A road cutting pile-sheet wall structure
By pre-embedding of steel pipes and perforated steel bars in the cantilever section of the anti-sliding pile and fixedly connecting them with the transverse steel bars in the retaining plate, the problem of drilling and planting ribs easily drilling and breaking the main ribs and stirrups of the anti-sliding piles in the existing technology is solved, and the connection firmness and construction efficiency of the anti-sliding piles and the retaining plate are improved.
Patent Information
- Application Number
- CN202420984929.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2034-05-08
AI Technical Summary
The prior art drills holes and planting ribs on cast anti-slip piles, which can easily drill and break the main ribs and stirrups of the anti-slip piles, reducing the positive cross-section resistance and inclined cross-section shear resistance of the anti-slip piles.
A plurality of first embedded steel pipes and second embedded steel pipes are embedded in the cantilever section of the anti-sliding pile, and the first perforated steel bars and the second perforated steel bars are inserted into these embedded steel pipes, and fixedly connected with the transverse steel bars in the retaining plate to avoid on-site drilling and implantation.
Through the design of embedded steel pipes and perforated steel bars, the main ribs and stirrups of anti-slip piles are avoided from being drilled and broken, and the connection between the anti-slip piles and the retaining plate is improved, so that the joint stress effect of the anti-slip piles and the retaining plate is fully utilized, and the construction progress is accelerated and construction costs are reduced.
Smart Images

Figure CN222701038U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of anti-sliding retaining structures, and in particular to a road cutting pile-sheet wall structure. Background Art
[0002] The pile-sheet wall is a slope retaining structure composed of anti-slide piles and retaining plates. This structure has the advantages of good support and reinforcement effect, strong slope shrinkage ability, and can be used for "reverse construction". It is widely used in slope reinforcement and protection or landslide control. In the construction of anti-slide piles, after the construction of the anti-slide piles is completed, the soil in front of the piles of the cantilever section needs to be excavated. In order to avoid soil collapse, it is necessary to construct a retaining plate structure between two adjacent anti-slide piles to support the soil.
[0003] In order to make the anti-sliding pile and the retaining plate jointly bear the soil pressure of the slope or the sliding force of the landslide, the existing technology is to drill holes on the anti-sliding piles that have been cast, plant reinforcement, and weld them with the transverse reinforcement in the retaining plate. The steel cage of the anti-sliding pile is hidden under the protective layer, and the pile body reinforcement is relatively dense. The main disadvantages of the existing technology are as follows: it is very easy to touch the reinforcement when drilling and planting reinforcement, and it is impossible to go deep, resulting in insufficient anchoring depth, which seriously affects the firmness of the anti-sliding pile and the retaining plate; the reinforcement of the anti-sliding pile is relatively hidden, and in order to avoid the reinforcement, it is necessary to constantly test and rework when drilling, which seriously affects the strength and construction progress of the anti-sliding pile; when drilling and planting reinforcement are not careful, it is very easy to drill off the main reinforcement and stirrups of the anti-sliding pile, reducing the bending resistance of the positive section and the shear resistance of the inclined section of the anti-sliding pile, which brings potential threats to slope reinforcement and management. Utility Model Content
[0004] The embodiment of the present application provides a road cutting pile-board wall structure, which solves the technical problem in the prior art that drilling holes and planting reinforcement bars on the cast anti-sliding piles can easily break the main reinforcement and stirrups of the anti-sliding piles, thereby reducing the anti-bending capacity of the anti-sliding piles in the normal section and the anti-shear capacity of the oblique section.
