A drainage pipe docking auxiliary tool
By designing a drainage pipe docking auxiliary tool including base, drainage pipe, sliding plate, electric cylinder and clamping mechanism, the problems of high difficulty and low accuracy of drainage pipe docking operation in the prior art are solved, and efficient and accurate drainage pipe docking is achieved.
Patent Information
- Application Number
- CN202420662695.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2034-04-02
AI Technical Summary
The existing drainage pipe docking equipment is difficult to operate and requires the precise cooperation of two staff members. A slight shaking will lead to a poor installation, large errors and long time.
Design a drainage pipe docking auxiliary tool, including a base, drainage pipe, sliding plate, electric cylinder and clamping mechanism, through the clamping mechanism and rotating components, the drainage pipe can be firmly clamped and precisely connected.
It improves the accuracy and efficiency of drainage pipe docking, reduces the operation difficulty and error of staff, and saves labor and time.
Smart Images

Figure CN222712000U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of drainage pipes, and in particular relates to a drainage pipe docking auxiliary tool. Background Art
[0002] Drainage pipes refer to a system consisting of pipes and their ancillary facilities used to collect and discharge sewage, wastewater and rainwater. This system includes main pipes, branch pipes and pipes leading to treatment plants. They may be located on the streets or anywhere else. As long as the pipes play a drainage role, they should be included in the statistics of drainage pipes. Drainage pipes need to be connected to ensure the continuity of the entire pipe system. If there are gaps or mismatches between pipes, it may cause water flow interruption or slowdown, affecting the drainage effect. It should effectively prevent water from leaking out of the gaps in the pipes, reduce environmental pollution and waste of water resources.
[0003] In the drainage pipe docking equipment of the prior art, the staff needs to install flange rings on the interfaces of the two water pipes respectively. After the installation, the two drainage pipes need to be lifted to the same height at the same time for precise docking. This operation tests the cooperation ability of the two staff members. Any slight shaking will cause the two drainage pipes to be installed loosely. However, the operation is difficult and the error is large during this period. It also consumes a lot of labor and time. Utility Model Content
[0004] In response to the problems existing in the prior art, the utility model provides a drainage pipe docking auxiliary tool, which has the advantages of setting the drainage pipes at the same height and then clamping them to make them stable at this height, thereby achieving precise docking. It solves the problem of testing the cooperation ability of two workers in the existing drainage pipe docking. A slight shake will cause the two drainage pipes to be installed loosely. However, the operation is difficult and the error is large during this period, and it will also consume a lot of labor and time.
[0005] The utility model is implemented as follows: a drainage pipe docking auxiliary tool, comprising:
[0006] Base;
[0007] Drainage pipe: the drainage pipe is arranged above the base;
[0008] Sliding plate: the lower surface of the sliding plate is slidably connected to the upper surface of the base, and a third sliding component is arranged on the lower surface of the sliding plate;
[0009] Electric cylinder: the lower surface of the electric cylinder is fixedly connected to the upper surface of the sliding plate;
[0010] Clamping mechanism: The clamping mechanism is arranged above the electric cylinder and includes:
[0011] First clamping block: two first clamping blocks are provided, and the inner surfaces of the two first clamping blocks are movably connected to the left and right sides of the drainage pipe, and the first clamping blocks are arc-shaped;
[0012] Second clamping block: the inner surface of the second clamping block is movably connected to the bottom of the drainage pipe, and the second clamping block is arc-shaped;
[0013] Connecting assembly: The connecting assembly is arranged at the rear end of the first clamping block.
[0014] As a preferred embodiment of the present invention, a rotating assembly is provided at one end of the connecting assembly.
[0015] The package includes:
[0016] “L”-shaped connecting plate: two “L”-shaped connecting plates are provided, and both of the two “L”-shaped connecting plates are fixedly connected to the rear end of the first clamping block, and fixed components are provided on the left and right sides of the “L”-shaped connecting plate;
[0017] Connecting piece: the upper end of the connecting piece is fixedly connected to the bottom end of the second clamping block;
[0018] Connecting column: The upper surface of the connecting column is fixedly connected to the bottom end of the connecting piece.
[0019] As a preferred embodiment of the present invention, the rotating assembly includes:
[0020] Rotating block: the upper surface of the rotating block is fixedly connected to the lower surface of the connecting column, and the rear surface of the rotating block is provided with a first sliding assembly;
[0021] Rollers: Two rollers are provided, and the outer surfaces of the two rollers are both rotatably connected to the bottom end of the "L"-shaped connecting plate, and the outer surfaces of the rollers are rollingly connected to the two sides of the rotating block.
