A buffer unloading device

By designing a cache unloading device, using funnel transition and valve control, the problems of low feeding efficiency and mechanical waste in traditional construction are solved, and construction efficiency is improved and mechanical losses are reduced.

CN222701530UActive Publication Date: 2025-04-01BEIJING BAODU STEEL STRUCTURE ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420668608.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2025-04-01
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

During traditional construction, when the material truck is parked on the factory or the side of the building, it will cause waste of equipment and machinery and lack of buffering time.

Method used

A buffer discharge device is designed, including a funnel, a valve, a leg and a hanging lug. The filling material is temporarily stored through the funnel transition, and the discharge is controlled by the valve to realize the feeding of multiple funnels.

Benefits of technology

By adding funnel transition and valve control, the feeding efficiency of the material truck is improved and mechanical losses are reduced, saving time and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222701530U_ABST
    Figure CN222701530U_ABST
Patent Text Reader

Abstract

The utility model discloses a buffer unloading device, including a funnel, a valve, a leg and a lifting lug. The valve is arranged at the bottom discharge port of the funnel, the leg is arranged vertically outside the funnel, the upper end of the leg is fixed to the outer wall of the funnel, the lower end of the leg is below the height of the valve, a plurality of legs are provided, and the plurality of legs are evenly distributed around the funnel, the lifting lug is fixed to the outer wall of the funnel near the top opening, a plurality of pairs of the lifting lugs are provided, and the plurality of pairs of the lifting lugs are evenly distributed around the funnel, and the two lifting lugs in the same pair are symmetrically distributed relative to the funnel. By adding a funnel transition, the pouring material is temporarily stored in the funnel, and the valve is used to control the discharge at any time, so that one material truck can feed multiple funnels, saving time, improving efficiency, and reducing mechanical loss.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a buffer unloading device. Background Art

[0002] During the construction process, the traditional way of adding materials is: the material truck is parked at the factory or the side of the building, and the materials are poured according to the demand. This construction mode will cause serious waste of equipment and machinery, and there is no buffer time. Utility Model Content

[0003] To this end, the utility model provides a buffer unloading device to solve one or more of the above-mentioned problems.

[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0005] A cache unloading device includes a funnel, a valve, a leg and a lifting ear, wherein the valve is arranged at the bottom discharge port of the funnel, the leg is vertically arranged on the outside of the funnel, the upper end of the leg is fixed to the outer wall of the funnel, and the lower end of the leg is below the height of the valve. There are multiple legs, and the multiple legs are evenly distributed around the funnel. The lifting ear is fixed on the outer wall of the funnel near the top opening. There are multiple pairs of lifting ears, and the multiple pairs of lifting ears are evenly distributed around the funnel. The two lifting ears in the same pair are symmetrically distributed relative to the funnel.

[0006] Furthermore, the funnel comprises a cylindrical body and a conical body, the cylindrical body is located above the conical body, and the cylindrical body is integrally formed with the conical body.

[0007] Furthermore, the buffer unloading device also includes a skirt, which is arranged at the top opening of the cylindrical body and protrudes radially outward.

[0008] Furthermore, the cache unloading device also includes a material pipe, which is vertically arranged, the upper end of the material pipe is connected to the bottom discharge port of the conical cylinder, and the lower end of the material pipe is connected to the valve through a flange.

[0009] Furthermore, a plurality of welding blocks are welded on the circumference of the cylindrical body, the plurality of welding blocks are evenly distributed on the circumference of the cylindrical body, and the plurality of legs are welded and fixed to the plurality of welding blocks in a one-to-one correspondence.

[0010] Furthermore, the lifting ear includes a base plate and an ear plate, the base plate is welded and fixed to the outer wall of the cylindrical body, the ear plate is vertically arranged and welded and fixed to the base plate, and a rope threading hole for lifting is provided in the middle of the ear plate.

[0011] Furthermore, the cache unloading device also includes an oblique brace, one end of which is welded and fixed to the outer wall of the conical cylinder, and the other end of which is welded and fixed to the support leg.

[0012] Furthermore, the cache unloading device also includes a pad, which is arranged horizontally, and one pad is fixed to the bottom end of each leg.

[0013] The utility model has the following advantages:

[0014] By adding a funnel transition, the pouring material can be temporarily stored in the funnel, and the valve can be used to control the discharge at any time. In this way, one material truck can feed multiple funnels, saving time, improving efficiency and reducing mechanical loss. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for the implementation or the prior art description. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.

[0016] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification so as to facilitate understanding and reading by persons familiar with the technology. They are not used to limit the conditions under which the present invention can be implemented, and therefore have no substantial technical significance. Any structural modification, change in proportion or adjustment in size shall still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.

[0017] Figure 1 A schematic diagram of the structure of a buffer unloading device provided in an embodiment of the utility model;

[0018] Figure 2 for Figure 1 A is an enlarged view of the middle image.

[0019] In the figure: 1-funnel, 11-cylindrical cylinder, 12-conical cylinder, 13-material pipe, 14-skirt; 2-valve; 3-leg, 31-welding block, 32-straight support, 33-pad; 4-lifting ear, 41-bottom plate, 42-ear plate, 43-rope threading hole; 5-material receiving horn, 51-conveying pipeline. DETAILED DESCRIPTION

[0020] The following is a specific embodiment of the present invention. People familiar with the technology can easily understand the other advantages and functions of the present invention from the contents disclosed in this specification. Obviously, the described embodiment is a part of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] The terms such as "upper", "lower", "left", "right", "middle", etc. cited in this specification are only for the convenience of description and are not used to limit the scope of implementation of the present invention. Changes or adjustments to their relative relationships should be regarded as the scope of implementation of the present invention without substantially changing the technical content.