[0005] An embodiment of the present application provides a road cutting pile-board wall structure, comprising an anti-slip pile and a retaining plate; a groove is provided on the retaining plate facing the anti-slip pile, at least part of the anti-slip pile is located in the groove and is connected to the groove; a plurality of first pre-buried steel pipes and a plurality of second pre-buried steel pipes are provided in the cantilever section of the anti-slip pile, the plurality of first pre-buried steel pipes and the plurality of second pre-buried steel pipes are all arranged at intervals along the height direction of the anti-slip pile, and both ends of the plurality of first pre-buried steel pipes and the plurality of second pre-buried steel pipes extend to the outer wall of the anti-slip pile; the first pre-buried steel pipe and the second pre-buried steel pipe are arranged at intervals along the horizontal plane of the anti-slip pile, and the first pre-buried steel pipe and the second pre-buried steel pipe are both in the horizontal plane with the vertical steel bars of the anti-slip pile. The projections do not overlap; at least two first fixed steel bars are arranged at the bottom of each of the first embedded steel pipes, and at least two second fixed steel bars are arranged at the bottom of each of the second embedded steel pipes; the first fixed steel bar and the second fixed steel bar are fixedly connected to the transverse stirrups of the anti-sliding piles; a plurality of first perforated steel bars and a plurality of second perforated steel bars are respectively arranged in the plurality of the first embedded steel pipes and the plurality of the second embedded steel pipes; both ends of the plurality of the first perforated steel bars and the plurality of the second perforated steel bars extend into the retaining plate; the plurality of first transverse steel bars in the retaining plate are fixedly connected to the corresponding first perforated steel bars, and the plurality of second transverse steel bars in the retaining plate are fixedly connected to the corresponding second perforated steel bars.
[0006] In a possible implementation, the first fixing steel bar and the second fixing steel bar are both Grade III threaded steel bars.
[0007] In a possible implementation, the cutting pile-sheet wall structure further includes a pipe cap; both ends of the first pre-buried steel pipe and the second pre-buried steel pipe are provided with the pipe cap.
[0008] In a possible implementation manner, the first perforated steel bars are welded to both ends of the first pre-embedded steel pipe; and the second perforated steel bars are welded to both ends of the second pre-embedded steel pipe.
[0009] In a possible implementation, the first transverse steel bar in the retaining plate is welded to the first perforated steel bar, and the welding length thereof is not less than 500 mm; the second transverse steel bar in the retaining plate is welded to the second perforated steel bar, and the welding length thereof is not less than 500 mm.
[0010] In a possible implementation, both ends of the first embedded steel pipe and the second embedded steel pipe extend out of the anti-sliding pile by a length of 50 mm.
[0011] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects:
[0012] The road cutting pile-slab wall structure provided in the embodiment of the present application includes anti-sliding piles and retaining plates. When making the steel cage of the anti-sliding piles, the first embedded steel pipe and the second embedded steel pipe are arranged at a certain distance along the height direction of the cantilever section of the anti-sliding pile. The vertical spacing between the first embedded steel pipe and the second embedded steel pipe is determined according to the position of the first transverse reinforcement and the second transverse reinforcement in the retaining plate, and the first embedded steel pipe is fixedly connected to the two first fixed reinforcements at its bottom, and the second embedded steel pipe is fixedly connected to the two second fixed reinforcements at its bottom, and then the first fixed reinforcement and the second fixed reinforcement are respectively connected to the transverse stirrups of the anti-sliding pile; when the steel cage of the anti-sliding pile is hoisted on site, After the concrete is poured and cured, the slope is excavated downward from the top of the anti-sliding pile to expose the cantilever section of the anti-sliding pile; the surface cement mortar at the ends of the first embedded steel pipe and the second embedded steel pipe is chiseled off, and the first perforated steel bar and the second perforated steel bar are respectively inserted into the channels of the first embedded steel pipe and the second embedded steel pipe, and are respectively fixedly connected to the first embedded steel pipe and the second embedded steel pipe; the first transverse steel bar and the second transverse steel bar in the retaining plate are respectively fixedly connected to the first perforated steel bar and the second perforated steel bar; the concrete of the retaining plate is cast in a formwork to connect the anti-sliding pile and the retaining plate. Therefore, the road cutting pile-slab wall structure of the embodiment of the present application is to pre-embed the first embedded steel pipe and the second embedded steel pipe in the anti-sliding pile, avoiding on-site drilling and reinforcing bar planting, thereby avoiding drilling off the main reinforcement and stirrups of the anti-sliding pile, making the anti-sliding pile and the retaining plate more firmly connected, and thus making the joint force effect of the anti-sliding pile and the retaining plate fully exerted, while speeding up the construction progress and reducing the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments of the present application will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0014] Figure 1 A schematic diagram of the structure of a cutting pile-sheet wall structure provided in an embodiment of the present application;
[0015] Figure 2 A top view of a cutting pile-sheet wall structure provided in an embodiment of the present application;
[0016] Figure 3 A schematic diagram of the structure of the first embedded steel pipe provided in an embodiment of the present application;
[0017] Figure 4 A schematic diagram of the structure of the first fixed steel bar and the second fixed steel bar provided in an embodiment of the present application;
[0018] Figure 5A schematic diagram of the structure of a first embedded steel pipe and a pipe cap provided in an embodiment of the present application;
[0019] Figure 6 A schematic diagram of the structure of a tube cap provided in an embodiment of the present application.