[0022] As a preferred embodiment of the present invention, the fixing assembly includes:
[0023] Fixing member: There are two fixing members, and the front ends of the two fixing members are rotatably connected to the left and right ends of the "L"-shaped connecting plate;
[0024] Fixed plate: Two fixed plates are provided, the inner sides of the two fixed plates are fixedly connected to the bottom end of the fixing member, and the bottom of the fixed plate is fixedly connected to the upper surface of the sliding plate by bolts.
[0025] As a preferred embodiment of the present invention, a second sliding component is provided at the front end of the first sliding component, and the first sliding component includes:
[0026] First slider: the front end of the first slider is fixedly connected to the rear surface of the rotating block;
[0027] First slide rail: the inner surface of the first slide rail is slidably connected to the outer surface of the first sliding block.
[0028] As a preferred embodiment of the present invention, the second sliding assembly includes:
[0029] Second slide rail: the lower surface of the second slide rail is fixedly connected to the upper surface of the sliding plate;
[0030] Second slider: the lower surface of the second slider is slidably connected to the upper surface of the second slide rail, the left side of the second slider is fixedly connected to the output end of the electric cylinder, and the upper surface of the second slider is slidably connected to the lower surface of the rotating block.
[0031] As a preferred embodiment of the present invention, the third sliding assembly includes:
[0032] Third slide rail: the third slide rail is provided on the upper surface of the base;
[0033] The third slider is slidably connected to the third slide rail, and the third slider is fixedly connected to the lower surface of the sliding plate.
[0034] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0035] 1. The utility model sets a clamping mechanism. When the drainage pipes need to be butt-jointed, the staff places the drainage pipes at a certain height and starts the device. The "L"-shaped connecting plate starts to rotate, and the upper end of the "L"-shaped connecting plate rotates inward, so that the first clamping block starts to tighten, and the connecting piece also starts to move upward, while driving the second clamping block until the inner surfaces of the first clamping block and the second clamping block are both attached to the outer surface of the drainage pipe. When the two drainage pipes need to be butt-jointed, the two drainage pipes are stably fixed at the same height, so that the docking accuracy is improved when the two drainage pipes are butt-jointed.
[0036] 2. The utility model sets a rotating assembly. When the first clamping block and the second clamping block need to be tightened, the rotating block moves upward. Under the action of the rotating block, the connecting member moves upward accordingly. The connecting member applies an upward force to the second clamping plate, causing it to move upward as well. The roller begins to slide downward along the left and right sides of the rotating block. Since the roller and the "L"-shaped connecting plate are in a rolling connection, the roller drives the "L"-shaped connecting plate to deviate the lower end of the "L"-shaped connecting plate toward the outside and the upper end of the "L"-shaped connecting plate toward the inside. Finally, the "L"-shaped connecting plate drives the clamping plate, so that the clamping plate can clamp the drainage pipe more stably to fix it. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a schematic diagram of a three-dimensional structure provided by an embodiment of the utility model;
[0038] Figure 2 yes Figure 1 A local enlarged schematic diagram of the middle A;
[0039] Figure 3 This is a schematic diagram of a three-dimensional structure from another perspective provided by an embodiment of the utility model;
[0040] Figure 4 yes Figure 3 A local enlarged schematic diagram of point B in the middle.
[0041] In the figure: 1. base; 2. drainage pipe; 3. sliding plate; 4. third sliding assembly; 401. third slide rail; 402. third slider; 5. electric cylinder; 6. clamping mechanism; 610. first clamping block; 620. second clamping block; 630. connecting assembly; 631. "L"-shaped connecting plate; 632. connecting piece; 633. connecting column; 7. rotating assembly; 701. rotating block; 702. roller; 8. fixing assembly; 801. fixing piece; 802. fixing plate; 9. first sliding assembly; 901. first slider; 902. first slide rail; 10. second sliding assembly; 1001. second slide rail; 1002. second slider. DETAILED DESCRIPTION
[0042] In order to further understand the content, features and effects of the present invention, the following embodiments are given as examples and described in detail with reference to the accompanying drawings.
[0043] The structure of the utility model is described in detail below in conjunction with the accompanying drawings.