[0022] like Figure 1 and 2 As shown, this embodiment provides a buffer unloading device, including a funnel 1 and a valve 2. The funnel 1 includes a cylindrical body 11 and a conical body 12. The cylindrical body 11 is located above the conical body 12, and the cylindrical body 11 and the conical body 12 are integrally formed; generally, the cylindrical body 11 and the conical body 12 are both made of steel, that is, the funnel 1 is made of steel as a whole, which can improve the bearing capacity. The bottom discharge port of the conical body 12 is connected to a vertical material pipe 13, and the lower end of the material pipe 13 is connected to the valve 2 through a flange. A skirt 14 protruding radially outward is provided at the top opening of the cylindrical body 11. The skirt 14 is a steel ring with high structural strength.

[0023] By adding funnel 1 for transition, the filling material is temporarily stored in the funnel 1, and the valve 2 is used to control the discharge at any time. In this way, one material truck can add material to the funnel 1 of multiple buffer unloading devices, saving time, improving efficiency and reducing mechanical loss.

[0024] In this embodiment, the buffer unloading device also includes four legs 3, which are vertically arranged outside the funnel 1, the upper ends of the legs 3 are fixed to the outer wall of the funnel 1, and the lower ends of the legs 3 are below the height of the valve 2; specifically, four welding blocks 31 are welded on the circumference of the cylindrical body 11, and the four welding blocks 31 are evenly distributed on the circumference of the cylindrical body 11. The four legs 3 are welded and fixed to the four welding blocks 31 one by one, which improves the connection stability between the legs 3 and the funnel 1 on the one hand, and makes the four legs 3 evenly distributed on the circumference of the funnel 1 on the other hand, improving the support stability; the legs 3 are used to support the funnel 1 to avoid the hose connected below the valve 2 from being bent. An oblique support 32 is also provided between the legs 3 and the conical body 12, one end of the oblique support 32 is welded and fixed to the outer wall of the conical body 12, and the other end is welded and fixed to the legs 3, so that the stability of the legs 3 can be improved. A pad 33 is fixed to the bottom end of each leg 3, and the pad 33 is arranged horizontally to increase the force-bearing area and reduce the pressure.

[0025] In this embodiment, the buffer unloading device further includes two pairs of lifting ears 4, which are evenly distributed around the hopper 1, and the two lifting ears 4 in the same pair are symmetrically distributed relative to the hopper 1, and the four lifting ears 4 are fixed to the outer wall of the hopper 1 near the top opening. The lifting ears 4 include a bottom plate 41 and an ear plate 42, the bottom plate 41 is welded and fixed to the outer wall of the cylindrical body 11, the ear plate 42 is vertically arranged and welded and fixed to the bottom plate 41, and a rope threading hole 43 for lifting is provided in the middle of the ear plate 42. The lifting ears 4 facilitate lifting operations.

[0026] Use a crane to hoist the buffer unloading device to the building above the grouting material, and fix the legs 3; then connect the material receiving horn 5 and the conveying pipeline 51 to the funnel 1 and the grouting place of the equipment; after the arrangement is proper, add grouting material to the funnel 1 and stop when the funnel 1 is filled; then use the valve 2 to control the discharge of the material to meet the filling conditions.

[0027] Although the utility model has been described in detail above with general descriptions and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements can be made to the utility model. Therefore, these modifications or improvements made without departing from the spirit of the utility model are within the scope of protection claimed by the utility model.

Claims

1. A buffer unloading device, characterized in that: The cache unloading device includes a funnel, a valve, a leg and a lifting ear. The valve is arranged at the bottom discharge port of the funnel, the leg is vertically arranged on the outside of the funnel, the upper end of the leg is fixed to the outer wall of the funnel, and the lower end of the leg is below the height of the valve. The legs are provided in plurality, and the plurality of legs are evenly distributed around the funnel. The lifting ear is fixed on the outer wall of the funnel near the top opening, and the lifting ears are provided in multiple pairs, and the plurality of pairs of the lifting ears are evenly distributed around the funnel, and the two lifting ears in the same pair are symmetrically distributed relative to the funnel.

2. The cache unloading device according to claim 1, characterized in that: The funnel comprises a cylindrical body and a conical body, wherein the cylindrical body is located above the conical body, and the cylindrical body is integrally formed with the conical body.

3. The cache unloading device according to claim 2, characterized in that: The buffer unloading device also includes a skirt, which is arranged at the top opening of the cylindrical body and protrudes radially outward.

4. The cache unloading device according to claim 2, characterized in that: The buffer unloading device also includes a material pipe, which is vertically arranged. The upper end of the material pipe is connected to the bottom discharge port of the conical cylinder, and the lower end of the material pipe is connected to the valve through a flange.

5. The cache unloading device according to claim 2, characterized in that: A plurality of welding blocks are welded on the circumferential side of the cylindrical body, the plurality of welding blocks are evenly distributed on the circumferential side of the cylindrical body, and the plurality of legs are welded and fixed to the plurality of welding blocks in a one-to-one correspondence.

6. The cache unloading device according to claim 2, characterized in that: The lifting ear comprises a bottom plate and an ear plate, wherein the bottom plate is welded and fixed to the outer wall of the cylindrical body, the ear plate is vertically arranged and welded and fixed to the bottom plate, and a rope threading hole for lifting is provided in the middle of the ear plate.

7. The buffer unloading device according to claim 2, characterized in that: The buffer unloading device also includes an oblique brace, one end of which is welded and fixed to the outer wall of the conical cylinder, and the other end of which is welded and fixed to the supporting leg.

8. The cache unloading device according to claim 1, characterized in that: The buffer unloading device also includes a pad, which is arranged transversely, and one pad is fixed to the bottom end of each leg.