[0020] Figure numerals: 1-anti-slip piles; 11-first embedded steel pipe; 111-first perforated steel bars; 12-second embedded steel pipe; 121-second perforated steel bars; 13-vertical steel bars; 14-transverse stirrups; 15-first fixed steel bars; 16-second fixed steel bars; 2-retaining board; 21-first transverse steel bars; 22-second transverse steel bars; 3-pipe caps. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0022] In the description of the embodiments of the present application, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the embodiments of the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. The terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance. In addition, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.
[0023] The present application embodiment provides a road cutting pile-sheet wall structure, such as Figures 1 to 6As shown. The road cutting pile-board wall structure includes an anti-sliding pile 1 and a retaining plate 2. A groove is provided on the side of the retaining plate 2 facing the anti-sliding pile 1, and at least part of the anti-sliding pile 1 is located in the groove and connected to the groove. A plurality of first pre-embedded steel pipes 11 and a plurality of second pre-embedded steel pipes 12 are provided in the cantilever section of the anti-sliding pile 1, and the plurality of first pre-embedded steel pipes 11 and the plurality of second pre-embedded steel pipes 12 are arranged at intervals along the height direction of the anti-sliding pile 1, and both ends of the plurality of first pre-embedded steel pipes 11 and the plurality of second pre-embedded steel pipes 12 extend to the outer wall of the anti-sliding pile 1. The first pre-embedded steel pipe 11 and the second pre-embedded steel pipe 12 are both reserved passages for the first perforated steel bar 111 and the second perforated steel bar 121.
[0024] The first embedded steel pipe 11 and the second embedded steel pipe 12 are arranged at intervals along the horizontal plane of the anti-sliding pile 1, and the first embedded steel pipe 11 and the second embedded steel pipe 12 do not overlap with the projection of the vertical steel bar 13 of the anti-sliding pile 1 on the horizontal plane. At least two first fixed steel bars 15 are arranged at the bottom of each first embedded steel pipe 11, and at least two second fixed steel bars 16 are arranged at the bottom of each second embedded steel pipe 12. The first fixed steel bars 15 and the second fixed steel bars 16 are both fixedly connected to the transverse stirrups 14 of the anti-sliding pile 1. Two first fixed steel bars 15 are arranged at the bottom of the first embedded steel pipe 11 of the embodiment of the present application, and the two first fixed steel bars 15 provide support for the first embedded steel pipe 11. Similarly, two second fixed steel bars 16 are arranged at the bottom of the second embedded steel pipe 12, and the two second fixed steel bars 16 provide support for the second embedded steel pipe 12.
[0025] Specifically, the first embedded steel pipe 11 is welded to the first fixed steel bar 15 , the second embedded steel pipe 12 is welded to the second fixed steel bar 16 , and both the first fixed steel bar 15 and the second fixed steel bar 16 are spot welded to the transverse stirrups 14 of the anti-sliding pile 1 .
[0026] A plurality of first perforated steel bars 111 and a plurality of second perforated steel bars 121 are respectively arranged in the plurality of first embedded steel pipes 11 and the plurality of second embedded steel pipes 12. Both ends of the plurality of first perforated steel bars 111 and the plurality of second perforated steel bars 121 extend into the retaining plate 2. The plurality of first transverse steel bars 21 in the retaining plate 2 are fixedly connected to the corresponding first perforated steel bars 111, and the plurality of second transverse steel bars 22 in the retaining plate 2 are fixedly connected to the corresponding second perforated steel bars 121.