[0044] like Figures 1 to 4 As shown, an embodiment of the utility model provides a drainage pipe docking auxiliary tool, comprising:
[0045] Base 1;
[0046] Drainage pipe 2: The drainage pipe 2 is arranged above the base 1;
[0047] Sliding plate 3: The lower surface of the sliding plate 3 is slidably connected to the upper surface of the base 1, and a third sliding component 4 is arranged on the lower surface of the sliding plate 3;
[0048] Electric cylinder 5: The lower surface of the electric cylinder 5 is fixedly connected to the upper surface of the sliding plate 3;
[0049] Clamping mechanism 6: The clamping mechanism 6 is arranged above the electric cylinder 5, and includes:
[0050] First clamping block 610: Two first clamping blocks 610 are provided, and the inner surfaces of the two first clamping blocks 610 are movably connected to the left and right sides of the drainage pipe 2, and the first clamping blocks 610 are arc-shaped;
[0051] Second clamping block 620: The inner surface of the second clamping block 620 is movably connected to the bottom of the drainage pipe 2, and the second clamping block 620 is arc-shaped;
[0052] Connecting assembly 630 : The connecting assembly 630 is disposed at the rear end of the first clamping block 610 .
[0053] refer to Figure 2 and Figure 4 As shown, a rotating assembly 7 is provided at one end of the connecting assembly 630, and the connecting assembly 630 includes:
[0054] “L”-shaped connecting plate 631: Two “L”-shaped connecting plates 631 are provided, and both “L”-shaped connecting plates 631 are fixedly connected to the rear end of the first clamping block 610. The left and right sides of the “L”-shaped connecting plate 631 are provided with fixing components 8;
[0055] Connecting member 632: The upper end of the connecting member 632 is fixedly connected to the bottom end of the second clamping block 620;
[0056] Connecting column 633 : The upper surface of the connecting column 633 is fixedly connected to the bottom end of the connecting member 632 .
[0057] The above scheme is adopted: when the drainage pipe 2 needs to be docked, the "L"-shaped connecting plate 631 starts to rotate, and the upper end of the "L"-shaped connecting plate 631 rotates inward, causing the first clamping block 610 to start to tighten, and the connecting piece 632 also starts to move upward, while driving the second clamping block 620 until the inner surfaces of the first clamping block 610 and the second clamping block 620 are both attached to the outer surface of the drainage pipe 2.
[0058] refer to Figure 2 As shown, the rotating assembly 7 includes:
[0059] Rotating block 701: The upper surface of the rotating block 701 is fixedly connected to the lower surface of the connecting column 633, and the rear surface of the rotating block 701 is provided with a first sliding assembly 9;
[0060] Roller 702: Two rollers 702 are provided, and the outer surfaces of the two rollers 702 are both rotatably connected to the bottom end of the “L”-shaped connecting plate 631 , and the outer surfaces of the rollers 702 are rollingly connected to the two sides of the rotating block 701 .
[0061] The above scheme is adopted: when the first clamping block 610 and the second clamping block 620 need to be tightened, the rotating block 701 moves upward, and the connecting member 632 moves upward under the action of the rotating block 701. The connecting member 632 applies an upward force to the second clamping block 620, causing it to move upward, and the roller 702 begins to slide downward along the left and right sides of the rotating block 701. Since the roller 702 and the "L"-shaped connecting plate 631 are rollingly connected, the roller 702 drives the "L"-shaped connecting plate 631, causing the lower end of the "L"-shaped connecting plate 631 to deviate outward, and the upper end of the "L"-shaped connecting plate 631 to deviate inward, driving the first clamping block 610 to be tightened.
[0062] refer to Figure 4 As shown, the fixing assembly 8 comprises:
[0063] Fixing member 801: Two fixing members 801 are provided, and the front ends of the two fixing members 801 are rotatably connected to the left and right ends of the “L”-shaped connecting plate 631;
[0064] Fixed plates 802: Two fixed plates 802 are provided, and the inner sides of the two fixed plates 802 are fixedly connected to the bottom ends of the fixing members 801 , and the bottoms of the fixed plates 802 are fixedly connected to the upper surface of the sliding plate 3 by bolts.
[0065] The above scheme is adopted: the fixing part 801 mainly plays the role of making the "L"-shaped connecting plate 631 rotate. Since one end of the "L"-shaped connecting plate 631 is rotatably connected to the fixing part 801, the "L"-shaped connecting plate 631 rotates around the fixing part 801 as the center, and the fixing plate 802 mainly plays the role of fixing the fixing part 801 at a specified height.
