A cutting device for steel pipe production

By designing a cutting device for steel pipe production including sink, support table, groove, collection assembly and cleaning assembly, the problem of metal debris accumulation at the cutting machine base is solved, the convenience and efficiency of cleaning are achieved, and maintenance costs and equipment failure rate are reduced.

CN222710945UActive Publication Date: 2025-04-04TIANJIN LETONG JUXIN STEEL PIPE MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421488197.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2025-04-04
Estimated Expiration
2034-06-27

AI Technical Summary

Technical Problem

During the cutting process of existing cutting machines, the base will accumulate metal debris generated by the steel pipe, causing the internal space of the equipment to occupy, affect the normal operation of the water pump and other mechanical components, and cleaning requires a lot of manpower and time, increasing maintenance costs.

Method used

Design a cutting device for steel pipe production, including a base, sink, support table, groove, collection assembly and cleaning assembly. The cleaning assembly consists of support strips, scrapers and dials, and the collection assembly consists of debris shells, filter mesh and sealing sleeves to facilitate cleaning and collecting metal debris.

Benefits of technology

By simplifying the cleaning process, reducing downtime, improving cutting machine work efficiency, reducing maintenance costs, extending equipment service life, and preventing equipment failures and replacement needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222710945U_ABST
    Figure CN222710945U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of cutting machines, and discloses a cutting device for steel pipe production, the cutting device for steel pipe production comprising a base, a water tank is provided on the top of the base, a support platform is fixedly connected to the inner wall near the top of the water tank, a groove is provided on one side of the bottom of the water tank with one end connected to the outside, a collecting component is slidably connected in the groove, and a cleaning component slidably connected to the groove is installed at the bottom of the water tank; by making it easy to clean the metal debris of the base and collect them together for processing, downtime can be reduced and the working efficiency of the cutting machine can be improved. The simplification of the cleaning process will enable maintenance personnel to complete the cleaning task more quickly, thereby reducing production interruption time. Regular cleaning and collection of metal debris can prevent equipment failure caused by excessive accumulation of debris, thereby reducing the cost of equipment maintenance and replacement of parts. By reducing the equipment failure rate, the service life of the equipment can also be extended, further reducing maintenance costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cutting machines, in particular to a cutting device for steel pipe production. Background Art

[0002] A pipe cutting machine is a device specially used for cutting pipes. The cutting machine includes a base that can store water, a pumping system for pumping water to circulate and flush the cutting blade, and a cutting blade structure. The main purpose is to improve cutting efficiency, reduce the heat generated during the cutting process, and extend the service life of the cutting blade. The base of the cutting machine is designed with a water storage area for storing a certain amount of water. The water pump (usually a water pump) is connected to the water storage area through a pipeline and is responsible for pumping out water and sending it to the cutting blade. When the cutting blade performs a cutting operation, the water pump starts working and transports the water in the base to the cutting blade through a pipeline. The water is sprayed on the cutting area at a certain speed and pressure to flush away the dust and debris generated during the cutting process, and at the same time plays a role in cooling the cutting blade. The flushed water may be mixed with dust and debris and flow back to the water storage area of ​​the base again. This process can realize the recycling of water and reduce the waste of water resources.

[0003] However, the existing technical solutions still have the following problems:

[0004] The base will accumulate metal debris generated by the steel pipe. The metal debris is heavy and not easily carried away by the water flow. The accumulation of metal debris in the base will occupy the internal space of the cutting machine, affecting the normal operation of the pump and other mechanical parts. The debris may block the water flow channel, reduce the flushing effect, and even cause the cutting machine to fail to operate normally. Cleaning the metal debris in the base requires a lot of manpower and time, increasing the maintenance cost of the equipment. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model provides a cutting device for steel pipe production to solve at least one of the problems raised by the background technology, such as: making it easy to clean and collect metal debris on the base for processing, thereby improving the work efficiency of workers, reducing equipment maintenance costs and improving equipment performance.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a cutting device for steel pipe production, comprising a base, a water trough is provided on the top of the base, a support platform is fixedly connected to the inner wall near the top of the water trough, a groove with one end connected to the outside is provided on one side of the bottom of the water trough, a collecting component is slidably connected in the groove, and a cleaning component slidably connected to the groove is installed at the bottom of the water trough.

[0007] Furthermore: the cleaning component includes a support bar, a scraper and a shifting block. The inner walls on both sides of the sink are provided with sliding openings that are slidably connected to the two ends of the support bar. The sliding openings at both ends of the support bar are fixedly connected to the shifting blocks, and the scraper is fixedly connected to the bottom of the support bar.