[0027] Specifically, the outer diameters of the first embedded steel pipe 11 and the second embedded steel pipe 12 of the embodiment of the present application are both 42 mm, and the wall thicknesses are both 3.5 mm. The middle of the first embedded steel pipe 11 is not less than 150 mm away from the outer wall of the anti-slip pile 1, and the lateral spacing between the first embedded steel pipe 11 and the second embedded steel pipe 12 is not less than 100 mm.
[0028] It should be noted that when making the steel cage of the anti-sliding pile 1, the first embedded steel pipe 11 and the second embedded steel pipe 12 are arranged at a certain distance along the height direction of the cantilever section of the anti-sliding pile 1, and the vertical spacing of the first embedded steel pipe 11 and the second embedded steel pipe 12 is determined according to the position of the first transverse reinforcement 21 and the second transverse reinforcement 22 in the retaining plate 2, and the first embedded steel pipe 11 is fixedly connected to the two first fixed reinforcements 15 at the bottom thereof, and the second embedded steel pipe 12 is fixedly connected to the two second fixed reinforcements 16 at the bottom thereof, and then the first fixed reinforcement 15 and the second fixed reinforcement 16 are respectively connected to the transverse stirrups 14 of the anti-sliding pile 1; when the steel cage of the anti-sliding pile 1 is hoisted on site, After the installation is in place, the concrete is poured and cured, the slope is excavated downward from the top of the anti-sliding pile 1 to expose the cantilever section of the anti-sliding pile 1; the surface cement mortar at the ends of the first pre-buried steel pipe 11 and the second pre-buried steel pipe 12 is chiseled off, and the first perforated steel bar 111 and the second perforated steel bar 121 are respectively inserted into the channels of the first pre-buried steel pipe 11 and the second pre-buried steel pipe 12, and are respectively fixedly connected to the first pre-buried steel pipe 11 and the second pre-buried steel pipe 12; the first transverse steel bar 21 and the second transverse steel bar 22 in the retaining plate 2 are respectively fixedly connected to the first perforated steel bar 111 and the second perforated steel bar 121; the concrete of the retaining plate 2 is poured with a formwork to connect the anti-sliding pile 1 and the retaining plate 2. Therefore, the road cutting pile-board wall structure of the embodiment of the present application is to pre-embed the first pre-embedded steel pipe 11 and the second pre-embedded steel pipe 12 in the anti-sliding pile 1, avoiding on-site drilling and planting of reinforcement bars, thereby avoiding drilling off the main reinforcement and stirrups of the anti-sliding pile 1, making the connection between the anti-sliding pile 1 and the retaining board 2 more firmly, thereby making the joint force effect of the anti-sliding pile 1 and the retaining board 2 fully exerted, while accelerating the construction progress and reducing the construction cost.
[0029] In the embodiment of the present application, the first fixing steel bar 15 and the second fixing steel bar 16 are both Grade III threaded steel bars.
[0030] In the embodiment of the present application, the road cutting pile sheet wall structure also includes a pipe cap 3. Pipe caps 3 are provided at both ends of the first embedded steel pipe 11 and the second embedded steel pipe 12. Specifically, the inner diameter of the pipe cap 3 in the embodiment of the present application is 42.5 mm, the wall thickness is 1.5 mm, and the height is 40 mm. The pipe caps 3 are tightened with the first embedded steel pipe 11 and the second embedded steel pipe 12 respectively. During construction, the surface cement mortar of the ends of the first embedded steel pipe 11 and the second embedded steel pipe 12 is chiseled off, and the pipe cap 3 is pried open, and then the first perforated steel bar 111 and the second perforated steel bar 121 are respectively inserted into the first embedded steel pipe 11 and the second embedded steel pipe 12. The pipe cap 3 can prevent the first embedded steel pipe 11 and the second embedded steel pipe 12 from being blocked when pouring the concrete of the anti-slip pile 1.
[0031] In the embodiment of the present application, the first perforated steel bar 111 is welded to both ends of the first embedded steel pipe 11. The second perforated steel bar 121 is welded to both ends of the second embedded steel pipe 12. In the embodiment of the present application, the first perforated steel bar 111 is spot welded to both ends of the first embedded steel pipe 11, and the second perforated steel bar 121 is spot welded to both ends of the second embedded steel pipe 12.