[0066] refer to Figure 2 and Figure 3 As shown, a second sliding assembly 10 is disposed at the front end of the first sliding assembly 9, and the first sliding assembly 9 includes:
[0067] First slider 901: The front end of the first slider 901 is fixedly connected to the rear surface of the rotating block 701;
[0068] First slide rail 902 : The inner surface of the first slide rail 902 is slidably connected to the outer surface of the first sliding block 901 .
[0069] The above scheme is adopted: when the rotating block 701 starts to move upward, since the rotating block 701 is fixedly connected to the first slider 901, the rotating block 701 can drive the first slider 901 to move upward together, and the first slider 901 can slide inside the first slide rail 902. The first sliding component 9 mainly serves to facilitate the up and down movement of the rotating block 701, and the rotating block 701 is more stable when moving up and down.
[0070] refer to Figure 2As shown, the second sliding assembly 10 includes:
[0071] Second slide rail 1001: The lower surface of the second slide rail 1001 is fixedly connected to the upper surface of the sliding plate 3;
[0072] The second slider 1002 : The lower surface of the second slider 1002 is slidably connected to the upper surface of the second slide rail 1001 , the left side of the second slider 1002 is fixedly connected to the output end of the electric cylinder 5 , and the upper surface of the second slider 1002 is slidably connected to the lower surface of the rotating block 701 .
[0073] The above scheme is adopted: when the drainage pipe 2 needs to be docked, the electric cylinder 5 is started and the electric cylinder 5 starts to work. Since the output end of the electric cylinder 5 is fixedly connected to the second slider 1002, the electric cylinder 5 works to make the second slider 1002 start to move to the right. The second slider 1002 can move on the second slide rail 1001. When the second slider 1002 moves to the right, the second slider 1002 squeezes the rotating block 701 on the upper surface, so that the rotating block 701 moves upward along the right end of the second slider 1002 as the second slider 1002 is squeezed to the right.
[0074] refer to Figure 1 As shown, the third sliding assembly 4 includes:
[0075] The third slide rail 401: The third slide rail 401 is provided on the upper surface of the base 1;
[0076] The third slider 402 : the third slider 402 is slidably connected to the third slide rail 401 , and the third slider 402 is fixedly connected to the lower surface of the sliding plate 3 .
[0077] The above solution is adopted: after the first clamping block 610 and the second clamping block 620 clamp the drainage pipe 2, since the sliding plate 3 and the third slider 402 are fixedly connected, the sliding plate 3 can move forward along the third slide rail 401 through the third slider 402, so that the two drainage pipes 2 can be accurately docked.
[0078] The working principle of this utility model:
[0079] When in use, the staff places the drainage pipe 2 at a certain height, and then starts the electric cylinder 5, and the electric cylinder 5 starts to work. Since the output end of the electric cylinder 5 is fixedly connected to the left end of the second slider 1002, the electric cylinder 5 can drive the second slider 1002 to move to the right. While the second slider 1002 moves to the right, it squeezes the rotating block 701 on the upper surface of the second slider 1002, so that the rotating block 701 starts to move upward, and the rotating block 701 drives the connecting column 633 on the upper surface, and the connecting column 633 drives the connecting piece 632. Since the upper end of the connecting piece 632 is fixedly connected to the second clamping block 620, the connecting piece 632 can drive the second clamping block 620 to move upward until the inner surface of the second clamping block 620 is attached to the outer surface of the drainage pipe 2. When the rotating block 701 moves upward, the roller 702 moves along the rotating The left and right sides of block 701 begin to roll downward, and the roller 702 can drive the "L"-shaped connecting plate 631 to start rotating. The "L"-shaped connecting plate 631 then begins to rotate around the fixing piece 801, and the upper end of the "L"-shaped connecting plate 631 rotates inward. Since the upper end of the "L"-shaped connecting plate 631 is fixedly connected to the first clamping block 610, the rotation of the "L"-shaped connecting plate 631 drives the first clamping block 610 to move inward until the inner surface of the first clamping block 610 is attached to the outer surface of the drainage pipe 2. After clamping the drainage pipe 2, the third slider 402 drives the sliding plate 3 to start moving forward along the third slide rail 401 until the drainage pipe 2 is successfully docked, thereby achieving the effect of making the two drainage pipes 2 stably fixed at the same height when they need to be docked, so that the docking accuracy is improved when they are docked.
