing the distance between the second beam 2 and the first beam 1, and thereby driving the sling 3 to move, thereby realizing the adjustment of the elevation of the steel sling 3 of the hanging basket within any range, effectively solving the adjustment problem of the steel sling 3 of the hanging basket.
[0025] The above description of the utility model and its implementation methods is not restrictive. The drawings are only one of the implementation methods of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.
Claims
1. A steel sling mechanism for a bridge construction hanging basket, comprising a first crossbeam, characterized in that: It also includes a second crossbeam, a sling and a lifting assembly, wherein the second crossbeam is arranged above the first crossbeam, and the second crossbeam is opposite to the first crossbeam, the lifting assembly is symmetrically fixedly connected to both sides of the top of the first crossbeam, and the lifting assembly is slidably connected to the bottom of the second crossbeam, the sling is slidably connected to the first crossbeam and the second crossbeam, and the sling is arranged between the lifting assemblies on both sides; The lifting assembly includes a lifting motor, a bearing seat, a bidirectional screw, a first driving block, a second driving block, a first sliding block, a second sliding block, a first connecting rod and a second connecting rod. The bearing seat is symmetrically fixedly connected to both sides of the top of the first beam, and the bidirectional screw is rotatably connected to the bearing seat. The first driving block is slidably connected to one side of the top of the first beam, the first driving block is threadedly connected to one side of the bidirectional screw, the second driving block is slidably connected to the other side of the top of the first beam, the second driving block is threadedly connected to the other side of the bidirectional screw, the first sliding block is slidably connected to one side of the bottom of the second beam, and the second sliding block is slidably connected to the other side of the bottom of the second beam, one end of the first connecting rod is hinged on the first sliding block, the other end of the first connecting rod is hinged on the second driving block, one end of the second connecting rod is hinged on the second sliding block, and the other end of the second connecting rod is hinged on the first driving block, the intersection of the first connecting rod and the second connecting rod is hinged, the lifting motor fixed connection body is on one side of the first beam, and the output end of the lifting motor is connected to the bidirectional screw.
2. A steel sling mechanism for a bridge construction hanging basket according to claim 1, characterized in that: A motor frame is fixedly connected to one side of the first cross beam, and the lifting motor is fixedly connected to the motor frame.
3. The steel sling mechanism for a bridge construction hanging basket according to claim 2 is characterized in that: The top of the second cross beam is symmetrically fixedly connected with fixed ear seats, the fixed ear seats are arranged on both sides of the sling, and the fixed ear seats are provided with matching holes.
4. The steel sling mechanism for a bridge construction hanging basket according to claim 3 is characterized by: The sling is evenly provided with connecting holes, the connecting holes are opposite to the matching holes, the fixing ear seat is pinned with connecting nails, and the connecting nails match the connecting holes and the matching holes.
5. The steel sling mechanism for a bridge construction hanging basket according to claim 4, characterized in that: Rubber pads are provided at both sides of the bottom of the first cross beam, the rubber pads contact the sling, and fixing plates are fixedly connected at both sides of the rubber pads. Fixing bolts are threadedly connected to the fixing plates, and the fixing bolts are threadedly connected to the first cross beam.