[0032] In the embodiment of the present application, the first transverse reinforcement 21 in the retaining plate 2 is welded to the first perforated reinforcement 111, and the welding length thereof is not less than 500 mm. The second transverse reinforcement 22 in the retaining plate 2 is welded to the second perforated reinforcement 121, and the welding length thereof is not less than 500 mm.
[0033] In the embodiment of the present application, both ends of the first embedded steel pipe 11 and the second embedded steel pipe 12 extend out of the anti-sliding pile 1 by a length of 50 mm.
[0034] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other. Each embodiment focuses on the differences from other embodiments.
[0035] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit the present application. Although the present application has been described in detail with reference to the aforementioned embodiments, a person of ordinary skill in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the present application.
Claims
1. A road cutting pile-sheet wall structure, characterized in that: It comprises an anti-slide pile (1) and a retaining plate (2); A groove is provided on one side of the retaining plate (2) facing the anti-slip pile (1), and at least a portion of the anti-slip pile (1) is located in the groove and connected to the groove; A plurality of first pre-buried steel pipes (11) and a plurality of second pre-buried steel pipes (12) are arranged in the cantilever section of the anti-sliding pile (1); the plurality of first pre-buried steel pipes (11) and the plurality of second pre-buried steel pipes (12) are arranged at intervals along the height direction of the anti-sliding pile (1), and both ends of the plurality of first pre-buried steel pipes (11) and the plurality of second pre-buried steel pipes (12) extend to the outer wall of the anti-sliding pile (1); The first embedded steel pipe (11) and the second embedded steel pipe (12) are arranged at intervals along the horizontal plane of the anti-sliding pile (1), and the first embedded steel pipe (11) and the second embedded steel pipe (12) do not overlap with the projection of the vertical steel bars (13) of the anti-sliding pile (1) on the horizontal plane; At least two first fixing steel bars (15) are arranged at the bottom of each first embedded steel pipe (11), and at least two second fixing steel bars (16) are arranged at the bottom of each second embedded steel pipe (12); The first fixing steel bar (15) and the second fixing steel bar (16) are both fixedly connected to the transverse stirrups (14) of the anti-sliding pile (1); A plurality of first perforated steel bars (111) and a plurality of second perforated steel bars (121) are respectively arranged in the plurality of first pre-buried steel pipes (11) and the plurality of second pre-buried steel pipes (12); Both ends of the plurality of first perforated steel bars (111) and the plurality of second perforated steel bars (121) extend into the retaining plate (2); The plurality of first transverse steel bars (21) in the retaining plate (2) are all fixedly connected to the corresponding first perforated steel bars (111), and the plurality of second transverse steel bars (22) in the retaining plate (2) are all fixedly connected to the corresponding second perforated steel bars (121).
2. The cutting pile-sheet wall structure according to claim 1, characterized in that: The first fixing steel bar (15) and the second fixing steel bar (16) are both Grade III threaded steel bars.
3. The cutting pile-sheet wall structure according to claim 1, characterized in that: Also includes a pipe cap (3); Both ends of the first embedded steel pipe (11) and the second embedded steel pipe (12) are provided with pipe caps (3).
4. The cutting pile-sheet wall structure according to claim 1, characterized in that: The first perforated steel bar (111) is welded to both ends of the first embedded steel pipe (11); The second perforated steel bar (121) is welded to both ends of the second embedded steel pipe (12).
5. The cutting pile-sheet wall structure according to claim 1, characterized in that: The first transverse steel bar (21) in the retaining plate (2) is welded to the first perforated steel bar (111), and the welding length is not less than 500 mm; The second transverse steel bar (22) in the retaining plate (2) is welded to the second perforated steel bar (121), and the welding length is not less than 500 mm.
6. The cutting pile-sheet wall structure according to claim 1, characterized in that: The length of the transverse stirrups (14) extending out of the anti-sliding pile (1) at both ends of the first embedded steel pipe (11) and the second embedded steel pipe (12) is 50 mm.