[0080] To sum up: this drainage pipe docking auxiliary tool, through the base 1, drainage pipe 2, sliding plate 3, third sliding component 4, electric cylinder 5, clamping mechanism 6, rotating component 7, fixed component 8, first sliding component 9 and second sliding component 10, solves the problem of the cooperation ability of two workers needed to be tested in the existing drainage pipe docking. A slight shake will cause the two drainage pipes to be installed loosely, but the operation is difficult and the error is large during this period, and it will also consume a lot of labor and time.
[0081] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0082] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A drainage pipe docking auxiliary tool, characterized in that: include: Base (1); Drainage pipe (2): the drainage pipe (2) is arranged above the base (1); Sliding plate (3): the lower surface of the sliding plate (3) is slidably connected to the upper surface of the base (1), and a third sliding component (4) is provided on the lower surface of the sliding plate (3); Electric cylinder (5): the lower surface of the electric cylinder (5) is fixedly connected to the upper surface of the sliding plate (3); Clamping mechanism (6): the clamping mechanism (6) is arranged above the electric cylinder (5), and comprises: First clamping block (610): two first clamping blocks (610) are provided, and the inner surfaces of the two first clamping blocks (610) are movably connected to the left and right sides of the drainage pipe (2), and the first clamping blocks (610) are arc-shaped; A second clamping block (620): the inner surface of the second clamping block (620) is movably connected to the bottom of the drainage pipe (2), and the second clamping block (620) is arc-shaped; Connecting assembly (630): the connecting assembly (630) is arranged at the rear end of the first clamping block (610).
2. A drainage pipe docking auxiliary tool as claimed in claim 1, characterized in that: A rotating assembly (7) is provided at one end of the connecting assembly (630), and the connecting assembly (630) comprises: "L"-shaped connecting plate (631): two "L"-shaped connecting plates (631) are provided, and the two "L"-shaped connecting plates (631) are both fixedly connected to the rear end of the first clamping block (610), and fixing components (8) are provided on the left and right sides of the "L"-shaped connecting plate (631); Connecting piece (632): the upper end of the connecting piece (632) is fixedly connected to the bottom end of the second clamping block (620); Connecting column (633): the upper surface of the connecting column (633) is fixedly connected to the bottom end of the connecting member (632).
3. A drainage pipe docking auxiliary tool as claimed in claim 2, characterized in that: The rotating assembly (7) comprises: Rotating block (701): the upper surface of the rotating block (701) is fixedly connected to the lower surface of the connecting column (633), and the rear surface of the rotating block (701) is provided with a first sliding component (9); Roller (702): Two rollers (702) are provided, and the outer surfaces of the two rollers (702) are both rotatably connected to the bottom end of the "L"-shaped connecting plate (631), and the outer surfaces of the rollers (702) are rollingly connected to the two sides of the rotating block (701).
4. A drainage pipe docking auxiliary tool as claimed in claim 2, characterized in that: The fixing assembly (8) comprises: Fixing member (801): two fixing members (801) are provided, and the front ends of the two fixing members (801) are rotatably connected to the left and right ends of the "L"-shaped connecting plate (631); Fixed plates (802): Two fixed plates (802) are provided, the inner sides of the two fixed plates (802) are fixedly connected to the bottom end of the fixing member (801), and the bottom of the fixed plates (802) is fixedly connected to the upper surface of the sliding plate (3) by bolts.
5. A drainage pipe docking auxiliary tool as claimed in claim 3, characterized in that: A second sliding component (10) is arranged at the front end of the first sliding component (9), and the first sliding component (9) comprises: First sliding block (901): the front end of the first sliding block (901) is fixedly connected to the rear surface of the rotating block (701); First slide rail (902): the inner surface of the first slide rail (902) is slidably connected to the outer surface of the first sliding block (901).
6. A drainage pipe docking auxiliary tool as claimed in claim 5, characterized in that: The second sliding assembly (10) comprises: Second slide rail (1001): the lower surface of the second slide rail (1001) is fixedly connected to the upper surface of the sliding plate (3); Second slider (1002): the lower surface of the second slider (1002) is slidably connected to the upper surface of the second slide rail (1001), the left side of the second slider (1002) is fixedly connected to the output end of the electric cylinder (5), and the upper surface of the second slider (1002) is slidably connected to the lower surface of the rotating block (701).
7. A drainage pipe docking auxiliary tool as claimed in claim 6, characterized in that: The third sliding assembly (4) comprises: A third slide rail (401): the third slide rail (401) is provided on the upper surface of the base (1); Third sliding block (402): the third sliding block (402) is slidably connected to the third sliding rail (401), and the third sliding block (402) is fixedly connected to the lower surface of the sliding plate (3).