[0008] Furthermore, the bottom of the scraper is fitted and connected to the bottom surface of the water tank, and the two ends of the scraper are fitted and connected to the inner wall of the water tank.

[0009] Furthermore: the collection component includes a debris shell, a filter screen and a sealing sleeve. The outer side of the debris shell and the inner wall of the groove are fitted and connected, and the debris shell and the groove are slidably connected. The filter screen is embedded in the bottom of the debris shell, and a sealing sleeve is provided on the outer side of one end of the debris shell.

[0010] Furthermore: a pull ring is installed at one end of the debris shell.

[0011] Furthermore: a drain pipe connected to the groove is installed on one side of the base, and a water valve is installed on the outside of the drain pipe.

[0012] Compared with the prior art, the utility model has the following beneficial effects:

[0013] The utility model can reduce downtime and improve the working efficiency of the cutting machine by making it easy to clean the metal debris on the base and collect them together for processing. The simplification of the cleaning process will enable maintenance personnel to complete the cleaning task more quickly, thereby reducing production interruption time. Regular cleaning and collection of metal debris can prevent equipment failure caused by excessive accumulation of debris, thereby reducing the cost of equipment maintenance and replacement of parts. By reducing the equipment failure rate, the service life of the equipment can also be extended, further reducing maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the utility model;

[0015] Figure 2 This is a schematic diagram of the three-dimensional structure of the base of the utility model;

[0016] Figure 3 This is a schematic diagram of the three-dimensional structure of the cleaning component of the utility model;

[0017] Figure 4 It is a schematic diagram of the three-dimensional structure of the collection component of the utility model.

[0018] In the figure: 1. base; 101. sink; 102. groove; 103. sliding port; 2. support platform; 3. cleaning assembly; 301. support bar; 302. scraper; 303. dial block; 4. collecting assembly; 401. debris shell; 402. filter screen; 403. sealing sleeve; 404. pull ring; 5. drain pipe; 501. water valve. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0020] like Figures 1 to 4 As shown, a cutting device for steel pipe production includes a base 1, a water tank 101 is provided on the top of the base 1, a support platform 2 is fixedly connected to the inner wall near the top of the water tank 101, a groove 102 with one end connected to the outside is provided on one side of the bottom of the water tank 101, a collecting component 4 is slidably connected in the groove 102, and a cleaning component 3 slidably connected to the water tank 101 is installed at the bottom.

[0021] like Figures 1 to 4 As shown, when a cutting device for steel pipe production in the utility model is in use, the base 1 is the supporting foundation of the entire cutting device, ensuring the stability and reliability of the device. A water tank 101 is provided on the top of the base 1. The water tank 101 is designed to collect metal scraps, waste water and other waste materials generated during the cutting process to keep the working environment clean. The support table 2 is fixedly connected to the top inner wall of the water tank 101, close to the top of the water tank 101. The support table 2 is used to place the steel pipe to be cut to ensure its stability and accuracy during the cutting process. The cleaning component 3 allows the operator to easily clean the waste in the water tank 101 to ensure the cleanliness and continuous use of the water tank 101. A groove 102 is provided on one side of the bottom of the water tank 101. One end of the groove 102 is connected to the outside to facilitate the sliding and removal of the collection component 4. The main function of the collection component 4 is to collect waste materials such as metal scraps in the water tank 101, which is convenient for subsequent cleaning and processing.

[0022] like Figures 2 to 3 As shown, the cleaning component 3 includes a support bar 301, a scraper 302 and a shift block 303. The inner walls on both sides of the water tank 101 are provided with sliding openings 103 that are slidably connected to the two ends of the support bar 301. The sliding openings 103 at both ends of the support bar 301 are fixedly connected to the shift block 303, and the scraper 302 is fixedly connected to the bottom of the support bar 301.

[0023] Specifically, by setting the two ends of the support bar 301 through the sliding openings 103 opened on the inner walls of the two sides of the water tank 101, it is ensured that the cleaning component 3 can slide stably along the sliding openings 103. The scraper 302 is fixedly connected to the bottom of the support bar 301, and its main function is to scrape off metal debris and waste at the bottom of the water tank 101. Here, the material of the scraper 302 has a certain elasticity and wear resistance to ensure that the bottom of the water tank 101 will not be damaged when scraping off the waste, and the waste can be effectively cleaned up. The shift block 303 is fixedly connected to the two ends of the support bar 301 and passes through the sliding opening 103, so that the operator can move the cleaning component 3 through the shift block 303.

[0024] like Figures 2 to 3 As shown, the bottom of the scraper 302 is closely connected to the bottom surface of the water tank 101 , and the two ends of the scraper 302 are closely connected to the inner wall of the water tank 101 .

[0025] Specifically, by this arrangement, the bottom of the scraper 302 is tightly connected to the bottom surface of the water tank 101, ensuring that the bottom waste can be scraped off completely and without omission during the sliding process. The two ends of the scraper 302 are also tightly connected to the inner wall of the water tank 101, so that even when cleaning the waste at the edge of the water tank 101, the cleaning effect can be ensured.

[0026] like Figure 4 As shown, the collecting assembly 4 includes a debris shell 401, a filter screen 402 and a sealing sleeve 403. The outer side of the debris shell 401 and the inner wall of the groove 102 are fitted and connected, and the debris shell 401 and the groove 102 are slidably connected. The filter screen 402 is embedded in the bottom of the debris shell 401, and a sealing sleeve 403 is provided on the outer side of one end of the debris shell 401.

[0027] Specifically, the debris shell 401 is the main part of the collection component 4, which is used to hold the waste cleaned out from the water tank 101. The debris shell 401 and the groove 102 are connected by sliding, which is convenient for the operator to slide the debris shell 401 full of waste out of the groove 102 for cleaning and replacement. The filter screen 402 can intercept larger metal debris and other solid waste, while allowing liquid to pass through, thereby achieving preliminary separation of the waste. The sealing sleeve 403 is usually made of elastic material and can fit tightly at the port of the groove 102 to prevent waste from leaking out of the gap and prevent water in the water tank 101 from leaking out of the port.

[0028] like Figure 4 As shown, a pull ring 404 is installed at one end of the debris shell 401.

[0029] Specifically, through this arrangement, when the debris shell 401 is full of waste, the operator can easily slide the debris shell 401 out of the groove 102 by holding the pull ring 404. During the sliding process, the sealing sleeve 403 will remain in close contact with the groove 102 to prevent waste from leaking. When reinstalling the debris shell 401, it is only necessary to push the debris shell 401 and the sealing sleeve 403 together into the groove 102 to ensure that the sealing sleeve 403 is in close contact with the groove 102.

[0030] like Figure 1 to Figure 2 As shown, a drain pipe 5 connected to the groove 102 is installed on one side of the base 1, and a water valve 501 is installed on the outer side of the drain pipe 5.

[0031] Specifically, through this arrangement, when the liquid waste in the water tank 101 and the debris shell 401 accumulates to a certain extent, the operator can discharge the waste through the drain pipe 5. The water valve 501 is installed on the outside of the drain pipe 5 to control the opening and closing of the drain pipe 5.

[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A cutting device for steel pipe production, comprising a base (1), characterized in that: The base (1) is provided with a water tank (101) at the top, a support platform (2) is fixedly connected to the inner wall of the top of the water tank (101), a groove (102) with one end connected to the outside is provided on one side of the bottom of the water tank (101), a collecting component (4) is slidably connected in the groove (102), and a cleaning component (3) slidably connected to the groove (102) is installed at the bottom of the water tank (101).

2. A cutting device for steel pipe production according to claim 1, characterized in that: The cleaning assembly (3) comprises a support bar (301), a scraper (302) and a shifting block (303); sliding openings (103) slidably connected to the two ends of the support bar (301) are provided on the inner walls of both sides of the water tank (101); the two ends of the support bar (301) penetrate the sliding openings (103) and are fixedly connected to the shifting block (303); and the bottom of the support bar (301) is fixedly connected to the scraper (302).

3. A cutting device for steel pipe production according to claim 2, characterized in that: The bottom of the scraper (302) is in close contact with the bottom surface of the water tank (101), and the two ends of the scraper (302) are in close contact with the inner wall of the water tank (101).

4. A cutting device for steel pipe production according to claim 1, 2 or 3, characterized in that: The collecting assembly (4) comprises a debris shell (401), a filter screen (402) and a sealing sleeve (403); the outer side of the debris shell (401) and the inner wall of the groove (102) are fitted and connected, and the debris shell (401) and the groove (102) are slidably connected; the filter screen (402) is embedded and installed at the bottom of the debris shell (401), and the sealing sleeve (403) is sleeved on the outer side of one end of the debris shell (401).

5. A cutting device for steel pipe production according to claim 4, characterized in that: A pull ring (404) is installed at one end of the debris shell (401).

6. A cutting device for steel pipe production according to claim 1, 2 or 3, characterized in that: A water discharge pipe (5) connected to the groove (102) is installed on one side of the base (1), and a water valve (501) is installed on the outside of the water discharge pipe (5).

7. A cutting device for steel pipe production according to claim 4, characterized in that: A water discharge pipe (5) connected to the groove (102) is installed on one side of the base (1), and a water valve (501) is installed on the outside of the water discharge pipe (5).